Department of Environment and Natural Resources Environmental Management Bureau
Department of Environment and Natural Resources Environmental Management Bureau
Department of Environment and Natural Resources Environmental Management Bureau
e-mail address
Name. ___
Pollution Control
Tel #: Fax #: ___
Officer
e-mail address: ___
We hereby certify that the above information are true and correct.
VICENTE B. CUYOP
Name/Signature of CEO/President Name/Signature of PCO
Name of Plant:
Reference No:
___________________________________
DENR Permits/Licenses/Clearances
Environmental
Permits Date of Issue Expiry Date
Laws
RA 9275 DP No.
ECC 3
DENR
Registry ID
CCO Registry
RA 6969 Importer
Clearance No
Permit to
Transport
A/C No.
RA 8749
PO No.
Operation
Operating hours/day Operating days/week # of shift/day
Average 9 hrs 63 Hrs 2 shift
Maximum 12 hrs 84 Hrs
Operation/Production/Capacity:
Average Daily
Total Output this Quarter
Production Output
Total Water Consumption Total Electric
this Quarter (cubic Consumption this Quarter
meters) (KwH)
Please use additional sheet/s if necessary
MODULE 2: RA 6969
For producers
Average Daily
Total Output this Quarter
Production Output
Quantity of Stock Quantity of Stock
Inventory (Start of Inventory (End of
Quarter) Quarter)
Name of Buyer Quantity Date of Purchase
Other Information:
Manner of handling storage on-site Treatment on-site
hazardous wastes storage off-site Treatment off-site
Chemical Substitute Yes (please attach copy if not submitted/included in previous report/s or had been revised)
Plan No
HW Generation:
Remaining HW from
HW HW Generated
HW No. HW Class HW Nature Previous Report
Cataloguing
Quantity Unit Quantity Unit
Waste Storage, Treatment and Disposal:(Please fill-up one table per HW)
HW No,: ___
HW Details Qty of HW Treated: Unit: ___
TSD Location: ___
Name: ___
Storage
Method: ___
HW No,: ___
HW Details Qty of HW Treated: Unit: ___
TSD Location: ___
Name: ___
Storage
Method: ___
New/Additional
Investments in WTP
(Description)
Cost of New/Add
Investments
Summary of APSE/APCF
Process Equipment Location # of hrs of operations
1.
2.
3.
4.
Fuel Burning Quantity # of hrs of
Location Fuel Used
Equipment Consumed operations
1.
2.
3.
4.
5.
6.
Pollution Control Facility Location # of hrs of operations
1.
2.
3.
4.
Cost of Treatment
Month 1 Month 2 Month 3
Cost of Person employed,
(salary)
Total Consumption of
Water (cubic meters)
Total Cost of chemicals
used (e.g., activated
carbon, KMnO4)
Total Consumption of
Electricity (KwH)
Administrative and
Overhead Costs
Cost of operating in-
house laboratory, if any
Improvement or
modification, if any.
(Description)
Cost of improvement of
modification
MODULE 6: OTHERS
Personnel/Staff Training
# of Personnel
Date Conducted Course/Training Description
Trained
I hereby certify that the above information are true and correct.
Name/Signature of PCO
VICENTE B. CUYOP
Name/Signature of CEO
SUBSCRIBED AND SWORN before me, a Notary Public, this ________ day of
______________________, affiants exhibiting to me their Community Tax Receipts:
Survey Change of land Limit the area to be Project Cost based Cost integrated in
revealed that some use affected by the proponent on the project
portion of the project is construction of assessment
classified as forest land facilities/ planting more of DENR-
based on its slope trees under the NGP CENRO for
category. Program SLUP
Conduct geological
Siting of infrastructure assessment through the
Can cause loss Proponent, Cost integrated in
within hazard prone MGB and validate on
of lives / MGB, the project
area site to best suited
properties Contractors,
project location to get
Design
rid of hazard prone
Engineers, LGU
area
Diffun
Develop a detailed
engineering design
which is most
appropriate for the
project site
The Water
Decrease serviceability Educate the workers to Proponent; Cost integrated in
of spring water due to adopt and implement Contractor; the project
utilization during proper utilization and Environmental
construction of facilities recycling of water Unit
and road network Provision of water tank
to collect water
Provide water for
adjacent community
who are presently
drawing water from the
same source
Plant and maintain tree
species that can hold
supply of water
during rainy season
Biological
Environment
1. Terrestrial Flora
and Fauna
Vegetation clearing Disturbance/ Recompense for loss of Proponent Cost integrated in
clearing of vegetation in the area Environmental the project
Impact of vegetation natural through reforestation Unit /
removal on water vegetation program. Contractor’s
resources Altered natural Minimize disturbance Supervising
environment of habitat of wildlife Officer
Greening Program
Proper maintenance of
Increase Proponent/
the facility
concentration Contractor
of pollutant gas
from stationary
generators
Cost integrated in
Plant and maintain tree -do-
the project
species that can hold
supply of water during
rainy season
Increase
Install signage in
economic
Revenue generation -do- coordination of
activity on site
the LGU’s
Increase
Residual and MOA with LGU
generation of Implement a proper -do-
Unavoidable Impacts solid waste waste management
and disposal in the
project area (Provide
With budget for
MRF, segregation bins,
-do- regular
no burning of waste)
maintenance
ESWM Plan to be -do-
Introduction of
approved by LGU
disease carrying
concerned
vectors due to
poor
Proper & Regular
maintenance of
maintenance/
swimming
sanitation of pools
pools
3.0 The Air
Dust pollution Install signage in
Air Pollution due to traffic coordination of
volume the LGU’s
Pollution from
Maintenance of road
networks
Maintenance of vehicle
Increase noise
Noise
level in the area
Regulate blowing of
due to increase
horn/acceleration of
of activity/
vehicles within the
passage of
populated community
working vehicle
With barangay /
Increase
municipal ordinance on
nuisance due to
nuisance
presence of
recreation
facilities
Prepared by:
VICENTE B. CUYOP
Proponent