Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

HPS Review RTRW Final Hal - 1

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

BERDASARKAN KEPBUP BANDUNG BARAT

NOMOR : 910/Kep.369-DPPKAD/2009, 7 DESEMBER 2009


TENTANG : Mencabut Keputusan Bupati Bandung Barat No. 910/SK.212-
DPPKAD/2008 tentang ANALISA STANDAR BELANJA DAERAH PEMERINTAH
KAB. BANDUNG BARAT TAHUN 2009

S1- SKA
Kepbup Pembulatan Harga OE ( 90 % x Pembulatan)
1 4,000,000.00 ###
2 4,333,333.33 4,333,000.00 3,899,700.00
3 4,666,666.67 4,666,000.00 4,199,400.00
4 5,000,000.00 5,000,000.00 4,500,000.00
4 5,000,000.00 5,000,000.00 4,500,000.00
5 5,375,000.00 5,375,000.00 4,837,500.00
6 5,750,000.00 5,750,000.00 5,175,000.00
7 6,125,000.00 6,125,000.00 5,512,500.00
8 6,500,000.00 6,500,000.00 5,850,000.00

S2 - SKA
1 5,000,000.00 ###
2 5,333,333.33 5,333,000.00 4,799,700.00
3 5,666,666.67 5,666,000.00 5,099,400.00
4 6,000,000.00 6,000,000.00 5,400,000.00
4 6,000,000.00 6,000,000.00 5,400,000.00
5 6,375,000.00 6,375,000.00 5,737,500.00
6 6,750,000.00 6,750,000.00 6,075,000.00
7 7,125,000.00 7,125,000.00 6,412,500.00
8 7,500,000.00 7,500,000.00 6,750,000.00
S1 (Assisten)
1 3,000,000.00 3,000,000.00 2,700,000.00
2 3,600,000.00 3,600,000.00 3,200,000.00
3 4,200,000.00 4,200,000.00 3,780,000.00
4 4,800,000.00 4,800,000.00 4,320,000.00

Surveyor 3,000,000.00 2,700,000.00


Juru Gambar 2,000,000.00 1,800,000.00
Operator Komputer 1,500,000.00 1,350,000.00

S2 - SKA

Kepbup Pembulatan Harga OE ( 90 % x Pembulatan)


Ahli Muda
7,500,000.00
8,500,000.00 8,500,000.00

HPS Review RTRW final Hal - 1


9,500,000.00

S1 - SKA
Ahli Muda
5,000,000.00
6,750,000.00 6,000,000.00
8,500,000.00

HPS Review RTRW final Hal - 1


HARGA PERHITUNGAN SENDIRI / OWNER ESTIMATE (OE)
PEMBUATAN VIDEO EKOWISATA TERINTEGRASI KEBUN RAYA KUNINGAN
SEKTOR PARIWISATA KAB. KUNINGAN
DINAS PENANAMAN MODAL DAN PELAYANAN TERPADU SATU PINTU
TAHUN ANGGARAN 2017
BIAYA LANGSUNG PERSONIL
1.1 Tenaga Ahli Profesional
Jumlah Orang
No Keahlian Kualifikasi Durasi
Tenaga Bulan

1 Tim Leader S1, 4 Tahun 1 1 1


2 Tenaga Ahli Bidang Editing Film S1, 4 Tahun 1 1 1
3 Tenaga Ahli Bidang Narasi S1, 4 Tahun 1 1 1
4 Tenaga Ahli Bidang Multimedia S1, 4 Tahun 1 1 1

Sub-Total I.1 1

I.2 Tenaga Pendukung


Jumlah Orang
No Keahlian Kualifikasi Durasi
Tenaga Bulan
1 Sutradara D3 / STM 1 1 1
2 Cameramen D3 / STM 1 1 1
3 Narator D3 / STM 1 1 1
4 Editor D3 / STM 2 1 1

Sub-Total I.1

TOTAL -I
UNGAN SENDIRI / OWNER ESTIMATE (OE)
OWISATA TERINTEGRASI KEBUN RAYA KUNINGAN
OR PARIWISATA KAB. KUNINGAN
MODAL DAN PELAYANAN TERPADU SATU PINTU
TAHUN ANGGARAN 2017

