PLUMBING NOTES:

1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH


THE LATEST PROVISIONS OF THE PHILIPPINE PLUMBING
CODE AND SHOULD COMPLY WITH THE REQUIREMENTS OF
THE LOCAL SANITARY AUTHORITY.

2. ALL MATERIALS TO BE USED SHAL BE NEW AND OF


APPROVED TYPE FOR LOCATION AND PURPOSE.

3. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF FUSION


PIPES, PN 20 MIRAGA BRAND OR APPROVED EQUIVALENT. Ø3P"VCDSPIE
Ø3P"VCDSPIE

4. ALL WORKS HEREIN SHALL BE OF CLASS WORKMANSHIP, RD RD


PIPING SYSTEM MUST BE DOUBLE-CHECKED ESPECIALLY ON VSTR
FD
JOINTS TO ENSURE WATERTIGHT PLUMBING SYSTEM. HB CO CO CB

DS Ø6P"VCSAPN-IE
51m
2.mØPNC20-WL FD
5. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT KS LAV WC TSH KS LAV
PVCBLUEPIE
SUPERVISION OF A DULY LICENSED MASTER PLUMBER. WC

6. PROVIDE 2% SLOPE IN T&B FLOOR PRIOR FLOOD TESTING

Ø6P"VCSAPN-IE

Ø6P"VCSAPN-IE
20mmØPNC20-WPLVCBLUEPIE
LEGEND :

MARK DESCRIPTION

FD FLOOR DRAIN CO
CV DS
RD ROOF DRAIN
M
LAV LAVATORY SEPTIC TANK RD RD
GV
25mmØPNC20-WL Ø3P"VCDSPIE
WC WATER CLOSET Ø3P"VCDSPIE
CB
TSH TELEPHONE SHOWER TONEARESCTANAL/
DRANIAGESYSTEM
KS KITCHEN SINK
FROMLOCAL
WATERCOMPANY
F FAUCET TONEARESCTANAL/
DRANIAGESYSTEM
HB HOSEBIBB

AREA DRAIN/CATCH
AD/CB
BASIN
CLEAN WATER LINE PLUMBING LAY- OUT SANITARY LINE PLUMBING LAY- OUT SANITARY LINE PLUMBING LAY- OUT
DS DOWNSPOUT

SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M


ST SEPTIC TANK

MH MANHOLE

CO CLEANOUT

SP SOIL PIPE

GV GATE VALVE

CV CHECK VALVE
ARIANNA
M WATER METER

FROM THE OFFICE OF: MASTER PLUMBER/ SANITARY ENGINEER NOTE: THESE DRAWINGS AND SPECIFICATIONS AND PROJECT TITLE OWNER REVISIONS SHEET CONTENTS SHEET NO.
OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED
OR SEALED AS INSTRUMENT OF SERVICES, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENT OF THE
RAFAELAHOMES ITEM DRAWN DATE
ARCHITECT,WHETHER THE OBJECT FOR WHICH THEY
ARE MADE EXECUTED OR NOT, IT SHALL BE UNLAWFUL
PRIMEWORLD SANITARY LINE PLUMBING
S
T
1
ORE
R
Y
ED
S
E
IN
A
B
T
L
ID
G.
PRC:
PTR:
DATE:
DATE:
FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES
OF SAID DOCUMENTS FOR USE IN THE REPETITION OF
AND FOR OTHER PROJECTS OR THE BUILDINGS,
WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT LOCATION
LAND HOLDINGS, INC. LAY- OUT
CLEAN WATER LINE
PLUMBING
P -1
PLACE: TIN: THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHOR LAY- OUT
OF SAID DOCUMENTS. BRGY. MAKINABANG, BALIUAG, BULACAN APPROVAL
REPUBLIC ACT. 9266 SEC. 33 DATE PLUMBING

You might also like