Bioswale
Bioswale
Bioswale
TABLE OF CONTENTS
SHOWN
5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE
OR AS
5'-0"
PLANTED AREA GI-206
EXISTING
CATCH BASIN BIOSWALE BIOSWALE FLOW
OUTLET INLET
C B A
PLAN
EQ EQ
5'-0"
SEE GI-201 FOR OR AS SHOWN JUTE MESH
SEDIMENT PAD DETAILS 12"x5" PRECAST TREE 3-SIDED STEEL TREE PIT
1/2" EXPANSION JOINT
PLANTING GUARDS SEE DRAWINGS
CURB TYPE TO MATCH AND FILLER PER NYC CONCRETE STRIP
GI-601A, B, C, D & 602A
CONTRACT PLANS DOT HIGHWAY SPEC. 3"-THICK LEVELING 1'-6"
DROP CURB
DROP CURB [INLET] SECTION 2.15 (TYP.) COURSE (TYP.) SIDEWALK TO CURB
[OUTLET] SIDEWALK
ROADWAY SIDEWALK
6" ROADWAY LOW ROADWAY
10% POINT PLANTED
PLANTED
2"
PITCH AREA
AREA
1'-0"
1'-3"
+
1'-4"
8"
ENGINEERED ENGINEERED
9"
B
SOIL SOIL
8" REINFORCED 18"x46"x8" PRECAST
WWM 6x6-W8xW8
CONCRETE CONCRETE GUTTER OR POURED
18"x46"x8" PRECAST OR HEADER (3) SIDES REINFORCED
POURED REINFORCED CONCRETE APRON
CONCRETE APRON L-SHAPED EDGING WITH
WRAP STONE IN MINIMUM 9" STAKES, 12"x5" PRECAST UNDISTURBED
UNDISTURBED SOIL SOIL
GEOTEXTILE SEE DRAWING GI-204 CONCRETE
3"-THICK LEVELING OPEN-GRADED OPEN-GRADED
A
(TOP AND SIDES OPEN-GRADED
COURSE STONE BASE WRAP GABION WALL IN 12" WIDE GABION STONE BASE STEEL SPIKE IN 4" DIA.
ONLY) STONE BASE
12" WIDE GABION GEOTEXTILE (TOP AND WALL FILLED WITH CONCRETE ENCASEMENT
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE PLACED IN ENGINEERED
OPEN-GRADED STONE 12" WIDE GABION WRAP GABION WALL IN SOIL (TYP.)
WRAP GABION WALL IN WALL FILLED WITH GEOTEXTILE (TOP AND
GEOTEXTILE (TOP AND OPEN-GRADED STONE 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
SIDES ONLY)
SIDES ONLY)
ROWB A B
WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6"
P.E. 07-19-2017
DEPTH SCHEDULE DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS JOINT AT MID-SPAN
FROM GI STANDARDS
SURFACE GRADING AS
PER DRAWING GI-124
SIDEWALK CONCRETE HEADER
5'-0" OR AS SHOWN LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 +
SET 1"-3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO WITH MINIMUM 9" STAKES
OUTLET INVERT MATCH CONTRACT PLANS SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
1'-6"
8"-THICK REINFORCED
PITCH
EXISTING EXISTING CURB
D D CONCRETE GUTTER
10%
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT ROADWAY
LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
PRECAST OR POURED 3'-10" 3'-10" 18"x46" PRECAST OR
REINFORCED CONCRETE POURED REINFORCED
APRON CONCRETE APRON
PLAN
8"
GUTTER, TOP FLUSH
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. WITH APRON
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING. 18"x46"x8" PRECAST OR WWM 6x6-W8xW8
POURED REINFORCED BOTTOM OF CURB
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND CONCRETE APRON
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
SECTION D-D
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
B B PITCH
OR AS
INTO PERMEABLE
BOTTOM OF COLUMN TO BE
PENETRATION
SOIL LAYER
OPEN
STONE FILLED PERFORATED 12" MIN 5'-0"
DIAMETER PVC PIPE WRAPPED PERMEABLE SOIL
ALL AROUND WITH GEOTEXTILE LAYER
FABRIC (TYP.)
SECTION A-A
OPEN BOTTOM (TYP.)
AT BIOSWALE VERTICAL DRAIN
5'-0" OR AS SHOWN
COLUMN 1"-3" BELOW ONLY IN ROW BIOSWALE COLUMN STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206
OUTLET INVERT
+ WITHOUT TREE (3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO WITH MINIMUM 9" STAKES
OUTLET INVERT MATCH CONTRACT PLANS SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
1'-6"
8"-THICK REINFORCED
PITCH
EXISTING EXISTING CURB
CONCRETE GUTTER
10%
ASPHALT
PAVEMENT
C TO MATCH EXISTING C TO REMAIN
ROADWAY
LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
PRECAST OR POURED 3'-10" 3'-10" 18"x46" PRECAST OR
REINFORCED CONCRETE POURED REINFORCED
APRON CONCRETE APRON
PLAN
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE EXTENT OF NEW CURB VARIES PER FIELD
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
CONDITIONS
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY HEIGHT OF ADJACENT ASPHALT PAVEMENT
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE FLUSH WITH CONCRETE APRON
WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. TOP OF CURB BEYOND
14" 18" 14" TYPICAL EXPANSION
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF WORK. JOINT
ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS.
ADJACENT 8"-THICK,
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. 18"-WIDE PRECAST OR
POURED CONCRETE
8"
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR AFTER GUTTER, TOP FLUSH
PLANTING. WITH APRON
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 18"x46"x8" PRECAST OR WWM 6x6-W8xW8
CONSULTATION WITH THE CERTIFIED ARBORIST. POURED REINFORCED BOTTOM OF CURB
CONCRETE APRON
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS. SECTION C-C
9. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PEFORATED PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC
INSERTED IN THE 14" CASING
10. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE
SHOWN
OR AS
5'-0"
CURB LINE 5"-THICK PRECAST CONCRETE STRIP (TYP.),
PLANTED AREA SEE GI-206
A
EXISTING FLOW
CATCH BASIN
REFER TO DETAILS
ON DRAWING GI-204
BIOSWALE OUTLET BIOSWALE INLET A
STORM WATER INLET
C B SEE DRAWINGS GI-202 OR
PLAN GI-203
5'-0" 5'-0"
OR AS SHOWN PLANTED AREA, SEE PLANTING OR AS SHOWN
PLANS (NO TREE PERMITTED)
22 12
MOLDED ELBOW STEEL TREE PIT GUARDS
SLOPE TO FRAME CURB TO MATCH PLANTED AREA, SEE
8" SOLID DUAL WALL (3 SIDES) SEE DRAWING
CONTACT PLANS PLANTING PLANS (NO
C.I. FRAME AND GRATING HDPE PIPE SEE DETAIL GI-601A, B, C, D & GI-602A
DROP CURB TREE PERMITTED)
(WITHOUT CURB PIECE) ON DRAWING GI-204 JUTE MESH
[OUTLET] JUTE MESH
ROADWAY ROADWAY CLEAN ROADWAY
10% CLEAN OUT, SEE
2" OUT,
PITCH GI-204
SEE
1'-0"
GI-204
HT. VARIES
1'-4"
8"
WWM 6x6-W8xW8
9" 18"x46"x8" PRECAST OR
POURED REINFORCED CONCRETE HEADER
CONCRETE HEADER
CONCRETE APRON (3) SIDES
(3 SIDES)
12"x5" PRECASET 3"-THICK LEVELING
ENGINEERED SOIL CONCRETE COURSE (TYP.)
18"x46"x8" PRECAST OR WRAP STONE IN L-SHAPED EDGING
OPEN-GRADED UNDISTURBED SOIL
POURED REINFORCED OPEN-GRADED GEOTEXTILE (TOP AND WITH MINIMUM 9"
STAKES STONE BASE ENGINEERED SOIL
CONCRETE APRON STONE BASE SIDES ONLY)
12" WIDE GABION 8" SOLID HDPE PIPE
12" WIDE GABION 8" PERFORATED
WALL FILLED WITH
WALL FILLED WITH HDPE PIPE WRAPED
OPEN-GRADED STONE
OPEN-GRADED STONE WITH GEOTEXTILE
WRAP GABION WALL IN
STORMWATER GEOTEXTILE (TOP AND
INLET [SEE EITHER SIDES ONLY)
DRAWINGS GI-202 SECTION B-B SECTION C-C
OR GI-203] AT BIOSWALE OUTLET
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 + (3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
SET 1"-3" BELOW
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO WITH MINIMUM 9" STAKES
OUTLET INVERT MATCH CONTRACT PLANS SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
1'-6"
8"-THICK REINFORCED
PITCH
EXISTING EXISTING CURB
SOLID PIPE TO
D D CONCRETE GUTTER
10%
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT STORMWATER
ROADWAY INLET, SEE PLANS LIMIT OF NEW CURB TO EXTEND
AND DETAILS BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
PRECAST OR POURED 3'-10" 3'-10" 18"x46" PRECAST OR
REINFORCED CONCRETE PLAN POURED REINFORCED
CONCRETE APRON
APRON
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". EXTENT OF NEW CURB VARIES PER FIELD
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE CONDITIONS
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. HEIGHT OF ADJACENT ASPHALT PAVEMENT
FLUSH WITH CONCRETE APRON
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY TOP OF CURB BEYOND
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL 14" 18" 14" TYPICAL EXPANSION
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
JOINT
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF ADJACENT 8"-THICK,
WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS. 18"-WIDE PRECAST OR
POURED CONCRETE
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
8"
GUTTER, TOP FLUSH
WITH APRON
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING.
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND 18"x46"x8" PRECAST OR WWM 6x6-W8xW8
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN POURED REINFORCED BOTTOM OF CURB
CONSULTATION WITH THE CERTIFIED ARBORIST. CONCRETE APRON
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE. SECTION D-D
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
SHOWN
5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE
OR AS
5'-0"
PLANTED AREA GI-206
EXISTING
CATCH BASIN BIOSWALE BIOSWALE FLOW
OUTLET INLET
C B A
PLAN
1'-3"
1'-6"
ENGINEERED ENGINEERED ENGINEERED
WWM 6x6-W8xW8
SOIL 9" SOIL SOIL
18"x46"x8" PRECAST OR
POURED REINFORCED 8" REINFORCED 18"x46"x8" PRECAST
CONCRETE APRON CONCRETE CONCRETE GUTTER OR POURED REINFORCED
HEADER (3) SIDES CONCRETE APRON
UNDISTURBED SOIL L-SHAPED EDGING WITH 1' W x 1'- 6" H GABION UNDISTURBED
4" MINIMUM
3'-0"
OPEN-GRADED MINIMUM 9" STAKES, WALL FILLED WITH SOIL
1' W x 1'- 6" H GABION OPEN-GRADED STONE STONE
STONE BASE SEE DRAWING GI-204
WALL FILLED WITH COVER STEEL SPIKE IN 4" DIA.
1' W x 1'- 6" H GABION OPEN-GRADED CONCRETE ENCASEMENT
OPEN-GRADED STONE STONE BASE
WRAP STONE IN WALL FILLED WITH PLACED IN ENGINEERED
WRAP GABION WALL IN GEOTEXTILE OPEN-GRADED STONE 18'-0" L x 47" W x 26.5" H SOIL (TYP.)
GEOTEXTILE (TOP AND (TOP AND
WRAP GABION WALL IN STORMWATER CHAMBER
SIDES ONLY) SIDES ONLY)
GEOTEXTILE (TOP AND CAPPED AT BOTH ENDS;
5" MINIMUM
SEE DRAWING GI-204
BEDDING
SIDES ONLY) 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS JOINT AT MID-SPAN
FROM GI STANDARDS 18' L x 47" W x 26.5" H STORMWATER
CHAMBER CAPPED AT BOTH ENDS;
SEE DRAWING GI-204
SURFACE GRADING AS
PER DRAWING GI-124
SIDEWALK CONCRETE HEADER
GABION WALL BELOW PRECAST 5'-0" OR AS SHOWN LOW POINT STEEL TREE PIT GUARDS
CONCRETE STRIP, SEE GI-206 +
SET 1"-3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) OUTLET NEW CURB TYPE TO WITH MINIMUM 9" STAKES
INVERT MATCH CONTRACT PLANS SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
1'-6"
8"-THICK REINFORCED
PITCH
EXISTING EXISTING CURB
D D CONCRETE GUTTER
10%
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT ROADWAY
LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
PRECAST OR POURED 3'-10" 3'-10" 18"x46" PRECAST OR
REINFORCED CONCRETE POURED REINFORCED
APRON CONCRETE APRON
PLAN
8"
GUTTER, TOP FLUSH
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. WITH APRON
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING. 18"x46"x8" PRECAST OR WWM 6x6-W8xW8
POURED REINFORCED BOTTOM OF CURB
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND CONCRETE APRON
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
SECTION D-D
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
- NO CONNECTION TO SEWERS
SHOWN
5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE
OR AS
5'-0"
PLANTED AREA GI-206
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A
PLAN
EQ EQ
5'-0"
SEE GI-201 FOR OR AS SHOWN JUTE MESH
SEDIMENT PAD DETAILS 12"x5" PRECAST TREE 3-SIDED STEEL TREE PIT
1/2" EXPANSION JOINT
PLANTING GUARDS SEE DRAWINGS
CURB TYPE TO MATCH AND FILLER PER NYC CONCRETE STRIP
GI-601A, B, C, D & 602A
CONTRACT PLANS DOT HIGHWAY SPEC. 3"-THICK LEVELING 1'-6"
DROP CURB
DROP CURB [INLET] SECTION 2.15 (TYP.) COURSE (TYP.) SIDEWALK TO CURB
[OUTLET] SIDEWALK
ROADWAY SIDEWALK
6" ROADWAY LOW ROADWAY
10% POINT PLANTED
PLANTED
2"
PITCH AREA
AREA
1'-0"
1'-3"
+
1'-4"
8"
ENGINEERED ENGINEERED
9"
B
SOIL SOIL
8" REINFORCED 18"x34"x8" PRECAST OR
WWM 6x6-W8xW8
CONCRETE CONCRETE GUTTER POURED REINFORCED
18"x34"x8" PRECAST OR HEADER (3) SIDES CONCRETE APRON
POURED REINFORCED
CONCRETE APRON L-SHAPED EDGING WITH
WRAP STONE IN MINIMUM 9" STAKES, 12"x5" PRECAST UNDISTURBED
UNDISTURBED SOIL SOIL
GEOTEXTILE SEE DRAWING GI-204 CONCRETE
3"-THICK LEVELING OPEN-GRADED OPEN-GRADED
A
(TOP AND SIDES OPEN-GRADED
COURSE STONE BASE WRAP GABION WALL IN 12" WIDE GABION STONE BASE STEEL SPIKE IN 4" DIA.
ONLY) STONE BASE
12" WIDE GABION GEOTEXTILE (TOP AND WALL FILLED WITH CONCRETE ENCASEMENT
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE PLACED IN ENGINEERED
OPEN-GRADED STONE 12" WIDE GABION WRAP GABION WALL IN SOIL (TYP.)
WRAP GABION WALL IN WALL FILLED WITH GEOTEXTILE (TOP AND
GEOTEXTILE (TOP AND OPEN-GRADED STONE 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
SIDES ONLY)
SIDES ONLY)
SURFACE GRADING AS
PER DRAWING GI-124
SIDEWALK CONCRETE HEADER
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 +
SET 1"-3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
OUTLET INVERT SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB 5"-THICK PRECAST
1'-0"
1'-6"
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET] FLOW
PITCH MATCH CONTRACT PLANS EXISTING CURB
1'-6"
EXISTING
PITCH
TO REMAIN
ASPHALT D D 8"-THICK REINFORCED
10%
TO MATCH EXISTING
PAVEMENT CONCRETE GUTTER PRECAST OR POURED LIMIT OF NEW CURB TO EXTEND
ROADWAY
REINFORCED BEYOND THE ROWB AS DETERMINED
2'-10" 2'-10" CONCRETE APRON BY FIELD CONDITIONS AND SITE
ENGINEER
PRECAST OR POURED
REINFORCED CONCRETE PLAN
APRON
8"
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. APRON
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING. WWM 6x6-W8xW8
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND 18"x34"x8" PRECAST OR BOTTOM OF CURB
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN POURED REINFORCED
CONSULTATION WITH THE CERTIFIED ARBORIST. CONCRETE APRON
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SECTION D-D
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE 07-19-2017
P.E.
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
5'-0"
SEE GI-201 FOR SEDIMENT JUTE MESH
PROPERTY LINE OR AS SHOWN
PAD DETAILS
1/2" EXPANSION JOINT
CURB TYPE TO MATCH AND FILLER PER NYC
CONTRACT PLANS DOT HIGHWAY SPEC.
A DROP CURB [INLET]
SECTION 2.15 (TYP.)
