MV Lavinia
MV Lavinia
MV Lavinia
BLOCKING DATA
PARENTSHIPS
ITEMS COMBINATIONS AVERAGES OWNER'S REQUIREMENT
LBP 2 and 3 233.11
B. mld 1 and 3 41.98
d. mld 1, 2 and 3 17.20
D.W (tonnes) 2 and 3 2900
Cdw 1,2 and 3 0.77
D.W / G.T 1,2 and 3 2.26
N.T/ G.T 1,2 and 3 0.71
Vs (knots) 12
2900
0.773
Answer : W. tons, for design used
3750.00
131250
LBP Vs V/(L)^1/2
228 12 0.795
229 12 0.793
230 12 0.791
231 12 0.790
232 12 0.788
233 12 0.786
234 12 0.784
235 12 0.783
236 12 0.781
237 12 0.779
238 12 0.778
Where= B= 41.98
d= 17.20
V= 131250
L= 233.11
Cb= 0.7797834758
2. Prismatic Coefficient, Cp
Where:
Cm= 0.97
Cp= Cb
Cm
LBP Cb Cp=Cb/Cm
Reference
Marine Engineer's Handbook By Marks & labberton page 1401
987.25
I. OWNER'S REQUIREMENT
Owner's Requirement
DRAFT 5 meters
5.522
0.405
2.033
11.259
13.786
2.487
1.459
299.559
5.802
0.921
1.086
12.210
0.024
92.261
0.774
0.000
0.000
0.000
2
AVERAGE
253.959
233.908
42.421
20.992
17.198
2935.000
133805.738
130542.183
0.022
2.261
0.714
1313.667
934.333
3707.700
3889.200
0.000
12.333
0.770
0.777
0.991
0.870
0.000
5.522
0.405
2.033
11.259
13.786
2.487
0.805
10570.716
19.031
0.921
1.086
12.210
0.080
10678.626
0.022
0.000
0.000
0.000
Value for Design Ship
Rounded value; Lower and
Higher
0.74-0.90
262.00-367.00
5.10-6.00
16.60-21.10
11.30-15.50
2.00-2.70
0.760-0.790
0.72-0.86
REFERENCES
Introduction to Naval Architecture 4th ed.
Introduction to Naval Architecture 4th ed.
Introduction to Naval Architecture 4th ed.
Scientific Journals of the Maritime Uni.
Forum Pelaut Indonesia
3
METHOD I.
Reference: Ship Design for Masters and Mates by C. Barass, pg. 5
Formula:
dwt x ( L/B )² x ( B/d ) 1/3 m
L=
ρ Cb CD
where:
L/B = 5.522 dwt = 2900 tonnes
Cb = 0.77 ρ= 1.025 ton/m3 (salt water density)
B/d = 2.49 CD = 0.77
1. Length (L)
2
2900 x 5.522 x 2.487 1/3
L=
1.025 0.77 0.77
L = 2829.268 x 39.579 x 3.216 1/3
L = 71.147 m adopt 71.0 for design use
2. Breadth (B)
L/B = 5.522
L
B=
5.522
71.147
=
5.522
B= 12.885 m adapt 13.0 for design use
3. Depth (D)
B/D = 2.033
B
D=
2.033
12.885
=
2.03
D= 6.337 m adapt 6.0 for design use
4. Draft (d)
B/d = 2.49
B
d=
2.49
12.89
=
2.49
d= 5.181 m adapt 5.0 for design use
5. Volume of Displacement (▽)
▽ = L x B x d x Cb
= 71.147x 12.885 x 5.181 x 0.77
▽ = 3658.537 m 3
6. Displacement (∆)
∆ = L x B x d x 1.025 x Cb
= 71.147x 12.885 x 5.181 x 0.77 x 1.025
∆= 3750 m3
4
METHOD II.
Reference: Elements of Ship Design, pg. 18
Formula:
○∆= L/B x d/B x B3 x Cb x 1.025 tonnes
where:
L/B = 5.522 Cb = 0.77
d/B = 0.405 ∆ = 3750.000
1. Breadth (B)
B3 = ∆
L/B x d/B x Cb x 1.025 tonnes
B3 = 3750.00
5.522 x 0.405 x 0.77 x 1.025
B = 3
2123.94855
B = 12.822 m
2. Length (L)
L/B = 5.522
L= B x 5.522
= 12.822x 5.522
L= 70.796 m
3. Depth (D)
B/D = 2.033
B
D=
2.033
12.822
=
2.033
D= 6.306 m
4. Draft (d)
d/B = 0.405
d= B x 0.405
d= 12.822x 0.405
d= 5.192 m
6. Displacement (∆)
∆ = L x B x d x 1.025 x Cb
x x x x
= 70.796x 12.822 x 5.192 x 1.025 x 0.77
∆= 3721.381 Tonnes
5
Length (L) = 71.15 m
Breadth (B) = 13.00 m
Draft (d) = 5.18 m
Depth = 6.34 m
Weight of displacement (∆) = 3750.00 m.ton
Volume of displacement (▽) = 3658.54 m3
III. MOMENTS
WPA x ρ where:
TPCM =
100 Awp = 805.0
solution: ρ= 1.0
804.98108x 1.025
TPCM =
100
TPCM = 8.251 tons/cm
Moment to change trim by 1 cm (MTCM)
Reference: Elements of Ship Design by R. Munro-Smith, chap. 5 pg. 55
formula:
7
7 (TPCM)² where:
MTCM =
B TPCM = 8.25
solution: B= 13.00
7 x 8.251 2
MTCM =
13.00
MTCM = 36.658 tonnes m
IV. Metacenters
iB2 where:
BMT =
d x Cb i 0.06
solution: Cb = 0.77
2
0.055 x 13.000 B= 13.00
BMT =
5.181 x 0.77 d= 5.18
BMT = 2.329 m
Transverse Height of the Metacenter Above Keel (KMT)
Reference:
formula:
9
I. SHIP DESIGN DATA
LENGTH L 71 M
BREADTH B 13 M
DEPTH D 6 M
DRAFT d 5 M
FREEBOARD M
DISPLACEMENT 3750 TONNES
VOL. OF DISPLACEMENT 3658 CU. M
BLOCK COEFFICIENT CB 0.77
MIDSHIP COEFFICIENT CM 0.991
PRISMATIC COEFFICIENT CP 0.77
DEADWEIGHT COEFFICIENT CD 0.773333
WATERPLANE COEFFICIENT CWP 0.87
AREA OF WATERPLANE AWP 749.0307 M^2
TONS PER CENTIIMETER OF IMMERSIONTPCM 8.251056TONS/CM
II. CENTERS
CWP Where:
V.C.B = d
CWP + CB d 1.83 Meters
0.71 CWP 0.71
V.C.B = 1.83
0.71 + 0.61 CB 0.61
V.C.B = 0.984 M above Keel
5 CB
V.C.B = d -
6 3 CWP
0.61
V.C.B = 1.83 0.83 -
3 0.71
V.C.B = 0.995 M above Keel Where:
d 1.83
CWP 0.71
CB 0.61
CWP^2 x B^2
BMT =
12 x d x CB
0.5041 x 57.76
BMT =
12 x 1.83 x 0.61
29.116816
BMT =
13.3956
Where:
BMT = 2.174 M
d 1.83 Meters
B 7.6 Meters
CWP 0.71
CB 0.61
11
2.) LONGITUDINCAL METACENTER (BML)
REFERENCE: Ship Stability - Notes & Examples by C.B Barrass Chapter 4, Pg. 54
3 x CWP^2 x L^2
BML =
40 x d x CB
3 x 0.5041 x 1369.00
BML =
40 x 1.83 x 0.61
2070.3387 Where:
BML =
44.652 d 1.83
L 37
BML = 46.3660911045 M
CWP 0.71
CB 0.61
Where:
distance in meter of the center of buoyancy to
BG =
the center of gravity
GMT = BMT - BG
GMT = 2.174 - 0.56
GMT = 1.612 M
12
REFERENCE 3:Elements of Ship Design by R. Munro-Smith, Chapter 5, p. 64
where:
TPCM= 2.046
B= 7.60
MTCM = 7
( TPCM )2
MTCM = 7
B
( 2.05 )2
MTCM = 7
7.60
4.19
MTCM = 7
7.60
MTCM = 3.86 ton - m
Solution:
IT = BMT ×
= 2.2 × 3658.00
IT = 7951.0669867718 m4
13
2.) LONGITUDINAL MOMENT OF INERTIA (IL)
REFERENCE: Parametric Design by Micheal Parsons. Chapter 11, p.18
Formula: where:
IL BML = 46.4 m
BML =
s s = 3658.0 m3
Solution:
IL = BML × s
= 46.4 × 3658.00
IL = 169607.2 m4
where:
k= transverse radius of gyration of the ship mass
k= 0.40 × beam
= 0.40 × 13.00
k= 5.20 m
π= 3.1416
convert to ft.
k = 5.20 m → k = 17.06 ft
g = 9.80 m/s2 → g = 32.15 ft/s2
GM = 7.00 m → GM = 22.97 ft
Solution:
2 × 3.1416 × 17.06
TR =
√ ( 32.15 × 22.97 )
107.20
=
√ 738.476
TR = 3.94 seconds
14
Length (L) = 71.15 m
Breadth (B) = 13.00 m
Draft (d) = 5.18 m
Depth (D) = 6.34 m
Weight of displacement (∆) = 3750.00 m.ton
Volume of displacement (▽) = 3658.54 m3
Block Coefficient = 0.77
Prismatic Coefficient = 0.77
Midship Coefficient = 0.99
Waterplane Coefficient = 0.87
15
SECTIONAL AREA
I. Design Data ROUNDED VALUE
Length (L) = 71 m 233.422 ft 71147 mm 71100 mm
Breadth (B) = 13 m 42.6509 ft 13000 mm 13000 mm
Draft (d) = 5 m 16.997 ft 5181 mm 5200 mm
Depth = 6 m 20.7903 ft 6337 mm 6300 mm
Weight of displacement (∆) = 3750.00 m.ton
Volume of displacement (▽) = 3658.54 m3
Block coefficient = 0.77 DESIGN DATA
Midship coefficient = 0.99 71000 mm
Prismatic coefficient = 0.77 13000 mm
Waterplane coefficient = 0.87 5000 mm
6000 mm
Table I. Ordinates for Curve of Sectional Area Entrance and Run
Stations in Run
Cp of Run
A.P 1/2 1 1 1/2 2 2 1/2 3 4 5
0.740 0.054 0.195 0.423 0.632 0.792 0.900 0.956 0.992 1.000
0.760 0.060 0.222 0.470 0.680 0.833 0.920 0.963 0.993 1.000
0.767 0.068 0.259 0.534 0.745 0.889 0.947 0.973 0.994 1.000
Trial No. 1
STN. S.A Ordinate S.M. f (V)
AP 0.068 1/2 0.034
1/2 0.259 2 0.517
1 0.534 1 0.534
1 1/2 0.745 2 1.491
2 0.889 1 0.889
2 1/2 0.947 2 1.894
3 0.973 1 1/2 1.459
4 0.994 4 3.977
5 1.000 2 2.000
6 0.994 4 3.977
7 0.973 1 1/2 1.459
7 1/2 0.947 2 1.894
8 0.889 1 0.889
8 1/2 0.745 2 1.491
9 0.534 1 0.534
9 1/2 0.279 2 0.558
FP 0.000 1/2 0.000
30 23.597
=23.597/
17
30
CPT= 0.787 1.025261
23.597 0.444960387
3750.295
Displacement Calculation in Feet
Cal. 1 Cal.2 Cal. 3 Cal. 4 2x3 Cal. 5 Cal. 6 4x5 Cal. 7 Cal. 8 6x7
Sectional Area Sectioanal Area of
Station Half M.A S.M F (V) F (L) F (LM)
Coeff.( Modified) Station
AP 0.068 357.947 24.398 1/2 12.199 5 60.994
1/2 0.259 357.947 92.608 2 185.216 4 1/2 833.472
1 0.534 357.947 191.115 1 191.115 4 764.460
1 1/2 0.745 357.947 266.771 2 533.541 3 1/2 1867.394
2 0.889 357.947 318.129 1 318.129 3 954.386
2 1/2 0.947 357.947 339.047 2 678.094 2 1/2 1695.236
3 0.973 357.947 348.110 1 1/2 522.165 2 1044.331
4 0.994 357.947 355.928 4 1423.712 1 1423.712
5 1.000 357.947 357.947 2 715.893 0 8643.983
6 0.994 357.947 355.928 4 1423.712 1 1423.712
7 0.973 357.947 348.110 1 1/2 522.165 2 1044.331
7 1/2 0.947 357.947 339.047 2 678.094 2 1/2 1695.236
8 0.889 357.947 318.129 1 318.129 3 954.386
8 1/2 0.745 357.947 266.771 2 533.541 3 1/2 1867.394
9 0.534 357.947 191.115 1 191.115 4 764.460
9 1/2 0.279 357.947 99.896 2 199.792 4 1/2 899.062
FP 0.000 357.947 0.000 1/2 0.000 5 8648.579
8446.611 8648.579
= 1/3 (S) (FV) (2) - 8643.983
= 1/3 (23.31) (8446.11)(2) 4.596
= 131260.340 cu.ft (V)
35.000
3750.295
0.295
24
23
24
SUMMARY FOR BONJEANS CURVE
STA W.L. W.L. W.L. W.L. STA W.L. W.L. W.L. W.L.
