JS1020 X P07 1501
JS1020 X P07 1501
JS1020 X P07 1501
'7 "
APPROVAL OF VEHUOR DOCUM E NT~ BY CCHJ
DOES UOT RELlF VE VEHO OR., fRO f~ ,.t';~
RESPOtiSIBILiliES Of THE PURCdfl$[ vrd)d,
.ll / ~'
I A1 Mar, 25, 2014 I ISSUED FOR APPROVAL ~ ~~SM [ 1 ~KK I IMD I
!: PREPARED
'I CHK'D I APP'D
TRE CCE_D I
REV DATE DESCRIPTION
i BY BY
I
I
I
I
I
APP D I
I
A
TR E JOB NO. J68299
CC ENERGY DEVE L OPMENT S.A.L
(Oman Branch) _,&_)!3~
1!) . ..1
-rt:CN!Cil.S REUNIDAli
Jli~1~:-~~-;;.
I ·;~;;_TfiWIS
~r/''~ .
OTt, TET HYS OIL AB ..d~, r~-~F- -Pl' 1J..E
~ --"' -
~ ;w-;;;~·,,.
-·'..;;;-;;;i7~-
(.ft:t -~. -=r
.:J
TR Engineeri ng LLC
PROJECT
BLOCK 3 & 4 DEVELOPMENT PROJECT (PHASE II)- OMAN
DETAIL ENGINEERING OF 16" PIPELINE AND QAS-CCED FACILITIES
I
TIT LE
I
TECHNICAL SPECIFICATION FOR GLOBE AND CHECK VALVES
I JOB NR.
JS 1 020 _
I
_ _ j __
DOCUMENT NR.
__ J::....:S::....:1c..::.0=20::....:-X
:..:..-..:....
P..:.:
I REV.
07:....-.:..::
15:..:::0.:.
I DATE
1 _ _~......:....: 1 __L
A..:.... I M,il r. 2 5 , 2014
I_ SHEET
1 of 26
SHEET II REVISIONS
I i A1 ! I
1 X i 40 !
2 X i ~-- ~
41 I i
3 X 42
4 X I 43
5 X ! 44 I
6 X I 45 I i
7 X 46
8 X 47
9 X 48
10 IX 49
11 X 50 _l_
--- - ---
12 IX I 51 I I I
I 13 IX 52 I i I
14 X 53 ! l
15 X II 54 I ' : r
i 16 !X I I
i 55 I !
17 ,X j
I 56
;
I ! i
i 18 :x I 57 l i
I
i 19 [X I i 58 I i
20 X ! 59 iI
I 21 ,x I I
60 I
22 X II I 61 I
23 X 62
I 24
+~}- -r--~--
X I I-- -
25 X I
26 X i 65 I
27 I I 66
28 67
29 i 68 I
30 - 69
31 I
70 I
I l
32 I 71 I
I
33 72 I
34 73 -r I
35 I 74 I i I
36 ! 75 I i I II
37 I I 76 I ! !
38 I I
I I i 77 i i !
I I
39 I I 78 I i I I I i
JS1020-X-P07 -1501.Al
PROJECT
CC ENERGY DEVELOPMENT S.A.L
\i}ti a
(OmmlBrancn) 1(1,·~ tstOCF\3-&<1-DEVECOPMEf'J I
~
PROJECT (PHASE II) -OMAN
TETHYS OIL AB ~ ~~3t1~M.~ I
T! CNIUS RfUNIDAS
TR Engineering LLC
DETAIL ENGINEERING OF 16"
PIPELINE AND QAS-CCED
I FACILITIES
JOB NR. I DOCUMENT NR. 1 REV. I DATE I SHEET
I--=:=-:::-
JS_1_0_2_0 _ _ JS1020-X-P07-1501 : A1 I M ar, 25, 2014 3 of 26
TITLE
1
1
1.1 Definitions 7
3.1 General 9
3.7 Steam 11
3.8 Dra in, Vents, Flushing Connections 11
4. VALVES DESIGN 13
4.1 General 13
5. END CONNECTION 15
JS1020-X-P07-1501.A1
~A
PROJ ECT
CC ENERGY DEVELOPMENT S.A.L
(Oman Branch) . ..I!Jr~ BLOCK 3 & 4 DEVELOPMENT
PROJECT (PHASE II)- OMAN
i 41mI .1.B
I
I ~~;>,
:'"TETH~S
.- -\._,,.;1 •
OJJ.. TETHYS OIL AB ,.~M E Pl\U~
v i>··=U'i'"i.~
TECN ICAS Rl'UN!DAS
TR Enginocring LLC
DETAIL ENG INEERING OF 16"
PIPELINE AND QAS-CCED
FACILITIES
I JOB NR. I DOCUMENT NR. I REV. I DATE SHEET
JS1020 JS10 20:X·P07- 1501 A1 Mar, 25, 2014 I 4 of26
TITLE
6. MATERIAL 16
6.2 Bolting 17
7. IMPACT TESTING 18
7.1 Ge nera l 18
8. WELDING 18
8.1 Gene r al 18
10.1 General 22
11.1 M arking 23
11.4 Pa inting 23
12.1 General 24
12.2 Preservation 24
------------------rI:
A-. CC ENERGY DEVELOPMENT S.A.L
PROJECT