LOCATION OF BIOSWALE 15'-0" STEEL TREE PIT GUARDS (3 SIDES TYP.) EXISTING
VARIES OR AS SHOWN SEE DRAWING GI-601A, B, C, D & GI-602A ROADWAY SIDEWALK
3'-6" 3'-6" CONCRETE
L-SHAPED EDGING WITH MINIMUM SEE DRAWINGS GI-502A, B, C & D FOR SIDEWALK
9" STAKES SEE DRAWING GI-204 TYPICAL PLANTING PLANS 10%
PITCH PLANTED
CURB LINE 5"-THICK PRECAST CONCRETE AREA
B B
SHOWN
OR AS
BOTTOM OF COLUMN TO BE
INTO PERMEABLE
OPEN
PENETRATION
SOIL LAYER
MIN 5'-0"
15'-0" OR AS SHOWN
PLACE EXPANSION
SEE NOTES BELOW FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
SURFACE GRADING AS
3'-6" 3'-6" PER DRAWING GI-124
STONE COLUMNS
SIDEWALK CONCRETE HEADER
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 +
SET 1"-3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
OUTLET SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS INVERT SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB 1'-0" 5"-THICK PRECAST
1'-6"
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET] FLOW
MATCH CONTRACT PLANS EXISTING CURB
C PITCH
C
1'-6"
EXISTING
PITCH
8"-THICK REINFORCED TO REMAIN
ASPHALT
10%
TO MATCH EXISTING
PAVEMENT CONCRETE GUTTER PRECAST OR POURED LIMIT OF NEW CURB TO EXTEND
ROADWAY
REINFORCED BEYOND THE ROWB AS DETERMINED
2'-10" 2'-10" CONCRETE APRON BY FIELD CONDITIONS AND SITE
ENGINEER
PRECAST OR POURED
REINFORCED CONCRETE PLAN
APRON
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE EXTENT OF NEW CURB VARIES
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. PER FIELD CONDITION
HEIGHT OF ADJACENT
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE ASPHALT PAVEMENT FLUSH
WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. WITH CONCRETE APRON
TOP OF CURB BEYOND
10" 14" 10"
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF WORK. TYPICAL EXPANSION JOINT
ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS. ADJACENT 8"-THICK,
18"-WIDE PRECAST OR
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. POURED CONCRETE
GUTTER, TOP FLUSH WITH
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR AFTER
8"
PLANTING. APRON
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN WWM 6x6-W8xW8
CONSULTATION WITH THE CERTIFIED ARBORIST. 18"x34"x8" PRECAST OR BOTTOM OF CURB
POURED REINFORCED
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND CONCRETE APRON
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS. SECTION C-C
9. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PEFORATED PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC
INSERTED IN THE 14" CASING
P.E. 07-19-2017
10. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE
REFER TO DETAILS ON
C B CLEAN-OUT AND HDPE PIPES SEE DETAIL ON SIDEWALK
DRAWING GI-204
DRAWING GI-204 8"-THICK REINFORCED CONCRETE GUTTER
L-SHAPED EDGING WITH
SHOWN
OR AS
PLANTED AREA 5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE
5'-0"
MINIMUM 9" STAKES
GI-206
CURB LINE
A
FLOW
C B
PLAN
5'-0" 5'-0"
OR AS SHOWN PLANTED AREA, SEE PLANTING OR AS SHOWN
PLANS (NO TREE PERMITTED)
22 12
MOLDED ELBOW STEEL TREE PIT GUARDS
SLOPE TO FRAME CURB TO MATCH PLANTED AREA, SEE
8" SOLID DUAL WALL (3 SIDES) SEE DRAWING
CONTACT PLANS PLANTING PLANS (NO
C.I. FRAME AND GRATING HDPE PIPE SEE DETAIL GI-601A, B, C, D & GI-602A
DROP CURB TREE PERMITTED)
(WITHOUT CURB PIECE) ON DRAWING GI-204 JUTE MESH
[OUTLET] JUTE MESH
ROADWAY ROADWAY CLEAN ROADWAY
10% CLEAN OUT
2" OUT
PITCH
1'-0"
HT. VARIES
1'-4"
8"
WWM 6x6-W8xW8
9" 18"x34"x8" PRECAST OR
POURED REINFORCED CONCRETE HEADER
CONCRETE HEADER
CONCRETE APRON (3) SIDES
(3 SIDES)
12"x5" PRECASET
ENGINEERED SOIL
CONCRETE
18"x46"x8" PRECAST OR WRAP STONE IN L-SHAPED EDGING UNDISTURBED SOIL
OPEN-GRADED
POURED REINFORCED OPEN-GRADED GEOTEXTILE (TOP AND WITH MINIMUM 9"
STONE BASE ENGINEERED SOIL
CONCRETE APRON STONE BASE SIDES ONLY) STAKES
8" DIA. SOLID HDPE PIPE
1' W x 3' H GABION WALL 1'W x 3'H GABION WALL
FILLED WITH 8" DIA. PERFORATED
FILLED WITH HDPE PIPE WRAPED
OPEN-GRADED STONE OPEN-GRADED STONE
WITH GEOTEXTILE
WRAP GABION WALL IN
STORMWATER GEOTEXTILE (TOP AND
INLET [SEE EITHER SIDES ONLY)
DRAWINGS GI-202 SECTION B-B SECTION C-C
OR GI-203] AT BIOSWALE INLET AT BIOSWALE OUTLET
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 + (3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
SET 1"-3" BELOW
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) OUTLET INVERT WITH MINIMUM 9" STAKES
SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB 5"-THICK PRECAST
1'-0"
1'-6"
TO REMAIN CONCRETE STRIP EXPANSION JOINT
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET] FLOW
PITCH MATCH CONTRACT PLANS EXISTING CURB
1'-6"
EXISTING
PITCH
8"-THICK REINFORCED TO REMAIN
ASPHALT D D
10%
TO MATCH EXISTING
PAVEMENT CONCRETE GUTTER PRECAST OR POURED LIMIT OF NEW CURB TO EXTEND
ROADWAY
REINFORCED BEYOND THE ROWB AS DETERMINED
2'-10" 2'-10" CONCRETE APRON BY FIELD CONDITIONS AND SITE
ENGINEER
PRECAST OR POURED
REINFORCED CONCRETE PLAN
APRON
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". EXTENT OF NEW CURB VARIES
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE PER FIELD CONDITION
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY WITH CONCRETE APRON
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL TOP OF CURB BEYOND
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 10" 14" 10"
TYPICAL EXPANSION JOINT
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF ADJACENT 8"-THICK,
WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS. 18"-WIDE PRECAST OR
POURED CONCRETE
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. GUTTER, TOP FLUSH WITH
8"
APRON
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING.
WWM 6x6-W8xW8
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 18"x34"x8" PRECAST OR BOTTOM OF CURB
CONSULTATION WITH THE CERTIFIED ARBORIST. POURED REINFORCED
CONCRETE APRON
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
SECTION D-D
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
SHOWN
5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE
OR AS
5'-0"
PLANTED AREA GI-206
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A
PLAN
1'-3"
1'-6"
ENGINEERED ENGINEERED ENGINEERED
WWM 6x6-W8xW8
SOIL 9" SOIL SOIL
18"x34"x8" PRECAST OR
POURED REINFORCED 8" REINFORCED 18"x34"x8" PRECAST
CONCRETE APRON CONCRETE CONCRETE GUTTER OR POURED REINFORCED
HEADER (3) SIDES CONCRETE APRON
UNDISTURBED SOIL L-SHAPED EDGING WITH 1' W x 1'- 6" H GABION UNDISTURBED
4" MINIMUM
3'-0"
OPEN-GRADED MINIMUM 9" STAKES, WALL FILLED WITH SOIL
1' W x 1'- 6" H GABION OPEN-GRADED STONE STONE
STONE BASE SEE DRAWING GI-204
WALL FILLED WITH COVER STEEL SPIKE IN 4" DIA.
1' W x 1'- 6" H GABION OPEN-GRADED CONCRETE ENCASEMENT
OPEN-GRADED STONE STONE BASE
WRAP STONE IN WALL FILLED WITH PLACED IN ENGINEERED
WRAP GABION WALL IN GEOTEXTILE OPEN-GRADED STONE 18'-0" L x 47" W x 26.5" H SOIL (TYP.)
GEOTEXTILE (TOP AND (TOP AND
WRAP GABION WALL IN STORMWATER CHAMBER
SIDES ONLY) SIDES ONLY)
GEOTEXTILE (TOP AND CAPPED AT BOTH ENDS;
5" MINIMUM
SEE DRAWING GI-204
BEDDING
SIDES ONLY) 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
PLACE EXPANSION
SEE NOTES BELOW FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DEVIATION IN DIMENSIONS
FROM GI STANDARDS 13'-0" L x 47" W x 26.5" H
STORMWATER CHAMBER CAPPED AT
BOTH ENDS; SEE DRAWING GI-204
SURFACE GRADING AS
PER DRAWING GI-124
SIDEWALK CONCRETE HEADER
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW PRECAST
CONCRETE STRIP, SEE GI-206 +
SET 1"-3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER OUTLET INVERT L-SHAPED EDGING
TO FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
OUTLET INVERT SEE DRAWING GI-204
NEW CURB TYPE TO MATCH
CONTRACT PLANS SEE GI-201 FOR
SEDIMENT PAD DETAILS
EXISTING CURB 5"-THICK PRECAST
1'-0"
1'-6"
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET] FLOW
PITCH MATCH CONTRACT PLANS EXISTING CURB
1'-6"
EXISTING
D D
PITCH
8"-THICK REINFORCED TO REMAIN
ASPHALT
10%
TO MATCH EXISTING
PAVEMENT CONCRETE GUTTER PRECAST OR POURED LIMIT OF NEW CURB TO EXTEND
ROADWAY
REINFORCED BEYOND THE ROWB AS DETERMINED
2'-10" 2'-10" CONCRETE APRON BY FIELD CONDITIONS AND SITE
ENGINEER
PRECAST OR POURED
REINFORCED CONCRETE PLAN
APRON
8"
APRON
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR WWM 6x6-W8xW8
AFTER PLANTING. 18"x34"x8" PRECAST OR BOTTOM OF CURB
POURED REINFORCED
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN CONCRETE APRON
CONSULTATION WITH THE CERTIFIED ARBORIST.
SECTION D-D
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
- NO CONNECTION TO SEWERS
SHOWN
OR AS
5"-THICK PRECAST CONCRETE STRIP (TYP.), SEE GI-206
5'-0"
8"-THICK REINFORCED CONCRETE GUTTER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET B INLET
C A
EQ EQ
5'-0"
SEE GI-201 FOR OR AS SHOWN JUTE MESH
SEDIMENT PAD DETAILS 12"x5" PRECAST TREE 3-SIDED STEEL TREE PIT
1/2" EXPANSION JOINT
CONCRETE STRIP PLANTING GUARDS SEE DRAWINGS
CURB TYPE TO MATCH AND FILLER PER NYC
GI-601A, B, C, D & 602A
CONTRACT PLANS DOT HIGHWAY SPEC. 3"-THICK LEVELING 1'-6"
DROP CURB
DROP CURB [INLET] SECTION 2.15 (TYP.) COURSE (TYP.) SIDEWALK TO CURB
[OUTLET] SIDEWALK
ROADWAY SIDEWALK
6" ROADWAY LOW ROADWAY
10% POINT PLANTED
PLANTED
2"
PITCH AREA
AREA
1'-0"
1'-3"
+
1'-4"
8"
ENGINEERED ENGINEERED
9"
B
SOIL SOIL
8" REINFORCED 18"x30"x8" PRECAST OR
WWM 6x6-W8xW8
CONCRETE CONCRETE GUTTER POURED REINFORCED
12"x30"x8" PRECAST OR HEADER (3) SIDES CONCRETE APRON
POURED REINFORCED
CONCRETE APRON L-SHAPED EDGING WITH
WRAP STONE IN MINIMUM 9" STAKES, 12"x5" PRECAST UNDISTURBED
UNDISTURBED SOIL SOIL
GEOTEXTILE SEE DRAWING GI-204 CONCRETE
3"-THICK LEVELING OPEN-GRADED OPEN-GRADED
A
(TOP AND SIDES OPEN-GRADED
COURSE STONE BASE WRAP GABION WALL IN 12" WIDE GABION STONE BASE STEEL SPIKE IN 4" DIA.
ONLY) STONE BASE
12" WIDE GABION GEOTEXTILE (TOP AND WALL FILLED WITH CONCRETE ENCASEMENT
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE PLACED IN ENGINEERED
OPEN-GRADED STONE 12" WIDE GABION WRAP GABION WALL IN SOIL (TYP.)
WRAP GABION WALL IN WALL FILLED WITH GEOTEXTILE (TOP AND
GEOTEXTILE (TOP AND OPEN-GRADED STONE 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
SIDES ONLY)
SIDES ONLY)
ROWB A B
WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6"
5'-0" OR AS SHOWN
STEEL TREE PIT GUARDS
GABION WALL BELOW LOW POINT (3-SIDES TYP.) SEE DRAWING
PRECAST CONCRETE STRIP,
SEE GI-206 +
SET 1"-3" BELOW
GI-601A, B, C, D & GI-602A
L-SHAPED EDGING
PRECAST CONCRETE TAPER NEW CURB TYPE TO OUTLET INVERT
WITH MINIMUM 9" STAKES
TO FOLLOW CURB LINE (TYP.) MATCH CONTRACT
SEE DRAWING GI-204
PLANS
NEW CURB TYPE TO MATCH OUTLET
CONTRACT PLANS INVERT SEE GI-201 FOR SEDIMENT
PAD DETAILS
EXISTING CURB 5"-THICK PRECAST
1'-0"
TO REMAIN CONCRETE STRIP EXPANSION JOINT
1'-6"
FLOW
+
[OUTLET] [INLET] FLOW
EXISTING ASPHALT PITCH EXISTING CURB
1'-6"
8"-THICK CONCRETE
PITCH
TO REMAIN
10%
PAVEMENT GUTTER
TO MATCH EXISTING
PRECAST OR POURED
REINFORCED CONCRETE
D ROADWAY D PRECAST OR POURED
REINFORCED
LIMIT OF NEW CURB TO
EXTEND BEYOND THE ROWB
APRON CONCRETE APRON AS DETERMINED BY FIELD
2'-6" 2'-6" CONDITIONS AND SITE
PLAN ENGINEER
NOTES:
EXTENT OF NEW CURB
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". VARIES PER FIELD CONDITION
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE 16"x30"x8" PRECAST OR POURED
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
REINFORCED CONCRETE APRON
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
TOP OF CURB BEYOND
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 9" 12" 9" TYPICAL EXPANSION JOINT
ADJACENT 8"-THICK, 18"-WIDE
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF
PRECAST OR POURED
WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS.
CONCRETE GUTTER, TOP
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. FLUSH WITH APRON
8"
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING.
WWM 6x6-W8xW8
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND BOTTOM OF CURB
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST. SECTION D-D
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS. P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
- NO CONNECTION TO SEWERS
PROPERTY LINE
5'-0"
SEE GI-201 FOR SEDIMENT
OR AS SHOWN
L-SHAPED EDGING WITH MINIMUM 9" STAKES PAD DETAILS
SEE DRAWING GI-204 CURB TYPE TO MATCH 1'-6"
EXISTING
LOCATION OF BIOSWALE A 10'-0" STEEL TREE PIT GUARDS (3 SIDES TYP.) CONCRETE CONTRACT PLANS 1/2" EXPANSION JOINT AND
VARIES OR AS SHOWN SEE DRAWINGS GI-601A, B, C, D & GI-602A SIDEWALK FILLER PER NYC DOT HIGHWAY
DROP CURB [INLET]
1'-6" SEE DRAWINGS GI-503A, B, C & D FOR TYPICAL SPEC. SECTION 2.15 (TYP.)
1'-6"
PLANTING PLANS SIDEWALK
B B ROADWAY
SHOWN
10% PIT
5'-0"
GI-206 CH PLANTED
8"-THICK REINFORCED CONCRETE GUTTER AREA
BIOSWALE FLOW
CURB LINE OUTLET BIOSWALE
EXISTING STONE COLUMN INLET
CATCH BASIN A ENGINEERED
PLAN WWM 6x6 - W8xW8 SOIL CONCRETE
18"x30"x8" PRECAST OR HEADER (3) SIDES
POURED REINFORCED
STEEL TREE PIT GUARDS (3 GRADE TO ALLOW FOR 1"-3" CONCRETE APRON
1'-6"
SIDES TYP) SEE DRAWINGS DEEP DEPRESSION, SEE UNDISTURBED SOIL
GI-601A, B, C, D & GI-602A DRAWING GI-124 STEEL SPIKE IN 4" DIA.
12" WIDE GABION WALL
12" CONCRETE
FILLED WITH OPEN-GRADED
ENCASEMENT PLACED
STONE WRAPPED IN
IN ENGINEERED SOIL
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
SECTION B-B DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
10'-0" OR AS SHOWN
STONE COLUMN
SURFACE GRADING AS PER
1'-6"
DRAWING GI-124
SIDEWALK
CONCRETE HEADER
5'-0" OR AS SHOWN
LOW POINT STEEL TREE PIT GUARDS
GABION WALL BELOW
(3-SIDES TYP.) SEE DRAWING
PRECAST CONCRETE STRIP,
SEE GI-206
1'-6" +
SET 1"-3" BELOW
GI-601A, B, C, D & GI-602A
1'-0"
TO REMAIN CONCRETE STRIP EXPANSION JOINT
1'-6"
8" 9" 12" 9" 9" 12" 9" 1'-2"
FLOW
+
[OUTLET] [INLET] FLOW
EXISTING ASPHALT PITCH EXISTING CURB
1'-6"
8"-THICK CONCRETE
PITCH
TO REMAIN
10%
PAVEMENT GUTTER
TO MATCH EXISTING
PRECAST OR POURED C ROADWAY C PRECAST OR POURED LIMIT OF NEW CURB TO
REINFORCED CONCRETE REINFORCED EXTEND BEYOND THE ROWB
APRON CONCRETE APRON AS DETERMINED BY FIELD
2'-6" 2'-6" CONDITIONS AND SITE
PLAN ENGINEER
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
EXTENT OF NEW CURB
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. VARIES PER FIELD CONDITION
16"x30"x8" PRECAST OR POURED
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY REINFORCED CONCRETE APRON
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE
WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 9" 12" 9" TYPICAL EXPANSION JOINT
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF WORK. ADJACENT 8"-THICK, 18"-WIDE
ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS. PRECAST OR POURED
CONCRETE GUTTER, TOP
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. FLUSH WITH APRON
8"
5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR AFTER
PLANTING.