1.30 2.60 3.90 5.20 1.30 2.60 3.90 5.20
FP 0.000 0.000 0.000 0.000 FP 0.000 0.000 0.000 0.000
1/2 1.366 3.498 5.908 8.577 1/2 341.535 874.566 1477.004 2144.175
1 2.966 7.421 12.394 17.731 1 741.405 1855.312 3098.406 4432.824
1 1/2 4.355 10.737 17.636 24.850 1 1/2 1088.696 2684.309 4409.080 6212.535
2 5.393 12.976 20.955 29.157 2 1348.210 3244.052 5238.665 7289.285
3 6.824 15.242 23.661 32.080 3 1705.938 3810.592 5915.247 8019.901
4 6.918 15.337 23.755 32.174 4 1729.529 3834.184 5938.838 8043.492
5 6.925 15.343 23.762 32.180 5 1731.148 3835.803 5940.457 8045.111
6 6.918 15.337 23.755 32.174 6 1729.529 3834.184 5938.838 8043.492
7 6.918 15.337 23.755 32.174 7 1729.529 3834.184 5938.838 8043.492
8 6.894 15.312 23.729 32.146 8 1723.381 3827.932 5932.348 8036.439
8 1/2 4.355 10.737 17.636 21.068 8 1/2 1088.696 2684.309 4409.080 5267.050
9 2.966 7.421 12.394 17.745 9 741.405 1855.312 3098.406 4436.361
9 1/2 0.904 2.523 5.190 9.230 9 1/2 225.927 630.795 1297.550 2307.566
AP 0.000 0.000 0.175 2.261 AP 0.000 0.000 43.792 565.258
26
36
27
29
30
32
33
35
NAME OF VESSEL: MV LAVINIA COMPUTED BY: Dominic C. Villamante
HALF - BREADH
STA SM W.LINE 0.00 W.LINE 0.65 W.LINE 1.30 F(A)s F(V)s LA F(LM)s STA.A/2
SMh 1 4 1
25
25
8 1.5 0.000 0.000 6.359 9.538 6.499 9.748
X 2 1140.109
HALF - BREADH
STA SM W.LINE 1.30 W.LINE 1.95 W.LINE 2.60 F(A)s F(V)s LA F(LM)s STA.A/2
1 4 1
28
2 4.558 9.117 4.957 9.914 5.181 10.362
8.5
4.558 19.828 5.181 29.567 59.135 3.5 206.971 10.737
X 2 3633.265
HALF - BREADH
STA SM W.LINE 2.60 W.LINE 3.25 W.LINE 3.90 F(A)s F(V)s LA F(LM)s STA.A/2
SMh 1 4 1
31
2 5.181 10.362 5.331 10.662 5.455 10.910
8.5
5.181 21.325 5.455 31.961 63.921 3.5 223.724 17.636
X 2 6241.366
HALF - BREADH
STA SM W.LINE 3.90 W.LINE 4.55 W.LINE 5.20 F(A)s F(V)s LA F(LM)s STA.A/2
SMh 1 4 1
34
2 5.455 10.910 2.058 4.117 2.210 4.421
8.5
5.455 8.233 2.210 15.898 31.797 3.5 111.289 21.068
X 2 8684.944
`3
1/2 F(A) 151.395 AFT 147.247 1/2 F(LI)s 1/2 F(TI)s 5506.563
NET -0.375
W.L. 2.60
`3
1/2 F(A) 157.703 AFT 159.759 1/2 F(LI)s 1/2 F(TI)s 5816.049
NET 0.528
W.L. 3.90
`3
1/2 F(A) 162.303 AFT 173.403 1/2 F(LI)s 1/2 F(TI)s 5994.556
NET 8.709
W.L. 5.20
`3
1/2 F(A) 160.647 AFT 165.281 1/2 F(LI)s 1/2 F(TI)s 5879.606
SUMMARY:
NAME OF VESSEL: M/V LAVINIA
WATER LINE 2.600
SUMMARY:
NAME OF VESSEL: M/V LAVINIA
WATER LINE 3.900
SUMMARY:
NAME OF VESSEL: M/V LAVINIA
WATER LINE 5.200
196502.441 M4
0.223 M4
196502.218 M.
264.454 M.
28.327 T-M
-0.182 M.TON
8706.123 M.
11.717 M.
11.740 M.
264.477 M.
41
2.600
0.018 M.
1.088 M.
1672.172 M3
1715.048 M. TONS
1672.172 M.TONS
29.105 M2
735.667 M2
748.007 M2
7.545 M. TONS
7.672 M.TONS
0.695
0.808
0.861
0.809
0.024 M.
219056.228 M4
0.425 M4
219055.803 M.
131.001 M.
31.579 T-M
0.257 M.TON
9195.434 M.
5.499 M.
6.587 M.
132.088 M.
3.900
0.126 M.
1.888 M.
2649.100 M3
2717.026 M. TONS
2649.100 M.TONS
45.942 M2
758.052 M2
769.825 M2
7.775 M. TONS
7.896 M.TONS
0.734
0.810
0.906
0.832
0.382 M.
238449.693 M4
112.195 M4
238337.499 M.
89.969 M.
34.358 T-M
4.237 M.TON
9477.662 M.
3.578 M.
5.465 M.
91.857 M.
5.200
0.018 M.
2.605 M.
3626.506 M3
3719.493 M. TONS
3626.506 M.TONS
62.779 M2
749.031 M2
761.972 M2
7.682 M. TONS
7.815 M.TONS
0.754
0.812
0.929
0.824
-0.252 M.
241312.086 M4
48.463 M4
241263.623 M.
66.528 M.
34.780 T-M
-2.770 M.TON
9295.921 M.
2.563 M.
5.168 M.
69.133 M.
VESSEL: LAVINIA
TRIM LINE NO. 1 - F FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
Comp't. Volume
1 TRIAL FLOODABLE LENGTH = = l = 1.540 M.
Sec. Area (Mean)
7 APPROX. XC = X W + Xm = 4.205 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 1.548 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 26.540 26.540 2 53.080 2ND TRIAL XC, = 7 4.205 M.
1 4 38.290 153.160 1 153.160
2 2 49.860 99.720 0 206.240 8 S (Station Spacing) = l/4 = 0.387 M. S/3 = 0.129 M,
3 4 61.146 244.584 1 244.584
FOR'D. 4 1 71.128 71.128 2 142.256 9 Compt. Volume = å F(V) x S/3 = 153.6 CU. M.
å F(V) 595.132 386.840
å F(M) 180.600 10 Computed X'm = å F(M) / å F(V) x S = 0.117 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9) = 0.774 M.
11 6 9
76.780 1.544 4.205
153.559 0.774 4.206 12 XC = XW + 10 = 4.206 M.
76.370 1.548 4.205
VESSEL: LAVINIA
43
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 3.075 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 33.830 33.830 2 67.660 3 S (Station Spacing) = l/4 = 0.769 M. S/3 = 0.256 M,
1 4 37.293 149.172 1 149.172
2 2 41.019 82.038 0 216.832 4 Compt. Volume = å F(V) x S/3
251.8194
= CU. M.
3 4 44.496 177.984 1 177.984
FOR'D. 4 1 48.284 48.284 2 96.568 5 Computed Xm = å F(M) / å F(V) x S =
0.090 M.
å F(V) 491.308 274.552
å F(M) 57.720 6 APPROX. FLOODABLE LENGTH = l x (VC / 4) = 3.081 M.
7 APPROX. XC = X W + Xm = 4.976 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 66 = 3.081 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 67.660 67.660 2 135.320 2ND TRIAL XC, = 7 4.976 M.
1 4 74.586 298.344 1 298.344
2 2 82.038 164.076 0 433.664 8 S (Station Spacing) = l/4 = 0.770 M. S/3 = 0.257 M,
3 4 88.992 355.968 1 355.968
FOR'D. 4 1 96.568 96.568 2 193.136 9 Compt. Volume = å F(V) x S/3 = 504.58 CU. M.
å F(V) 982.616 549.104
å F(M) 115.440 10 Computed X'm = å F(M) / å F(V) x S = 0.090 M.
10
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 1.541 M.
252.291 3.078 4.976
504.58 1.541 4.976 12 XC = XW + 10 = 4.976 M.
251.8194 3.081 4.976
VESSEL: LAVINIA
TRIM LINE NO. 2.5 - F FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
18.67 CU. M.
COMPARTMENT VOLUME AT 85% PERMEABILITY = VC = 21.96 CU. M.
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 0.246 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 42.860 42.860 2 85.720 3 S (Station Spacing) = l/4 = 0.062 M. S/3 = 0.021 M,
1 4 44.105 176.420 1 176.420
2 2 44.602 89.204 0 262.140 4 Compt. Volume = å F(V) x S/3
21.83117
= CU. M.
3 4 44.730 178.920 1 178.920
FOR'D. 4 1 44.602 44.602 2 89.204 5 Computed Xm = å F(M) / å F(V) x S =
0.001 M.
å F(V) 532.006 268.124
å F(M) 5.984 6 APPROX. FLOODABLE LENGTH = l x (VC /4 ) = 0.248 M.
7 APPROX. XC = X W + Xm = 44.792 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.248 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 85.720 85.720 2 171.440 2ND TRIAL XC, = 7 44.792 M.
1 4 88.210 352.840 1 352.840
2 2 89.204 178.408 0 524.280 8 S (Station Spacing) = l/4 = 0.062 M. S/3 = 0.021 M,
3 4 89.460 357.840 1 357.840
FOR'D. 4 1 89.204 89.204 2 178.408 9 Compt. Volume = å F(V) x S/3 = 43.93 CU. M.
9
å F(V) 1064.01 536.248
å F(M) 11.968 10 Computed X'm = å F(M) / å F(V) x S = 0.001 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.124 M.
21.96 0.247 44.792
43.93 0.124 44.792 12 XC = XW + 10 = 44.792 M.
21.83117 0.248 44.792
VESSEL: LAVINIA
TRIM LINE NO. 2.5 - A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
45
7 APPROX. XC = X W + Xm = 6.566 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.562 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 89.200 89.200 2 178.400 2ND TRIAL XC, = 7 6.566 M.
1 4 89.432 357.728 1 357.728
2 2 89.200 178.400 0 536.128 8 S (Station Spacing) = l/4 = 0.140 M. S/3 = 0.047 M,
8
3 4 88.438 353.752 1 353.752
FOR'D. 4 1 85.682 85.682 2 171.364 9 Compt. Volume = å F(V) x S/3 = 99.70 CU. M.
å F(V) 1064.76 525.116
å F(M) -11.012 10 Computed X'm = å F(M) / å F(V) x S = -0.001 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.281 M.
49.85 0.560 6.566
99.70 0.281 6.566 12 XC = XW + 10 = 6.566 M.