--~~~~~~~r~an~c~h~)~~~~----wr~n.---torn
orc~K~3n&!.A
4nD~Evv~EL~O~P~M~E~N~Tr-~-----------------t
14.1 Scope 24
14.2 Design 24
JS1020-X-P07-1501.Al
PROJ ECT
CC ENERGY DEVELOPMENT S.A.L
(Omans=ra=
n=c~~~~4---~'"~,-~runac~rK4~V
PROJECT (PHASE II) - OMAN
II ~-;_-.:t:.t:,
~l' ,tr:t:.t~1~ TECN!CM RtVNiDAS i DETAIL ENGINEERING OF 16"
~f?/-lETIIYS CU. TETHYS OIL AB
PIPELINE AND QAS-CCED
TR Engineering LLC
I FACILITIES
I JOB NR. I DOCUMENT NR. DATE I SHEET
JS1020 JS1020-X-P07-1501 Mar, 25, 2014 ! 6 of 26
TITLE
ABBREVIATION
PE Polyethylene
JS 1020-X-P07-1501.A1
A
PROJECT
CC ENERGY DEVELOPMENT S.A.L
(Oman Branch) BLOCK 3 & 4 DEVELOP MENT
I~''"''·
l$j PROJ ECT (PHASE II)- OMAN
~~U\J~~~!#
TETHYS OIL AB 'ITCNICAS RfUNlOI\S DETAIL ENG INEERING OF 16"
~& l'fitH'tSO~!.
'iij:"'l"!' . TR Engi neering LLC PIPELINE AND QAS-CCED
FACILITIES
JOB NR. I DOCUMENT NR. I REV. I DATE SHEET
I
JS1020 JS102 0-X-P07 -1501 I A1 Mar, 25, 2014 I 7 of 26
TITLE
1. INTRODUCTION
This specification defines the minimum requirements for the design, materials,
fabrication, inspection and testing of valves for piping systems designated for
onshore facil itates.
This specification should be read in conjunction with the Piping Material Class
Specifications and Valve Data Sheet specifications.
1.1 Definitions
COMPANY CC Energy Development (CCED)
ENGINEERING CONSULTANT TR Engineering LLC
CONTRACTOR/PURCHASER CCED
MANUFACTURER The party which manufactures the Valves
SUPPLIER/VENDOR The party which manufacture or supplies t he
Valves
PROJECT Block 3 & 4 Development Project (Phase H)-
Oman
Detail Engineering of 16" Pipeline and QAS·
CCED Facilities
SHALL Is understood as mandatory in relation to this
Document
SHOULD Is understood as a strong recommendation to
comply with the requirement of this doc ument
JS1020-X-P07-1501.A1
I
I A • ---~
----------------~f-~--.-
C~C~E~N~EnR~G~
. Y ~D~E~V~
EL~O~P~MwE~N~T~s~.A~
Bran~h-)
(Oman
. L~----~==~--~~~~~~~~~~~r------------------
-- &
PROJECT
BLOCK 3 4 DEVELOPM ENT
i ~ PROJECT (PHAS E II) - OMAN
}_· ~ '"··~.
-.~:
.,~ · . OU.
....TE'ttl'fS TETHYS OIL A B 4> !\{.~._f.~~.~~ lKNlCA.'i rt£UNiti;\S
TR Englnocring LLC
1
J
DETAIL ENGINEERING OF 16"
PIP ELINE AND QAS-CCED
FACI LITIES
J OB NR. DOCUMENT NR. DATE SHEET
JS1020 JS 1020-X-P07-15 01 Ma r, 25, 2014 B of 26
I TITLE
TECHNICAL SPECIFICATION FOR GLOBE AND CHEC K VALVES
I
2.1 Project Documents
JS1020-X-P07 -lSOl.Al
PROJECT
CC ENERGY DEVELO
(Om an Branch ) BLOCK 3 & 4 DEVELOPMENT
PROJECT (PHASE II)- OMAN
I 4!·-(,~.
sP Tk\fiYSOI\. TETHYS OIL AB -:$>· t~~h~~ TF.CNlCI\S R~UN!UAS , DETAIL ENGINEERING OF 16"
1 PIPELINE AND QAS-CCED
I \'t~ . TR Engineering LLc
I FACILITI~Sc.___-r_ _ _--1
JOB NR. DOCUMENT NR. DATE SHEET
I J$1020 JS1020-X-P07-1501 Mar, 25, 2014 9 of 26
T ITLE
JS1020-X-P07 -1501.A1
~
PROJECT
CG.Eli!ERGYDE-VELOE.MEN-"LS.A.
r -.. ..
~
~.;.!~;_ .L
iITECNICAS
toj ~~~UNI!)AS
~ROJ.ECT (PHASE II) - OMAN
Lever operated valves shall be fitted with removable levers which shall fit parallel to
the pipe when the valve is in the open position . Stems with a square top section are
not acceptable. They shall be of th e elongated pattern to prevent mis-orientation.
Levers shall be rigidly constructed from carbon steel and a clockwise motion of the
lever shall close t he valve. Direction of closure shall always be indicated on the
valves .
Gear operated valves shall have full enclosed rigid construction gearboxes that are
capable of withstanding heavy use and are fully protected from an aggressive
atmosphere and permit lubrication and maintenance. Clockwise rotation of the
handwheel shall close the valve. Direction of closure shall be ind icat ed on all valves.
Components manufactured from flake graphite (grey) cast iron or aluminum alloys
are not acceptable (ductile I nodular cast iron is acceptable).
~
300 8" and above 10" and above ! 8" and above
600 6" and above
I
8" and above
I 6" and above i
I
Valves shall be capable of satisfactorily operation with the valve stems in any
position , i.e. vertical, horizontal, or inclined. The CONTRACTOR will define any
valves required to have stems below horizontal. Valves shall be capable of operating
. JS1020-X-P07-1501.Al
I~
PROJECT
CC ENERGY DEVELOPMENT S.A L
~
(Oman Branch) BLOCK 3 & 4 DEVELOPMENT
PROJECT (PHASE II) - OMAN
:.>
t<-7~-:>!-
~~!.~~
TETHYS OIL AB T<CNICJ\S REIJHIOAS DETAIL ENGIN EERING OF 16"
·r_ )Tehtu au..
.if..·. . PIPELINE AND QAS-CCED
TR Engineering LLC
FACI LITIES I
I JOB NR. I DOCUMENT NR. I
I
TIT LE
JS1020 JS1020-X-P07-1501
: REV.
I Al
DATE
Ma r, 25, 2014 l SHEET
11 of 26
I
in both the vertical and horizontal position unless stated otherwise on the Valve
Specifications.
Uni-directional valves and check valves wh ere the design is limited to sealing against
flow or pressure from one direction and valves with a preferred direction for sealing,
w here such designs have been agreed with the CONTRACTOR, shall have a flow
direction arrow integrally cast with the body.
A ll the above size demarcations are based on the valve closing fully and passing the
seat leakag e test using the maximum closing force stated above.
3.5 Position Indicators
Quarter turn valves with non-rising stem or valves with gear operators shall have
position indicators, which cannot be wrongly orientated , either on initial assembly or
during subsequent dismantling and reassemble. The position indicator shall be of a
robust construction.
3.6 Back Seats
All valves of gate shall have back seats.
3.7 Steam
All stems shall be blowout proof.
The maximum force or torque output from the valve operator, throughout the full
range of the valve stroke, shall not exceed the allowable force or torq ue capability of
the valve stem. The VENDOR may be called upon, to submit detailed calculations,
and/or test resu lts, verifying the valve stem design.
3.8 Drain, Vents, Flushing Connections
Th e requirements for vent, drain and flushing connections shall be as stated on t he
Valve Data sheets and shall compl y with ASME 8 16.34.
3.9 Soft Seat and Seal Material
All soft seat and seal materials shall be suitable for the service and minimum/maximu
design and (or operating) temperatures/pressures, as stated on the individual Valve
Data Sheets.
All soft seat and seal materials in classes 600 and above in hydrocarbon gas
services shall be resistant to explos ive decompression. All elastometric 0 -rings in
hydrocarbon gas service in classes 600 and above to be limited to 6mm-diameter
maximum . CONTRACTOR, as recommended by the VENDOR, shall consider
alternat ive materials or grades/design of seta and seals, at bid stage.
JS1020-X-PD7 -lSOl.Al
- A CC FNFRGY nFV£LQEMENJ__5..AJ
:PROJECT
t1;. ~;·~.~r,
.; -~ 1 'E'HtYS Oit.
·.._;!'...~ .
TETHYS OIL AB ~·M.E.PM_f.:. ~.
....... """" ......... ., ... l~<;;NlCA~ RF.'•.INIP'>.S
TR Engineering LLC
DETAIL ENGINEERING OF 16"
PIPELINE AND QAS-CCED
FACILITIES !
l JOB NR. I DOCUM ENT NR. i REV. I DATE SHEET
JS1020 J S102~-X-P07- 1 50 1 1
I Al Mar, 25, 2014 I 12 of 26
TITLE
Graph ite packing shall be low to medium density, high purity, incorporating a
passivating corrosion inhibitor and anti-extrusion elemen ts.
VENDOR must ensure that any lubricated packing for low temperature duties shall
not solidify or have any detrimental effect on the valve operation at the design
temperatures specified.
Th e body to bonnet connection shall be flanged and the flange facings shall be
maleand female or tongue-and-groove.