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND WWM 6x6-W8xW8
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN BOTTOM OF CURB
CONSULTATION WITH THE CERTIFIED ARBORIST. SECTION C-C
7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.
8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.
9. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PEFORATED PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC
INSERTED IN THE 14" CASING P.E. 07-19-2017
10. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. RAIN GARDEN TYPE1, TYPE 2, AND TYPE 3
- NO CONNECTION TO SEWERS
W
EXISTING
CATCH BASIN
R.O.W. R.O.W. FLOW
OUTLET INLET
C B A
PLAN
18"
ENGINEERED ENGINEERED ENGINEERED
WWM 6x6-W8xW8 SOIL 9" SOIL SOIL
PRECAST OR POURED PRECAST OR POURED
REINFORCED CONCRETE 8" REINFORCED REINFORCED
CONCRETE CONCRETE GUTTER
APRON CONCRETE APRON
HEADER (3) SIDES
OPEN-GRADED L-SHAPED EDGING WITH OPEN-GRADED 12"x5" PRECAST OPEN-GRADED
UNDISTURBED
18"
UNDISTURBED SOIL STONE BASE MINIMUM 9" STAKES, STONE BASE CONCRETE STONE BASE
WRAP STONE IN SOIL
SEE DRAWING GI-204
12" WIDE GABION GEOTEXTILE 12" WIDE GABION WALL STEEL SPIKE IN 4" DIA.
WALL FILLED WITH (TOP AND SIDES 12" WIDE GABION FILLED WITH CONCRETE
OPEN-GRADED STONE ONLY) WALL FILLED WITH OPEN-GRADED STONE ENCASEMENT PLACED IN
W OPEN-GRADED STONE W W
GEOTEXTILE WRAPPED ENGINEERED SOIL (TYP.)
GEOTEXTILE WRAPPED
SECTION A-A AROUND GABION
SECTION B-B AROUND GABION SECTION C-C
AT R.O.W. INLET AT MIDSECTION [LOWEST POINT] AT R.O.W. OUTLET
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W.RAIN GARDENS
- NO CONNECTION TO SEWERS
L
SURFACE
GRADING AS
PER DRAWING
GI-124
SIDEWALK
LOW POINT
+
SET 1"-3"
W
BELOW OUTLET
INVERT
OUTLET INVERT
CURB LINE
EXISTING CURB
5"-THICK PRECAST
TO REMAIN
CONCRETE
A B A A B A
FLOW
+
[OUTLET] [INLET] FLOW
PITCH 8"-THICK REINFORCED
PITCH
EXISTING
10%
ASPHALT CONCRETE GUTTER
TO MATCH EXISTING
PAVEMENT ROADWAY
C C
TYPE 1/ TYPE 2
L
SURFACE
R.O.W. BIOSWALE OR RAIN GARDEN DETAILS INLET/OUTLET DIMENSIONS PLANTING PLAN GRADING AS PER
SIDEWALK DRAWING GI-124
LENGTH (L), WIDTH (W),
TYPE A B C TYPE / PAGE NUMBER
1FT. INCREMENT 6 IN. INCREMENT
LOW POINT
4'-0" TO 6'-0" TYPE 1 14" 18" 3'-10" TYPE 1 / GI-501A-D +
SET 1"-3" BELOW
W
4'-0" TO 6'-0" TYPE 2 10" 14" 2'-10" TYPE 2 / GI-502A-D OUTLET INVERT
1'-0"
5"-THICK PRECAST CURB LINE
1'-6"
TO REMAIN 2" 2" 8"
NOTES: CONCRETE
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TYPE SPECIFIED. 8" A B A A B A 1'-2"
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL CONFIRM THE LEVELS OF THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TO
PREVENT FLOODING.
FLOW +
[OUTLET] [INLET] FLOW
PITCH
PITCH
8"-THICK REINFORCED
10%
3. DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'.
TO MATCH EXISTING CONCRETE GUTTER
4. PLANTING QUANTITIES AND PLANS FOR VARIABLE WIDTH R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS AS PER THE PAGE NUMBERS ROADWAY
SPECIFIED, DISTRIBUTED EVENLY. C C
TYPE 3
5. TREES SPECIES AS DIRECTED BY DPR. TREES ARE ONLY PERMITTED IN R.O.W. BIOSWALES WITH AN ENGINEERED SOIL LAYER 24"
DEEP.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STONE COLUMN SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS
L
SURFACE
GRADING AS
PER DRAWING
STONE COLUMNS GI-124
A EQ EQ A
SIDEWALK
LOW POINT SET 1"-3"
W
+ BELOW OUTLET
INVERT
CURB LINE
EXISTING CURB
5"-THICK PRECAST
TO REMAIN
CONCRETE
FLOW
+
[OUTLET] [INLET] FLOW
PITCH 8"-THICK REINFORCED
PITCH
EXISTING
10%
ASPHALT CONCRETE GUTTER
TO MATCH EXISTING
PAVEMENT ROADWAY
TYPE 1/ TYPE 2
L
A
SIDEWALK DRAWING GI-124
LENGTH (L), WIDTH (W), NUMBER OF
TYPE A
1FT. INCREMENT 6 IN. INCREMENT COLUMNS
LOW POINT
4'-0" TO 6'-0" TYPE 1 3 4'-6"
A
+
SET 1"-3" BELOW
W
4'-0" TO 6'-0" TYPE 2 2 3'-6" OUTLET INVERT
STONE
4'-0" TO 6'-0" TYPE 3 1 1'-6" COLUMN OUTLET
INVERT
PITCH
8"-THICK REINFORCED
10%
3. ROWB WITH THREE COLUMNS WILL NOT CONTAIN A TREE.
TO MATCH EXISTING CONCRETE GUTTER
4. TOP OF STONE COLUMN COVER BELOW INTERFACE OF ENGINEERED SOIL AND STONE BASE ROADWAY
TYPE 3
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SURFACE GRADING PLANS FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
- NO CONNECTION TO SEWERS
EXTENTS OF RETENTION AREA TO
MATCH INLET INVERT L
CONTOU R (TYP.)
R (TYP.) CONTOU
SIDEWALK
RETENTION AREA
RETENTION AREA
EXTENDS EVEN WITH +
LOW POINT
RETENTION AREA
EXTENDS EVEN WITH
W
INSIDE EDGE OF OUTLET SET 1"-3" BELOW INSIDE EDGE OF INLET
APRON. OUTLET INVERT APRON.
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
PITCH
EXISTING 8"-THICK REINFORCED
10%
ASPHALT TO MATCH EXISTING CONCRETE GUTTER
PAVEMENT ROADWAY
9"
CO
N UR
(T TO TO .)
SIDEWALK YP UR N P
.) CO (TY
RETENTION AREA
+
LOW POINT
W
9"
INVERT
1. ALL SURFACE GRADING TO TAPER
TOWARDS THE LOW POINT. EXISTING CURB
1'-0"
TO REMAIN CONCRETE
2. CONTOUR LINES SHOWN ON THIS
DRAWING ARE SCHEMATIC ONLY AND 1'-2"
DEPEND ON THE STREET GRADE.
FLOW +
[OUTLET] [INLET] FLOW
PITCH
PITCH
EXISTING ASPHALT 8"-THICK
10%
PAVEMENT TO MATCH REINFORCED
EXISTING CONCRETE GUTTER
ROADWAY
OUTLET INVERT AT
GRADING PLAN 2
BOTTOM OF CURB FOR ROWB WITHOUT STONE COLUMN AND
L = LESS THAN 13'
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W.B. - PERFORATED PIPE
- NO CONNECTION TO SEWERS
ROWB ROWB
A A
EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET
PLAN
CONCRETE WALKWAY
5'-0" FOOTERS
AREA AREA
21"
GEOTEXTILE (TOP
ENTIRE BIOSWALE
AND SIDES ONLY) 6"
6" 6"
5'-0" DEPTH
12"
CONCRETE HEADER 12"
5'-0"
(3) SIDES 8" REINFORCED
CONCRETE GUTTER OPEN-GRADED STONE
2'-6"
PERFORATED 6" DIA. SLOTTED P.E. CORRUGATED PIPE OPEN-GRADED STONE PERFORATED BASE WRAPPED IN
WRAP STONE IN
END PLUG WRAPPED IN GEOTEXTILE AT INTERFACE WRAPPED IN GEOTEXTILE (TOP END PLUG GEOTEXTILE (TOP AND
GEOTEXTILE (TOP
OF ENGINEERED SOIL AND STONE BASE AND SIDES ONLY) 6" DIA. SLOTTED P.E. SIDES ONLY)
AND SIDES ONLY)
CORRUGATED PIPE
WRAPPED IN GEOTEXTILE
WRAP STONES IN 5'-0" OR AS SHOWN
LENGTH AS SHOWN GEOTEXTILE (TOP AND
SIDES ONLY)
SECTION A-A SECTION B-B
AT PERFORATED PIPE AT WALKWAY
NOTE: USE SMALLER SIZE STORMWATER CHAMBER AS SHOWN ON GI-204 WHEN REQUIRED
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN 3'-6" OR AS FLOW
SHOWN OUTLET INLET
(TYP.) (TYP.)
C B A
PLAN
1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL 9" SOIL SOIL
WWM 6x6-W8xW8 8" REINFORCED 18"x46"x8" PRECAST OR
CONCRETE GUTTER POURED REINFORCED
18"x46"x8" PRECAST OR CONCRETE CONCRETE APRON
POURED REINFORCED HEADER (3) SIDES
CONCRETE APRON L-SHAPED EDGING WITH UNDISTURBED SOIL
UNDISTURBED SOIL MINIMUM 9" STAKES, 12"x5" PRECAST STEEL SPIKE IN 4" DIA.
3'-0"
OPEN-GRADED WRAP STONE IN SEE DRAWING GI-204 CONCRETE CONCRETE ENCASEMENT
3"-THICK LEVELING
STONE BASE GEOTEXTILE (TOP WRAP GABION WALL IN OPEN-GRADED OPEN-GRADED PLACED IN ENGINEERED
COURSE 12" WIDE GABION
AND SIDES ONLY) GEOTEXTILE (TOP AND STONE BASE STONE BASE SOIL (TYP.)
12" WIDE GABION WALL FILLED WITH
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE
OPEN-GRADED STONE 12" WIDE GABION
WALL FILLED WITH WRAP GABION WALL IN
WRAP GABION WALL IN 3'-6"
OPEN-GRADED STONE 3'-6" GEOTEXTILE (TOP AND
GEOTEXTILE (TOP AND OR AS SHOWN 3'-6"
OR AS SHOWN SIDES ONLY)
SIDES ONLY) OR AS SHOWN
SECTION A-A SECTION B-B SECTION C-C
AT GREEN STRIP INLET AT MIDSECTION [LOWEST POINT] AT GREEN STRIP OUTLET
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
CONCRETE STRIP, SEE GI-206 INVERT SEE GI-201 FOR SEDIMENT PAD
DETAILS
EXISTING CURB TO NEW CURB TYPE TO
5"-THICK PRECAST
1'-6"
FLOW
+
[OUTLET] [INLET] FLOW
PITCH EXISTING CURB
8"-THICK REINFORCED
1'-6"
PITCH
EXISTING TO REMAIN
10%
ASPHALT D TO MATCH EXISTING D CONCRETE GUTTER
PAVEMENT EXPANSION JOINT - LIMIT OF NEW
ROADWAY
CURB TO EXTEND BEYOND THE
3'-10" 3'-10" ROWB AS DETERMINED BY FIELD
CONDITIONS AND SITE ENGINEER
PRECAST OR POURED
REINFORCED CONCRETE
APRON
PLAN
NOTES:
EXTENT OF NEW CURB VARIES PER FIELD
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE THE ADJACENT EXISTING SIDEWALK FLAG TO NEAREST SIDEWALK JOINT CONDITIONS
BEYOND THE LIMITS OF THE BIOSWALE. THE CONTRACTOR SHALL REPLACE THAT SIDEWALK IN KIND IN FULL COMPLIANCE WITH THE APPLICABLE
SECTIONS OF STANDARD HIGHWAY SPECIFICATION. HEIGHT OF ADJACENT ASPHALT PAVEMENT
FLUSH WITH CONCRETE APRON
TOP OF CURB BEYOND
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2')
FOOT WIDTH OF ROADWAY CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. 14" 18" 14" TYPICAL EXPANSION
ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. JOINT
ADJACENT 8"-THICK,
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY PLANTING PERMITS FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) AND NYC
18"-WIDE PRECAST OR
DEPARTMENT OF TRANSPORTATION (DOT) PRIOR TO THE START OF WORK.
POURED CONCRETE
8"
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL GUTTER, TOP FLUSH
FROM DPR. WITH APRON
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G.,
GENERATORS AND COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS 18"x46"x8" PRECAST OR WWM 6x6-W8xW8
APPROVED BY THE ENGINEER IN CONSULTATION WITH THE CERTIFIED ARBORIST. POURED REINFORCED BOTTOM OF CURB
CONCRETE APRON
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED
TO, LUMBER, FUEL, AND OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN
ANY EXISTING R.O.W. GREEN INFRASTRUCTURE PRACTICE
SECTION D-D
7. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD
CONDITIONS, REFER TO THE DIMENSION SCHEDULE ON GI-133 AND SPECIFICATIONS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN 3'-6" OR AS FLOW
SHOWN OUTLET INLET
(TYP.) (TYP.)
C B A
PLAN
1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL 9" SOIL SOIL
WWM 6x6-W8xW8 8" REINFORCED 18"x34"x8" PRECAST
CONCRETE GUTTER OR POURED REINFORCED
18"x34"x8" PRECAST OR CONCRETE
POURED REINFORCED CONCRETE APRON
HEADER (3) SIDES UNDISTURBED SOIL
CONCRETE APRON L-SHAPED EDGING WITH
MINIMUM 9" STAKES, 12"x5" PRECAST STEEL SPIKE IN 4" DIA.
UNDISTURBED SOIL
3'-0"
WRAP STONE IN SEE DRAWING GI-204 CONCRETE CONCRETE ENCASEMENT
3"-THICK LEVELING OPEN-GRADED OPEN-GRADED
GEOTEXTILE (TOP OPEN-GRADED PLACED IN ENGINEERED
COURSE STONE BASE WRAP GABION WALL IN 12" WIDE GABION STONE BASE
AND SIDES ONLY) STONE BASE SOIL (TYP.)
12" WIDE GABION GEOTEXTILE (TOP AND WALL FILLED WITH
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE
OPEN-GRADED STONE 12" WIDE GABION WRAP GABION WALL IN
WRAP GABION WALL IN WALL FILLED WITH GEOTEXTILE (TOP AND
3'-6" 3'-6" 3'-6"
GEOTEXTILE (TOP AND OPEN-GRADED STONE SIDES ONLY)
OR AS SHOWN OR AS SHOWN OR AS SHOWN
SIDES ONLY)
SECTION A-A SECTION B-B SECTION C-C
AT GREEN STRIP INLET AT MIDSECTION [LOWEST POINT] AT GREEN STRIP OUTLET
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
PLACE EXPANSION
SEE NOTES BELOW FOR JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS SURFACE GRADING AS PER
FROM GI STANDARDS DRAWING GI-133
CONCRETE HEADER
SIDEWALK STEEL TREE PIT GUARDS
3'-6" OR AS SHOWN
(3 SIDES TYP.) SEE DRAWING
LOW POINT 1"-3" BELOW GI-601A, B, C, D & GI-602A
PRECAST CONCRETE TAPER
TO FOLLOW CURB LINE (TYP.)
GABION WALL BELOW PRECAST OUTLET
+
OUTLET INVERT
L-SHAPED EDGING WITH MINIMUM
9" STAKES SEE DRAWING GI-204;
CONCRETE STRIP, SEE GI-206 INVERT SEE GI-201 FOR SEDIMENT PAD
DETAILS
EXISTING CURB TO NEW CURB TYPE TO
5" THICK PRECAST
REMAIN
1'-6"
POROUS CONCRETE MATCH CONTRACT PLANS
FLOW +
[OUTLET] [INLET] FLOW
PITCH
1'-6"
EXISTING 8"-THICK REINFORCED
PITCH
D D
10%
ASPHALT TO MATCH EXISTING CONCRETE GUTTER EXPANSION JOINT - LIMIT OF NEW
PAVEMENT ROADWAY CURB TO EXTEND BEYOND THE
ROWB AS DETERMINED BY FIELD
2'-10" 2'-10" CONDITIONS AND SITE ENGINEER
PLAN
NOTES:
EXTENT OF NEW CURB VARIES
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE THE ADJACENT EXISTING SIDEWALK FLAG TO NEAREST SIDEWALK JOINT PER FIELD CONDITION
BEYOND THE LIMITS OF THE BIOSWALE. THE CONTRACTOR SHALL REPLACE THAT SIDEWALK IN KIND IN FULL COMPLIANCE WITH THE APPLICABLE
SECTIONS OF STANDARD HIGHWAY SPECIFICATION. HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') WITH CONCRETE APRON
FOOT WIDTH OF ROADWAY CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. TOP OF CURB BEYOND
10" 14" 10"
ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. TYPICAL EXPANSION JOINT
ADJACENT 8"-THICK,
3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY PLANTING PERMITS FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) AND NYC 18"-WIDE PRECAST OR
DEPARTMENT OF TRANSPORTATION (DOT) PRIOR TO THE START OF WORK.
