Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

BOM of Tank

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

SL Unit Weight MTO Q'ty

Service Item UOM Q'ty


No. (kg) Kg

1 PLATE(6000 x 2000 14 THK) Nos 26 1,318.80 34,288.80


PLATE(6000 x 2000 x 12
2 Nos 29 1,130.40 32,781.60
THK)
PLATE(6000 x 2000 x 10
3 Nos 176 942 165,792.00
THK)
4 PLATE(6000 x 2000 x 8 THK) Nos 177 753.6 133,387.20
5 PLATE(6000 x 2000 x 6 THK) Nos 247 565.2 139,604.40
6 ANGLE (90x90x10 THK) M 273 13.4 3658.2
7 ANGLE (75x75x6 Thk) M 400 6.8 2720
8 ANGLE (50x50x6 Thk) M 346 4.5 1557
9 Expansion Bolt- M16X150 Lg. Nos 18 0.5 9
10 BOLT WITH NUT M20x65 Lg Nos 1,192 0.28 330.18
11 BOLT WITH NUT M16x60 Lg Nos 1,742 0.15 266.53
12 CHANNEL (CH16A) M 132 16.8 2217.6
13 CHANNEL (CH16B) M 172 16.8 2889.6
14 CHANNEL (CH40A) M 884 50.1 44288.4
15 CHANNEL (CH10) M 63 9.56 602.28
16 CHEQURED PLATE 5THK. -75 M2 M2 165 39.25 6476.25
STEP GRATINGS
17 Nos 375 5.954 2232.75
(250x800mm)
PLATFORM GRATING 25
18 M2 5.6 29.77 166.712
THK - 1000X1000
19 PLATE 10THK M2 47 78.5 3689.5
20 PLATE 8THK M2 119 62.8 7473.2
21 PLATE 6THK M2 64.48 47.1 3037.008
SUPPORT PIPE 350NB -
22 Nos 30 54.69 1640.7
SCH 10
23 HANDRAILING -PIPE - 32NB M 2,352 3.56 8,373.12
24 FLAT (75 x 6 THK.) M 197 3.5325 695.9025
25 FLAT (100x6 Thk) M 457 4.71 2152.47
26 FLAT (120 x 10THK.) M 12 9.42 113.04
27 FLAT (50x6THK.) M 349 2.355 821.895
28 FLAT (75 x 10 THK.) M 111 5.8875 653.5125
29 RUNGS- 20 DIA M 96 2.47 237.12
30 SQUARE BAR (20 Sq.) M 465 3.14 1460.1
Total 10,722.08
Tank Wise BOM As Pe
Total
Weight HFO Storage HOF Storage HFO Settling HFO Settling HFO Service HFO Service
(Drawing) Tank-1 Tank-2 Tank-1 Tank-2 Tank-1 Tank-2
(T-101) (T-102) (T-104) (T-105) (T-106) (T-107)

34,288.80 17,144.40 17,144.40


29,390.40 14,695.20 14,695.20
162,074.00 56520 56520 9420 9420 4710 4710
131,878.40 43708.8 43708.8 9796 9042.8 4521 4521.8
137,796.42 14695.2 14695.6 14695.2 14881 12964.11 12964.11
3,283.44 1631.5 1631.5 3.52 3.52
1,948.13 140.68 140.68 425.75 424.39 326.75 336.75
1,004.49 203.66 203.66 219.4 20.48 203.66
10.00
576.00 288.00 288.00
894.00 432.00 462.00
1,028.09 1028.09
3,076.80 1538.4 1538.4
23,649.45 23649.45
11,935.28 4090.85 4090.85 1052.34 1051.99 812.2 812.2
0.00
0.00
0.00
1,543.31 14.08 592 230.3 235.58 144.52 141
6,336.56 2704.16 2705.04 220.86 220.86 242.82 242.82
1,668.18 124.96 124.96 602.84 100.9 108.4 108.4
0.00
0.00
169.52 11.44 11.44 11.45 11.45
1,318.80 357.96 357.96 146.01 146.01 113.04 113.04
72.46
447.37
0.00
0.00
0.00
0.00
Tank Wise BOM As Per Drawing
HFO DO
Fresh Lube Used Lube Oil Used Lube Sludge Sludge Oily Water DM Water
Service
Oil Tank Tank Oil Tank Tank-1 Tank-2 Tank Tank
Tank (T-
(T-301) (T-302) (T-303) (T-601) (T-602) (T-603) (T-801)
201)

4710 1884 1884 2826 2826 1884 4760


2260.8 1507.2 1507.2 1507.2 2260.8 2260.8 1507.2 3768
11302 5086 5086.8 5086.8 6782.4 6782.4 5086.8 7688
2.68 2.68 2.68 2.68 2.68
85.87 33.63 33.63
153.63
2 2 2 2 2

24.85

3.52 33.63 33.63 40.71 40.71 33.63

82.93 82.53 82.53 82.53 41.8 41.8 36.54 47.06

8.68 57.53 57.53


84.78
9 9 9 11.98 11.98 9 12.5
53.7 53.7 53.7 73.6 73.6 53.7 85.37
Difference between
MTO and Drawing
BOM

0.00
3,391.20
3,718.00
1,508.80
1,807.98
374.76
771.87
552.51
-1.00
-245.82
-627.47
1,189.51
-187.20
20,638.95
-11,333.00
6,476.25
2,232.75
166.71
2,146.19
1,136.64
1,368.83
1,640.70
8,373.12
526.38
833.67
40.58
374.53
653.51
237.12
1,460.10
0.00

You might also like