3.12 Bonnet and Gland Bolting
All bolting shall comply with what specif ied on the Valve Data Sheets and shall meet
the requirements of ASME 816.34 paragraph 2.4. The VEN DOR shall advise at the
bid stage where bolting is below the minimum requ irements (see ASME 816.34
paragraph 6.4).
3.13 Body Active relief
All valves with body cavities except where the valve is to be used for double isolation
applications are to be provided with a body cavity pressure relief facility to relieve
high pressure that may exist due to temperature changes in fluids trapped in the
body cavity. Wh ere rel ief valves are fitted th ese shall be set between 1.1 x and 1.3x
the rated pressure and shall be fitted with an isolation block valve. Vendor to state
how this is achieved at the bid stage.
JS 1020-X-P07 -lSOl .A l
£ CC ENERGY DFVFI nPMFI>JT c:; A.
I PROJECT
.AtA (Oman Branch) ~~ ! BLOCK 3 & 4 DEVELOPMENT
~
.Ll
~ ; IPROJECT {PHASE II)- OMAN
~l·:~~
~~., 'CF.JH'IS Oil. TETHYS OIL AB ~
~ MKEl\1Jj:
................
"''
1\:CNICA~ Rl:UN!l:)A_S DETAIL ENGINEERING OF 16"
, . .r.-1 . TR Engineering LLC PIPELINE AND QAS-CCED
JOB NR.
J$1020
I DOCUMENT NR.
JS 1020-X-P07 -1501
I REV.
A1
l FACILITIES
DATE
Mar, 25, 2014 l SHEET
13 of 26
TITLE
All valve bodies shall be strong enough to self support actuator regardless of valve
actuator orientation, ESD actuators shall be able to with stand specified blast loads.
4. VALVES DESIGN
4.1 General
Valves shall comply with the relevan t Standards and Codes as specified in section
2. 0
Valves shall normally meet the rating requirements of ASME 816.34. The VENDOR
shall confirm at the bid stage the valve pressure/temperature rating. The VENDOR
shall provide a pressu re/temperature chart for all seat/seal materials.
All valve bodies are to be strong enough to accommodate the following end
connection loadings with the design pressure and temperatue:
Valves shall be fully forged or cast to shape. Valves machined from barstock, plate or
billet are not acceptable.
~~
PROJECT (PHA~)- OMAN
- -
' -
~::;.-Y:.-~~-~
.lfJ I
TETHYS OIL AB ,.{~ N:IEJ•f"1.E 'fECNlCAS REU NI[)I\S DETAIL ENGINEERING OF 16" i
G.~~~r~m·s o r.. ~-p< ;,,~--~,.'" o:;·"'"' TR Engineering LLC PIPELINE AND QAS-CCED II
JOB NR
JS1020
I DOCUMENT NR.
JS102D·X·PD7-1501
l REV.
Al
J
FACILITIES
DATE
Mar, 25, 2014 l SHEET
14 of 26
TITLE
Fugitive emissions are to be minimized. VENDORS shall state in their bid, the design
features that are incorporated in their design to ensure this req uirement is met.
All ball valves shall incorporate anti-blow-out stems and an anti-static device that
ensure electrical continuity between body, stem and ball, and Valves shall be
typetested , the test ing being carried out on new dry "as-built" valves of each type
after pressure testing. The rest for electrical continuity shall be carried out after the
te st valve has been operated at least five times . It shall then be demonstrated that
the discharge path between components has electrical continuity with a resistance
not exceeding 1 ohm from a power source not exceeding 12V.
The VENDOR shall submit, with the bid, details of design and state accuracy of
alignment of ball to bore of valve. Accuracy shall be maintainable to 0.25 mm (1 ") up
to 50 mm (2") and to the lesser of 0.5 mm or 1 degree for sizes larger than 2". Gear
and manually operated Ball valves shall be equipped with stop limiting devices to
prevent ball overtravel in the open and closed positions. The design shall provide for
repeatable positive methods of accurately aligning the bores of valve components.
Reduced bore ball valves shall be limited to one size reductio n. Two size reduction
may n be allowed if detailed at the bid stage and agreed prior to order placement.
The VENDOR shall also select materials to minimize the effect of galvanic corrosion
nand galling, e.g. overlaying seat pockets, overlaying seals areas or overlaying fully
wetted areas inclusive of through bo re and gasket faces or grooves.
All ball valves shall be supplied w ith flanges for through bolting for attachment to
vessels or piping flanges. Studded connection flanges are not acceptable.
Actuated valves shall have limit stops incorporated in the actuator design.
~
BLOCK 3 & 4 DEVELOPMENT
(Oman Branch)
PROJECT (PHASE II)- OMAN I
f.:,:.:~
TETHYS OIL AB ~ OO!.f,f..~!~ TEC:NIC:AS REU!-IIDt\5 DETAIL ENG INEERING OF 16" 1
._.,..,- .
;;ftTi--fHYS Oil.