49.58516 0.562 6.566
VESSEL: LAVINIA
TRIM LINE NO. 2 - A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 0.018 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
46
AFT 0 1 48.378 48.378 2 96.756 3 S (Station Spacing) = l/4 = 0.005 M. S/3 = 0.002 M,
1 4 48.445 193.780 1 193.780
2 2 46.619 93.238 0 290.536 4 Compt. Volume = å F(V) x S/31.67565
= CU. M.
3 4 42.545 170.180 1 170.180
FOR'D. 4 1 37.946 37.946 2 75.892 5 Computed Xm = å F(M) / å F(V) x S =
0.000 M.
å F(V) 543.522 246.072
å F(M) -44.464 6 APPROX. FLOODABLE LENGTH = l x (VC /4 ) = 0.019 M.
7 APPROX. XC = X W + Xm = 354.988 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.019 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 96.756 96.756 2 193.512 2ND TRIAL XC, = 7 354.988 M.
7
1 4 96.890 387.560 1 387.560
2 2 93.238 186.476 0 581.072 8 S (Station Spacing) = l/4 = 0.005 M. S/3 = 0.002 M,
3 4 85.090 340.360 1 340.360
FOR'D. 4 1 75.892 75.892 2 151.784 9 Compt. Volume = å F(V) x S/3 = 3.45 CU. M.
å F(V) 1087.04 492.144
å F(M) -88.928 10 Computed X'm = å F(M) / å F(V) x S = 0.000 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.010 M.
1.72 0.019 354.988
3.45 0.010 354.988 12 XC = XW + 10 = 354.988 M.
1.67565 0.019 354.988
VESSEL: LAVINIA
TRIM LINE NO. 1- A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 1.045 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 41.543 41.543 2 83.086 3 S (Station Spacing) = l/4 = 0.261 M. S/3 = 0.087 M,
1 4 34.377 137.508 1 137.508
2 2 24.681 49.362 0 220.594 4 Compt. Volume = å F(V) x S/3
54.28392
= CU. M.
3 4 20.084 80.336 1 80.336
47
7 APPROX. XC = X W + Xm = 22.789 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.993 M.
6
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 83.086 83.086 2 166.171 2ND TRIAL XC, = 7 22.789 M.
1 4 68.754 275.016 1 275.016
2 2 49.362 98.724 0 441.187 8 S (Station Spacing) = l/4 = 0.248 M. S/3 = 0.083 M,
3 4 40.168 160.672 1 160.672
FOR'D. 4 1 5.990 5.990 2 11.980 9 Compt. Volume = å F(V) x S/3 = 103.14 CU. M.
å F(V) 623.488 172.652
å F(M) -268.54 10 Computed X'm = å F(M) / å F(V) x S = -0.107 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.496 M.
51.57 1.020 22.788
103.14 0.496 22.794 12 XC = XW + 10 = 22.794 M.
54.28392 0.993 22.789
48
VESSEL: LAVINIA
TRIM LINE NO. 1 - F FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 1.336 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 13.270 13.270 2 26.540 3 S (Station Spacing) = l/4 = 0.334 M. S/3 = 0.111 M,
1 4 19.145 76.580 1 76.580
2 2 24.930 49.860 0 103.120 4 Compt. Volume = å F(V) x S/3 66.24
= CU. M.
3 4 30.573 122.292 1 122.292
FOR'D. 4 1 35.564 35.564 2 71.128 5 Computed Xm = å F(M) / å F(V) x S 0.101
= M.
å F(V) 297.566 193.420
å F(M) 90.300 6 APPROX. FLOODABLE LENGTH = l x (VC 4
/ ) = 1.343 M.
7 APPROX. XC = X W + Xm = 4.190 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 1.343 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 26.540 26.540 2 53.080 2ND TRIAL XC, = 7 4.190 M.
1 4 38.290 153.160 1 153.160
2 2 49.860 99.720 0 206.240 8 S (Station Spacing) = l/4 = 0.336 M. S/3 = 0.112 M,
3 4 61.146 244.584 1 244.584
FOR'D. 4 1 71.128 71.128 2 142.256 9 Compt. Volume = å F(V) x S/3 = 133.2 CU. M.
å F(V) 595.132 386.840
å F(M) 180.600 10 Computed X'm = å F(M) / å F(V) x S = 0.102 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.671 M.
11 6 9
66.59 1.339 4.190
133.2 0.671 4.190 12 XC = XW + 10 = 4.190 M.
49
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 2.667 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 33.830 33.830 2 67.660 3 S (Station Spacing) = l/4 = 0.667 M. S/3 = 0.222 M,
1 4 37.293 149.172 1 149.172
2 2 41.019 82.038 0 216.832 4 Compt. Volume = å F(V) x S/3
218.4148
= CU. M.
3 4 44.496 177.984 1 177.984
FOR'D. 4 1 48.284 48.284 2 96.568 5 Computed Xm = å F(M) / å F(V) x S 0.078
= M.
å F(V) 491.308 274.552
å F(M) 57.720 6 APPROX. FLOODABLE LENGTH = l x (VC 4
/ ) = 2.672 M.
7 APPROX. XC = X W + Xm = 4.964 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 2.672 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 67.660 67.660 2 135.320 2ND TRIAL XC, = 7 4.964 M.
1 4 74.586 298.344 1 298.344
2 2 82.038 164.076 0 433.664 8 S (Station Spacing) = l/4 = 0.668 M. S/3 = 0.223 M,
3 4 88.992 355.968 1 355.968
FOR'D. 4 1 96.568 96.568 2 193.136 9 Compt. Volume = å F(V) x S/3 = 437.647 CU. M.
å F(V) 982.616 549.104
å F(M) 115.440 10 Computed X'm = å F(M) / å F(V) x S = 0.078 M.
10
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH = x (V
6C / )9= 1.336 M.
218.824 2.670 4.964
437.65 1.336 4.964 12 XC = XW + 10 = 4.964 M.
218.4148 2.672 4.964
VESSEL: LAVINIA
TRIM LINE NO. 2.5 - F FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
18.67 CU. M.
COMPARTMENT VOLUME AT 98% PERMEABILITY = VC = 19.05 CU. M.
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 0.214 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 42.860 42.860 2 85.720 3 S (Station Spacing) = l/4 = 0.053 M. S/3 = 0.018 M,
1 4 44.105 176.420 1 176.420
2 2 44.602 89.204 0 262.140 4 Compt. Volume = å F(V) x S/3
18.9352
= CU. M.
3 4 44.730 178.920 1 178.920
FOR'D. 4 1 44.602 44.602 2 89.204 5 Computed Xm = å F(M) / å F(V) x S 0.001
= M.
å F(V) 532.006 268.124
å F(M) 5.984 6 APPROX. FLOODABLE LENGTH = l x (VC 4
/ ) = 0.215 M.
7 APPROX. XC = X W + Xm = 44.792 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.215 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 85.720 85.720 2 171.440 2ND TRIAL XC, = 7 44.792 M.
1 4 88.210 352.840 1 352.840
2 2 89.204 178.408 0 524.280 8 S (Station Spacing) = l/4 = 0.054 M. S/3 = 0.018 M,
3 4 89.460 357.840 1 357.840
FOR'D. 4 1 89.204 89.204 2 178.408 9 Compt. Volume = å F(V) x S/3 = 38.10 CU. M.
9
å F(V) 1064.01 536.248
å F(M) 11.968 10 Computed X'm = å F(M) / å F(V) x S = 0.001 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.107 M.
19.05 0.214 44.792
38.10 0.107 44.792 12 XC = XW + 10 = 44.792 M.
18.9352 0.215 44.792
VESSEL: LAVINIA
TRIM LINE NO. 2.5 - A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
51
7 APPROX. XC = X W + Xm = 6.566 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.487 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 89.200 89.200 2 178.400 2ND TRIAL XC, = 7 6.566 M.
1 4 89.432 357.728 1 357.728
2 2 89.200 178.400 0 536.128 8 S (Station Spacing) = l/4 = 0.122 M. S/3 = 0.041 M,
8
3 4 88.438 353.752 1 353.752
FOR'D. 4 1 85.682 85.682 2 171.364 9 Compt. Volume = å F(V) x S/3 = 86.47 CU. M.
å F(V) 1064.76 525.116
å F(M) -11.012 10 Computed X'm = å F(M) / å F(V) x S = -0.001 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.244 M.
43.24 0.486 6.566
86.47 0.244 6.566 12 XC = XW + 10 = 6.566 M.
43.00754 0.487 6.566
VESSEL: LAVINIA
TRIM LINE NO. 2 - A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 0.016 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
52
AFT 0 1 48.378 48.378 2 96.756 3 S (Station Spacing) = l/4 = 0.004 M. S/3 = 0.001 M,
1 4 48.445 193.780 1 193.780
2 2 46.619 93.238 0 290.536 4 Compt. Volume = å F(V) x S/3
1.45337
= CU. M.
3 4 42.545 170.180 1 170.180
FOR'D. 4 1 37.946 37.946 2 75.892 5 Computed Xm = å F(M) / å F(V) x S 0.000
= M.
å F(V) 543.522 246.072
å F(M) -44.464 6 APPROX. FLOODABLE LENGTH = l x (VC 4
/ ) = 0.017 M.
7 APPROX. XC = X W + Xm = 354.988 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.017 M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 96.756 96.756 2 193.512 2ND TRIAL XC, = 7 354.988 M.
7
1 4 96.890 387.560 1 387.560
2 2 93.238 186.476 0 581.072 8 S (Station Spacing) = l/4 = 0.004 M. S/3 = 0.001 M,
3 4 85.090 340.360 1 340.360
FOR'D. 4 1 75.892 75.892 2 151.784 9 Compt. Volume = å F(V) x S/3 = 2.99 CU. M.
å F(V) 1087.04 492.144
å F(M) -88.928 10 Computed X'm = å F(M) / å F(V) x S = 0.000 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH =6 x (VC / 9 ) = 0.008 M.
1.50 0.016 354.988
2.99 0.008 354.988 12 XC = XW + 10 = 354.988 M.
1.45337 0.017 354.988
VESSEL: LAVINIA
TRIM LINE NO. 1- A FLOODABLE LENGTH CALCULATION DATE:
BY: VILLAMANTE
A
1 TRIAL FLOODABLE LENGTH = Comp't. Volume = l = 0.906 M.
Sec. Area (Mean)
SECTION SM SECTION SM 2 TRIAL Xm M. CORRESPONDING XC = M.
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 41.543 41.543 2 83.086 3 S (Station Spacing) = l/4 = 0.227 M. S/3 = 0.076 M,
1 4 34.377 137.508 1 137.508
2 2 24.681 49.362 0 220.594 4 Compt. Volume = å F(V) x S/3
47.08299
= CU. M.
3 4 20.084 80.336 1 80.336
53
7 APPROX. XC = X W + Xm = 22.804 M.
B
SECTION SM SECTION SM 2ND TRIAL FLOODABLE LENGTH 6 = 0.861 M.
6
NUMBER VOL. AREA F (V) MT. F (M)
AFT 0 1 83.086 83.086 2 166.171 2ND TRIAL XC, = 7 22.804 M.
1 4 68.754 275.016 1 275.016
2 2 49.362 98.724 0 441.187 8 S (Station Spacing) = l/4 = 0.215 M. S/3 = 0.072 M,
3 4 40.168 160.672 1 160.672
FOR'D. 4 1 5.990 5.990 2 11.980 9 Compt. Volume = å F(V) x S/3 = 89.46 CU. M.
å F(V) 623.488 172.652
å F(M) -268.54 10 Computed X'm = å F(M) / å F(V) x S = -0.093 M.
INTERPOLATION
VC FL XC 11 FLOODABLE LENGTH6 = x (VC / 9 ) = 0.430 M.
44.73 0.885 22.803
89.46 0.430 22.809 12 XC = XW + 10 = 22.809 M.