POURED CONCRETE
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL GUTTER, TOP FLUSH WITH
8"
FROM DPR. APRON
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G.,
GENERATORS AND COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS WWM 6x6-W8xW8
APPROVED BY THE ENGINEER IN CONSULTATION WITH THE CERTIFIED ARBORIST. 18"x34"x8" PRECAST OR BOTTOM OF CURB
POURED REINFORCED
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED
TO, LUMBER, FUEL, AND OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN CONCRETE APRON
ANY EXISTING R.O.W. GREEN INFRASTRUCTURE PRACTICE
7. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD SECTION D-D
CONDITIONS, REFER TO THE DIMENSION SCHEDULE ON GI-133 AND SPECIFICATIONS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'x3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN 3'-6" OR AS FLOW
SHOWN
OUTLET
B INLET
(TYP.) (TYP.)
C A
PLAN
1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL 9" SOIL SOIL
WWM 6x6-W8xW8 8" REINFORCED 18"x30"x8" PRECAST OR
CONCRETE GUTTER POURED REINFORCED
18"x30"x8" PRECAST OR CONCRETE CONCRETE APRON
POURED REINFORCED HEADER (3) SIDES UNDISTURBED SOIL
CONCRETE APRON L-SHAPED EDGING WITH
MINIMUM 9" STAKES, 12"x5" PRECAST STEEL SPIKE IN 4" DIA.
UNDISTURBED SOIL
3'-0"
WRAP STONE IN SEE DRAWING GI-204 CONCRETE CONCRETE ENCASEMENT
3"-THICK LEVELING OPEN-GRADED OPEN-GRADED
GEOTEXTILE (TOP OPEN-GRADED PLACED IN ENGINEERED
COURSE STONE BASE WRAP GABION WALL IN 12" WIDE GABION STONE BASE
AND SIDES ONLY) STONE BASE SOIL (TYP.)
12" WIDE GABION GEOTEXTILE (TOP AND WALL FILLED WITH
WALL FILLED WITH SIDES ONLY) OPEN-GRADED STONE
OPEN-GRADED STONE 12" WIDE GABION WRAP GABION WALL IN
WRAP GABION WALL IN WALL FILLED WITH GEOTEXTILE (TOP AND
3'-6" 3'-6" 3'-6"
GEOTEXTILE (TOP AND OPEN-GRADED STONE SIDES ONLY)
OR AS SHOWN OR AS SHOWN OR AS SHOWN
SIDES ONLY)
SECTION A-A SECTION B-B SECTION C-C
AT GREEN STRIP INLET AT MIDSECTION [LOWEST POINT] AT GREEN STRIP OUTLET
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'x3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS
10'-0" OR AS SHOWN
SEE NOTES BELOW FOR EXPANSION JOINT
DEVIATION IN DIMENSIONS SURFACE GRADING AS PER
FROM GI STANDARDS DRAWING GI-133
CONCRETE HEADER
SIDEWALK STEEL TREE PIT GUARDS
(3 SIDES TYP.) SEE DRAWING
3'-6" OR AS SHOWN
PRECAST CONCRETE TAPER LOW POINT GI-601A, B, C, D & GI-602A
TO FOLLOW CURB LINE (TYP.) + L-SHAPED EDGING WITH MNIMUM
9" STAKES SEE DRAWING GI-204
SET 1"-3" BELOW
OUTLET OUTLET INVERT
GABION WALL BELOW PRECAST 5"x12" PRECAST CONCRETE
CONCRETE STRIP, SEE GI-206 INVERT STRIP BED (TYP.)
1'-6"
TO REMAIN CONCRETE
FLOW
+
[OUTLET] [INLET] FLOW
EXISTING CURB TO REMAIN
8"-THICK
D D REINFORCED
1'-6"
PITCH
PITCH
PRECAST OR POURED EXPANSION JOINT - LIMIT OF NEW
10%
TO MATCH EXISTING
CONCRETE GUTTER REINFORCED CONCRETE CURB TO EXTEND BEYOND THE
ROADWAY
APRON ROWB AS DETERMINED BY FIELD
CONDITIONS AND SITE ENGINEER
2'-6" 2'-6"
PLAN
8"
4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL
FROM DPR.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., WWM 6x6-W8xW8
GENERATORS AND COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS BOTTOM OF CURB
APPROVED BY THE ENGINEER IN CONSULTATION WITH THE CERTIFIED ARBORIST. SECTION D-D
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED
TO, LUMBER, FUEL, AND OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN
ANY EXISTING R.O.W. GREEN INFRASTRUCTURE PRACTICE
7. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD
CONDITIONS, REFER TO THE DIMENSION SCHEDULE ON GI-133 AND SPECIFICATIONS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SURFACE GRADING & DIMENSION SCHEDULE PLANS FOR R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS
L
RETENTION AREA EXTENTS TO
MATCH OUTLET INVERT
FLOW
+
[OUTLET] [INLET] FLOW
PITCH
1'-6"
8"-THICK REINFORCED
PITCH
EXISTING
10%
ASPHALT CONCRETE GUTTER
TO MATCH EXISTING
PAVEMENT ROADWAY
C C
GRADING NOTES:
TYPE 1 & TYPE 2 GRADING PLAN
1. ALL SURFACE GRADING TO TAPER TOWARDS THE LOW POINT.
2. CONTOUR LINES SHOWN ON THIS DRAWING ARE SCHEMATIC
ONLY AND DEPEND ON THE STREET GRADE.
L
GRA P.)
(TY
9"
R.O.W. GREEN STRIP INLET/OUTLET DIMENSIONS PLANTING PLAN SIDEWALK DIN
G (T DI NG
YP.
) GRA
LENGTH (L), WIDTH (W), 6 IN.
1FT. INCREMENT INCREMENT
TYPE A B C TYPE / PAGE NUMBER
2'-3"
R E T E N T I O N + A R E A
2'-3"
3'-6"
1'-0"
TYPE 1 14" 18" 3'-10" GI-504A & B 1'-5" OUTLET
9"
INVERT
3'-0" TO 3'-6" TYPE 2 10" 14" 2'-10" GI-504A & B
1'-6"
PITCH
DIMENSION AND PLANTING NOTES: PITCH
10%
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. GREENSTRIP TYPE TO MATCH EXISTING
SPECIFIED. ROADWAY
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL CONFIRM THE LEVELS OF THE R.O.W. c c
GREEN STRIP TO PREVENT FLOODING.
TYPE 3 GRADING PLAN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS
PLAN
3"
3"
5" 6" 4"
PLANTED AREA PLANTED AREA
1'-3"
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. PRECAST POROUS CONCRETE PAVEMENT
- NO CONNECTION TO SEWERS
1/2" PRE-MOLDED
JOINT FILLER EXISTING CURB
C 24"x48" C.I.P. CONCRETE
2'-0" PAVEMENT PANEL
PROPERTY
LINE WELLHEAD PROTECTIVE
PANELS SHALL BE CAST WITH FLUSH MOUNTING
CASING
2'-0"
PERMANENT LIFTING INSERTS
CURB LINE 5"-THICK PRECAST POROUS - SUBMIT SHOP DRAWINGS 1/2" PRE-MOLDED
CONCRETE PANELS FOR APPROVAL JOINT FILLER
4'-0"
4'-6" 6" CONCRETE HEADER
A B B 1'-0" POROUS CONCRETE
PANEL
CONCRETE HEADER
4'-0"
1/2" PRE-MOLDED JOINT
FILLER TO MATCH
6"
EXISTING CONCRETE
EXISTING COLOR (TYP.)
CATCH BASIN
A C
FLOW
EXISTING
ROADWAY
TYPICAL CAST IN PLACE CONCRETE AT PIEZOMETER
PLAN PART PLAN
WATER LEVEL LOGGER SHALL BE GLOBAL
WATER WL16U-15-10 (PRESSURE RANGE NEW CAST IN PLACE CONCRETE
0'-15' CABLE LENGTH 10') WITH WELDED WIRE FABRIC W4
FULL DEPTH SAWCUT PRECAST POROUS
CAST-IN-PLACE CONCRETE FULL DEPTH SAWCUT 4x4 WITH 3" MINIMUM COVER.
EXISTING ASPHALT CONCRETE PANEL
HEADER; 0" REVEAL SAND AND GRAVEL BACKFILL
PAVEMENT EXISTING CURB EXISTING ASPHALT
EXPANSION JOINT (TYP.) SIDEWALK PAVEMENT EXISTING CURB
EXISTING ASPHALT OR
CONCRETE BASE TO 2" COVER EXISTING ASPHALT OR EXPANSION JOINT (TYP.)
PRECAST POROUS 1/8" OPEN JOINT
REMAIN SLOPE TO MATCH CONCRETE PANEL (SPACER PLATE SHALL CONCRETE BASE TO
SLOPE TO MATCH
EXISTING BE PROVIDED) REMAIN
EXISTING
2"
2"
5"
5"
1'-0"
PER DESIGN
DEPTH AS
PER DESIGN
6"
DEPTH AS
3" COVER 3/8" LEVELING
OPEN-GRADED UNDISTURBED SOIL SCREENED PVC SHALL HAVE
COURSE
#3@12" STONE BASE OPEN-GRADED A SLOT WIDTH OF .125"
GEOTEXTILE IMPERMEABLE MEMBRANE
#5 TOP AND BOTTOM STONE BASE
ABOVE THE 2" LEVELING
1'-0"
(SIDES ONLY)
UNDISTURBED COURSE
SOIL 2" SOLID PVC
OPEN GRADED 6" PRESSURE
SECTION A-A STONE BASE TRANDUCER
SECTION B-B
NOTES: TYPICAL CAST IN PLACE CONCRETE AT PIEZOMETER
1. MAXIMUM JOINT SPACE IS 1"
2. CONTRACTOR SHALL TRIM (VIA SAWCUT) POROUS CONCRETE PANELS TO NO MORE THAN 6" ON ANY END SECTION C-C
3. NO POROUS CONCRETE PANEL SHALL BE LESS THAN 4FT IN LENGTH WITHOUT THE ENGINEER'S APPROVAL
4. ADJUST THE LIMIT OF WORK TO AVOID END PANELS LESS THA 4'T IN LENGHT
5. CONTRACTOR SHALL INSTALL 3/4" STONE IN LIFTS OF 12" (MAX.) AND SHALL MAKE TWO PASSES OF A PLATE
COMPACTOR (200 LBS MIN.) OVER EACH LIFT PRIOR TO INSTALLATION OF 3/8" LEVELING COURSE
6. AT THE DIRECTION OF THE ENGINEER, CONTRACTOR TO REPLACE ANY CURB OR DRIVEWAY APRON THAT IS
DAMAGED DURING CONSTRUCTION AS PER NYCDOT STANDARDS.
7. SEAL EDGES OF ANY SAWCUTS IN THE WEARING COURSE WITH LIQUID ASPHALT CEMENT AS PER TITLE 34
NYCDOT HIGHWAY RULES (PAGE 71, SECTION 2-11(E)(VIII)) 07-19-2017
P.E.
8. CAST IN PLACE CONCRETE TO BE INSTALLED TO A DEPTH OF 9" IF THE EXISTING PAVEMENT BASE IS ASPHALT
AND TO A DEPTH OF 12" IF THE EXISTING BASE IS CONCRETE DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. STORMWATER SEEPAGE BASIN WITH TYPE 2 CATCH BASIN
- NO CONNECTION TO SEWERS
PROPERTY LINE
SIDEWALK PLACEMENT
R.O.W. STORMWATER OPTION. SEE NOTE 1 EXISTING
SEEPAGE BASIN. SEE CONCRETE
GI-205 FOR SCHEDULE SIDEWALK
CURB LINE CATCH BASIN
CONNECTION
ROADWAY PLACEMENT
OPTION. SEE NOTE 1 DEP STANDARD TYPE
2 CATCH BASIN
EXISTING FLOW
CATCH BASIN
A A
EXISTING SIDEWALK
MANHOLE CASTING OR ROADWAY
PLAN
6" MIN
5/8" MIN.
TOP OF COVER FLUSHED D
WITH EXISTING SURFACE 10"
6"
LAID RADIALLY CIRCULAR SLAB COVER
SEE DETAIL A DRAWING 1'-0"
GI-205
10"
3'-0"
4"
4"
6"
2'-0"
1'-0"
6" MIN.
CONNECTION
12" MAX.
2'-0"
12"
6" MIN
tw
5/8" x 6"
D WRAP STONE IN
GEOTEXTILE (TOP ELEVATION SECTION ELEVATION SECTION
AND SIDES ONLY)
PERFORATED PRECAST SOLID CONCRETE RING PRECAST PERFORATED CONCRETE RING
CONCRETE RING
VARIES
(TYP.)
NOTES:
1. THE LOCATION OF THE ROW SEEPAGE BASIN SHALL BE SUCH THAT THE OPENING IN THE TOP SLAB TOGETHER WITH FRAME AND COVER SHALL BE
2'-0" MIN. 2'-0" MIN. ENTIRELY IN THE ROADWAY AREA OR ENTIRELY IN THE SIDEWALK AREA.
2. ALL SLABS AND RINGS SHALL BE PLACED ON A ONE HALF (1/2) INCH THICK FULL BED OF FRESH MORTAR.
3. SEEPAGE BASIN SOLID RING AND SEEPAGE RING REINFORCING COMPLIES WITH AREA REQUIREMENTS OF ASTM C478. EXCEPT THAT ALL WALL SECTIONS
SHALL BE REINFORCED WITH WWM 6x12 W0.8xW0.4 PLACED IN CENTER OF WALL. IN SOLID RING 1-#4 HOOP SHALL BE PLACED AROUND ALL CAST PIPE
PRECAST REINFORCED OPENINGS. (THE 1-#4 HOOP WILL BE REQUIRED AT CORED OPENINGS FOR BASIN CONNECTIONS IN SOLID RINGS.) (ALL VALUES OF AREA OF STEEL (AS)
CONCRETE CIRCULAR ARE IN SQUARE INCHES AND ARE A MINIMUM.)
FOOTING RING SEE 4. PRECAST PIPE OPENINGS AND CORED OPENINGS FOR CATCH BASIN CONNECTION WILL BE PLACED IN SOLID RING ONLY. NO CORED OPENING WILL BE
DETAIL B DRAWING
10"
FOOTING
8. OPENINGS FOR SPACING AND HANDLING WILL BE ALLOWED IN UPPER PORTION OF SOLID RING. HOWEVER, THE CONTRACTOR SHALL FILL ALL SUCH
d OPENINGS WITH NON SHRINK GROUT IMMEDIATELY AFTER INSTALLATION.
UNDISTURBED SOIL
9. IN NO CASE SHALL THE AREA OF THE DRAIN OPENING BE LESS THAN 3.0 SQ. IN.
P.E. 07-19-2017
SECTION A-A DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS
SHOWN
PRECAST CONCRETE TRENCH CONCRETE TOP
OR AS
TRENCH
5'-0"
STEEL GRATE (TYP.) 3" THICK LEVELING
6" 10" 6" COURSE
1'-10"
EXISTING IMPERMEABLE
4"
CATCH BASIN FLOW MEMBRANE
NEW STEEL FACED CURB
4"
4"
OUTLET INLET
OPEN-GRADED
STONE
C B A
4"
3"- THICK LEVELING 4" 4"
PRECAST
COURSE CONCRETE
PLAN WWM 6x6-W8xW8 CHAMBER
SECTION D-D
8" DIAMETER SLOTTED 5"-THICK PRECAST OR CAST
PIPE WRAPPED IN IN PLACE CONCRETE TOP REMOVABLE OR CAST IN
GEOTEXTILE IMPERMEABLE MEMBRANE 5"-THICK PRECAST OR CAST PLACE CONCRETE TOP
1/2" EXPANSION JOINT IN PLACE CONCRETE TOP CLEAN OUT - TOP OF
STEEL GRATE 8" DIAMETER SLOTTED STEEL GRATE
3"-THICK LEVELING AND FILLER PER NYC IMPERMEABLE MEMBRANE COVER FLUSHED WITH
PERFORATED COVER COURSE DOT HIGHWAY SPEC.
3"-THICK LEVELING
HDPE PIPE WRAPED D TOP OF SURFACE
CLEAN OUT, SEE SECTION 2.15 (TYP.) WITH GEOTEXTILE DROP CURB
DROP CURB [INLET] COURSE (TYP.) SIDEWALK [OUTLET] 1'-0" 8" SOLID HDPE PIPE
GI-204 SIDEWALK STEEL FACING SIDEWALK
STEEL FACING CURB STEEL FACING CURB
6" CURB
OPENING SEE GI-168 OPENING, SEE GI-168
ROADWAY 10% ROADWAY
PITCH ROADWAY
1'-3"
4"
6"-12"
1'-10"
8"
1'-0"
4"
4"
4"
2% SLOPE 9"
4"
5'-0"
CONCRETE GUTTER 4" 1'-0" 4" 3"-THICK LEVELING
2'-2"
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
CONCRETE HEADER
5"- THICK CAST IN PLACE
1'-0" CLEAN OUT CLEAN OUT
6"-12"
OR PRECAST CONCRETE
5'-0" OR AS SHOWN SURFACE
2% CONSTANT SLOPE PRECAST CONCRETE
SIDEWALK
CHAMBER
1'-0"
18"L x 3"H STEEL FACE OPENING
SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" E 8" 18" 8"
E EXISTING CURB
TO REMAIN 2'-0" OUTLET 2'-0" TO REMAIN
INVERT 5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
REINFORCED CONCRETE
2'-6" APRON 3'-6"
PLAN
2'-2"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND 4" 4"
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
4"
CONSULTATION WITH THE CERTIFIED ARBORIST. OPENING FOR 8" DIA.
