Project Name Project No.: OOOO: Installation of Lighting Fixture, Switch and Outlet

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

Project Name

Project No. : OOOO


INSTALLATION OF LIGHTING FIXTURE, SWITCH AND OUTLET
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

ITEM / TAG NO. TYPE

RESULT
NO. INSPECTION
ACCEPT REJECT N/A.

1 No damage has been found to devices/fixtures/switches

2 Correct type / size / identification as per drawings

3 Identification / name plate attached correctly

4 Lighting pole and support as per drawings

5 Welding (if required) and touch up

6 Anchor bolting / Bolt tightening

7 Mounting height / orientation / direction as per drawings

8 Accessibility

9 Assembling compartments properly installed

10 Check on missing or loose part of lighting accessory properly

11 Earthing and bonding properly installed

12 Cleanliness

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE


SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE

EL-009-F01
Project Name
Project No. : OOOO
LIGHTING / RECEPTACLE PANEL INSTALLATION
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

ITEM / TAG NO. TYPE

RESULT
NO. INSPECTION
ACCEPT REJECT N/A.

1 No damage has been found to equipment / component

2 Correct type / size as per drawings

3 Equipment foundation / supports are completed

4 Correct level / alignment / orientation as per drawings

5 Identification / name plate - correct and properly attached

6 Welding (if required) and touch up

7 Anchor bolting / Bolt correctly lttightened

8 Door locks operation / opening

9 Assembling compartments properly installed

10
Check on missing or loose part of lighting accessory
properly

11 Earthing and bonding properly installed

12 Adequate protection of equipment and cleanliness

REMARK:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE


DATE DATE DATE
Project Name
Project No. : OOOO
LIGHTING CABLES INSTALLATION
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

Result
No. Area to be inspected Remarks
Accept Reject

1 Correct cable type/size/ installed as per approved drawing

2 No damage of cable has found and maintain insulation resistance

3 Cable route to the designated location and correctly identified

4 Cable installed with sufficient separation and layer

5 Cable installed with sufficient bending radius

6 Cable pulling tension and use proper pulling tools

7 Cable tie, markers, clamps installed properly as per specification

8 Cable Numbering System & Labeling

9 Cable support on raceway installed properly

10 Proper arrangement, dressing of cables, carry out megger test

11 Cable shall be fixed by means of fixing and supporting material

12 Cable protection and sealing

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE


DATE DATE DATE
CABLES INSTALLATION
SHEET NO

AREA DESCRIPTION

SUBCONTRACTOR/SUPPLIER

Remarks

COMPANY
NAME

SIGNATURE

DATE
DATE
DONG GWANG BUSINESS
PARK PROJECT
INSTALLATION OF LIGHTING FIXTURE, SWITCH AND OUTLET
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ITEM / TAG NO. TYPE

RESULT
NO. INSPECTION
ACCEPT REJECT N/A.

1 No damage has been found to devices/fixtures/switches

2 Correct type / size / identification as per drawings

3 Identification / name plate attached correctly

4 Lighting pole and support as per drawings

5 Welding (if required) and touch up

6 Anchor bolting / Bolt tightening

7 Mounting height / orientation / direction as per drawings

8 Accessibility

9 Assembling compartments properly installed

10 Check on missing or loose part of lighting accessory properly

11 Earthing and bonding properly installed

12 Cleanliness

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE


DONG GWANG BUSINESS
PARK PROJECT
LIGHTING CABLES INSTALLATION
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

Result
No. Area to be inspected Remarks
Accept Reject

1 Correct cable type/size/ installed as per approved drawing

2 No damage of cable has found and maintain insulation resistance

3 Cable route to the designated location and correctly identified

4 Cable installed with sufficient separation and layer

5 Cable installed with sufficient bending radius

6 Cable pulling tension and use proper pulling tools

7 Cable tie, markers, clamps installed properly as per specification

8 Cable Numbering System & Labeling

9 Cable support on raceway installed properly

10 Proper arrangement, dressing of cables, carry out megger test

11 Cable shall be fixed by means of fixing and supporting material

12 Cable protection and sealing

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE