"Waste Heat Recovery System ": Internship / Summer Vocational Training Project Report On
"Waste Heat Recovery System ": Internship / Summer Vocational Training Project Report On
report on
“WASTE HEAT RECOVERY SYSTEM “
Submitted by: - Anoop kumar singh
Date:
Place:
ACKNOWLEDGEMENT
I express my deep sense of gratitude to my guide Mr. K. Pandey for
his help in providing reviews, ideas and suggestions and helped me turn
this project more useful. Because of inspiring and guidance provided by
him, this work is reached upto success level. It has been privilege and
pleasure working under his guidance.
I sincerely acknowledge my deep sense of gratitude towards Mr.
MANISH SHARMA and also Mr. ASHOK VERMA from the HR department
of UTCL HIRMI, for his constant support and encouragement throughout
the course of my project.
I am thankful to Mr. TALEEB SIR, ENGINEER BHARUKA
CONSTRUCTIONS without whom this project would have remained just
an idea, his guidance from time to time and making us realise that we
are on right path at different stages of taking initiatives for this training. I
am also thankful to all those people who have directly or indirectly
helped me.
I am greatful to the institution IIMT Engineering College (127) and
Uttar Pradesh Technical University for granting permission to me to
undertake this project.
Name of student
ANOOP KUMAR SINGH
DECLARATION
I hereby declare that this project entitled “WATE HEAT REOVERY
SYSTEM” is an original work done by me. This work in the same form or
in any form is not submitted by me or anyone else.
1. INTRODUCTION
2. NAME OF WHRS STRUCTURES
3. MEASURING &LEVELLING OF PLANT AREA
4. LEVELLING METHOD (TOTAL STATION)
5. PROCEDURE OF TOTAL STATION
6. DRAWING OF FOOTING PLACES
7. MEASURING AND MARKING OF FOOTING AREA
8. EXCAVATION OF FOOTING AREA
9. IMPORTANCE OF WHRS
10. WHRS CONSTRUCTION SITE IN UTCL HIRMI
11. CONCLUSION
INTERODUCTION
LEVELLING PROCESS
Procedure-
After measuring that can start marking. For that they used many
things chalk, oil paint etc.
Completing all the work than they can start the excavation process
for the foundation. Here the marking and pointing is done on
following ways.
For the marking there are two way.
1. Mid to right left.
2. Corner to corner.
EXCAVATION OF FOOTING
Excavation is a process
by cutting the soil or
rock from any working
area (ground).
IMPORTANCE OF WASTE HEAT RECOVERY
SYSTEM
1 2
3 4
1 2
3 4
1 2