47.08299 0.861 22.804
54
VI. HULL STRENGTH
MEMBER Dn A Dn A Dn2 Io
1 BOTTOM PLATE 3.300 2803.680 9252.144
2 INNER BOTTOM PLAT 2.300 977.040 2247.192
3 BILGE PLATE 2.730 2899.260 7914.980
4 SIDE SHELL PLATE 3.230 3462.560 11184.069 12.833
5 BTM. CENTER GIR. P 2.960 3772.224 11165.783 14.972
6 BTM. CENTER GIR. FL 2.912 17318.246 50430.734
7 BTM. SIDE GIR. PL. 2.085 700.627 1460.948
8 BTM. SIDE GIR. FL. 2.500 70.000 175.000
9 SIDE LONG'LS 3.000 22.260 66.780
10 HOPPER TANK PL. 3.000 108.000 324.000
11 BTM. LONG'LS 1.064 1771.560 1884.940
12 INNER BTM. LONG'LS 1.013 562.437 569.974
13 LONG'L SIDE FRAME 1.016 13.715 13.933
14 SIDE SHELL FL. 1.616 200.210 323.519
15 HOPPER TANK LONG' 1.303 30.438 39.661
97053.655 27.805
TOTAL BELOW N.A. 34712.257 97081.460
55
4826.474
MEMBER Dn A Dn A Dn2 Io
1 DECK PLATE 2.684 2943.127 7898.175
2 SIDE PLATE 1.549 830.103 1285.581 12.833
3 SIDE SHELL LONG'LS 1.549 323.753 501.494 1.189
4 DECK LONG'LS 2.588 1309.003 3387.830
5 DECK GIRDER PL. 2.485 43.724 108.653
6 DECK GIRDER FL. 2.263 12.727 28.794
7 TOP SIDE TANK LONG 1.345 2985.012 4013.647
8 SIDE STRINGER PL. 0.784 0.000 0.000
9 SIDE STRNGER FL. 0.747 0.000 0.000
10 STRENGHT DECK PL. 1.345 285.678 384.237
11 TOP SIDE TANK PLAT 0.784 18.314 14.358
17622.770 14.021
TOTAL ABOVE N.A. 8751.441 17636.791
GRAND TOTAL 18244.65 25960.817 114718.251
56
TABLE IN CAPACITY PLAN
Unit
LOADLINE FREEBOAR DRAFT (MMT LT 1 L.T = 1.016047
DISP. DISP. 1 FT.3 = 0.028317
TROPICAL FRESH 3.418 10.973 8072.732 7945.235
FRESH WATER 3.046 9.606 7914.443 7789.446
TROPICAL 1.367 7.927 7878.036 7753.614
SUMMER 1.875 6.052 7866.688 7742.445
WINTER 1.367 4.685 7860.284 7736.142
WNA 1.867 3.318 7854.089 7730.045
S = 1405.500426
3. FRICTIONAL COEFFICIENT
0.075
CF = + 0.004
(Log Rn-2)2
0.075
CF =
(Log Rn-2)2
1.075
CF =
44.3970318183
CF = 0.0242133304
4. REYNOLD'S NUMBER
Vs x LBP
Rn =
√
7.72 x 71.000
Rn =
1.19E-06
Rn = 460372921.22
5. RESIDUARY RESISTANCE
RR = 0.5 x PSW x S x VS2 x CR
RR = 0.5 x 1025 x 1405.5 x 41.3436 x 0.0013
RR = 38714.76620766
59
6. AIR AND WIND RESISTANCE (RA)
RA = 0.5 x PA x SF x VA2
RA = 0.5 x 1.23 x 94.193 x 28.7725
RA = 1666.753145173
RT = RF + RR + RA
RT = 721087 + 38714.77 + 1666.75
RT = 761468.7696
PE = RT + RF PE = 1987.34 HP
PE = 7.61E+05 7.21E+05
PE = 1.48E+06 watts
K - N √LBP where
QPC =
10000 N 400 RPM
0.84 - 400 x 9.72291 K 0.84
QPC =
10000 LBP 94.535 M.
QPC = 0.451084
PD = PE PD = 4405.7 HP
QPC
PD = 1.48E+06
0.451084
PD = 3.29E+06
DIAMETER = 50 x PS0.2
NO.6
DIAMETER = 50 x 5.38 9.07
36.41 258.44
DIAMETER = 7.38 FT.
PD x 1
PS = NS x NB
4405.704 x 1
PS =
0.98
PS = 4495.616 HP
60
13. BRAKE HORSEPOWER (PB)
1
PB = PS x
NG
1
PB = 4495.616
0.97
PB = 4634.656 HP
PP = PE x NT
PP = 1987.341 x 4.948563
PP = 9834.48
NT = NH + NO + NR + NS
NT = 2.047963 + 0.97 + 0.98 + 0.9506
NT = 4.948563
NO = 0.97
NS = PD
PB
NS = 4405.704
4634.656
NS = 0.9506
NR = 0.98
0.1B
a = + 0.149
L
0.1 x 13.000
a = + 0.149
71.000
a = 0.01831 + 0.149
a = 0.16731
0.05B
b = + 0.449
L
0.05 x 13.000
b = + 0.449
71.000
b = 0.009155 + 0.449
b = 0.458155
502B B2
c = 585 - + 11700
L L2
502 13.000 13.000
c = 586 - + 11700
71.000 71.000
c = 586 - 91.91549 + 392.244
c = 586 - 91.91549 + 392.244
c = 586 - 484.16
c = 101.8409
d = 0.625B
+ 0.08
L
d = 0.8125
+ 0.08
71.000
d = 0.091444 61
0.25B
e = 0.165 -
L
0.25 x 13.000
e = 0.165 -
71.000
3.25
e = 0.165 -
71.000
e = 0.165 - 0.045775
e = 0.119225
8060B B2
f = 525 - + 20300 x
L L2
104780
f = 525 - + 20300 x 0.03353
71.000
f = 525 - 1475.775 + 20300 x 0.024
f = -950.775 + 487.2
f = -463.575
THRUST REDUCTION
e
t1 = d +
f(0.98 - cb)3+ 1
0.1192253521
t1 = 0.091444 +
-463.5746 (0.98 - 0.731)3 + 1
0.1192253521
t1 = 0.091444 +
-463.5746 x 0.01544 + 1
0.119225
t1 = 0.091444 +
-6.156781
t1 = 0.091444 + -0.019365
t1 = 0.072079
t2 = -0.01 FA
t2 = -0.01 -2
t2 = 0.02
DPROP 0.04
t3 = 2 x -
L
2.39 0.04
t3 = 2 x -
94.535
t3 = 2 x 0.025282 - 0.04
t3 = 0.010563
t = t1 + t2 + t3
t = 0.072079 + 0.02 + 0.01056
t = 0.102642
x 1 - W
PT = 1987.341
1 - t
1 - 0.56183
PT = 1987.341 x
1 - 0.10264
0.438171
PT = 1987.341 x
0.897358
PT = 1987.341 x 0.48829
PT = 970.3986
62
WAKE
b
W1 = a +
c (0.98 - cb)3 + 1
0.4581549296
W1 = 0.16731 +
101.8409 (0.98 - cb)3 + 1
0.4581549296
W1 = 0.16731 +
101.8409 x 0.009 + 1
0.4581549296
W1 = 0.16731 +
1.9431486173
W1 = 0.16731 + 0.23578
W1 = 0.40309
0.025 x FA
W2 =
100 (Cb-07)2
1
0.025 x -2
W2 =
100 x 0.000961 + 1
-0.05
W2 =
1.0961
W2 = -0.04562
0.00756
W3 = 0.18 +
DPROP
+ 0.002
L
0.00756
W3 = 0.18 +
24.00986
+ 0.002
71.000
W3 = 0.18 + 0.00756
0.338167 + 0.002
W3 = 0.18 + 0.024356
W3 = 0.204356
W = W1 + W2 + W3
W = 0.40309 + -0.045616 + 0.20436
W = 0.561829
1 - t
Nh =
1 - w
1 - 0.102642
Nh =
1 - 0.561829
0.897358
Nh =
0.438171
Nh = 2.047963
63
MAIN ENGINE
SPECIFICATIONS
POWER RANGE 6196 - 7577 BHP (4600 - 5650 bKW)
EMISSIONS IMO II
ASPIRATION TTA
BORE 280.00 mm
STROKE 300.00 mm
DISPLACEMENT 296.00 L
LENGTH 5690.00 mm
HEIGHT 3403.00 mm
WIDTH 2032.00 mm
64
PROPELLER DESIGN
I. DATA OF SHIPS
LENGTH (L) 71.000 M SHAFT HORSE POWER (P4495.62
BREADTH (B) 13.000 M WETTED SURFACE AREA 1405.5
DRAFT (d) 5.000 M
TON DISPLACEMENT (∆) 3750.00 M.TON
BLOCK COEFFICIENT (CB) 0.770
PRISMATIC COEFFICIENT (CP) 0.770
MIDSHIP COEFFICIENT (CM) 0.990
S (SPEED) 12.500 KNOTS 6.43 M/S
VOLUME DISPLACEMENT (▽) 3658 M.TON
50 x (PS)0.2
D =
RPM0.6
50 x (4495.62)0.2
D =
(400) 0.6
50 x 5.38
D =
36.4112840605
268.86
D =
36.411
D = 7.384 FT.
2. DISK AREA
�
AD =
4D2
�3.1416
AD =
4(7.825)2
�3.1416
AD =
244.92
AD = 0.0128
3. HUB DIAMETER
HUB DIAMETE = 0.2 x D PROPELLER DIAMETER 7.825
HUB DIAMETE = 0.2 x 2.385 2.385
HUB DIAMETE = 0.477 M.
9. BLADE HEIGHT
D
BLADE HEIGHT = - HUB DIAMETER
2
2.385
BLADE HEIGHT = - 0.477
2
BLADE HEIGHT = 0.7155 M.
DEVELOPED AREA OF BLADE
SEC ORD SM f(A)
1 R 0.7493 1 0.74925
2R 1.12 4 4.48
3R 1.23 2 2.46
4R 1.29 4 5.16
5R 1.31 2 2.62
6 R 1.309 4 5.236
7R 1.26 2 2.52
8R 1.13 4 4.52
9 R 0.8452 1 0.8452
∑= 28.59045
1
DEVELOPED BLADE AREA = x S x ∑f(A) x 2
3
1
DEVELOPED BLADE AREA = x 0.1168 x 28.59 x 2
3
DEVELOPED BLADE AREA = 2.20398061 mm2
III. COEFFICIENTS
FT
M
66
67
TAILSHAFT DESIGN
I. DATA OF SHIPS
LENGTH (L) 71.000 M SHAFT HORSE POWER 4495.62
BREADTH (B) 13.000 M RPM 400
DRAFT (d) 5.000 M
TON DISPLACEMENT (∆) 3750.00 M.TON
BLOCK COEFFICIENT (CB) 0.770
PRISMATIC COEFFICIENT (CP) 0.770
MIDSHIP COEFFICIENT (CM) 0.990
S (SPEED) 12.500 KNOTS 6.43 M/S
VOLUME DISPLACEMENT (▽) 3658 M.TON
1. TORQUE
SHP SHP 4495.62 Hp
TORQUE =
RPM RPM 800
2.65E+11
TORQUE =
800
TORQUE = 3.31E+08 N - mm
)
1
(
/
T 3 2E+08
D = 1.72 x
j 3E+11
D = 1.72 x 656150
D = 142.935 mm
3. BRAKE POWER
BRAKE POWER = (T) x RPS RMP 800
BRAKE POWER = 3E+08 x 13.33 RPS 13.33
BRAKE POWER = 4E+09 N - MM
4. SHAFT POWER
SHAFT POWER = BRAKE POWER x 20%
SHAFT POWER = 4E+09 x 20%
SHAFT POWER = 9E+08 N - MM
D4
J = 3.1416 x
32
142.935
J = 3.1416 x
32
4E+08
J = 3.1416 x
32
J = 3.1416 x 1E+07
J = 4E+07 mm4
TORQUE CALCULATED BY YIELD STRENGTH OF MATERIAL (T)
3.1416
T = * G * D3
16
T = 0.19635 * 215 * 3E+06
T = 1E+08 N.mm
J
T = 505 x
R
4E+07
T = 506 x
71.74
T = 505 x 571212
T = 3E+08
Hp
HP
LB FT
/MIN
N mm.