SLOTTED PIPE
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
CONCRETE 3"- THICK LEVELING
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI
PRACTICE. CHAMBER COURSE
WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. SECTION E-E
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
PROPERTY LINE STEEL GRATE JOINT AND FILLER
5"-THICK PRECAST OR CAST
PER NYC DOT
PERFORATED COVER IN PLACE CONCRETE TOP
HIGHWAY SPEC.
3"-THICK LEVELING
DROP CURB [INLET] SECTION 2.15 (TYP.)
COURSE
STEEL FACING CURB SIDEWALK
. VARIES 20'-0"
A EXISTING
CONCRETE
OPENING, SEE GI-168
3" 1'-8" 1'-0"
6"
LOCATION CONCRETE HEADER
OR AS SHOWN SIDEWALK ROADWAY 10%
CONCRETE SURFACE
PRECAST CONCRETE 4'-6" EQ EQ 4'-6" PITCH
TRENCH STEEL GRATE
EXISTING
1'-3"
CATCH BASIN PRECAST CONCRETE TRENCH
SHOWN
B
OR AS
CURB LINE
B
5'-0"
1'-0"
4"
2% SLOPE 6"-12" 9"
FLOW
NEW STEEL FACED CURB
OUTLET INLET
18"x42"x8" PRECAST OR CONCRETE
4"
POURED REINFORCED HEADER (3) SIDES
A
2'-2"
STONE COLUMNS CONCRETE APRON 4" 1'-0" 4" IMPERMEABLE
(BELOW 8" DIAMETER PIPE) MEMBRANE
PRECAST CONCRETE
PLAN CHAMBER
1'-6"
3"-THICK LEVELING PERFORATED END
8" DIA. SLOTTED HDPE PIPE WRAPPED TOP OF STEEL GRATE FLUSH OPENING FOR 8" PLUG (TYP.)
COURSE 12"
IN GEOTEXTILE. MAINTAIN 2% SLOPE WITH TOP OF SURFACE DIAMETER SLOTTED PIPE
STONE COLUMN CAP WRAP STONE IN
CLEAN OUT, 3"-THICK LEVELING COURSE CLEAN OUT, PERFORATED 3'-6" SIDEWALK
TO BE PERFORATED GEOTEXTILE
SEE GI-204 IMPERMEABLE MEMBRANE (TYP.) SEE GI-204 COVER (TYP.)
(TOP AND SIDES
ONLY)
OPEN-GRADED STONE
2'-2"
GEOTEXTILE, TOP
AND SIDES ONLY WRAPPED ALL AROUND WITH
4" 4" GEOTEXTILE FABRIC.
4"
8" DIAMETER PIPE WITH 8" DIAMETER PIPE PERMEABLE SOIL
CLEAN OUTS BEYOND PRECAST CONCRETE
4"
TRENCH 14" DIAMETER CASING TO
WWM 6x6-W8xW8 MINIMUM 5'-0" AUGERED
INTO PERMEABLE LAYER
14"
1'-6"
1'-6"
1'-6"
INTO PERMEABLE
PENETRATION
SOIL LAYER
MIN 5'-0"
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
6"-12"
5'-0" OR AS SHOWN STONE
PIPE (TYP.) SURFACE COLUMN
2% CONSTANT SLOPE PRECAST CONCRETE
SIDEWALK
CHAMBER
1'-0"
18"L x 3"H STEEL FACE OPENING
SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" C 8" 18" 8"
C EXISTING CURB
TO REMAIN 2'-0" 2'-0" TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
REINFORCED CONCRETE
2'-6" PLAN APRON 3'-6"
2'-2"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND 4" 4"
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
OPEN-GRADED STONE
4"
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI CONCRETE 3"- THICK LEVELING
PRACTICE. CHAMBER COURSE
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED WWM 6x6-W8xW8
IN THE 14" CASING
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
SECTION C-C
OPEN GRADED STONE
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
SHOWN
PRECAST CONCRETE TRENCH
OR AS
TRENCH
5'-0"
STEEL GRATE 3" THICK LEVELING
6" 10" 6" COURSE
1'-10"
EXISTING IMPERMEABLE
4"
CATCH BASIN FLOW MEMBRANE
4"
4"
NEW STEEL FACED CURB
OUTLET INLET
OPEN-GRADED
STONE
C B A
4"
3"- THICK LEVELING 4" 4"
PRECAST
COURSE CONCRETE
PLAN WWM 6x6-W8xW8 CHAMBER
4"
6"-12"
1'-10"
8"
1'-0"
4"
4"
4"
2% SLOPE 9"
4"
5'-0"
CONCRETE GUTTER 4" 1'-0" 4" 3"-THICK LEVELING
2'-2"
BEDDING
5'-0" OR AS SHOWN STORMWATER CHAMBER, 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
5"-7"
SEE GI-204 FOR STONE BASE
DIMENSION SCHEDULE
SECTION A-A SECTION B-B SECTION C-C
AT INLET AT MIDSECTION AT OUTLET
NOTE:
1. USE SMALLEST STORMWATER CHAMBER SIZE SHOWN ON GI-204
2. OPEN GRADED STONE AROUND THE STORMWATER CHAMBER TO BE HAND
COMPACTED AT A DEPTH OF 1'-0" FROM THE BASE OF INFILTRATION BASIN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
6"-12"
5'-0" OR AS SHOWN
SURFACE
2% CONSTANT SLOPE PRECAST CONCRETE
SIDEWALK
CHAMBER
1'-0"
18"L x 3"H STEEL FACE OPENING
1'-0" SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" E 8" 18" 8"
E EXISTING CURB
TO REMAIN 2'-0" 2'-0" TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
2'-6"
PLAN REINFORCED CONCRETE
3'-6"
APRON
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE TOP OF STEEL GRATE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. PERFORATED COVER (TYP.)
3'-6" FLUSH WITH TOP OF
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY 5"-THICK PRECAST OR CAST SURFACE
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL IN PLACE CONCRETE TOP SIDEWALK
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. IMPERMEABLE MEMBRANE
3" THICK LEVELING COURSE
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
8" DIAMETER SLOTTED
6" 6" 6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND PIPE WRAPED IN
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN GEOTEXTILE
2'-2"
CONSULTATION WITH THE CERTIFIED ARBORIST.
4" 4"
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OPEN-GRADED STONE
4"
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI
PRACTICE. OPENING FOR 8" DIA.
SLOTTED PIPE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL CONCRETE 3"- THICK LEVELING
OPEN GRADED STONE. CHAMBER COURSE
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS. WWM 6x6-W8xW8
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE SECTION E-E
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS
SHOWN
PRECAST CONCRETE TRENCH
1'-10"
OR AS
TRENCH
5'-0"
IMPERMEABLE
4"
STEEL GRATE MEMBRANE
4"
4"
EXISTING OPEN-GRADED
CATCH BASIN FLOW STONE
NEW STEEL FACED CURB
4"
OUTLET INLET 3"- THICK LEVELING 4" 4"
PRECAST
COURSE CONCRETE
C B A WWM 6x6-W8xW8 CHAMBER
SECTION D-D
PLAN
4"
6"-12"
1'-10"
8"
1'-0"
4"
4"
4"
2% SLOPE 9"
4"
5'-0"
CONCRETE GUTTER 4" 1'-0" 4" 3"-THICK LEVELING
2'-2"
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
CONCRETE HEADER
5"- THICK CAST IN PLACE
OR PRECAST CONCRETE CLEAN OUT
6"-12"
5'-0" OR AS SHOWN
1'-0"
SURFACE
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" 1'-2" EXPANSION JOINT.
EXISTING CURB
SURFACE (TYP.) E E EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
EXTEND THE NEW STEEL FACE
PITCH
EXISTING 8"-THICK REINFORCED
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
PLAN
2'-2"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. GEOTEXTILE
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4"
4" 4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI PRECAST CONCRETE 3"- THICK LEVELING
PRACTICE. CHAMBER COURSE
WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. SECTION E-E
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
PROPERTY LINE
STEEL GRATE JOINT AND FILLER
5"-THICK PRECAST OR CAST
PER NYC DOT
PERFORATED COVER IN PLACE CONCRETE TOP
HIGHWAY SPEC.
3"-THICK LEVELING
DROP CURB [INLET] SECTION 2.15 (TYP.)
COURSE
A EXISTING
CONCRETE
STEEL FACING CURB
3" 1'-8" 1'-0" SIDEWALK
LOCATION VARIES 15'-0" CONCRETE HEADER OPENING, SEE GI-168 6"
OR AS SHOWN CONCRETE SURFACE SIDEWALK
PRECAST CONCRETE 3'-6" 3'-6" ROADWAY 10%
TRENCH STEEL GRATE PITCH
EXISTING
1'-3"
CATCH BASIN PRECAST CONCRETE TRENCH
SHOWN
B
OR AS
CURB LINE
5'-0"
1'-0"
4"
FLOW 2% SLOPE 6"-12" 9"
NEW STEEL FACED CURB
OUTLET INLET
18"x42"x8" PRECAST OR CONCRETE
4"
A POURED REINFORCED HEADER (3) SIDES
2'-2"
CONCRETE APRON 4" 1'-0" 4" IMPERMEABLE
MEMBRANE
PLAN PRECAST CONCRETE
CHAMBER
1'-6"
8" DIAMETER SLOTTED PIPE WRAPPED 3"-THICK LEVELING PERFORATED END
IN GEOTEXTILE. MAINTAIN 2% SLOPE TOP OF STEEL GRATE FLUSH OPENING FOR 8" PLUG (TYP.)
3'-6" COURSE 12"
WITH TOP OF SURFACE DIAMETER SLOTTED
IMPERMEABLE MEMBRANE (TYP.) STONE COLUMN CAP
PIPE (TYP.) WRAP STONE IN
CLEAN OUT, 3"-THICK LEVELING PERFORATED TO BE PERFORATED GEOTEXTILE
SEE GI-204 COURSE COVER (TYP.) SIDEWALK
(TOP AND SIDES
ONLY)
OPEN-GRADED STONE
2'-2"
GEOTEXTILE, TOP
AND SIDES ONLY WRAPPED ALL AROUND WITH
4" 4" GEOTEXTILE FABRIC.
4"
1'-0"
4"
PERMEABLE SOIL
8" DIAMETER PIPE WITH PRECAST CONCRETE
CLEAN OUTS BEYOND TRENCH 14" DIAMETER CASING TO
WWM 6x6-W8xW8 MINIMUM 5'-0" AUGERED
UNDISTURBED
INTO PERMEABLE LAYER
SOIL 14"
1'-6"
1'-6"
INTO PERMEABLE
PENETRATION
SOIL LAYER
MIN 5'-0"
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
CONCRETE HEADER
5"- THICK CAST IN PLACE
OR PRECAST CONCRETE CLEAN OUT
6"-12"
5'-0" OR AS SHOWN
1'-0"
SURFACE
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" 1'-2" EXPANSION JOINT.
EXISTING CURB
SURFACE (TYP.) C C EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
PLAN
NOTES:
PERFORATED COVER TOP OF STEEL GRATE
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". 5"-THICK PRECAST OR CAST 3'-6" FLUSH WITH TOP OF
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE IN PLACE CONCRETE TOP SURFACE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. SIDEWALK
IMPERMEABLE MEMBRANE
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY 3" THICK LEVELING
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COURSE
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 6" 6" 6"
8" DIAMETER SLOTTED
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. PIPE WRAPED IN
2'-2"
GEOTEXTILE
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 4" 4"
CONSULTATION WITH THE CERTIFIED ARBORIST. OPEN-GRADED STONE
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
4"
SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI 3"- THICK LEVELING
PRACTICE. PRECAST CONCRETE
CHAMBER COURSE
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED WWM 6x6-W8xW8
IN THE 14" CASING
SECTION C-C
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
TOP OF STEEL GRATE PERFORATED
FLUSH WITH TOP OF COVER FOR 4" DIA.
SURFACE 2'-6"
OPENING (TYP.)
PROPERTY LINE
C B A EXISTING 5"-THICK PRECAST
SIDEWALK OR CAST IN PLACE
CONCRETE
LOCATION VARIES 15'-0" CONCRETE HEADER CONCRETE TOP
SIDEWALK
OR AS SHOWN
CURB LINE CONCRETE SURFACE 3" THICK LEVELING
PRECAST CONCRETE 6" 10" 6" COURSE
SHOWN
PRECAST CONCRETE TRENCH
OR AS
1'-10"
TRENCH
5'-0"
IMPERMEABLE
4"
STEEL GRATE MEMBRANE
4"
4"
EXISTING OPEN-GRADED
CATCH BASIN FLOW STONE
NEW STEEL FACED CURB
INLET
4"
OUTLET 4" 4"
3"- THICK LEVELING PRECAST
COURSE
C B A WWM 6x6-W8xW8
CONCRETE
CHAMBER
SECTION D-D
PLAN
8" DIAMETER SLOTTED 5"-THICK PRECAST OR CAST
PIPE WRAPPED IN IN PLACE CONCRETE TOP REMOVABLE OR CAST IN
GEOTEXTILE IMPERMEABLE MEMBRANE 5"-THICK PRECAST OR CAST PLACE CONCRETE TOP
1/2" EXPANSION JOINT IN PLACE CONCRETE TOP CLEAN OUT - TOP OF
STEEL GRATE 8" DIAMETER SLOTTED STEEL GRATE
3"-THICK LEVELING AND FILLER PER NYC IMPERMEABLE MEMBRANE COVER FLUSHED WITH
PERFORATED COVER COURSE DOT HIGHWAY SPEC.
3"-THICK LEVELING
HDPE PIPE WRAPED D TOP OF SURFACE
CLEAN OUT, SEE SECTION 2.15 (TYP.) WITH GEOTEXTILE DROP CURB
DROP CURB [INLET] COURSE (TYP.) SIDEWALK [OUTLET] 1'-0" 8" SOLID HDPE PIPE
GI-204 SIDEWALK STEEL FACING SIDEWALK
STEEL FACING CURB STEEL FACING CURB
6" CURB
OPENING SEE GI-168 OPENING, SEE GI-168
ROADWAY 10% ROADWAY
PITCH ROADWAY
1'-3"
4"
6"-12"
1'-10"
8"
1'-0"
4"
4"
4"
2% SLOPE 9"
4"
5'-0"
CONCRETE GUTTER 4" 1'-0" 4" 3"-THICK LEVELING
2'-2"
5" MINIMUM
STORMWATER CHAMBER,
BEDDING
5'-0" OR AS SHOWN 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
SEE GI-204 FOR STONE BASE
DIMENSION SCHEDULE
SECTION A-A SECTION B-B SECTION C-C
AT INLET AT MIDSECTION AT OUTLET
NOTE:
1. USE SMALLEST STORMWATER CHAMBER SIZE SHOWN ON GI-204
2. OPEN GRADED STONE AROUND THE STORMWATER CHAMBER TO BE HAND
COMPACTED AT A DEPTH OF 1'-0" FROM THE BASE OF INFILTRATION BASIN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
6"-12"
5'-0" OR AS SHOWN
1'-0"
SURFACE
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE 6" SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" 1'-2" EXPANSION JOINT.
EXISTING CURB
SURFACE (TYP.) E E EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
PLAN
NOTES: PERFORATED COVER TOP OF STEEL GRATE
5"-THICK PRECAST OR CAST 3'-6" FLUSH WITH TOP OF
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". SURFACE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE IN PLACE CONCRETE TOP
SIDEWALK
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. IMPERMEABLE MEMBRANE
3" THICK LEVELING
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COURSE
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 8" DIAMETER SLOTTED 6" 6" 6"
PIPE WRAPED IN
2'-2"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. GEOTEXTILE
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4"
4" 4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI PRECAST CONCRETE 3"- THICK LEVELING
PRACTICE. CHAMBER COURSE
WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. SECTION E-E
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
- NO CONNECTION TO SEWERS
SHOWN
PRECAST CONCRETE TRENCH 6" 10" 6"
OR AS
TRENCH COURSE
5'-0"
1'-10"
CONCRETE TRENCH COVER IMPERMEABLE
4"
MEMBRANE
4"
4"
EXISTING
CATCH BASIN FLOW OPEN-GRADED
NEW STEEL FACED CURB STONE
OUTLET B INLET
4"
3"- THICK LEVELING 4" 4"
PRECAST
C A COURSE CONCRETE
WWM 6x6-W8xW8 CHAMBER
4"
6"-12"
1'-10"
8"
1'-0"
4"
4"
4"
2% SLOPE 9"
4"
5'-0"
CONCRETE GUTTER 4" 1'-0" 4" 3"-THICK LEVELING
2'-2"
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
- NO CONNECTION TO SEWERS
6"-12"
SURFACE
PIPE WRAPPED IN
1'-0"
2% CONSTANT SLOPE GEOTEXTILE (TYP).