TR Englnoerlng LLC PIPELINE AND QAS-CCED
! FACILITIES I
JOB NR. I DOCUMENT NR. I REV. I DATE I SHEET
JS1020 JS1020-X-P07 -1501 A1 Mar, 25, 2014 i 15 of 26
~E
TECHNICAL SPECIFICATION FOR GLOBE AND CHECK VALVES
Valves with a double flanged design are acceptable in lieu of a lugged design where
signi ficant weight and cost savings can be made. Face to face dimensions must
remain nthe same. All VENDORS are to confirm at the bid stage which design for
each size and rating is being offered.
Double flanged valves shall have flanged ends such that the length of bolts required
for bolting to adjacent flanges are the same lengths as for a standard flange
connection.
Both 'retainer' and 'retainerless' designs are acceptable. The 'retainerless' design
shall be such that the pin keeper plates/inserts do not impinge on the gasket contact
surface areas. The 'retainer' design shall incorporate a seal on all possible leak to
atmosphere, to eliminate fugitive emissions.
4.4 lntegeral Block and Bleed Valves
All integral valves shall consist of a single piece forging or be of a bolted
construction.
All forgings shall be forged close to the fi nal shape and size.
Valves levers/hand les shall not be used for pre-tensioning stem seals. Pre-tensioning
shall be achieved by separate means, allowing the lever/handle to be removed
without affecting the integrity of the stem seals.
Lever reta ining nuts shall be positively locked or be of the self-locking type to prevent
loosening by vibration.
Valves having two seats shall be provided with a means of relieving cavity
overpressure to the upstream side of the seat.
5. END CONNECTION
5.1 Flanged Valves
All flanged connections up to and including 24" N.B. (12" N.B. for Class 2500) shall
be in accordance with ASME B16.5 Flanges 26" N.B. (14" N.B . for Class 2500) and
larger shall be in accordance with ASM E 816.47 Series "A.
JS 1020 -X-P07-1501.Al
A
-----------------t-~·~--~~~~(O
~m~an~B~
cc ENERGY DEVELOPMENT S.A.L
ra~n~chfl)~~·~-+----U~~E~~-~;
I
~=.~~--~,~~B~L~O~C~K~3~&~4~D~
I PROJECT
EV~E~L~O~P~M~E~N~T~~~~----------------~
~flj ! PROJ ECT (PHASE II) - OMAN Jj
.or;,·l"~.1_
;~·'!._; TRiHYS OI L. TETHYS OIL AB ~~~fM~ TECNICJ\S RliUNU)I\S ! DETAIL ENGINEERING OF 16"
!=::_i:· . TR Engineering LLC I! PI PELINE AND QAS-CC ED
FACILITIES
JOB NR. DOCUMENT NR. REV. I DATE I 16 of 26
SHEET
TITLE
JS1020 I JS 1020-X-P07 -1501 I A1 Mar, 25, 2014
Flange jointing faces shall have the following surface roughness in accordance with
ASME 846.1. The surface roughness shall be verified by visual or tactile means with
appropriate roughness comparison specimens .
The holes shall be equispaced about the vertical and horizontal axes of the flange .
6. MATERIAL
6.1 Genera l
At the bid stage the VENDO R shall provi de full details of all component materials and
the material condition including procedures and qualification for overlays or any other
surface treatment.
The VENDOR shall confi rm th at the materials offered are suitable for extended
operation in the specified service. This is particularly important for valves in
production fluid service.
All materials shall be new and clean and free from rust, mill scale, pits and defects.
When specifyin g materials the VENDOR shall give careful consideration to t he
prevent ion of galling and pick-up between bearing and seal ing surfaces and any
possible galvanic reactions between dissimilar materials.
The Supplier's scope shall include, but not limited to, the design, engineering,
manufacture , inspection, testing, certification/documentation, sh ipment,
supply/delivery, including coordination with Sub-suppliers (including expediting) of
the following items:
JS1020-X-P07 -1501.A1
~
PROJECT
CC ENERGY DEVELOPMENT S.A.L
4~;J
(Oman B ranch) BLOCK 3 & 4 DEVELOPMENT
I
~~-: !<;.
"'~}.11 PROJECT (P HAS_§_ II)- OMAN
I
' .Jj]1'EfH't8 O:U.
-~~ -
TETHYS OIL AB ~·~n.~t~~ IT.:t-ltO.:> R£ 1JN!f.l."-.S
TR Engincorlng LLC
DETAIL ENGINEERING OF 16"
PIPELINE AND QAS-CCED
I FACILITIES
I JOB NR.
JS1020
I DOCUMENT NR.
JS1020-X-P07-1501
I
1
REV.
Al
I DATE
Mar, 25, 2014
l SHEET
17 of 26
I
1
TITLE
TECHNICAL SPECIFICATION FOR GLOBE AND CHECK VALVES
6.2 Bolting
All bolting shall be suitable for the fu ll pressure/temperature range as stated on the
valve data sheets.
If bolting is directly exposed to the process fluid it shall have at least the same
resistance as the valve body material.
Where valves are specified for sour service, the bolting material shall meet the
requirements of NACE MR0175/ISO 15156.
6.3 Carbo n St eel and Low Temperat ure Carbon steel
Carbon steel used for the manufacture of cast or forged valve bodies and
components shall be produced in an electrical furnace , or by the basic oxygen
process. The chemical composition of carbon and carbon manganese steel castings
and forgings shall be restricted as follows -
All flanged carbon steel valves shall have a carbin content of 0.25% maximum
(Check Analysis) or 0.23% (Ladle Analysis) and a carbon equivalent of 0.45%
maximum (Check Analysis) or 0.43% maximum (Ladle Analysis) .
The carbon equivalent (CE) based upon either ladle or product (if available) analysis
shall be calculated using the formula:
CE = C + Mn + Cr+Mo+V + Cu+Ni
6 5 15
Where the material standard or certification does not include all of the above
elements, and with CONTRACTOR approval, the following short formula may be
substituted:
CE =C + Mn + 0.05
6
All forged temperature carbon steel materi als shall have a maximum sulphur content
of 0.015% (by product analysis) . Casting sulphur limits shall be su bm itted for
approval.
Where sour service is designated, all materials shall meet NACE MR 0175/ISO
15156.
6.4 Austen iti c Stai nless St eel
Austenitic stainless steel castings shall be produced from steel refined by the Argon
Oxygen Decarbutisation (AOD) or the Vacuum Oxygen Decarburisation (VOD)
process or acceptable equivalent.
JS1020-X-P07-1501.A1
PROJECT
Cc....EJllffiG_'UJBLELOEMEIII-T- S.. A.I
AtA (Oman Branch) J't
&u~j
f-;"'l:;"!d B LOCK 3 & 4 DEVELOPMENT
_f~HOJECT (PHASE II)- OMAN
ii~~;.
if~~HYSOJL
TETHYS OIL AB -~ ~1t;f~?.~~: U CNit.AS RWNIIJAS
TR Engineering LLC
DETAIL ENGINEERING OF 16"
PIPELINE AND QAS-CCED
FACILITIES _____j
JOB NR. I DOCUMENT NR. I REV. I DATE I SHEET
TITLE
JS1020 JS1020-X-P07-1501 ..J A1 Ma r, 25, 2014 18 of 26 I
I
TECHNICAL SPECIFICATION FOR GLOBE AND CHECK VALVES I
i
Austenitic stainless steel valves shall be supplied in the solution-annealed condition.
Th e VENDOR shall provide manufacturer certification, which states the heat
treatment condition of the finished component as being 'solution annealed '. Failure to
do so shall result in rejection of the material with the item being replaced at cost to
th e VENDOR.
All repair welds shall be solution annealed in accordance with the relevant product
specification. The ferrite content of deposited weld material shall be 3%-10%.
7. IMPACT TESTING
7.1 General
Where specified, impact testing of parent material , welds and heat affected zones
shall mean Charpy V Notch type and shall be carried out using procedures and
apparatus in accordance with ASTM A370. The frequency of testing shall be one test
(3 specimens) for every heat.
Where due to the thickness of material, it is not possible to remove standard size
Charpy specimens, sub-size specimens shall be used. The minimum energy values
required fo r sub size specimens shall be the ration of the actual specimen width to
that of a full size specimen mu ltiplied by the full size specimen energy valu e.
8. WELDING
8.1 General
Where welding, including weld repairs , is proposed to be carried out in the
manufacture o f the valve, all welding shall be subject to welding procedures in
accordance with ASME IX as a minimum. All procedures shall be subject to
CONTRACTOR'S approval prior to commencement of any welding. (All welding
procedure specifications shall be qualified in accordance with the requ iremen ts of
A SME IX for ASME 831.3 scope and API 1104 for ASM E 831.4/83 1.8 'P ipeline'
scope.)
Welding of casting's only acceptable for valve bodies and bonnets/cover plates , in
accordance with th e provisions of their respective specifications and subject to prior
agreement by the CONTRACTOR. Repairs to all body castings by peening or
impregnation are prohibited . All excavations shall be subject to MPI or DPI prior to
welding. No repairs will be permitted to cast ings, which suffer through wall leakage
during hydrostatic or gas testing .
For weld repair procedure qualification the VENDOR shal l carry out any heat
treatment,
NOT, including hardness testing , and charpy impact testing in accordance with the
material specification and as required by this specification.
Impact testing in accordance with Section 7.0 shall be performed for the weld metal
fusion line and heat affected zone (+2mm and +5mm locations) when impact testing
is specified for the parent material.
All welds, including repair welds, shall be subject to 100% MPI/OPI and 100%
radiography or ultrasonic examination . Minor defects may be ground or blended out
provided that minimum wall thickness requirement (including corrosion allowance)
are not affected.
Repairs shall be post weld heat treated if required by the product specification and in
all cases for valves in sour service and certified to NACE MR0175/ISO 15156.
A ll the documents specified in this requis ition and the project material requisition
shall be submitted by the manufacturer.
All the documents and drawings shall be in English.
Design calculations, drawings and welding procedu re shall be approved by the
PURCHASER prior to manufacturing.
All documentation shall be given in soft format in a CO.
Grades of satellite or other fusion -bonded overlays, which may be proposed by the
VENDOR including methods of application, shall be agreed with the CONTRACTOR
at the bid stage. Note that all fusion-bonded overlays shall be machined or grou nd to
a smooth finish .
Weld procedures and weld procedure qualifications for overlays including any post
weld heat treatment shall be submitted at the bid stage.
JS 1020-X-P07-1501.Al
PROJECT -~
i B LOCK 3 & 4 DEVELOPMENT
~ROJECT (PHASE II)- OMAN
In addition the machined surfaces of all High Alloy Steel valves, forged or cast, shall
be subjected to 100% Dye Penetrant Examinati on in accordance with AS ME B16 .34
Anned "0".
There shall be no linear defects > 3-mm. Any indication giving the appearance of a
crack shall not be permitted.
To determine wall thickness, the CONTRACTOR'S Inspector will select castings and
forgings at random. Valves selected shall provide assurance that the
JS1020-X-P07 -l SOl.Al
-
...
&,..a&..
CC ENERGY.l l E..\lELOP-MEN-T-S. A
(Oman Branch )
I
~,~
PROJECT
I i.-:r"""-.,.-. ~
; .% TETH'(S OH. TETHYS OIL AB ~MEPME
,..._............
TtCNICAS f(e,JNIOJ\S iI DETAIL ENGINEERING OF 16"
?.."· r .
· ~··,.. ~
TR Engineering LLC PIPE LINE AND QAS-CCED
j FACILITIES
JOB NR.
JS1020
I DOCUMENT NR.
JS1020-X·P07-1501
I REV.
Al
I DATE
Ma r, 25, 2014 II 21
SHEET
of 26
TITLE
forgings/castings supplied will comply with the wall thickness requ irements of the
referenced specifications.
By prior approval, ultrasonic examinat ion (UT) as an alternative to rad iography for
forgings will be accepted for Classes 150, 300 & 600.
Valves selected for gas leak testing of the seats in addition to the body leak testing,
shall have the 6.0 barg low press ure pneumatic seat test replaced by a 1.0 barg
pneumatic seta test with the same acceptance criteria.
The removal and refitting , during or after test, of any pressure retain ing components
shall be covered in the test procedure and shall be verified by, and to the satisfaction
of the CONTRACTOR'S inspector.
All soft seated valves shall be operated a min imum of three times in the dry
condition, before commencement of the hydrotest.
The minimum duration of the body test shall be 15 minutes.
Whilst carrying out the body test the valve shall be inspected for leakage through th e
stem packing . Any observable leak, which cannot be stopped by tighten ing, or at the
discretion of the CONTRACTOR'S Inspector, shall be cause for reject.
All butterfly and dual plated check valves shall additionally be subjected to disc
streng th test, in accordance with BS 5155, which shall be performed prior to
A
PROJECT
CC ENERGY DEVELOPMENT S.A.L
(Oman Branch) rn!"l.,~i
\tm..a
BLOCK 3 & 4 DEVELOPMENT
PROJECT (PHASE II)- OMAN l
I
,~:;~~...
,~~---r~.;.H'tS Oil. TETHYS OIL AB +~!!&!..~!~ f£(;N ICA5 REUNIDAS DETAIL ENGINEERING OF 16" I
,ftl~· - TR Engineering LLC PIPELINE AND QAS-CCED I
FAC ILITIES
I JOB NR.
I JS1 020
1 DOCUMENT NR.
JS1020-X-P07-150 1
I REV.
Al
I
DATE
Mar, 25, 2014
I SHEET
22 of 26
I T ITLE
TECHNICAL SPECIFICATION FOR GLOBE AND CHECK VALVES
hydrostatic and pneuma tic seat tests. Butterfly valves to be seat tested
hydrostatically from both sided .
Hydrostatic tests shall be carried out using potabl e water containing 1% by volume of
BP NID260S liquid or other biodegradable wett ing agent, at a minim um temperature
of 7 ·c.
Maximum permitted chloride and fluoride content of water for hydrotesting purposes
for stainless steel shall be 30 ppm . The PH value of the water shall be between 6 and
8.
All testing shall be carried out prior to the application of any primer or paint to the
valves.
Cast ings shall not be impregnated with sodium silicate or similar materials to prevent
leakage.
After completion of all seat hydrostatic testing, a torque test shall be carried out at full
differential pressure, and measured torque's recorded for seat breakou t, mid and end
range (See paragraph 3.4).
Body cavity pressure re lief shall have been tested to ensure high pressures in the
body cavity do not occ ur.
All valve body cavities shall be fully drained and thoroug hly dried after completion of
all hydrotests.