68
69
RUDDER DESIGN
I. DATA OF SHIPS
LENGTH (L) 71.000 M SHAFT HORSE POWER (P4495.6 Hp
BREADTH (B) 13.000 M WETTED SURFACE ARE 1405.5
DRAFT (d) 5.000 M
TON DISPLACEMENT (∆) 3750.00 M.TON
BLOCK COEFFICIENT (CB) 0.770
PRISMATIC COEFFICIENT (CP) 0.770
MIDSHIP COEFFICIENT (CM) 0.990
S (SPEED) 12.500 KNOTS 6.43 M/S
VOLUME DISPLACEMENT (▽) 3658 M.TON
WHERE
n 0.132
b MEAN HEIGHT OF RUDDER
A RUDDER BLADE AREA IN M2
KC 1
KL 1.15
VS SHIP SPEED IN KNOTS
b2 WHERE
KR = A + 2 b = 2.385 M.
3 A = 5.96 M2
5.6882 e = 2.5 M.
KR = 5.96 + 2 k = 0.4
3 AF = 2.39 M2
0.7146 a = 0.55
KR =
3 NU = 42
KR = 0.2382
Length (L) = 71 m
Breadth (B) = 13 m
Draft (d) = 5 m
Depth = 6 m
where:
c = 0.72 with effective strut
h = distance, in m (ft), from the keel to the load line, or two-thirds of the distance to the bulkhead or freeboard deck, whichever is the great
s = spacing of longitudinals, in m
l = distance, in m (ft), between the supports, but is not to be taken as less than 1.83 m (6 ft) without struts or 2.44 m (8 ft) with struts.
Where effective struts are fitted and the tank top is intended to be uniformly loaded with cargo, l may be taken as 81% of the distance
between supports subject to above minimum.
0.48
1.11125
5.08 1.11125
71.12
Members in cm. Area d (height) Ad Ad2
fl 3.81 x 0.48 1.81 7.22 13.11 94.67
web 6.35 x 0.64 4.03 3.81 15.36 58.53
p 60.90 x 1.27 77.34 0.64 49.11 31.19
83.19 77.58 184.39
13.55
197.94
72
Ad I = A (dg)2
dg =
A = 83.1897625 x 0.8697283118
77.5821281 = 72.35
=
83.1897625
Corr. I
= 0.93 SM =
C
125.585415 100.00%
=
Corr. I = 197.9 - 72.4 7.16
= 125.6 greater than min.
SM = 17.5 cm3 33%
requirement
B. INNER-BOTTOM LONGITUDINALS
7Reference: ABS Rules for Building and Classing Steel Vessels 2017, 3-2-4/11.5, page 86
Inner-bottom longitudinals are to have values of SM at least 85% of that required for the bottom longitudinals.
Formula:
SM = SM of Bottom Long'l X 0.85 SM = 10.53 X 0.85
SM = 8.9505
Assumed Members: 127 × 76.2 × 9.5 mm. L
3.18
0.48
5.08 0.64
73
60.96
Members in cm. Area d (height) Ad Ad2
3.81 x 0.48 1.82 5.80 10.53 61.04
5.08 x 0.48 2.44 3.02 7.36 22.24
60.96 x 0.95 57.91 0.48 27.51 13.07
62.17 45.40 96.34
5.24
101.58
Ad I = A (dg)2
dg =
A = 62.165865 x 0.5333135784
45.3986879 = 33.15
=
62.165865
Corr. I
= 0.73 SM =
C
68.4309331
=
Corr. I = 101.6 - 33.2 5.78
= 68.4 greater than min.
SM = 11.8 cm3 32%
requirement
F. Deck Longitudinals
Reference: ABS Rules for Building and Classing Steel Vessels 2017, 3-2-7/3.1, page 102
Each beam, in association with the plating to which it is attached, is to have a section modulus SM as obtained from the following equation:
Formula:
where:
c = 1.30 without struts
h = vertical distance, in m, from the middle of l to the deck at side
s = frame spacing, in m.
l = unsupported span between supporting members, in m. Where
brackets are fitted in accordance with 3-1-2/5.5 and are
supported by bulkheads, inner-bottom, or side shell, the length
length, l, may be measured as permitted therein.
Assumed Members: 127 × 88.9 × 7.9 mm. L
74
8.89
0.79375
12.70 0.79375
60.96
Members in cm. Area d (height) Ad Ad2
6.35 x 0.79 5.02 10.08 50.54 509.20
8.89 x 0.79 7.02 5.24 36.77 192.47
60.96 x 0.95 58.06 0.48 27.65 13.17
70.10 114.96 714.84
46.25
761.10
Ad I = A (dg)2
dg =
A = 70.104 x 2.6891216879
114.960337 = 188.52
=
70.104
Corr. I
= 1.64 SM =
C
572.578434 100.00%
=
Corr. I = 761.1 - 188.5 8.99
= 572.6 greater than min.
SM = 63.7 cm3 29%
requirement
F. Side Longitudinals
Reference: ABS Rules for Building and Classing Steel Vessels 2017, 3-2-5/3.17, page 95
The section modulus SM of each longitudinal side frame is to be not less than obtained from the following equation:
Formula:
s= 0.7112 m
SM = 41.08 cm3
l= 2.13 m
where:
c = 0.95
h = above 0.5D from the keel, the vertical distance, in m (ft), from the longitudinal frame to the bulkhead or freeboard deck,
but is not to be taken as less than 2.13 m
s = spacing of longitudinal frames, in m (ft)
l = the unsupported span, in m
15.24
0.2952
10.16 0.15
61.92
Members in cm. Area d (height) Ad Ad2
10.16 x 0.15 1.52 15.62 23.80 371.59
15.24 x 0.30 4.57 7.92 36.21 286.79
60.96 x 0.95 58.06 0.48 27.65 13.17
64.16 87.66 671.55
88.49
760.04
Ad I = A (dg)2
dg =
A = 64.1604 x 1.8667039681
87.6606705 = 119.77
=
64.1604
Corr. I
= 1.37 SM =
C
640.27081 100.00%
=
Corr. I = 760.0 - 119.8 14.98
76
where:
c = 0.95
h = above 0.5D from the keel, the vertical distance, in m (ft), from the longitudinal frame to the bulkhead or freeboard deck,
but is not to be taken as less than 2.13 m
s = spacing of longitudinal frames, in m (ft)
l = the unsupported span, in m
6.35
1.11125
12.70 1.11125
61.92
Members in cm. Area d (height) Ad Ad2
6.35 x 1.11 7.06 14.37 101.38 1456.50
77
Ad I = A (dg)2
dg =
A = 88.9111125 x 7.5508824414
244.317682 = 671.36
=
88.9111125
Corr. I
= 2.75 SM =
C
1781.41072 100.00%
=
Corr. I = 2452.8 - 671.4 12.17
= 1781.4 greater than min.
SM = 146.3 cm3 20%
requirement
SM = 193.96 cm3
c= 1.0
b= 5.50 m SM = ( 194.0 × 0.25 ) + 193.96
h= 3.75 m
SM = 242.45 cm3
l= 2.10 m
where:
c = 1.0
b = mean breadth of the area of deck supported, in m
h = height, as required by 3-2-7/3.1, for the beams supported, in m
l = span between centers of supporting pillars, or between pillar and bulkhead, in m
Where an effective bracket, in accordance with 3-2-6/7.1, is fitted at the bulkhead, the length l may be modified.
6.4
0.9525
7.6
0.9525
0.9525
356
356
Ad I = A (dg)2
dg =
A = 108.467525 x 18.4834067217
466.327192 = 2004.85
=
108.467525
Corr. I
= 4.30 SM =
C
4792.94688
=
Corr. I = 6797.8 - 2004.8 15.8620167
= 4792.9 greater than min.
SM = 302.2 cm3 25%
79
where:
c = 1.0
b = spacing of deck transverses, in m
h = height, as required by 3-2-7/3.1, for the beams supported, in m
l = span between supporting girders or bulkheads, or between girder and side frame, in m
Where an effective bracket is fitted at the side frame or bulkhead, the length l may be modified. See 3-2-6/7.1.
20.3
0.9525
25.4
0.9525
0.9525
356
Ad I = A (dg)2
dg =
A = 108.467525 x 18.4834067217
466.327192 = 2004.85
=
108.467525
Corr. I
= 4.30 SM =
C
4792.94688
=
Corr. I = 6797.8 - 2004.8 15.8620167
= 4792.9 greater than min.
SM = 302.2 cm3 25%
SM = 349.09 cm3
c= 1.5
h= 3.75 m SM = ( 349.1 × 0.25 ) + 349.09
s= 1.67 m
SM = 436.36 cm3
l= 2.80 m
where:
c = 1.5
h = vertical distance, in m (ft), from the middle of s to the load line, or to two-thirds of the
distance from the keel to the bulkhead deck, or 1.8 m (6 ft), whichever is greatest
s = sum of the half lengths, in m (ft), (on each side of the stringer) of the frames supported
l = span, in m (ft), between web frames, or between web frame and bulkhead; where brackets are fitted, the length l may be modified
20.3
81
0.79375
25.4
0.79375
0.95
290
Members in cm. Area d (height) Ad Ad2
20.30 x 0.79 16.11 26.59 428.46 11392.97
25.40 x 0.79 20.16 13.49 272.05 3670.99
290.0 x 0.95 275.50 0.48 130.86 62.16
311.77 831.37 15126.11
1083.94
16210.05
Ad I = A (dg)2
dg =
A = 311.774375 x 7.1106509278
831.371432 = 2216.92
=
311.774375
Corr. I
= 2.67 SM =
C
13993.1311
=
Corr. I = 16210.0 - 2216.9 24.4771696
= 13993.1 greater than min.
SM = 571.7 cm3 31%
SM = 571.7 cm3 31%
REFERENCE: ABS Rules for Building and Classing Steel Vessels Under 90m in Length, 2015
bh1
SM = 4.74 csl2 h + cm3
45K
12.5
= 726.962 3.50 + cm3
45
= 726.96 × 3.7777777778
82
= 98.8344
SM = 123.54 cm3
where:
c =
s = frame spacing, in m.
l = span, in m. at amidships from the line of the inner bottom to the
deck at the top of web frames.
h = vertical distance in m., from the middle of l to the load line; the
value of h is not to be less than 0.5l.
b = horizontal distance from the outside of the frames to the first row
of deck supports.
h1 = vertical distance in m., from the deck at the top of the frame to the bulkhead.
K = number of transverse frame spaces between web frames where
the deck is transversely framed.
Assumed Members: 558 × 457.2 × 7 mm. L
45.7
1.27
55.8
1.27
1.27
290
Members in cm. Area d (height) Ad Ad2
45.72 x 1.27 58.06 57.71 3350.61 193346.73
55.80 x 1.27 70.87 29.17 2067.16 60299.09
290.0 x 1.27 368.30 0.64 233.87 148.51
497.23 5651.64 253794.33
18387.60
83
272181.93
Ad I = A (dg)
2
dg =
A = 497.2304 x 129.1913139146
5651.63792 = 64237.85
=
497.2304
Corr. I
= 11.37 SM =
C
207944.084
=
Corr. I = 272182 - 64237.8 46.9737643
= 207944.1 greater than min.