5'-0"
SIDEWALK PRECAST CONCRETE
1'-0"
CHAMBER
CLEAN OUT COVER - TOP 14"L x 3"H STEEL FACE
FLUSH WITH WITH TOP OPENING SEE GI-168
12"L x 3"H STEEL FACE
SURFACE (TYP.)
OPENING SEE GI-168 9"
1'-6" E E EXPANSION JOINT.
EXISTING CURB 2'-0" 5" 12" 5" 10" 14" 10" 2'-0" EXISTING CURB
TO REMAIN TO REMAIN
[OUTLET]
+ [INLET]
FLOW PITCH FLOW
1'-6"
EXTEND THE NEW STEEL FACE
PITCH
EXISTING 8"-THICK REINFORCED
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
PRECAST OR POURED AS DETERMINED BY FIELD
2'-6" REINFORCED CONCRETE 3'-6" CONDITIONS AND SITE
APRON ENGINEER
PLAN
NOTES: PERFORATED COVER TOP OF STEEL GRATE
5"-THICK PRECAST OR CAST 3'-6" FLUSH WITH TOP OF
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". SURFACE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE IN PLACE CONCRETE TOP
SIDEWALK
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. IMPERMEABLE MEMBRANE
3" THICK LEVELING
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COURSE
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 8" DIAMETER SLOTTED 6" 6" 6"
PIPE WRAPED IN
2'-2"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. GEOTEXTILE
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4"
4" 4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI PRECAST CONCRETE 3"- THICK LEVELING
PRACTICE. CHAMBER COURSE
WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. SECTION E-E
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 3A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
PROPERTY LINE
STEEL GRATE JOINT AND FILLER
5"-THICK PRECAST OR CAST
PER NYC DOT
PERFORATED COVER IN PLACE CONCRETE TOP
HIGHWAY SPEC.
3"-THICK LEVELING
DROP CURB [INLET] SECTION 2.15 (TYP.)
COURSE
A EXISTING STEEL FACING CURB
3" 1'-8" 1'-0" SIDEWALK
LOCATION VARIES 10'-0" CONCRETE HEADER CONCRETE OPENING, SEE GI-168 6"
OR AS SHOWN SIDEWALK
PRECAST CONCRETE CONCRETE SURFACE ROADWAY 10%
EQ EQ PITCH
EXISTING TRENCH PRECAST CONCRETE TRENCH
1'-3"
CATCH BASIN CONCRETE TRENCH COVER
SHOWN
B
OR AS
CURB LINE
5'-0"
1'-0"
4"
FLOW 2% SLOPE 6"-12" 9"
NEW STEEL FACED CURB
OUTLET INLET
A 18"x42"x8" PRECAST OR CONCRETE
4"
POURED REINFORCED HEADER (3) SIDES
2'-2"
CONCRETE APRON 4" 1'-0" 4" IMPERMEABLE
MEMBRANE
PLAN PRECAST CONCRETE
CHAMBER
1'-6"
3"-THICK LEVELING PERFORATED END
8" DIAMETER SLOTTED PIPE WRAPPED TOP OF STEEL GRATE FLUSH OPENING FOR 8" PLUG (TYP.)
3'-6" COURSE 12"
IN GEOTEXTILE. MAINTAIN 2% SLOPE WITH TOP OF SURFACE DIAMETER SLOTTED PIPE
STONE COLUMN CAP WRAP STONE IN
CLEAN OUT, SEE GI-204 PERFORATED SIDEWALK
TO BE PERFORATED GEOTEXTILE
IMPERMEABLE MEMBRANE (TYP.) COVER (TYP.)
(TOP AND SIDES
ONLY)
2'-2"
GEOTEXTILE, TOP
AND SIDES ONLY WRAPPED ALL AROUND WITH
4" 4" GEOTEXTILE FABRIC.
4"
1'-0"
PERMEABLE SOIL
PRECAST CONCRETE
3"-THICK LEVELING COURSE
4"
PERMEABLE SOIL
SOIL LAYER
MIN 5'-0"
LAYER
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 3A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
LENGTH OF INFILTRATION BASIN 10'-0"
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS 5"- THICK CAST IN PLACE
OR PRECAST CONCRETE
EQ EQ SURFACE
STONE COLUMN CONCRETE HEADER
BELOW 8" DIA.
8" DIAMETER SLOTTED
6"-12"
PIPE (TYP.)
PIPE WRAPPED IN
1'-0"
2% CONSTANT SLOPE GEOTEXTILE (TYP).
5'-0"
SIDEWALK PRECAST CONCRETE
1'-0"
CHAMBER
CLEAN OUT COVER - TOP 14"L x 3"H STEEL FACE
FLUSH WITH WITH TOP OPENING SEE GI-168
12"L x 3"H STEEL FACE
SURFACE (TYP.)
OPENING SEE GI-168 EXPANSION JOINT.
9"
1'-6" C C
EXISTING CURB 2'-0" 5" 12" 5" 10" 14" 10" 2'-0" EXISTING CURB
TO REMAIN TO REMAIN
[OUTLET]
+ [INLET]
FLOW PITCH FLOW
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
PRECAST OR POURED AS DETERMINED BY FIELD
2'-6" REINFORCED CONCRETE 3'-6" CONDITIONS AND SITE
APRON ENGINEER
PLAN
NOTES:
PERFORATED COVER TOP OF STEEL GRATE
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". 5"-THICK PRECAST OR CAST 3'-6" FLUSH WITH TOP OF
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE IN PLACE CONCRETE TOP SURFACE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. SIDEWALK
IMPERMEABLE MEMBRANE
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY 3" THICK LEVELING
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COURSE
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 6" 6" 6"
8" DIAMETER SLOTTED
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. PIPE WRAPED IN
2'-2"
GEOTEXTILE
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 4" 4"
CONSULTATION WITH THE CERTIFIED ARBORIST. OPEN-GRADED STONE
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
4"
SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI 3"- THICK LEVELING
PRACTICE. PRECAST CONCRETE
CHAMBER COURSE
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED WWM 6x6-W8xW8
IN THE 14" CASING
SECTION C-C
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS.
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE P.E. 07-19-2017
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS
1'-0"
PRECAST CONCRETE
SHOWN
PRECAST CONCRETE TRENCH
OR AS
5'-0"
TRENCH 6" 10" 6"
STEEL GRATE
2'-4"
EXISTING
4"
4"
CATCH BASIN FLOW OPEN-GRADED
4"
4"
STONE
OUTLET INLET
WWM 6x6-W8xW8
C B A 4" 4" 3"- THICK LEVELING
COURSE
1'-0"
16"
1'-3"
2'-4"
4"
14"
6"-12" 9"
2'-6"
4"
4"
8" REINFORCED
4"
WWM 6x6-W8xW8 CONCRETE POURED REINFORCED
5'-0"
HEADER (3) SIDES CONCRETE GUTTER
18"x42"x8" PRECAST OR CONCRETE APRON
POURED REINFORCED PERFORATED UNDISTURBED OPEN-GRADED 4" 1'-0" 4" TOP SOIL
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) SOIL STONE BASE OPEN-GRADED
UNDISTURBED SOIL
BOTTOM HALF OF PIPE PRECAST CONCRETE STONE BASE
PRECAST CONCRETE
CHAMBER
OPEN-GRADED TO BE SOLID (TYP.) WRAP STONE IN
CHAMBER D 8" DIAMETER SLOTTED
STONE BASE PERFORATED COVER HDPE PIPE WRAPPED
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP
GEOTEXTILE AND SIDES ONLY) WITH GEOTEXTILE.
3"-THICK LEVELING WWM 6x6-W8xW8
(TOP AND SIDES BOTTOM HALF OF PIPE
COURSE WRAP STONE IN TO BE SOLID (TYP.)
ONLY)
GEOTEXTILE (TOP AND
5'-0" OR AS SHOWN 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
CONCRETE HEADER
GRASS SURFACE
1'-0" CLEAN OUT CLEAN OUT
6"-12"
5'-0" OR AS SHOWN
2% CONSTANT SLOPE PRECAST CONCRETE
SIDEWALK
CHAMBER
1'-0"
18"L x 3"H STEEL FACE OPENING
SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" E 8" 18" 8"
E EXISTING CURB
TO REMAIN 2'-0" 2'-0" TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
REINFORCED CONCRETE
2'-6" APRON 3'-6"
PLAN
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY 8" DIAMETER SLOTTED
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL PIPE WRAPED IN
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 6" 6" 6"
GEOTEXTILE
2'-6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND 4" 4"
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND SLOTTED PIPE
4"
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI CONCRETE 3"- THICK LEVELING
PRACTICE. CHAMBER COURSE
WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. SECTION E-E
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1 - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
PROPERTY LINE JOINT AND FILLER
STEEL GRATE GRASS
PER NYC DOT
PERFORATED COVER TOPSOIL HIGHWAY SPEC.
DROP CURB [INLET] SECTION 2.15 (TYP.)
STEEL FACING CURB
. VARIES 20'-0"
A EXISTING
CONCRETE OPENING, SEE GI-168
CLEAN OUT
6"
SIDEWALK
LOCATION CONCRETE HEADER
OR AS SHOWN GRASS SURFACE SIDEWALK ROADWAY 10%
PRECAST CONCRETE 4'-6" EQ EQ 4'-6" PITCH
STEEL GRATE
1'-0"
EXISTING TRENCH
16"
1'-3"
CATCH BASIN PRECAST CONCRETE TRENCH
SHOWN
B
OR AS
CURB LINE
B
5'-0"
6"-12" 9"
FLOW
4"
2'-6"
2% SLOPE
OUTLET INLET
18"x42"x8" PRECAST OR CONCRETE
STONE COLUMNS A POURED REINFORCED
CONCRETE APRON
HEADER (3) SIDES
(BELOW 8" DIAMETER PIPE) 4" 1'-0" 4" PERFORATED END
PLUG (TYP.)
PLAN PRECAST CONCRETE
CHAMBER
WRAP STONE IN
1'-6"
8" DIA. SLOTTED HDPE PIPE WRAPPED TOP OF STEEL GRATE FLUSH OPENING FOR 8" 3"-THICK LEVELING
GEOTEXTILE
IN GEOTEXTILE. MAINTAIN 2% SLOPE WITH TOP OF SURFACE 3'-6" DIAMETER SLOTTED PIPE COURSE 12" (TOP AND SIDES
CLEAN OUT, SEE 12" TOP SOIL GRASS COVER CLEAN OUT, PERFORATED 3'-0" SIDEWALK STONE COLUMN CAP ONLY)
GI-204 SEE GI-204 COVER (TYP.) TO BE PERFORATED
2'-6"
GEOTEXTILE, TOP
AND SIDES ONLY WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
4" 4"
4"
1'-0" PERMEABLE SOIL
8" DIAMETER PIPE WITH PRECAST CONCRETE
CLEAN OUTS BEYOND TRENCH 14" DIAMETER CASING TO
WWM 6x6-W8xW8 MINIMUM 5'-0" AUGERED
INTO PERMEABLE LAYER
14"
1'-6"
1'-6"
1'-6"
SOIL LAYER
MIN 5'-0"
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
6"-12"
5'-0" OR AS SHOWN BELOW 8" DIA. STONE
PIPE (TYP.) COLUMN
2% CONSTANT SLOPE PRECAST CONCRETE
SIDEWALK
CHAMBER
1'-0"
18"L x 3"H STEEL FACE OPENING
SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" EXISTING CURB
2'-0" 8" 18" 8" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
REINFORCED CONCRETE
2'-6" APRON 3'-6"
PLAN
TOP OF STEEL GRATE
NOTES: FLUSH WITH TOP OF
PERFORATED 3'-6" SURFACE
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". COVER (TYP.)
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE GRASS 3'-1"
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. SIDEWALK
12" TOP SOIL
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL 8" DIAMETER SLOTTED
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. PIPE WRAPED IN 6" 6" 6"
GEOTEXTILE
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
2'-6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 4" 4"
4"
CONSULTATION WITH THE CERTIFIED ARBORIST. OPEN-GRADED STONE
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
SLOTTED PIPE
4"
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI
PRACTICE. CONCRETE 3"- THICK LEVELING
CHAMBER COURSE
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED WWM 6x6-W8xW8
IN THE 14" CASING
SECTION C-C
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE.
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE 07-19-2017
P.E.
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
1'-0"
PRECAST CONCRETE
SHOWN
PRECAST CONCRETE TRENCH
OR AS
TRENCH 6" 10" 6"
5'-0"
2'-4"
STEEL GRATE
4"
4"
EXISTING OPEN-GRADED
4"
4"
CATCH BASIN FLOW STONE
OUTLET INLET WWM 6x6-W8xW8
3"- THICK LEVELING
C B A 4" 4"
COURSE
1'-0"
16"
1'-3"
2'-4"
4"
14"
6"-12" 9"
2'-6"
4"
4"
8" REINFORCED
4"
WWM 6x6-W8xW8 CONCRETE POURED REINFORCED
5'-0"
18"x42"x8" PRECAST OR HEADER (3) SIDES CONCRETE GUTTER CONCRETE APRON
POURED REINFORCED PERFORATED UNDISTURBED 4" 1'-0" 4" TOP SOIL
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) SOIL
BOTTOM HALF OF PIPE PRECAST CONCRETE
D UNDISTURBED SOIL
PRECAST CONCRETE OPEN-GRADED
CHAMBER TO BE SOLID (TYP.) CHAMBER 8" DIAMETER SLOTTED
STONE BASE WRAP STONE IN
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP PERFORATED COVER HDPE PIPE WRAPPED
GEOTEXTILE AND SIDES ONLY) WITH GEOTEXTILE.
3"-THICK LEVELING WWM 6x6-W8xW8
(TOP AND SIDES BOTTOM HALF OF PIPE
COURSE OPEN-GRADED WRAP STONE IN
ONLY) TO BE SOLID (TYP.)
STONE BASE GEOTEXTILE (TOP AND
BEDDING
5'-0" OR AS SHOWN STORMWATER CHAMBER, 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
5"-7"
SEE GI-204 FOR OPEN-GRADED
DIMENSION SCHEDULE STONE BASE
SECTION A-A SECTION B-B SECTION C-C
AT INLET AT MIDSECTION AT OUTLET
NOTE:
1. USE SMALLEST STORMWATER CHAMBER SIZE SHOWN ON GI-204
2. OPEN GRADED STONE AROUND THE STORMWATER CHAMBER TO BE HAND
COMPACTED AT A DEPTH OF 1'-0" FROM THE BASE OF INFILTRATION BASIN P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
20'-0" OR AS SHOWN
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
6"-12"
DRAWING GI-204
1'-0"
1'-0" 18"L x 3"H STEEL FACE OPENING
SEE GI-168
TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED
FLUSH WITH WITH TOP PIPE WRAPPED IN
1'-8"
1'-8"
SURFACE (TYP.)
EXISTING CURB 4 1/2" 14" 4" E 8" 18" 8"
E EXISTING CURB
TO REMAIN 2'-0" 2'-0" TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH 14"L x 3"H STEEL FLOW
1'-6"
PITCH
EXISTING
FACE OPENING SEE
10%
ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE
TO MATCH EXISTING GI-168
PAVEMENT LIMIT OF THE NEW CONCRETE CURB
ROADWAY
AS DETERMINED BY FIELD CONDITIONS
PRECAST OR POURED AND SITE ENGINEER
REINFORCED CONCRETE
2'-6" APRON 3'-6"
PLAN
TOP OF STEEL GRATE
NOTES:
FLUSH WITH TOP OF
PERFORATED 3'-6" SURFACE
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE COVER (TYP.)
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. GRASS 3'-1" SIDEWALK
12" TOP SOIL
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL 8" DIAMETER SLOTTED
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
PIPE WRAPED IN 6" 6" 6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR. GEOTEXTILE
2'-6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 4" 4"
4"
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPEN-GRADED STONE
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND OPENING FOR 8" DIA.
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI SLOTTED PIPE
4"
PRACTICE. CONCRETE 3"- THICK LEVELING
CHAMBER COURSE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
OPEN GRADED STONE. WWM 6x6-W8xW8
SECTION E-E
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
- NO CONNECTION TO SEWERS
1'-0"
SHOWN
PRECAST CONCRETE TRENCH
OR AS
6" 10" 6"
5'-0"
2'-4"
STEEL GRATE
4"
4"
EXISTING OPEN-GRADED
4"
4"
CATCH BASIN FLOW STONE
OUTLET INLET WWM 6x6-W8xW8
3"- THICK LEVELING
C B A 4" 4"
COURSE
1'-0"
16"
1'-3"
2'-4"
4"
14"
6"-12" 9"
2'-6"
4"
4"
8" REINFORCED
4"
WWM 6x6-W8xW8 CONCRETE POURED REINFORCED
5'-0"
HEADER (3) SIDES CONCRETE GUTTER
18"x42"x8" PRECAST OR CONCRETE APRON
POURED REINFORCED PERFORATED UNDISTURBED OPEN-GRADED 4" 1'-0" 4" TOP SOIL
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) SOIL STONE BASE OPEN-GRADED
UNDISTURBED SOIL
BOTTOM HALF OF PIPE PRECAST CONCRETE STONE BASE
PRECAST CONCRETE
CHAMBER
OPEN-GRADED TO BE SOLID (TYP.) WRAP STONE IN
CHAMBER D 8" DIAMETER SLOTTED
STONE BASE PERFORATED COVER HDPE PIPE WRAPPED
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP
GEOTEXTILE AND SIDES ONLY) WITH GEOTEXTILE.