JS 1020-X-P07 -lSOl.Al
nCNI<"i\S REUNit!Ali DETAI L ENGINEERING OF 16"
TR E ngineering LLC PIPELINE AND QAS-CCED
FACILITIES
JOB NR. DOCUMENT NR. DATE
JS1020 JS1020-X-P07-1501 Mar, 25, 2014
TITLE
11 .1 Marking
Body and Identification plates shall be legibly marked in accordance with relevant
Code, Standard, Specification or MSS-SP-25 as appropriat e.
The following additional markings shall be added to the permanently attached
identification plate on each valve:
Valve Tag Number or the S.P. Number
• Purchase Orde r Number
• Purchase Order Item Number
Material Code Stock No.
11 .2 Colour Coding
Colour Coding of valves is not requ ired .
The ends of all valves shall be suitably protected against damage or ingress of dirt
using plastic end capes or plywood/plastic discs (5 mm minimum thickness) as
follows:
Butt weld ends: plastic caps - to be tight fitting and securely fixed with waterproof
tape.
11.4 Painting
All valves shall be coated in accordance with the Painting Specification (Doc. No .
JS 1006 -X-G02-0003)
I
.A CC ENERGY DEVELOPMENT S.A.L
PROJ ECT
l
I I
ti1i
(Oman Branch) BLOCK 3 & 4 DEVELOPMENT
£,.•_&,. PROJECT (PHASE II) - OMAN
~v"'
~.i.~·
TETHYS OIL TETHYS OIL AB ~ME P.(11E TECNiCA$ Rfli,I!OIIS DETAIL ENGINEERING OF 16" I
'!~- .
........ U. ..- f ... , ... .....
TR Engineering LLC PIPELINE AND QAS-CC~
FACILITIES
JOB NR.
JS1020
.! DOCUMENT NR.
JS1020-X-P07-1501
I
l REV.
Al
I DATE
Mar, 25, 2014
I 24 of 26 I
SHEET
TITLE
12.1 General
Gate and globe valves shall be dispatched in the fully closed position.
Ball valves shall be dispatched in the fully open position.
In general, the dispatch of valves shall be in accordance with the VENDOR'S
specification and/or the CONTRACTOR approved packing procedure.
12 .2 Preservation
All valve preservation shall be in accordance with the Vendor's Preservation
Procedure .
All valves shall be stored undercover in a dry atmosphere, in a safe position.
No packing end caps, plywood or plastic discs shall be re moved until the valve is
required for installation into the piping system.
All substitutions of materials must have prior approval from the CONTRACTOR.
14.1 Scope
This section covers the design of special piping valves. Items are designated as
"special" because they are not included in or covered by both the Piping and valve
Material Specifications o r the Piping Engineering Standards .
14.2 Design
Design and fabrication shall be in accordance w ith the special items data sheet all
re levant codes, standards and specifications and all relevant Sections of th is
Specification.
JS1020-X-P07 -lSOl.Al
A
PROJECT
CC ENE~G Y. OE~EL.Q~MEf'-II S.A.l
~0]
(Oman Branch) BLOCK 3 & 4 DEVEL OPME NT
PROJECT (PHASE II) - OMAN -
~-1~~· ....~
~M~l~~l-f
TETHYS OIL AB IECN!':AS RElJNIOAS DETAIL ENGINEERING OF 16"
,~r~1" EIHYS OrL
·1.- . TR Engineering LLC P IPELINE AND QAS-CCED
FACILITIES
JOB NR. I DOCUMENT NR. I REV. I DATE SHEET
JS1020 JS 1020-X-P07 -1501 I Al Mar, 25, 2014 I 25 of 26
TITLE
The "tag" number (e.g. SP-0000) and VENDOR'S serial number and purchasers
code number shall be stamped on the plate in letters not less than 6 mm high.
The act uator shall be supplied in accordance with the instru ment data sheets and this
specification.
The valve torque used shall be those generated by the full differential pressure of the
pipeline across the valve. Actuator minimum torque values shall be 2.0 times the
required valve torque at maximum opera ting design conditions fo r all ESD and BDV
valves and 1.5 times for all other valves . These requirements to be discussed further
at bid stage. The valve and actuation torque valves shall be listed at the bid stage.
The actuator speed shall be controlled in accordance with the requirements shown
on the valve actuator data sheets.
The actuator shall position the ball of the valve to accuracy of approximately 0.25
degrees on the open position and approximately 0.50 degree on the closed position.
The actuator shall be mounted directly on the valve without an extension. The
VENDOR shall supply, if requ ired, a mounting plate or mounting assembly for the
actuator. The VENDOR shall confirm that the maximum actuator torque does not
cause permanent deformation or damage. All actuated valves should be self-
supporting regardless of actuator orientation.
End stops shall be provided. Mounting kits shall be designed to take account of the
full reaction torque/forces available from the actuator.
JS1020-X-P07 -1501.A l
PROJECT
CC ENERGY DEVELOPMENT S.A.L
(Oman Branch) BLOCK 3 & 4 DEVEL OPMENT
PROJECT (PHASE II)- OMAN
JS 1020-X-P07-1501.A1