SM = 4426.8 cm3 3483%
84
0.71 )( 2.12 )2
1.27
Io
7
3 13.55
9
39
5
94
0.00
er than min.
ement
1.27
Io
4
4 5.24
7
4
4
58
0.00
er than min.
ement
0.71 )( 2.13 )2
0.9525
0.9525
Io
20
47 46.25
7
84
5
10
0.00
er than min.
ement
0.71 )( 2.13 )2
deck,
0.95
Io
59
79 88.49
7
55
9
04
0.00
er than min.
ement
0.71 )( 2.10 )2
deck,
1.11125
Io
50
67 189.69
1
08
69
77
0.00
er than min.
ement
quation:
3.75 )( 2.10 )2
Io
78
30 520.51
2
29
51
80
er than min.
requirement
quation:
3.75 )( 2.10 )2
Io
78
30 520.51
2
29
51
80
er than min.
requirement
he following equation:
1.67 )( 2.80 )2
may be modified
Io
.97
99 1083.94
6
.11
94
.05
er than min.
requirement
c = 1.5
s = 2.00
l = 7.15
h = 3.50
b = 5.00
h1 = 2.5
K = 1
Io
6.73
.09 18387.60
51
4.33
.60
1.93
er than min.
requirement
VI. HULL STRENGTH
MEMBER Dn A Dn A Dn2 Io
1 BOTTOM PLATE 3.300 2803.680 9252.144
2 INNER BOTTOM PLAT 2.300 977.040 2247.192
3 BILGE PLATE 2.730 2899.260 7914.980
4 SIDE SHELL PLATE 3.230 3462.560 11184.069 12.833
5 BTM. CENTER GIR. P 2.960 3772.224 11165.783 14.972
6 BTM. CENTER GIR. FL 2.912 17318.246 50430.734
7 BTM. SIDE GIR. PL. 2.085 700.627 1460.948
8 BTM. SIDE GIR. FL. 2.500 70.000 175.000
9 SIDE LONG'LS 3.000 22.260 66.780
10 HOPPER TANK PL. 3.000 108.000 324.000
11 BTM. LONG'LS 1.064 1771.560 1884.940
12 INNER BTM. LONG'LS 1.013 562.437 569.974
13 LONG'L SIDE FRAME 1.016 13.715 13.933
14 SIDE SHELL FL. 1.616 200.210 323.519
15 HOPPER TANK LONG' 1.303 30.438 39.661
97053.655 27.805
TOTAL BELOW N.A. 34712.257 97081.460
100
4826.474
MEMBER Dn A Dn A Dn2 Io
1 DECK PLATE 2.684 2943.127 7898.175
2 SIDE PLATE 1.549 830.103 1285.581 12.833
3 SIDE SHELL LONG'LS 1.549 323.753 501.494 1.189
4 DECK LONG'LS 2.588 1309.003 3387.830
5 DECK GIRDER PL. 2.485 43.724 108.653
6 DECK GIRDER FL. 2.263 12.727 28.794
7 TOP SIDE TANK LONG 1.345 2985.012 4013.647
8 SIDE STRINGER PL. 0.784 0.000 0.000
9 SIDE STRNGER FL. 0.747 0.000 0.000
10 STRENGHT DECK PL. 1.345 285.678 384.237
11 TOP SIDE TANK PLAT 0.784 18.314 14.358
17622.770 14.021
TOTAL ABOVE N.A. 8751.441 17636.791
GRAND TOTAL 18244.65 25960.817 114718.251
101
I. Design Data
Length (L) 71.00 m 232.88 f
Breadth (B) 13.00 m 42.64 f
Depth (D) 6.00 m 19.68 f
Draft (d) 5.00 m 16.4 f
Weight of displacement ∆ 3750.00 m.ton
Volume of displacement ▽ 3658.00 m3
Block coefficient (Cb) 0.77
I Approximation of Gross & Net Tonnage
A. GROSS TONNAGE:
formula Where
GT = L x B x D x Cb L= 232.88
100 B= 42.64
D= 19.68
GT = 1504.753
therefore
c= GT x 100
L x B x D x Cb
c= 150475.3
150475.3
c= 1
so GT = L x B x D x Cb x c
100
GT = 150475.3
100
GT = 1504.753
4495.6161 x 7.5 x 24
1000
809.21089 gallons
TOTAL = 16
104
V.Calculation of Freash Water Consumption
Drinking water
no. of crews 16
weight allowance 50 LBS
no. of days 1.0633333
stores
weight in tons = 11 x 13 x 1.0633333
2240
= 0.0678824 tons
provision
weight in ton = 10 x 13 x 1.0633333
2240
= 0.0617113 tons
where:
all0wance of weight 11 allowance of weight 10
table 4 pna vol . (pg 96) table 4 pna vol . (pg 96)
= 658.85288 tons
where:
Cs 0.118 consants B 42.64
L 232.88 D 19.68
= 279.17495 tons
where:
Cw 0.05 B 42.64
L 232.88 D 19.68
IX Machinery Weight
= Cm x L x B x D
35
= 228.92346 tons
-296.252
107
HULL STRENGTH
MEMBER Dn A Dn A Dn2 Io
1 BOTTOM PLATE 3.300 38.808 128.066
2 INNER BOTTOM PLATE 2.300 69.552 159.970
3 BILGE PLATE 2.730 41.578 113.508
4 SIDE SHELL PLATE 3.230 73.838 238.496 9.955
5 BTM. CENTER GIR. PLT 2.960 11.070 32.768 0.030
6 BTM. CENTER GIR. FL. 2.912 978.432 2849.194
7 BTM. SIDE GIR. PL. 2.085 700.627 1460.948
8 BTM. SIDE GIR. FL. 2.500 70.000 175.000
9 SIDE LONG'LS 3.000 22.260 66.780
10 SSIDE STRINGER PL. 2.500 40.000 100.000
11 HOPPER TANK PL. 3.000 108.000 324.000
12 BTM. LONG'LS 1.064 1771.560 1884.940
13 INNER BTM. LONG'LS 1.013 562.437 569.974
14 LONG'L SIDE FRAME 1.016 13.715 13.933
15 SIDE SHELL FL. 1.616 200.210 323.519
16 HOPPER TANK LONG'L 1.303 30.438 39.661
8480.756 9.985
TOTAL BELOW N.A. 4732.525 8490.742
100
NEUTRAL AXIS: 3.00 M ABOVE BASELINE
MEMBER NO. SCANTLING AREA
1 DECK PLATE 1 575.70 X 0.70 402.990
2 SIDE PLATE 1 261.26 X 0.90 235.134
3 SIDE SHELL LONG'LS 1 261.26 X 0.80 209.008
4 DECK LONG'LS 6 11.80 X 7.50 X 0.70 371.700
5 DECK GIRDER PL. 0.5 39.10 X 0.90 17.595
6 DECK GIRDER FL. 0.5 12.50 X 0.90 5.625
7 TOP SIDE TANK LONG'L 4 18.50 X 20.00 X 1.50 2220.000
8 SIDE STRINGER PL. 1 18.50 X 0.10 1.850
9 SIDE STRNGER FL. 1 15.00 X 0.90 13.500
10 STRENGHT DECK PL. 3 11.80 X 7.50 X 0.70 185.850
11 TOP SIDE TANK PLATE 1 29.20 X 0.80 23.360
3686.612
MEMBER Dn A Dn A Dn2 Io
1 DECK PLATE 2.684 1081.464 2902.217
2 SIDE PLATE 1.549 364.152 563.962 1.337
3 SIDE SHELL LONG'LS 1.549 323.753 501.494 1.189
4 DECK LONG'LS 2.588 961.997 2489.744
5 DECK GIRDER PL. 2.485 43.724 108.653
6 DECK GIRDER FL. 2.263 12.727 28.794
7 TOP SIDE TANK LONG'L 1.345 2985.012 4013.647
8 SIDE STRINGER PL. 0.784 1.451 1.137
9 SIDE STRNGER FL. 0.747 10.079 7.525
10 STRENGHT DECK PL. 1.345 249.968 336.207
11 TOP SIDE TANK PLATE 0.784 18.314 14.358
10967.739 2.526
TOTAL ABOVE N.A. 6052.640 10970.265
GRAND TOTAL 6910.622 -1320.115 19461.007
SPACING = 0.65
SEC.AREA = 0.0464108233 x 2
SEC.AREA = 0.0928216467
SPACING = 0.65
SEC.AREA = 31.5064662033 x 2
SEC.AREA = 63.0129324067
STATION 6 33.07
W.L ORDINATES S.M F(V)
0 1 0
1 4 0
2 2 0
3 4 0
4 2 0
5 4 0
6 2 0
7 4 0
8 1 0
f(V)= 0
SPACING = #REF!
SEC.AREA = #REF! x 2
SEC.AREA = #REF!
STATION 8 1/2 24.78
W.L ORDINATES S.M F(V)
0 1 0
1 3.903882 4 15.61553
2 4.558408 2 9.116816
3 4.956953 4 19.82781
4 5.181046 2 10.36209
5 5.331143 4 21.32457
6 5.455017 2 10.91003
7 5.565095 4 22.26038
8 5.654542 1 5.654542
f(V)= 115.0718
SPACING = 0.65
SEC.AREA = 24.93 x 2
SEC.AREA = 49.86
STATION 1/2 8.60
W.L ORDINATES S.M F(V)
0 0 1 0
1 1.211385 4 4.8455412
2 1.483221 2 2.9664414
3 1.655569 4 6.6222772
4 1.771769 2 3.5435384
5 1.861845 4 7.4473784
6 1.944237 2 3.8884734
7 2.050137 4 8.2005476
8 2.218125 1 2.2181252
f(V)= 39.7323228
SPACING = 0.65
SEC.AREA = 1/3 x S x
1/3 x 0.65
SEC.AREA = 8.60866994 x 2
SEC.AREA = 17.21733988
STATION 3 32.34
W.L ORDINATES S.M F(V)
0 0 1 0
1 6.277911 4 25.111642
2 6.5 2 13
3 6.5 4 26
4 6.5 2 13
5 6.5 4 26
6 6.5 2 13
7 6.5 4 26
8 6.5 1 6.5
f(V)= 148.611642
SPACING = DRAFT / W.L no.
5.2 / 8
SPACING = 0.65
SEC.AREA = 1/3 x S x
1/3 x 0.65
SEC.AREA = 32.1991891 x 2
SEC.AREA = 64.3983782
STATION 7 32.34
W.L ORDINATES S.M F(V)
0 1 0
1 4 0
2 2 0
3 4 0
4 2 0
5 4 0
6 2 0
7 4 0
8 1 0
f(V)= 0
SPACING = #REF!
SEC.AREA = 1/3 x S
1/3 x #REF!
SEC.AREA = #REF! x
SEC.AREA = #REF!
STATION 9 17.76
W.L ORDINATES S.M F(V)
0 0 1 0
1 2.651873 4 10.60749
2 3.13101 2 6.26202
3 3.456845 4 13.82738
4 3.682696 2 7.365392
5 3.843891 4 15.37556
6 3.976724 2 7.953448
7 4.127428 4 16.50971
8 4.30635 1 4.30635
f(V)= 82.20736
SPACING = 0.65
SEC.AREA = 1/3 x S x
1/3 x 0.65
SEC.AREA = 17.81 x 2
SEC.AREA = 35.62
STATION 1 17.76
W.L ORDINATES S.M F(V)
0 0 1 0
1 2.651873 4 10.60749
2 3.13101 2 6.262021
3 3.456845 4 13.82738
4 3.682696 2 7.365392
5 3.843891 4 15.37556
6 3.976724 2 7.953449
7 4.114664 4 16.45866
8 4.291856 1 4.291856
f(V)= 82.14181
SPACING = 0.65
SEC.AREA = 17.79739 x
SEC.AREA = 35.59478
STATION 4 33.07
W.L ORDINATES S.M F(V)
0 1 0
1 6.358989 4 25.4359568
2 6.498916 2 12.9978316
3 6.499808 4 25.9992308
4 6.499938 2 12.9998756
5 6.499412 4 25.9976476
6 6.497989 2 12.9959776
7 6.497987 4 25.9919472
8 6.499624 1 6.4996238
f(V)= 148.918091
SPACING = DRAFT / W.L no.
#REF! / #REF!
SPACING = #REF!
SEC.AREA = #REF! x
SEC.AREA = #REF!
SPACING = DRAFT /
#REF! /
SPACING = #REF!
2 SEC.AREA = #REF!
SEC.AREA = #REF!
