Ali Rekso Tinamtu
Ali Rekso Tinamtu
Ali Rekso Tinamtu
Personal Data
2004 - 2008 : Faculty of Civil Engineering and Planning, Major Civil Engineering
by National Acreditation is A – Universitas Islam Indonesia,
Yogyakarta (www.civil.uii.ac.id)
• Bachelor Degree with overall GPA 3.42 scale 4
• Thesis : Design Cable Stayed Bridge of Kali Krasak Span 220 m
1
Contract base (start on third semester when my status was student in university and finished
after graduated)
Training
February 2008 : Training Professional ESQ 165 Leadership Center (Emotional and
Spiritual Quetiont)
March 2006 : Gama Informatika: Computer program AutoCad
March 2006 : SIPTRANS : Training survei and analysis traffic with software MKJI
97 program
May 2006 : Gama Informatika, Computer structural analysis program
ETABS
2006 : Seminar, Risk Management Project, by Post Graduated program
Master of Civil Engineering UII
Key Skills
Organization Experiences
Responsibility
• Development basic design for various onshore facilities
• Calculation Man Hour Requirements for Engineering Work
• Coordination and checking up with ME department
2. Tanjung Jati ‘B’ Coal-Fired Power Station Units 3&4 2x660 MW (NET)
Responsibility
• Perform full concrete design for various structure member and structural modifications.
Perform technical reviews to ensure designs conformance to client’s specifications.
• Perform full steel structure for various member and profile, splice joint design, base plat,
anchor bolt etc.
• Preparing for designers in the preparation of design drawings for construction execution.
Profesioanal Experiences on PT Wiratman & Associates (www.wiratman.co.id)
1. Basic Design of HSFO and HSD Jetty 35.000 DWT, PT. International Nickel
Indonesia (PT INCO Tbk) Soroako South Sulawesi
Responsibility
• Perform full conceptual breasting dolphin, Jetty an treastle design for various piping
modifications
• Perform technical reviews to ensure designs conformance to client’s specifications
• Perform environmental loading structural analysis including extreme wind, sea current and
sea wave
• Calculation Bill of Quantity for steel pile foundation in offshore are
2. Pre Feasibilty Study Jembatan Selat Sunda, joint consortium PT. Wiratman
& Artha Graha Network
Responsibility
• Make presentation for Ministry Government of Public Work (DPU) and Trans 7 television
station
• Preparing secondary data for pre design (design of trace, dimension, model and layout of
bridge)
• Make schedule for various item of work
• Discuss this project with consortium about costly and land use area of bridge
Responsibility
• Design review and/or planning of construction systems like: Piling works, Pile caps and
foundation, Steel and Concrete Structures
• Coordination with the Designer for the essential design as per Client Specification
• Preparing for designers in the preparation of design drawings for offshore and onshore
facilities
Basic Responsibility
• Mostly 2D drawings of general arrangement and Isometric drawings using AutoCAD 2004 LT
• Checking designers drawing’s, bulk material, take off list, weight control and center of gravity
calculations