Billing Rate Total Biaya

7,500,000 7,500,000
6,000,000 6,000,000
6,000,000 6,000,000
6,000,000 6,000,000

25,500,000

Billing Rate
Total Biaya
(Rp.)
6,000,000 6,000,000
5,000,000 5,000,000
5,000,000 5,000,000
5,000,000 5,000,000

21,000,000

46,500,000
II BIAYA LANGSUNG NON PERSONIL
2.1 BIAYA PERALATAN DAN ATK
Harga
No Komponen Unit Volume
Satuan (Rp.)
1 Sewa Susut Peralatan
Camera HD 2 Unit 1 bulan 1,000,000
Printer A4 dan Printer A3 2 Unit 1 bulan 105,000
Computer Laptop 1 Unit 1 bulan 1,500,000
2 Bahan Kantor dan Studio
ATK
- Tinta Komputer 3 Tube 56,000
- Kertas HVS Uk. F4 80 Gram 3 rim 50,000
- DVD blank 2 box 100,000
3 Komunikasi (Telp) 8 orang 1 bulan 100,000

Sub-Total 2.1

2.2 BIAYA TRANSPORTASI


Harga
No Komponen Unit Volume
Satuan (Rp.)
1 Konsumsi 8 orang 30 hari 30,000
2 Sewa Kendaraan roda 4 1 unit 1 bln 7,500,000
3 Penginapan @ 3 orang 3 lokasi 3 hari 400,000

Sub-Total 2.2

2.4 BIAYA PEMBAHASAN


Harga
No Komponen Unit Volume
Satuan (Rp.)
1 Pembahasan Laporan Kemajuan pekerjaan
Rapat Bulanan 1 Kali 1 BLN 400,000
Rapat Mingguan 4 Kali 1 BLN 250,000

Sub-Total 2.2

2.5 BIAYA PELAPORAN


Harga
No Komponen Unit Volume
Satuan (Rp.)

1 Laporan Pengawasan (Harian, Mingguan, Bulanan) 1 Buku 3 150,000


2 Foto Dokumentasi 1 Buku 3 150,000
3 DVD backup data 1 buah 100 6,000
Sub-Total 2.3

TOTAL -II
Total Biaya
(Rp.)

2,000,000
210,000
1,500,000

168,000
150,000
200,000
800,000

5,028,000

Total Biaya
(Rp.)
7,200,000
7,500,000
3,600,000

18,300,000

Total Biaya
(Rp.)

400,000
1,000,000

1,400,000

Total Biaya
(Rp.)

450,000
450,000
600,000
1,500,000

26,228,000
REKAPITULASI
HARGA PERHITUNGAN SENDIRI / OWNER ESTIMATE (OE)
PEMBUATAN VIDEO EKOWISATA TERINTEGRASI KEBUN RAYA KUNINGAN
SEKTOR PARIWISATA KAB. KUNINGAN
DINAS PENANAMAN MODAL DAN PELAYANAN PERIZINAN TERPADU SATU PINTU
TAHUN ANGGARAN 2017

No. KOMPONEN BIAYA (Rp.)

I. BIAYA LANGSUNG PERSONIL


1.1 TENAGA AHLI PROFESIONAL 25,500,000
1.2 TENAGA PENDUKUNG 21,000,000
Sub-Total I 46,500,000

II. BIAYA LANGSUNG


2.1 BIAYA PERALATAN DAN ATK 5,028,000
2.2 BIAYA TRANSPORTASI 18,300,000
2.4 BIAYA PEMBAHASAN 1,400,000
2.5 BIAYA PELAPORAN 1,500,000
Sub-Total II 26,228,000
TOTAL I + II 72,728,000
PPN 10 % 7,272,800
JUMLAH TOTAL 80,000,800
DIBULATKAN 80,000,000
TERBILANG :
TERBILANG : DELAPAN PULUH JUTA RUPIAH

Kuningan, April 2017


DPMPTSP KABUPATEN KUNINGAN
PEJABAT PENGGUNA ANGGARAN

Drs. H. Lili Suherli, M.Si.


NIP : 19591005 198307 1 001

You might also like