STATION 9 1/2 9.28
W.L ORDINATES S.M F(V)
0 0 1 0
1 0.808586 4 3.234344
2 0.952157 2 1.904314
3 1.234466 4 4.937864
4 1.612333 2 3.224665
5 2.045683 4 8.18273
6 2.560148 2 5.120296
7 3.128254 4 12.51302
8 3.642802 1 3.642802
f(V)= 42.76003
SPACING = 0.65
SEC.AREA = 9.26 x
SEC.AREA = 18.53
STATION 1 1/2 24.78
W.L ORDINATES S.M F(V)
0 0 1 0
1 3.903882 4 15.61553
2 4.558408 2 9.116816
3 4.956952 4 19.82781
4 5.181046 2 10.36209
5 5.331143 4 21.32457
6 5.455017 2 10.91003
7 5.565095 4 22.26038
8 5.703274 1 5.703274
f(V)= 115.1205
SPACING = DRAFT /
5.2 /
SPACING = 0.65
2 SEC.AREA = 24.94278
SEC.AREA = 49.88555
STATION 5 33.25
W.L ORDINATES S.M F(V)
0 1 0
1 6.358989 4 25.4359568
2 6.498916 2 12.9978316
3 6.499808 4 25.9992308
4 6.499938 2 12.9998756
5 6.499412 4 25.9976476
6 6.497989 2 12.9959776
7 6.497987 4 25.9919472
8 6.499624 1 6.4996238
f(V)= 148.918091
SPACING = DRAFT /
#REF! /
SPACING = #REF!
2 SEC.AREA = #REF!
SEC.AREA = #REF!
STATION 8 29.56
W.L ORDINATES S.M F(V)
0 1 0
1 6.358989 4 25.43596
2 6.498916 2 12.99783
3 6.499808 4 25.99923
4 6.499938 2 12.99988
5 6.499412 4 25.99765
6 6.497989 2 12.99598
7 6.497987 4 25.99195
8 6.499624 1 6.499624
f(V)= 148.9181
SPACING = 0.65
x 2 SEC.AREA = 32.27 x
SEC.AREA = 64.53
STATION AP 2.27
W.L ORDINATES S.M F(V)
0 0 1 0
1 0 4 0
2 0 2 0
3 0 4 0
4 0 2 0
5 0 4 0
6 0.811481 2 1.622962
7 1.657987 4 6.631949
8 2.219516 1 2.219516
f(V)= 10.47443
SPACING = DRAFT /
5.2 /
SPACING = 0.65
2 SEC.AREA = 2.27
SEC.AREA = 4.54
STATION 2 29.56
W.L ORDINATES S.M F(V)
0 0 1 0
1 4.86567 4 19.46268
2 5.520129 2 11.04026
3 5.886716 4 23.54686
4 6.063649 2 12.1273
5 6.162976 4 24.6519
6 6.245337 2 12.49067
7 6.331582 4 25.32633
8 6.427062 1 6.427062
f(V)= 135.0731
SPACING = 0.65
x 2 SEC.AREA = 29.26583
SEC.AREA = 58.53166
W.L no.
#REF!
S x F(V)
#REF! 148.9181
x 2
x F(V)
148.9181
2
W.L no.
8
S x F(V)
0.65 10.47443
x 2
/ W.L no.
/ 8
x S x F(V)
x 0.65 135.0731
x 2
WEIGHT ESTIMATION
① DECK DEPARTMENT
② ENGINE DEPARTMENT
No. POSITION
1 CHIEF COOK
1 ASST. COOK
2 MESSMAN
4
DECK DEPARTMENT 7
ENGINE DEPARTMENT 5
STEWARD DEPARTMENT 4
GRAND TOTAL 16
88
VI. FUEL CONSUMPTION CALCULATION
①PORT OF CALL
BATAAN PORT,PHILIPPINES
TO 780 NM
PORT OF MANILA
② NUMBER OF DAYS
DISTANCE IN NAUTICAL MILES
=
24 x SPEED
WHERE
DISTANCE = 1560 NM
SPEED = 12.5 KNOTS
1560
=
24 x 12.5
= 5.2000 DAYS
= BHP x 0.44 x 24
2240
TOTAL FUEL OIL FOR ROUND TRIP 21.85 x 7.50 = 163.87 L. TONS
ADDITIONAL 5% ALLOWANCE 163.87 x 0.05 = 8.19 L. TONS
TOTAL FUEL OIL CONSUMPTION = 172.06 L. TONS
89
⑤ FRESH WATER CONSUMPTION CALCULATION
A. DRINKING
NUMBER OF CREW = 18
WEIGHT ALLOWANCE OF CREW = 45 LBS
NUMBER OF DAYS = 8.0000 DAYS
V. STORES
WEIGHT IN TONS
= 11 x 18 x 8.0000
2400
= 0.6600 L.TONS
WHERE
ALLOWANCE IN WEIGHT
11 =
REF. PRINCIPLES OF NAVAL ARCHITECTURE VOL. 1, PG. 96 TABLE 4
VI. PROVISION
WEIGHT IN TONS
= 10 x 18 x 8.0000
2240
= 0.6429 L.TONS
WHERE
ALLOWANCE IN WEIGHT
10 =
REF. PRINCIPLES OF NAVAL ARCHITECTURE VOL. 1, PG. 96 TABLE 4
= Cw x L x B x D
35
= 539.69 L.TONS
MACHINERY WEIGHT
WHERE
Cm = 0.041
L = 310.15 ft
B = 48.05 ft
D = 25.35 ft
= Cm x L x B x D
35
= 442.55 L.TONS
91
STA. 1/2 STA. 1/2
ordinates S.M mm ordinates S.M Meters
0 1 0 0 1 0
1211.385 4 4845.541 1.211385 4 4.845541
1483.221 2 2966.441 1.483221 2 2.966441
1655.569 4 6622.277 1.655569 4 6.622277
1771.769 2 3543.538 1.771769 2 3.543538
1861.845 4 7447.378 1.861845 4 7.447378
1944.237 2 3888.473 1.944237 2 3.888473
2050.137 4 8200.548 2.050137 4 8.200548
2218.125 1 2218.125 2.218125 1 2.218125
39732.32 39.73232
STA. 1 STA. 1
ordinates S.M mm ordinates S.M Meters
0 1 0 0 1 0
2651.873 4 10607.49 2.651873 4 10.60749
3131.01 2 6262.021 3.13101 2 6.262021
3456.845 4 13827.38 3.456845 4 13.82738
3682.696 2 7365.392 3.682696 2 7.365392
3843.891 4 15375.56 3.843891 4 15.37556
3976.724 2 7953.449 3.976724 2 7.953449
4114.664 4 16458.66 4.114664 4 16.45866
4291.856 1 4291.856 4.291856 1 4.291856
82141.81 82.14181
STA. 3 STA. 3
ordinates S.M mm ordinates S.M Meters
0 1 0 0 1 0
6277.911 4 25111.64 6.277911 4 25.11164
6500 2 13000 6.5 2 13
6500 4 26000 6.5 4 26
6500 2 13000 6.5 2 13
6500 4 26000 6.5 4 26
6500 2 13000 6.5 2 13
6500 4 26000 6.5 4 26
6500 1 6500 6.5 1 6.5
148611.6 148.6116
STA. FP STA. FP STA. 8
ordinates S.M mm ordinates S.M Meters ordinates S.M
0 1 0 0 1 0 0 1
0 4 0 0 4 0 6358.989 4
0 2 0 0 2 0 6498.916 2
0 4 0 0 4 0 6499.808 4
0 2 0 0 2 0 6499.938 2
0 4 0 0 4 0 6499.412 4
0 2 0 0 2 0 6497.989 2
0 4 0 0 4 0 6497.987 4
214.2038 1 214.2038 0.214204 1 0.214204 6499.624 1
214.2038 0.214204
STA. 9 STA. 9
mm ordinates S.M Meters
0 0 1 0
10607.49 2.651873 4 10.60749
6262.02 3.13101 2 6.26202
13827.38 3.456845 4 13.82738
7365.392 3.682696 2 7.365392
15375.56 3.843891 4 15.37556
7953.448 3.976724 2 7.953448
16509.71 4.127428 4 16.50971
4306.35 4.30635 1 4.30635
82207.36 82.20736
STA. 9 1/2 STA. 9 1/2
mm ordinates S.M Meters
0 0 1 0
3234.344 0.808586 4 3.234344
1904.314 0.952157 2 1.904314
4937.864 1.234466 4 4.937864
3224.665 1.612333 2 3.224665
8182.73 2.045683 4 8.18273
5120.296 2.560148 2 5.120296
12513.02 3.128254 4 12.51302
3642.802 3.642802 1 3.642802
42760.03 42.76003
STA. AP STA. AP
mm ordinates S.M Meters
0 0 1 0
0 0 4 0
0 0 2 0
0 0 4 0
0 0 2 0
0 0 4 0
1622.962 0.811481 2 1.622962
6631.949 1.657987 4 6.631949
2219.516 2.219516 1 2.219516
10474.43 10.47443
DESIGN SHIP DATA
LENGTH (L) 71.000 m
BREADTH (B) 13.000 m
DRAFT (d) 5.000 m
DEPTH (D) 6.000 m
TON DISPLACEMENT (∆) 3750.000 T
VOLUME DISPLACEMENT (▽) 3658.000 m3
BLOCK COEFFICIENT (CB) 0.770
PRISMATIC COEFFICIENT (CP) 0.770
MIDSHIP COEFFICIENT (CM) 0.991
OTHER DATA
CB = 0.77
FRAME SPACING
Section 7: SIDE FRAMING
REFERENCE: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 7, pg. 85
The standard spacing of frames is to be calculated in accordance with the
following formula (whichever is lesser ):
S = 2L + 480 mm
= 2(71) + 480 mm
= 142.00 + 480 mm
= 622.00 mm
S = 609.6 mm used
SHELL PLATING
Section 3: SHELL PLATING
Bottom Shell and Bilge Strake
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 3, pg. 54
The width b of the keel plate is not to be less than the obtained from
the following formula:
Formula:
b = 900 + 3.5L mm
Solution:
b = 900 + 3.5 * 71 mm
= 900 + 248.5 mm
= 1148.5 mm
= 0.1 * 71 + 5 mm
= 7.1 + 5 mm
= 12.1 mm
In a ship with longitudinal bottom framing, the thickness t of bottom shell plating
within 0.4 L amidship is not to be less than the greater of the following values:
t = 0.1L + 2 mm
= 0.1 * 71 + 2 mm
= 7.1 + 2 mm
= 9.1 mm
(d) The thickness of bottom shell plating ( includine side shell plating ) for 0.075 from
the ends is not to be less than that obtained from the following formula:
(0.05 L + 5) √(�/
t = 600) mm
= 8.55 * 1.00796 mm
= 8.618058 mm
(b) Where the side shell is framed transversely, the thickness t of the side shell
plating within 0.4 L amidships is not to be less than the greatestof the following
values:
t = 0.0833L + 3.5 mm
t = 0.0833 * 71.00 + 3.5 mm
t = 5.9143 + 3.5 mm
t = 9.4143 mm
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 4.02, pg. 59
The sectional area of strenght deck amidships is to meet the requirements for the
midships section modulus of hull and the half sectional area, A, is not to be less than
the obtained from the following formula:
2.) For ships between 50 and 90 m in length, the sectional area is not to be
less than:
- for ships having one continuos deck: A= a B 〖 _1 〗
- for ships having two continuos deck: A= a B 〖 _2 〗
� = (71/75)
〖 ^(4/3) 〗
= 〖 ^(4/3) 〗
0.9466666667
= 0.9295286506
Z = 10.9994223651 * 6.065
= 66.7114966442
�/�
〖 A_0 〗 = L*
13/71
= 71*
= 13
�/ = 6/(13+0.2∗13/8.6181)
(�+0.2
�𝑜/𝑡𝑜)
= 0.301332
� �
( =0.54, =0.96)
13/13
〖 a_1 〗 = ( �* Z - B( 8.6181+0.2* )
13/13
= 36.0242 - 13* ( 8.6181+0.2 * )
= 36.0242 - 114.59964
= -78.575441
4.) The thickness t of strength deck plating amidship outside the, line opening is
in additional to the compliance of the above requirements of section muddles,
not to be less than that obtained from the following formula:
t = 0.05L + 5 mm
= (0.05*71) + 5
= 3.55 + 5
= 8.55 mm
USE 9.525 mm THICK PLATE
Where: Where the deck is framed eithere longitudinally or transversely, the thickness t of
strength deck plate inside the line of openings or for 0.1L from the ends is not to be
less than that obtained from the following formula:
t = 0.025L + 5.5 mm
= (0.025*71) + 5.5
= 1.775 + 5.5
= 7.275 mm
Lower Decks
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 4.05, pg. 65
(a) The thickness of lower deck plating.
The thickness t of second deck plating outside line of openings and
within 0.4L amidships is not to be less than:
t = 0.025L + 5.5 mm
= (0.025*71) + 5.5
= 1.775 + 5.5
= 7.275 mm
The thickness t of second deck plating inside line of openings and for 0.1L
at ends is not to be less than:
t = 0.02L + 5 mm
= (0.02*71) + 5
= 1.42 + 5
= 6.42 mm
t = 0.022L + 5 mm
= (0.022*71) + 5
= 1.562 + 5
= 6.562 mm
The thickness t of third deck plating inside line of openings and for 0.1L
at ends is not to be less than:
t = 0.02L + 5 mm
= (0.02*71) + 5
= 1.42 + 5
= 6.42 mm
t = 0.02L + 5 mm
= (0.02*71) + 5
= 1.42 + 5
= 6.42 mm
USE 7.9375 mm THICK PLATE
DOUBLE BOTTOM
Section 6: DOUBLE BOTTOMS
Center Girder
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 6.08, pg. 74
Duct Keels
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 6.13, pg. 75
(a) Where transverse framing is adopted in the double bottom, ring system
framing or bottom and inner bottom supporting members are fitted in the duct keel
at every frame, and the section modulus W of these framing members is not to be
less than that obtained from the following formula:
W = 22 s d〖ɭ ^2 〗 cm^3 〗
〖
W = 22 s d〖ɭ ^2 〗 cm^3 〗
〖
= 22 * 0.6096 * 5 * 0.76〖 ^2 〗
= 38.7315456〖 cm^3 〗
The thickness t of plate floors in cargo holds or engine rooms is not to be less than
that obtained from the following formula:
t = 0.03 L + 5 s + 2.6 mm
= 7.778 mm
USE 7.9375 mm THICK PLATE
Where the depth of watertight floors is greater than 0.9 m, they are to be fitted with
vertical stiffeners spaced not more than 0.9 m apart, and the thickness of the
stiffeners is to be the same as that of floors.
Bracket Floors
REF: PRS Rules for the construction and classfication of steel vessels 2017, Chapter E, Section 6.22, pg. 78
The bottom frames of bracket floors are to have a section modulus W not to be less than
that obtained from the following formula:
W = (15 - 2.5〖ɭ _1 d〖
) s〗ɭ ^2 〗
t = (0.055*71) + 5.8
= 3.905+5.8
= 9.705
The section modulus W of bottom longitudinal is not to be than that obtained from
the following formula:
W = 11.5 C s d〖
ɭ ^2 〗 〖
cm^3 〗
= 11.5*0.52*0.6096*5*0.76〖 ^2 〗 〖
cm^3 〗
= 10.527 〖
cm^3 〗
W = CC _1
〖 〖〗 ^2 〗
sdɭ cm^3 〗
〖
〖 _1 〗
where:
s - frame spacing, in m.
d - draf, in m.
l - span of frames, in m.
C1 - coefficient, to be equal to 1.08 - 0.01 D; when C 1 exceeds
it is to be taken as 1.
D - molded depth, in m.
C - coefficient, to be equal to:
where:
s - frame spacing, in m,
d - draf, in m,
l - span of frame, i.e. height of tween deck space measured at side,
in m, which is not to be taken as less than 2.6; and for
superstructures, <2.3m,
D - molded decpth, in m,
C - coefficient, to be equal to 0.7 + 4 (d/D), nut this value is not to be
taken as less than 3.3,
C1 - coefficient, to be determined in accordance with TABLE E 7.07.
Local Strengthening
W' = 0.2 n C W
W' = 0.2 1 8.4 58.83
W' = 98.8344 cm3
where:
n - number of frame spaces between web frames,
W - section modulus of main frames in the engine room, to be calculated in accordance with 7.03,
C - coefficient, obtained from TABLE 7.08 in accordance with the section modulus of main frames.
( a ) The calculated water head of the weather strength deck is not to bbe less than
that obtained from the following formula:
where:
L - Length of ship, in m,
When L < 30 m, it is to be taken as 30 m, when L > 140 m,
it is to be taken as 140 m.
d/Ds - The ratio of draf to the calculated molded depth,
When d/Ds < 0.7, it is to be taken as 0.7
Deck Beams
for the first tier superstructure or deckhouse deck above the strength deck, .
W = C s h �
W = 6.67 0.76 0.76 3.0487805 ^ 2
W = 35.8100833 cm 3
where:
s - beam spacing, in m,
h - water head, in m, to be taken in accordance with 8.01
l - span of beam, in m, i.e. the distance between deck girders or between the deck girder and the hatch
side girder, or the distance between the hatch side girder or the deck girder and the midpoint
of the horizontal arm of the beam knee. But value l is not to be less than 0.2B
C - Coefficients:
C = 15.8 - 27.2 (l/B) for strength deck, but not less than 6.67
C = 6.67 for the first tier superstructure or deckhouse deck above the strength deck,
C = 5.5 for the second tier and higher tiers above the strength deck,
C = 6.67 , for other decks.
Deck Girders
for strength deck, superstructure decks and top of deckhouses,
W = C b h �
W = 5.862 13 0.76 1.83 ^ 2
W = 193.956768 cm 3
where:
b - mean width, in m, of deck supported by the girder,
h - water head, in m, as given in 8.01,
l - span of girder, in m, i.e. the distance between centers of pillars or
between bulkheads, or between the pillar and the bulkhead,
C - Coefficients:
C = 7.14 - 0.018 L (but 4.6 ≤ C ≤ 6.6), for strength decks,
superstructure decks and top of the deckhouses,
C = 6.2, for other decks.
The section modulus W of tweendeck longitudinal is not to be less than that obtained from the
following formula:
�
W = C s h �
W = 18.482 0.59 1.1345333 2 ^ 2
W = 49.4855304 cm3
where:
s - spacing of longitudinal, in m,
h - water head, in m,
l - span go longitudinals m but is not to be less than 2m,
C - Coefficients.
C = k L + b
C = 0.042 71 + 15.5
C = 18.482
where:
L - length of ship in m (when L > 180m, it is to be taken as 180 m),
k, b - to be determined by TABLE 8.19
Deck Transverses
The section modulus W of strength deck or tween deck transverse is not to be less
than that obtained from the following formula:
W = 7 S h �
W = 7 0.76 0.76 1.83 ^ 2
W = 13.5402725 cm3
where:
S - spacing of transverse in m but is not to be greater than 3.5
h - water head in m to be determined in accordance with 8.01 of this Section.
l - span of deck transvere in m, i.e. the distance from the midpoint of the horizontal
arm of the deck transverse bracket of the hatch side girder.
Built- up Pillars
A = P
1.455 - 0.008l/r
Plate Thickness of Centerline Longitudinal Bulkheads
l = 〖
3 Pl^2 〗
t = 3.2 s √ℎ + 2.3 mm
W = Cshl
〖 ^2 〗 〖cm
^3 〗
= 2.5 * 0.76 * 2 * 2 〗
〖 ^2
= 15.2 〖cm
^3 〗
W = 〖Cshl
^2 〗 〖cm^3 〗
= 3.3 * 0.76 * 2 * 2 〗
〖 ^2
= 20.064 〖 cm
^3 〗
W = 〖Cshl
^2 〗 〖cm
^3 〗
= 4.2 * 0.76 * 2 * 2 〗
〖 ^2
= 25.536 〖cm^3 〗
W = Cshl
〖 ^2 〗 〖cm
^3 〗
= 5.3 * 0.76 * 2 * 2 〗
〖 ^2
〖 ^3 〗
= 32.224 〖cm
^3 〗
Beams of Decks
W = 〖 ^2 〗
4.2shl 〖cm
^3 〗
= 4.2 * 0.76 * 2 * 2 〗
〖 ^2
= 25.536 〖cm
^3 〗
t = 3.4 s √ℎ
+3 mm
12.08
W = Cshl
〖 ^2 〗 〖cm
^3 〗
= 5.5 * 0.76 * 0.76 * 1.83
〖 ^2 〗
〖 ^3 〗
= 10.6387855 〖cm
^3 〗
W = 〖Cshl
^2 〗 〖cm
^3 〗
= 7.2 * 0.76 * 0.76 * 1.83
〖 ^2 〗
= 13.9271374 〖cm^3 〗
W = 〖Cshl
^2 〗 〖cm
^3 〗
= 8.4 * 0.76 * 0.76 * 1.83
〖 ^2 〗
= 16.248327 〖cm^3 〗
12.09
W = 5.5bhl
〖 ^2 〗 〖cm
^3 〗
= 5.5 * 0.76 * 0.76 * 1.83
〖 ^2 〗
= 10.6387855 〖cm^3 〗
12.13
W = 9.24shl
〖 ^2 〗 〖cm
^3 〗
= 9.24 * 0.76 * 0.76 * 0.76
〖 ^2 〗
= 3.08266506 〖cm^3 〗
SECTION 13: STEMS, STERNFRAMES, BULBOUS BOWS AND PROPELLER SHAFT BRACKETS
13.01
A = 1.2L
= 1.2 * 71 〖cm
^2 〗
〖 ^2 〗
= 85.2 〖cm
^2 〗
13.02
t = 0.1L + 5
= 0.1 * 71 + 5
= 12.1 mm
t = 2.3 √� + 3
= 2.3 * √71 + 3
= 22.3798 mm
A = 41√�
= 41 * √71
= 345.466 mm
t 〗
〖 _1 = 3 √�
= 3 * √71
= 25.278 mm
√�
t 〗
〖 _1 = 4 √�
= 4 * √71
= 33.704 mm
R = 0.4L + 16
= 0.4 * 71 + 16
= 44.4 mm
13.10
b = 33√�
= 33 * √71
= 278.058 mm
t 〗
〖 _1 = 3.3√�
= 3.3 * √71
= 27.8058 mm
t 〗
〖 _2 = 3.7√�
= 3.7 * √71
= 31.1762 mm
t 〗
〖 _3 = 4.5√�
= 4.5 * √71
= 37.917 mm
R = 0.4L + 16
= 0.4 * 71 + 16
= 44.4 mm
A = 0.45
〖 d^2 〗 mm
〖 ^2 〗
= 0.45 * 5 〗
〖 ^2
= 11.25 mm
〖 ^2 〗
t = 0.33d mm
= 0.33 * 5
= 1.65 mm
l = 3d mm
= 3 * 5
= 15 mm
a = 0.20
〖 d^2 〗 mm
〖 ^2 〗
= 0.2 * 5 〗
〖 ^2
= 5 mm
〖 ^2 〗
SECTION 14: STRENGTHENING AT ENDS OF SHIP
Fore Peak Strengthening
14.01
t = 0.04 L + 6 mm
= 0.04 * 71 + 6
= 8.84 mm
14.03
A = 0.27 L + 8 mm
= 0.27 * 71 + 8
= 27.17 mm
14.04
b = 5.6 L + 190 mm
= 5.6 * 71 + 190
= 587.6 mm
t = 0.023 L + 6 mm
= 0.023 * 71 + 6
= 7.633 mm
USE 7.9375 mm THICK PLATE
14.05
t = 0.023 L + 5 mm
= 0.023 * 71 + 5
= 6.633 mm
A = 0.13 L + 4 〖cm^2 〗
= 0.13 * 71 + 4
= 13.23 〖cm^2 〗
16.05 (a)
t = K(0.05 L + 4.5) mm
= 1 ( 0.05 * 71 + 4.5 )
= 8.05 mm
(b)
t = K(0.050 L + 3) mm
= 1 ( 0.05 * 71 + 3 )
= 6.55 mm
(c)
t = K(0.035 L + 3.5) mm
= 1 ( 0.035 * 71 + 3.5 )
= 5.985 mm
16.06
W = 5.4 s〖h ^2
ɭ 〗 〖cm^3 〗
= 5.4 * 0.76 * 0.76 * 2.3^2 〗
〖
= 16.4997216
〖 ^2 〗 〖cm^3 〗
17.02
t = 0.025 L +3.5 mm
= 0.025 * 71 + 3.5
= 5.275 mm