ACBIL (INDIA) LTD.

2X30MW POWER PLANT CHAKABURA


UNIT-1 BOILER MOTORS MAINTENANCE CHECK LIST

Foundation & coupling


Earth Resistance <0.5
Earthing connection &

Physical Inspection of
Cooling fan condition

tightness & (Motor &


Measuring Vibration
(mm/sec.) Trial Run

Terminal checking ,
Greasing (Running

Current (CM)Amps

Terminal & cable


Check Sealing of
Space Heater
Hr>2000Hr)

Checking

Feeder)
NL/FL

gland
bolt
Drive Name/Rating Date Remarks


Schedule MONTHLY WEEKLY / FORTNIGHTLY

BFP-1 (660KW/40A)
BFP-2 (660KW/40A)
FD FAN-1 (355KW/585A)
FD FAN-2 (315KW/530A)
PA FAN-1 (132KW/210A)
PA FAN-2 (160KW/267A)
ID FAN-1 (110KW/188A)
ID FAN-2 (110KW/188A)
ACW-1 (75KW/133A)
ACW-2 (75KW/133A)
ACW-3(18.5KW/30A)
ACW-4 (18.5KW/30A)
DCF -1 (2.2KW / 4.4A)
DCF -2 (2.2KW / 4.4A)
DCF -3 (2.2KW / 4.4A)
DCF -4 (2.2KW / 4.4A)
DCF -5 (2.2KW / 4.4A)
DCF -6 (2.2KW / 4.4A)
DCF -7 (2.2KW / 4.4A)
DCF -8 (2.2KW / 4.4A)
Dea. M/UP-1(7.5KW/15A)
Dea. M/UP-2(7.5KW/15A)

SIG. TECHNICIAN SIG. MAINT. I/C


ACBIL (INDIA) LTD. 2X30MW POWER PLANT CHAKABURA
UNIT-1 TG & COOLING TOWER MOTORS MAINTENANCE CHECK LIST

Foundation & coupling


Earth Resistance <0.5
Earthing connection &

Physical Inspection of
Cooling fan condition

tightness & (Motor &


Measuring Vibration
(mm/sec.) Trial Run

Terminal checking ,
Greasing (Running

Current (CM)Amps

Terminal & cable


Check Sealing of
Space Heater
Hr>2000Hr)

Checking

Feeder)
NL/FL

gland
bolt
Drive Name/Rating Date Remarks


Schedule MONTHLY WEEKLY / FORTNIGHTLY

CEP-1 (55KW/95.6A)
CEP-2 (55KW/95.6A)
Barring Gear (37.5KW/)
JOP AC
JOP DC (5.5KW/)
EOP DC (5.5KW/)
OVEF(1.5KW/1.14)
COP-1 (5.5KW/6.8A)
CT FAN-1 (55KW/96A)
CT FAN-2 (55KW/96A)
CT FAN-3 (55KW/96A)
CT FAN-4 (55KW/96A)
CWP-1 (250KW/432A)
CWP-2 (250KW/432A)
CWP-3 (250KW/432A)
CT M/UP-1 (15KW/21A)
CT M/UP-2 (15KW/21A)

S.W.P-1(30KW/54A)
S.W.P-2(30KW/54A)
S.W.P-3(30KW/54A)

SIG. TECHNICIAN SIG. MAINT. I/C


ACBIL (INDIA) LTD. 2X30MW POWER PLANT CHAKABURA
UNIT-1 CHP & AHP MOTORS MAINTENANCE CHECK LIST

Foundation & coupling


Earth Resistance <0.5
Earthing connection &

Physical Inspection of
Cooling fan condition

tightness & (Motor &


Measuring Vibration
(mm/sec.) Trial Run

Terminal checking ,
Greasing (Running

Current (CM)Amps

Terminal & cable


Check Sealing of
Space Heater
Hr>2000Hr)

Checking

Feeder)
NL/FL

gland
bolt
Drive Name/Rating Date Remarks


Schedule MONTHLY WEEKLY / FORTNIGHTLY

BC-3 (30KW/53A)

BC-4(11KW/21A)

BC-5 (3.7KW/7.5A)

BC-6 (18.5KW/33A))

BC-7 (3.7KW/7.6A))

R.G. (37.5KW/66A)

F.F. SCREEN (22KW/40A)