3"-THICK LEVELING WWM 6x6-W8xW8
(TOP AND SIDES BOTTOM HALF OF PIPE
COURSE WRAP STONE IN TO BE SOLID (TYP.)
ONLY)
GEOTEXTILE (TOP AND
5'-0" OR AS SHOWN 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
CONCRETE HEADER
GRASS SURFACE
CLEAN OUT
6"-12"
5'-0" OR AS SHOWN
1'-0"
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" SURFACE (TYP.) 1'-2" EXPANSION JOINT.
EXISTING CURB 5" 12" 5"
E E EXISTING CURB
2'-0" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
PLAN
2'-6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
4" 4"
4"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN OPEN-GRADED STONE
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPENING FOR 8" DIA.
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
4"
SLOTTED PIPE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI 3"- THICK LEVELING
PRACTICE. PRECAST CONCRETE
CHAMBER COURSE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL WWM 6x6-W8xW8
OPEN GRADED STONE. SECTION E-E
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PROPERTY LINE PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
JOINT AND FILLER
STEEL GRATE GRASS
PER NYC DOT
PERFORATED COVER TOPSOIL HIGHWAY SPEC.
DROP CURB [INLET] SECTION 2.15 (TYP.)
A EXISTING
CONCRETE
STEEL FACING CURB CLEAN OUT SIDEWALK
LOCATION VARIES 15'-0" CONCRETE HEADER OPENING, SEE GI-168 6"
OR AS SHOWN GRASS SURFACE SIDEWALK ROADWAY
3'-6" 3'-6" 10%
STEEL GRATE PITCH
EXISTING
1'-0"
16"
1'-3"
CATCH BASIN PRECAST CONCRETE TRENCH
SHOWN
B
OR AS
CURB LINE
5'-0"
B
FLOW 6"-12" 9"
4"
2'-6"
OUTLET INLET 2% SLOPE
18"x42"x8" PRECAST OR CONCRETE
A POURED REINFORCED HEADER (3) SIDES
CONCRETE APRON 4" 1'-0" 4" PERFORATED END
PLUG (TYP.)
PLAN PRECAST CONCRETE
CHAMBER
WRAP STONE IN
1'-6"
3"-THICK LEVELING
8" DIAMETER SLOTTED PIPE WRAPPED TOP OF STEEL GRATE FLUSH OPENING FOR 8" GEOTEXTILE
3'-6" COURSE 12"
IN GEOTEXTILE. MAINTAIN 2% SLOPE WITH TOP OF SURFACE DIAMETER SLOTTED (TOP AND SIDES
PIPE STONE COLUMN CAP ONLY)
CLEAN OUT, 3"-THICK PERFORATED
3'-0" TO BE PERFORATED
SEE GI-204 LEVELING COVER (TYP.) SIDEWALK
COURSE
OPEN-GRADED STONE
2'-6"
AND SIDES ONLY WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
4" 4"
4"
PERMEABLE SOIL
1'-0"
8" DIAMETER PIPE WITH PRECAST CONCRETE
14" DIAMETER CASING TO
CLEAN OUTS BEYOND TRENCH
4"
MINIMUM 5'-0" AUGERED
UNDISTURBED WWM 6x6-W8xW8
INTO PERMEABLE LAYER
SOIL 14"
1'-6"
1'-6"
SOIL LAYER
MIN 5'-0"
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
3'-6" 3'-6"
CONCRETE HEADER
GRASS SURFACE
CLEAN OUT
6"-12"
5'-0" OR AS SHOWN
1'-0"
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" 1'-2" EXPANSION JOINT.
EXISTING CURB
SURFACE (TYP.) C C EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
PLAN
NOTES: TOP OF STEEL GRATE
PERFORATED COVER 3'-6" FLUSH WITH TOP OF
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
GRASS SURFACE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. TOP SOIL 3'-0"
SIDEWALK
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL 8" DIAMETER SLOTTED
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. PIPE WRAPED IN
GEOTEXTILE 6" 8" 6" 8" 6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
2'-6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
4" 4"
4"
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPEN-GRADED STONE
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI OPENING FOR 8" DIA.
4"
PRACTICE. SLOTTED PIPE
PRECAST CONCRETE 3"- THICK LEVELING
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED CHAMBER COURSE
IN THE 14" CASING WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
SECTION C-C
OPEN GRADED STONE.
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
TOP OF STEEL GRATE
FLUSH WITH TOP OF
SURFACE 2'-6" PRECAST CONCRETE
CHAMBER
PROPERTY LINE
C B A EXISTING SIDEWALK
GRASS SURFACE
CONCRETE PERFORATED
LOCATION VARIES 15'-0" CONCRETE HEADER SIDEWALK COVER FOR 4" DIA.
OR AS SHOWN
CURB LINE GRASS SURFACE OPENING (TYP.)
1'-0"
SHOWN
PRECAST CONCRETE TRENCH 6" 10" 6"
OR AS
5'-0"
2'-4"
STEEL GRATE
4"
4"
EXISTING OPEN-GRADED
4"
4"
CATCH BASIN FLOW STONE
OUTLET INLET WWM 6x6-W8xW8
4" 4" 3"- THICK LEVELING
C B A COURSE
1'-0"
16"
1'-3"
2'-4"
4"
14"
6"-12" 9"
2'-6"
4"
4"
8" REINFORCED
4"
WWM 6x6-W8xW8 CONCRETE POURED REINFORCED
5'-0"
18"x42"x8" PRECAST OR HEADER (3) SIDES CONCRETE GUTTER CONCRETE APRON
POURED REINFORCED PERFORATED UNDISTURBED 4" 1'-0" 4" TOP SOIL
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) SOIL
PRECAST CONCRETE
D UNDISTURBED SOIL
PRECAST CONCRETE BOTTOM HALF OF PIPE
OPEN-GRADED TO BE SOLID (TYP.) CHAMBER 8" DIAMETER SLOTTED
CHAMBER STONE BASE WRAP STONE IN
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP PERFORATED COVER HDPE PIPE WRAPPED
GEOTEXTILE AND SIDES ONLY) WITH GEOTEXTILE.
3"-THICK LEVELING WWM 6x6-W8xW8
(TOP AND SIDES BOTTOM HALF OF PIPE
COURSE OPEN-GRADED WRAP STONE IN
ONLY) TO BE SOLID (TYP.)
STONE BASE GEOTEXTILE (TOP AND
BEDDING
5'-0" OR AS SHOWN STORMWATER CHAMBER, 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
5"-7"
SEE GI-204 FOR OPEN-GRADED
DIMENSION SCHEDULE STONE BASE
SECTION A-A SECTION B-B SECTION C-C
AT INLET AT MIDSECTION AT OUTLET
NOTE:
1. USE SMALLEST STORMWATER CHAMBER SIZE SHOWN ON GI-204
2. OPEN GRADED STONE AROUND THE STORMWATER CHAMBER TO BE HAND
COMPACTED AT A DEPTH OF 1'-0" FROM THE BASE OF INFILTRATION BASIN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 15'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
15'-0" OR AS SHOWN
6"-12"
5'-0" OR AS SHOWN
1'-0"
PRECAST CONCRETE
SIDEWALK 2% CONSTANT SLOPE CHAMBER
1'-0"
6" 14"L x 3"H STEEL FACE OPENING
12"L x 3"H STEEL FACE SEE GI-168
OPENING SEE GI-168 TOP OF CLEAN OUT COVER 8" DIAMETER SLOTTED PIPE
FLUSH WITH WITH TOP WRAPPED IN GEOTEXTILE.
1'-8"
1'-8"
9" SURFACE (TYP.) 1'-2" EXPANSION JOINT.
EXISTING CURB
2'-0" 5" 12" 5" E 10" 14" 10"
E
2'-0"
EXISTING CURB
TO REMAIN TO REMAIN
5'-0"
+
[OUTLET] [INLET]
FLOW PITCH FLOW
1'-6"
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
PRECAST OR POURED
2'-6" 3'-6" CONDITIONS AND SITE
REINFORCED CONCRETE
ENGINEER
APRON
NOTES: PLAN
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". TOP OF STEEL GRATE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE PERFORATED COVER FLUSH WITH TOP OF
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 3'-6"
GRASS SURFACE
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY TOP SOIL 3'-0"
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL SIDEWALK
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 8" DIAMETER SLOTTED
PIPE WRAPED IN
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
GEOTEXTILE 6" 8" 6" 8" 6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
2'-6"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.
4" 4"
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND OPEN-GRADED STONE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI
PRACTICE. OPENING FOR 8" DIA.
4"
SLOTTED PIPE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL 3"- THICK LEVELING
OPEN GRADED STONE. PRECAST CONCRETE
CHAMBER COURSE
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE WWM 6x6-W8xW8
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS. SECTION E-E
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS
1'-0"
SHOWN
PRECAST CONCRETE TRENCH
OR AS
5'-0"
6" 10" 6"
STEEL GRATE
2'-4"
4"
EXISTING
4"
FLOW
OPEN-GRADED
CATCH BASIN
4"
4"
STONE
OUTLET B INLET WWM 6x6-W8xW8
C A 4" 4" 3"- THICK LEVELING
COURSE
1'-0"
16"
1'-3"
2'-4"
4"
14"
6"-12" 9"
2'-6"
4"
4"
8" REINFORCED
4"
WWM 6x6-W8xW8 CONCRETE POURED REINFORCED
5'-0"
HEADER (3) SIDES CONCRETE GUTTER
18"x42"x8" PRECAST OR CONCRETE APRON
POURED REINFORCED PERFORATED UNDISTURBED OPEN-GRADED 4" 1'-0" 4" TOP SOIL
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) SOIL STONE BASE
OPEN-GRADED UNDISTURBED SOIL
PRECAST CONCRETE BOTTOM HALF OF PIPE PRECAST CONCRETE
STONE BASE
CHAMBER
OPEN-GRADED TO BE SOLID (TYP.)
WRAP STONE IN
CHAMBER D 8" DIAMETER SLOTTED
STONE BASE PERFORATED COVER HDPE PIPE WRAPPED
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP
GEOTEXTILE AND SIDES ONLY) WITH GEOTEXTILE.
3"-THICK LEVELING WWM 6x6-W8xW8
(TOP AND SIDES BOTTOM HALF OF PIPE
COURSE WRAP STONE IN TO BE SOLID (TYP.)
ONLY)
GEOTEXTILE (TOP AND
5'-0" OR AS SHOWN 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS
LENGTH OF INFILTRATION BASIN 10'-0"
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
CONCRETE HEADER
GRASS SURFACE
8" DIAMETER SLOTTED
6"-12"
PIPE WRAPPED IN
1'-0"
2% CONSTANT SLOPE GEOTEXTILE (TYP).
5'-0"
SIDEWALK PRECAST CONCRETE
1'-0"
CHAMBER
CLEAN OUT COVER - TOP 14"L x 3"H STEEL FACE
FLUSH WITH WITH TOP OPENING SEE GI-168
12"L x 3"H STEEL FACE
SURFACE (TYP.)
OPENING SEE GI-168 EXPANSION JOINT.
EXISTING CURB
9"
1'-6" E E EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
[OUTLET]
+ [INLET]
FLOW PITCH FLOW
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
PRECAST OR POURED AS DETERMINED BY FIELD
2'-6" REINFORCED CONCRETE 3'-6" CONDITIONS AND SITE
APRON ENGINEER
PLAN
NOTES: TOP OF STEEL GRATE
PERFORATED COVER 3'-6" FLUSH WITH TOP OF
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". GRASS SURFACE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE 3'-0"
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. TOP SOIL
SIDEWALK
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY 8" DIAMETER SLOTTED
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL PIPE WRAPED IN
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. GEOTEXTILE 6" 8" 6" 8" 6"
2'-6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN 4" 4"
4"
CONSULTATION WITH THE CERTIFIED ARBORIST. OPEN-GRADED STONE
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND OPENING FOR 8" DIA.
4"
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI SLOTTED PIPE
PRACTICE. PRECAST CONCRETE 3"- THICK LEVELING
CHAMBER COURSE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL WWM 6x6-W8xW8
OPEN GRADED STONE.
SECTION E-E
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH PRECAST CONCRETE TOP
TYPE 3A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER SLOTTED HDPE 5'-0"
PIPE WRAPPED IN GEOTEXTILE OR AS SHOWN 1/2" EXPANSION
PROPERTY LINE
JOINT AND FILLER
STEEL GRATE GRASS
PER NYC DOT
PERFORATED COVER TOPSOIL HIGHWAY SPEC.
DROP CURB [INLET] SECTION 2.15 (TYP.)
A EXISTING STEEL FACING CURB CLEAN OUT SIDEWALK
LOCATION VARIES 10'-0" CONCRETE HEADER CONCRETE OPENING, SEE GI-168 6"
OR AS SHOWN GRASS SURFACE SIDEWALK ROADWAY 10%
EQ EQ STEEL GRATE PITCH
EXISTING
1'-0"
16"
1'-3"
CATCH BASIN PRECAST CONCRETE TRENCH
SHOWN
B
OR AS
CURB LINE
5'-0"
B
FLOW 6"-12" 9"
4"
2'-6"
OUTLET INLET 2% SLOPE
A 18"x42"x8" PRECAST OR CONCRETE
POURED REINFORCED HEADER (3) SIDES
CONCRETE APRON 4" 1'-0" 4" PERFORATED END
PLUG (TYP.)
PLAN PRECAST CONCRETE
CHAMBER
WRAP STONE IN
1'-6"
3"-THICK LEVELING
8" DIAMETER SLOTTED PIPE WRAPPED TOP OF STEEL GRATE FLUSH OPENING FOR 8" GEOTEXTILE
3'-6" COURSE 12"
IN GEOTEXTILE. MAINTAIN 2% SLOPE WITH TOP OF SURFACE DIAMETER SLOTTED (TOP AND SIDES
PIPE STONE COLUMN CAP ONLY)
CLEAN OUT, SEE GI-204 PERFORATED
3'-0" TO BE PERFORATED
COVER (TYP.) SIDEWALK
OPEN-GRADED STONE
2'-6"
AND SIDES ONLY WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
4" 4"
4"
PERMEABLE SOIL
1'-0"
PRECAST CONCRETE 14" DIAMETER CASING TO
TRENCH
4"
SOIL LAYER
P.E. 07-19-2017
SECTION B-B DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR 10'X5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 3A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
LENGTH OF INFILTRATION BASIN 10'-0"
SEE NOTES BELOW FOR PLACE EXPANSION
JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
DEVIATION IN DIMENSIONS
FROM GI STANDARDS
EQ EQ
STONE COLUMN CONCRETE HEADER
GRASS SURFACE
BELOW 8" DIA.
8" DIAMETER SLOTTED
6"-12"
PIPE (TYP.)
PIPE WRAPPED IN
1'-0"
2% CONSTANT SLOPE GEOTEXTILE (TYP).
5'-0"
SIDEWALK PRECAST CONCRETE
1'-0"
CHAMBER
CLEAN OUT COVER - TOP 14"L x 3"H STEEL FACE
FLUSH WITH WITH TOP OPENING SEE GI-168
12"L x 3"H STEEL FACE
SURFACE (TYP.)
OPENING SEE GI-168 9" EXPANSION JOINT.
EXISTING CURB
1'-6" C C EXISTING CURB
2'-0" 5" 12" 5" 10" 14" 10" 2'-0"
TO REMAIN TO REMAIN
[OUTLET]
+ [INLET]
FLOW PITCH FLOW
1'-6"
PITCH
EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE
10%
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
TO MATCH EXISTING
PAVEMENT INFILTRATION BASIN, THE LIMIT
ROADWAY
OF THE NEW CONCRETE CURB
PRECAST OR POURED AS DETERMINED BY FIELD
2'-6" REINFORCED CONCRETE 3'-6" CONDITIONS AND SITE
APRON ENGINEER
PLAN
NOTES: TOP OF STEEL GRATE
PERFORATED COVER 3'-6" FLUSH WITH TOP OF
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".
GRASS SURFACE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. TOP SOIL 3'-0"
SIDEWALK
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL 8" DIAMETER SLOTTED
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. PIPE WRAPED IN
GEOTEXTILE 6" 8" 6" 8" 6"
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
2'-6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
4" 4"
4"
CONSULTATION WITH THE CERTIFIED ARBORIST.
OPEN-GRADED STONE
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI OPENING FOR 8" DIA.
4"
PRACTICE. SLOTTED PIPE
PRECAST CONCRETE 3"- THICK LEVELING
6. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC INSERTED CHAMBER COURSE
IN THE 14" CASING WWM 6x6-W8xW8
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL SECTION C-C
OPEN GRADED STONE.
8. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. INFILTRATION BASINS
- NO CONNECTION TO SEWERS
L
SURFACE TYPE
PER CONTRACT
PLANS
SIDEWALK
W
A B
A
+
[OUTLET] [INLET]
A
FLOW PITCH FLOW
1'-6"
PITCH
EXISTING
10%
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
2'-6" C
TYPE 1/TYPE 2
STEEL FACING CURB BEYOND STEEL FACE PRECAST OR POURED L
HEIGHT OF ADJACENT ASPHALT A OPENING B REINFORCED CONCRETE
PAVEMENT FLUSH WITH APRON
3"
3"
PER CONTRACT
BOTTOM OF CURB PLANS
W
STEEL FACE OPENING
1'-6"
PITCH
EXISTING
10%
4'-0" TO 6'-0" TYPE 3 12" 14" 3'-6" ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
DIMENSIONS SCHEDULE 2'-6" C
TYPE 3
NOTES:
P.E. 07-19-2017
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. INFILTRATION BASIN TYPE SPECIFIED.
