PCI-05 Reff
PCI-05 Reff
PCI-05 Reff
PRE-STRESSING
ENGINEERING
BEARINGS
EXPANSION JOINTS
SEISMIC PROTECTION
REPAIR and
STRENGTHENING
BRIDGES
ENGINEERING
✔ PURUS FLYOVER,
Padang, West Sumatera, 2010
- present.
Post-tensioning on spliced PC
I-Girder.
Ground anchor
WTC Mangga
Dua, Jakarta.
Siak Sri Indrapuri
Cable Stay Bridge,
Pekanbaru.