Tromp Curve Example PDF
Tromp Curve Example PDF
Tromp Curve Example PDF
These laboratory results are the percentage of passing cumulated of hydrocyclone feed,
overflow (product) and underflow (rejects).
We observe that the efficiency is decreasing with higher sieves, it is absolutely normal.
According
Vfaverage = 1/4,037 = 0,247709
Vr = 1-0,247709 = 0,752291
and:
Now, for each value of T, we have to calculate the average size of the fraction size.
It means, for example, we choose (0+38)/2 = 19µ for the 0-38µ fraction
size.
We will have:
0µ-38µ (0 + 38)/2= 19 µ
38µ-53µ (38+53)/2= 45,5 µ
53µ-106µ (53+106)/2= 79,5 µ
106µ-150µ (106+150)/2= 128 µ
150µ-212µ (150+212)/2= 181 µ
212µ-300µ (212+300)/2= 256 µ
The next step is to plot the chart with the dimension (µ) in x-axis
and the T values in y-axis,
like that:
Dimension Tromp
19 38,19
45,5 41,35
79,5 45,94
128 57,95
181 68,67
256 77,61
Tromp
Dimension µ Tromp % reduced %
19 38,19 0
45,5 41,35 5,11
79,5 45,94 12,54
128 57,95 31,97
181 68,67 49,31
256 77,61 63,78
hydrocyclone
evaluation
Cut size
(D50%): 100µ this is a good estimation
D limit: < 20µ this is a rough estimation
by-pass: > 30% this is a rough estimation
Imperfection:
with the
formula:
In conclusion, this hydrocyclone has a abominable imperfection, a poor efficiency and a high by-pass.
www.themininggrindingoffice.com
All rights reserved © 2012-2014 The Mining Grinding Office
All rights reserved © 2012-2014 The Mining Grinding Office Go back to the top
http://www.thecementgrindingoffice.com/mining/expltrompminexample.html 3/3