MAG. SEP.(3.7KW/7.5A)

V.F.-1 (0.75KW/1.85A)

V.F.-2 (0.75KW/1.85A)

Unloading Sprout

Unloading Sprout

RVF-1 (2.2KW/4.8A)

RVF-2 (2.2KW/4.8A)

RVF-3 (2.2KW/4.8A)
ASH CONDITIONER-1(11KW/18.5A)
ASH CONDITIONER-2(11KW/18.5A)

SIG. TECHNICIAN SIG. MAINT. I/C


ACBIL (INDIA) LTD. 2X30MW POWER PLANT CHAKABURA
UNIT-1 DMP MOTORS MAINTENANCE CHECK LIST

Foundation & coupling


Earth Resistance <0.5
Earthing connection &

Physical Inspection of
Cooling fan condition

tightness & (Motor &


Measuring Vibration
(mm/sec.) Trial Run

Terminal checking ,
Greasing (Running

Current (CM)Amps

Terminal & cable


Check Sealing of
Space Heater
Hr>2000Hr)

Checking

Feeder)
NL/FL

gland
bolt
Drive Name/Rating Date Remarks


Schedule MONTHLY WEEKLY / FORTNIGHTLY

Boiler Fill Pump-1(22KW/37.5A)


Boiler Fill Pump-2(22KW/37.5A)
M.B. Regn. Pump-1(1.5KW/3.1A)
M.B. Regn. Pump-2(1.5KW/3.1A)
Neturilized pump Motor A(2.2KW/4.6A)
Neturilized pump Motor B(2.2KW/4.6A)
M.B. AlkaliPre P/P A(2.2KW/4.6A)
M.B. AlkaliPre P/P B(2.2KW/4.6A)
Dearetor Pump Motor A(3.7KW/7.6A)
Dearetor Pump Motor B(3.7KW/7.6A)
M.B. Feed Pump Motor A(3.7KW/7.6A)
M.B. Feed Pump Motor B(3.7KW/7.6A)
AIR Blower A(1.1KW/1.8A)
AiR Blower B(1.1KW/1.8A)
A.C.F. pump Motor A(3.7KW/7.6A)
A.F.C.pump Motor(3.7KW/7.6A)
M.B. Air Blower A(1.5KW/3.75A)
M.B. Air Blower B(1.5KW/3.75A)
Chemical Cleaning Tank A(2.2KW/4.6A)
Chemical Cleaning Tank B(2.2KW/4.6A)
C.M.F. Air Blower A(3.7KW/7.6A)
C.M.F Air Blower B(3.7KW/7.6A)
Filter Back Wash A(3.7KW/7.6A)
Filter Back Wash B(3.7KW/7.6A)
Acid Unloading Motor A(3.7KW/7.6A)
Acid Unloading Motor B(3.7KW/7.6A)
R.O.Pump MOTOR(11KW/18.4A)
SIG. TECHNICIAN SIG. MAINT. I/C
ACBIL (INDIA) LTD. 2X30MW POWER PLANT CHAKABURA
UNIT-1 PT PLANT & JACKWELL MOTORS MAINTENANCE CHECK LIST

Foundation & coupling


Earth Resistance <0.5
Earthing connection &

Physical Inspection of
Cooling fan condition

tightness & (Motor &


Measuring Vibration
(mm/sec.) Trial Run

Terminal checking ,
Greasing (Running

Current (CM)Amps

Terminal & cable


Check Sealing of
Space Heater
Hr>2000Hr)

Checking

Feeder)
NL/FL

gland
bolt
Drive Name/Rating Date Remarks


Schedule MONTHLY WEEKLY / FORTNIGHTLY

RGF BACK WASH PUMP -A(37.5KW/65A)

RGF BACK WASH PUMP-B(37.5KW/65A)

CMF FEED PUMP-A(3.7KW/7.6A)

CMF FEED PUMP-B(3.7KW/7.6A)

RGF AIR BLOWER -A(15KW/27.1A)

RGF AIR BLOWER -B(15KW/27.1A)

CLARIFIERPROPELLER(2.2KW/4.6A)

Jack Well Pump-1 (22KW/45A)

Jack Well Pump-2(22KW/45A)

Jack Well Pump-3(22KW/45A)

SIG. TECHNICIAN SIG. MAINT. I/C