Technical Proposal For Setting Up A Model Substation For Training
Technical Proposal For Setting Up A Model Substation For Training
Technical Proposal For Setting Up A Model Substation For Training
180119/INTL/ELEC-TR /Rev.0 P a g e |1
SYNOPSIS : This Technical Proposal is intended to cover design, basic engineering, detailed
engineering, manufacturing, assembly, factory testing, inspection, packing,
forwarding, transportation, erection, site testing, Commissioning & Handover of a
Model Substation at WZPDCL Training Institute to impart training on Operation &
Maintenance of 33 kV Substations
VERSION :
REVISION DATE COMMENTS
Rev-0.0 31.5.2019 First Release
DISTRIBUTION: xxxx
DISCLAIMER : This is an unpublished work, the copyright of which vests in Larsen & Toubro Limited. All rights
reserved. The information contained herein is the property of Larsen & Toubro Limited and is
supplied without liability for errors or omissions. No part may be reproduced or used except as
authorized by contract or other written permission. The copyright and the foregoing restriction on
reproduction and use extend to all media in which the information may be embodied.
180119/INTL/ELEC-TR /Rev.0 P a g e |2
This technical offer is prepared on the basis of requirement electronically transmitted to us via email
dated 05-12-2018 from SE, System Protection & Control WZPDCL, HQ, Khulna
wzse.protection@gmail.com, with following attachments
2. SYSTEM DESCRIPTION:
AUXILIARY SUPPLY
230V AC Normal
Spring charging of CB, space heater, panel lighting circuit,
a) (neutral solidly
solenoid valves, Contactor coils, control system devices,
grounded)
Control system I/ O circuits
b) 110V DC from battery Breaker control, IEDs, auxiliary relays, Automation System
180119/INTL/ELEC-TR /Rev.0 P a g e |3
1) A first-hand experience
2) Familiarise the participants on various
a) Power Equipment
b) Control Equipment
c) Protection Equipment
d) Automations System
3) Basic Design Concepts
4) Safe and Efficient Operation
5) Fault Finding and Rectifications
Reference:
1) Enclosed Single Line Diagram
2) Enclosed System Architecture
3) Enclosed Bill of Quantities
Power, Control, Protection & Automation Equipment will be supplied & Erected in accordance with
the Bill Of Quantities and the concept for the same would be as indicated in the Single Line Diagram
& System Architecture
A Model Substation will be designed and constructed as per the single line diagram, however for safe
operation of system, power circuit will not be connected to supply. AC & DC control supply for all the
equipment will be provided from respective distribution boards.
To ensure the safety of personnel a replica of this substation is conceptualized using LV switchgears
as shown in single line diagram with document no. xxx-xxx-xxx. All the circuit breakers are replicated
using power contactors. The power contactors are interlocked with respective bay circuit breakers.
This test bench is powered up using 3 phase 415 V variable supply. All the CTs used for metering &
protection are of metering class with CT ratio 1:1. CT & PTs output from this circuit is used for
protection & metering and are connected to respective feeder bay relays.
33kV substation will have auxiliary DC supply from battery chargers and battery bank as a backup.
Auxiliary AC supply will be derived from ACDB. Power from variac will energize the transformer T1 (
415/138V). The secondary of transformer is connected to variable load bank (R3) to simulate the load
current.
The resistor R1 is used for simulating differential protection and R2 is used for simulating REF
protection.
180119/INTL/ELEC-TR /Rev.0 P a g e |4
This system shall be hooked up with the protections relays of 33 kV & 11 kV IEDs over IEC61850
protocol and meters over Modbus Protocol
The Desk top PC shall also be loaded with Relay & Meter programming Software, so as to provide a
facility for online setting of Relay & Meter parameters
180119/INTL/ELEC-TR /Rev.0 P a g e |5
BILL OF QUANTITY
180119/INTL/ELEC-TR /Rev.0 P a g e |6
180119/INTL/ELEC-TR /Rev.0 P a g e |7
180119/INTL/ELEC-TR /Rev.0 P a g e |8
180119/INTL/ELEC-TR /Rev.0 P a g e |9
180119/INTL/ELEC-TR /Rev.0 P a g e | 10
Control transformer
India/Bangla
50 Nos 1
desh
180119/INTL/ELEC-TR /Rev.0 P a g e | 11
Fire Detection & Alarm System for the Control Room &
57 Switchgear Room India Set 1
Safety equipments
- Rubber mat
- Shock treatment charts India/Bangla
58 - Fire buckets Lot 1
desh
- Gloves
- Safety shoes etc
Civil Works:
a) Earth filling, Landscaping, Leveling, Dressing Bangladesh Lot 1
/Preparation of Gravel Pit, Laying of Gravel.
b) Construction of new 2-storied Control Building with Bangladesh
Office room (foundation will be 5-storied) including O/H
tank, Water Supply, Sanitary system, Internal Sq.m 0
electrification, Emergency Lighting, False Ceiling etc.
59
complete in all respects
180119/INTL/ELEC-TR /Rev.0 P a g e | 12
g) Boundary Wall with gates and guard post building and Bangladesh Rm 0
Drainage System
h) Switchyard Fencing with Barbed wire with gate Bangladesh m 45
180119/INTL/ELEC-TR /Rev.0 P a g e | 13
180119/INTL/ELEC-TR /Rev.0 P a g e | 14