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
2. DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'. DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. INFILTRATION BASIN
WITH COMBINATION OF CONCRETE & GRASS TOP
- NO CONNECTION TO SEWERS
1'-0"
TRENCH PRECAST CONCRETE TRENCH 6" 10" 6"
2'-3"
EXISTING
CATCH BASIN EXISTING GRASS STRIP FLOW
OUTLET OPEN-GRADED
4"
4"
INLET
AS SHOWN STONE
4"
ON PLANS
C B A 4" 4"
WWM 6x6-W8xW8
3"- THICK LEVELING
COURSE
PLAN
SECTION D-D
5"
OPENING, SEE GI-168
ROADWAY ROADWAY
10%
PITCH ROADWAY
1'-0"
3"
1'-3"
1'-3"
5"
3"
2'-4"
54" - 60" MAX. DEPTH
14"
4 1/2"
2"
4"
6"-12" 9" 9"
4"
8" REINFORCED
4"
CONCRETE APRON 4" 1'-0" 4" END PLUG (TYP.) 4" 1'-0" 4"
BOTTOM HALF OF STONE BASE
OPEN-GRADED BOTTOM HALF OF PIPE PIPE TO BE SOLID PRECAST CONCRETE
PRECAST CONCRETE
CHAMBER STONE BASE TO BE SOLID (TYP.)
WRAP STONE IN
CHAMBER D OPEN-GRADED
STONE BASE
WWM 6x6-W8xW8 WRAP STONE IN GEOTEXTILE (TOP PERFORATED COVER WRAP STONE IN
3"-THICK LEVELING GEOTEXTILE AND SIDES ONLY) WWM 6x6-W8xW8 GEOTEXTILE
COURSE (TOP AND SIDES (TOP AND SIDES
WRAP STONE IN
ONLY) ONLY)
GEOTEXTILE (TOP AND
5'-0" OR AS SHOWN 5'-0" OR AS SHOWN SIDES ONLY) 5'-0" OR AS SHOWN
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. INFILTRATION BASIN
WITH COMBINATION OF CONCRETE & GRASS TOP
- NO CONNECTION TO SEWERS
AS SHOWN ON PLANS
6"-12"
WRAPPED IN GEOTEXTILE
5"- THICK CAST IN PLACE (TYP.)
OR PRECAST CONCRETE
AS SHOWN ON PLANS SURFACE CLEAN OUT FOR TYPE 1 GRASS STRIP TO MATCH
AND TYPE 2 ONLY EXISTING CONDITIONS
SIDEWALK EDGE OF CONCRETE EXISTING GRASS STRIP
1'-6"
VARIES
1'-8"
GRASS SURFACE
EXISTING CURB E E EXISTING CURB
TO REMAIN 2'-0" 2'-0" TO REMAIN
+
[OUTLET] [INLET]
FLOW PITCH 8"-THICK REINFORCED FLOW
PITCH
EXISTING
STEEL FACING CURB
10%
ASPHALT CONCRETE GUTTER
TO MATCH EXISTING
PAVEMENT ROADWAY
PLAN
NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". TOP OF STEEL GRATE
ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE PERFORATED COVER FLUSH WITH TOP OF
APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 3'-6"
GRASS SURFACE
2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY TOP SOIL 3'-0"
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL SIDEWALK
COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS. 8" DIAMETER SLOTTED
PIPE WRAPED IN
3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.
GEOTEXTILE 6" 8" 6" 8" 6"
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
2'-6"
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.
4" 4"
4"
5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND OPEN-GRADED STONE
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI
PRACTICE. OPENING FOR 8" DIA.
4"
SLOTTED PIPE
7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL 3"- THICK LEVELING
OPEN GRADED STONE. PRECAST CONCRETE
CHAMBER COURSE
8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FOR IMPERMEABLE MEMBRANE REQUIREMENTS. WWM 6x6-W8xW8
9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE
SECTION E-E
DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR ROWB/ROWGS/ROWRG INLET WITH PRECAST CONCRETE SEDIMENT PAD
A
SURFACE
GRADING AS
PER DRAWING
GI-124
SIDEWALK
LOW POINT
OUTLET INVERT +
SET 1"-3" GABION WALL BELOW
L-SHAPED
EDGING (TYP.)
BELOW OUTLET PRECAST CONCRETE
GABION WALL BELOW INVERT SEDIMENT PAD L PRECAST
PRECAST CONCRETE CONCRETE STRIP
STRIP (TYP.)
CURB LINE
EXISTING CURB 1'-0"
TO REMAIN
1'-6"
FLOW 1'-0"
+
[OUTLET]
8"-THICK REINFORCED
[INLET] 1'-0"
FLOW
PITCH
1'-6"
PITCH
EXISTING CONCRETE GUTTER
10%
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
LEVELING COURSE
3"
5"
7"
1'-4"
16"
PRECAST OR POURED ENGINEERED SOIL
ROWB SEDIMENT PAD 9"
REINFORCED CONCRETE LENGTH LENGTH (L) L
APRON CONCRETE
HEADER (3) SIDES > 17' 4'-6"
PRECAST CONCRETE < 16' 3'-6"
SEDIMENT PAD
3"-THICK LEVELING DIMENSION SCHEDULE
PRECAST CONCRETE STRIP
COURSE OPEN-GRADED 3"W x 2"H 2"W x 2"H
3"-THICK LEVELING COURSE
GABION WALL FILLED WITH STONE BASE NOTCH AT NOTCH AT
OPEN-GRADED STONE CENTER ENDS GABION WALL FILLED WITH
OPEN-GRADED STONE
GEOTEXTILE WRAPPED
AROUND GABION
ISOMETRIC VIEW
"
N.T.S. 12
P.E. 07-19-2017
SECTION A-A DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
AT BIOSWALE INLET
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR STORMWATER INLET
FOR R.O.W. BIOSWALE TYPE 1B AND TYPE 2B - NO CONNECTION TO SEWERS
8"
1" CLEAR
6" L. HOOK, SEE
DEP STANDARDS
4'-10"
8'-0"
STANDARDS SE58 & SE59 C.I. HOOD,
6'-6"
SEE DEP
4'-0" SUMP
(3'-0" MIN.)
STANDARDS
SE60 8" 4'-0" 8"
8" 3'-6" 8"
5'-4"
A
PLAN [WITH CASTING]
12"
CURB
8"
2" NOTES:
(1) LOCATION OF CURB SHALL BE AS SHOWN UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
(2) LOCATION AND ANGLE OF 8" PVC OUTLET PIPE MAY BE VARIED TO SUIT FIELD CONDITIONS.
1'-4"
(3) KEYED CONSTRUCTION JOINTS ARE REQUIRED BETWEEN ANY SUCCESSIVE POURS.
8"
B CONC. SLOPE PAVEMENT
B SLOPE PAVEMENT TO CASTING SDWK. TO CASTING
FINAL GRADE (TOP OF CURB)
EXIST. RDWY. 7" EXIST. RDWY.
TYP.
SINGLE LAYER REMOVABLE PRECAST TYPE-2 SINGLE LAYER LAYER
BRICK SLAB (SEE DETAIL a-a)
MORTAR AROUND
3'-6"
8"
8"
PIPE OUTLET
4" (TYP.)
0.5" MORTAR
LIFTING HOOK, JOINT, TYP. 6" L. HOOK, SEE DEP
TYPICAL FOR FOUR LIFTING 4" STANDARDS SE60
8" SOLID DUAL
[SEE DETAIL] HOOK WALL HDPE PIPE 1 1/2"R WELDED HANDLE
8" [SEE DETAIL] ON MODIFIED C.I.
HOOD, SEE DEP
4"
1 1/2" STANDARDS SE60
WWM-AS=0.12 B.W. 15" X 15" OPENING
8" 4'-0" 8" #6 REINF. BAR
(SEE NOTE 1)
LIFTING HOOK (SEE
3'-0"
NOTES)
6'-6"
A WWM-AS=0.12 B.W.
10" MAX.
PLAN
4'-0" SUMP
(3'-0" MIN)
8" (TYP.)
a 1 1/2"R (TYP.)
NOTE:
1'-0"
R3"
6"
ALL STEEL LIFTING BAR
REINFORCEMENT [SEE DETAIL]
2" (TYP.) SECTION B-B
4'-10"
6" 6"
ARE #6 BARS
NOTES:
8"
1. LOCATION OF OPENING SHALL BE DETERMINED PRIOR TO THE MANUFACTURING OF BASIN BY FIELD MEASUREMENTS.
2. LOCATION OF CURB SHALL BE AS SHOWN UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. LOCATION AND ANGLE OF 8" PVC OUTLET PIPE MAY BE VARIED TO SUIT FIELD CONDITIONS. 1" CLEAR
4. LIFTING HOOKS SHALL BE LOCATED IN THE SECTION AS PER MANUFACTURERS RECOMMENDATIONS AND GROUTED 11" 2" 2"
4" 4"
a PRIOR TO BACKFILLING. (FOUR (4) LIFTING HOOKS SHALL BE PROVIDED FOR EACH SECTION AND SHALL BE PLACED 2" 3" 2"
5'-4" SYMMETRICALLY AND IN SUCH A MANNER AS TO PROVIDE FOR THE EVEN LIFTING OF THE SECTION.)
5. LIFTING BAR TO BE CUT FLUSH TO SURFACE AFTER PLACEMENT OF PRECAST TYPE 2 SLAB. 4'-10"
6. CONCRETE IS TO BE CLASS 40 AND 5% AIR ENTRAINED. REBARS-GRADE 60. WWM-F S = 65,000 PSI.
REINFORCEMENT PLAN 7. MODIFY STANDARD CAST IRON HOOD AND HOOKS [SE60] AS PER DRAWING DETAIL a-a
[REMOVABLE PRECAST TYPE 2 SLAB] [OF REMOVABLE PRECAST TYPE 2 SLAB]
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD R.O.W. SECTIONS AND DETAILS
H AREA
H
80 MIL HDPE
BARRIER; UTILITY
ENGINEERED WATERTIGHT
W 5" MIN LENGTH OF GI DUCT 3" 1'-0"
SOIL EXPANDING FOAM
PRACTICE 3"
D 2D SEALANT IN HDPE SPLIT
HDPE BARRIER SLEEVE 12" INTO ROW GI
BOTH ENDS OF STORMWATER SIDE VIEW END VIEW WITH 12" TOE 1'-0" PRACTICE
CHAMBER TO BE SEALED WITH
END CAPS INTERFACE BETWEEN
12"
ROW GI WIDTH W H OPEN-GRADED COLLAR AND HDPE
5" MINIMUM STONE BEDDING
CONCRETE STONE BASE BARRIER TO BE SEALED
NOTE: 47" 26.5" COLLAR (TYP.) WITH WATERPROOF
CHAMBER ONLY INSTALLED IN SEALANT
36" 20.5" WRAP STONES IN
ROWB WITH NO TREE CROSS-SECTION GEOTEXTILE (TOP 80 MIL HDPE BARRIER;
AT MIDSECTION [LOWEST POINT]
DIMENSION SCHEDULE AND SIDES ONLY) LENGTH OF GI
HDPE BARRIER DETAILS 6" DIA. CONCRETE
PRACTICE WITH 12"
AGAINST SIDEWALK TOE.
STORMWATER CHAMBER (ONLY IF DIRECTED)
PIER BEYOND
N.T.S.
N.T.S. NOTE:
ANY SEAMS IN THE HDPE BARRIER MUST HAVE A 1'-0"
OVERLAP AND BE SEALED WITH WATERTIGHT SEALANT
ENGINEERED
POUR RING DRAIN BODY
CONSTANT SLOPE HDPE PIPE TO ELBOW WATERTIGHT EXPANDING
SOIL
2D + 6" 2D FOAM SEALANT BETWEEN
UTILITY AND HDPE SPLIT
PERFORATED SLEEVE 12" INTO ROWB
END PLUG WYE 22 12 3" 3" CLASS B CONCRETE COLLAR
0.15"
FLOW
CROSS SECTION A-A
FROM INLET 8" PERFORATED HDPE PIPE OPEN GRADED STONE
PLAN OF CIRCULAR SLAB PLAN OF PRECAST CIRCULAR FOOTING RING PRECAST SEEPAGE BASIN SCHEDULE
VARIES #4 HOOPS TOP MIN.. 6" PRECAST CIRCULAR PRECAST CIRCULAR THICKNESS
AND BOTTOM MAX.12" SLAB (FT) FOOTING RING (FT) (IN)
3-#6@4" BOTH
WAYS D d t
SECTION IN CIRCULAR SLAB SECTION IN PRECAST CIRCULAR FOOTING RING CIRCULAR SLAB AND FOOTING SCHEDULE
DETAIL A DETAIL B
#6 REINFORCING
3"R BAR
10"
3"R
8" 8"
P.E. 07-19-2017
LIFTING BAR DETAIL DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD R.O.W. SECTIONS AND DETAILS
AS SHOWN ON CONTRACT PLANS
8"
BEYOND
FLOW
B
+
[OUTLET] 8"-THICK REINFORCED
[INLET]
B FLOW 8"-THICK PRECAST OR POURED
CONCRETE GUTTER REINFORCED CONCRETE APRON
PITCH TO MATCH
10% PITCH
SECTION B-B
EXISTING ROADWAY PLAN
LEVELING STONE
GABION WALL
BELOW PRECAST
CONCRETE STRIP GABION WALL
PLACED BELOW
OPEN GRADED SEDIMENT PAD FOR
STONE SUPPORT
2" x 2" x 1/4"
STEEL ANGLE
SECTION A-A TYP.
1" x 3/8" CROSS BAR
TYPICAL GABION WALL
1/2"
6" DIAMETER
PRECAST CONCRETE CONCRETE PIERS. SEDIMENT PAD 1" x 3/8" BEARING BAR
STRIP OUTLET EQ EQ EQ SEE NOTE BELOW
GRATING FASTENERS WITH
RECESSED BOLTS
3/8" x 4" PLAIN STEEL STUD
GABION WALL
LEVELING STONE METAL BAR GRATE
BELOW PRECAST
GABION WALL
BRACING DETAILS
CONCRETE STRIP
PLACED BELOW
OPEN GRADED SEDIMENT PAD FOR
STONE SUPPORT
SECTION A-A
GABION & CONCRETE PIER PLACEMENT WHEN UTILITY CROSSINGS
NOTE: ARE PRESENT
CONCRETE PIER PLACEMENT SHALL BE AS FOLLOWS:
TYPE 1 - 3 EQUAL SPACES P.E. 07-19-2017
TYPE 2 - 2 EQUAL SPACES DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
TYPE 3 - 1 SPACE DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR ROW INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER
A
SIDEWALK
2'-6" 3'-6"
1'-8"
1'-8"
EXISTING CURB EXISTING CURB
TO REMAIN OUTLET TO REMAIN
INVERT
+
FLOW FLOW
EXISTING
ASPHALT
PAVEMENT
A
EXPANSION JOINT
PLAN (TYP.)
STEEL FACING CURB
8" DIAMETER SLOTTED 5"-THICK PRECAST OR CAST
PIPE WRAPPED IN IN PLACE CONCRETE TOP STEEL FACING CURB -
GEOTEXTILE 3" INLET OPENING
IMPERMEABLE MEMBRANE 1/2" EXPANSION JOINT
STEEL GRATE HEADER (TYP.)
3"-THICK LEVELING AND FILLER PER NYC INLET INVERT
PERFORATED COVER COURSE DOT HIGHWAY SPEC. METAL GRATE ELEVATION
DROP CURB [INLET] CLEAN OUT, SEE SECTION 2.15 (TYP.) (PARTIALLY SHOWN
GI-204 1" CURB NOTCH FOR
STEEL FACING CURB SIDEWALK FOR CLARITY)
6" GALVANIZED STEEL
DETAIL B
OPENING SEE GI-168 PRECAST CONCRETE GRATE
ROADWAY 10% CHAMBER 4"
PITCH CONCRETE INLET
1'-3"
3"
SLOTTED PIPE PITCH (TYP.)
6"-12"
1'-0"
CONCRETE GUTTER
3"
4"
4"
2% SLOPE 9" 1" x 3/8" CROSS BAR 2" x 2" x 1/4" (TYP.)
STEEL ANGLE
4"
PERFORATED END
2'-1"
4" 1'-0" 4" PLUG (TYP.)
1/2"
BOTTOM HALF OF
PRECAST CONCRETE OPEN-GRADED PIPE TO BE SOLID
CHAMBER STONE BASE (TYP.)
WRAP STONE IN GRATING FASTENERS
WWM 6x6-W8xW8
GEOTEXTILE WITH RECESSED BOLTS
3"-THICK LEVELING ISOMETRIC VIEW
COURSE (TOP AND SIDES 3/8" x 4" PLAIN STEEL STUD
ONLY) N.T.S
5'-0" OR AS SHOWN
DETAIL - B
METAL BAR GRATE BRACING P.E. 07-19-2017
SECTION A-A DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
AT INLET
DEPARTMENT OF ENVIRONMENTAL PROTECTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT GUIDELINES
- NO CONNECTION TO SEWERS
PROPERTY LINE
CURB LINE
A FLOW
A
+ +
W
1' OFFSET
LOW POINT SET TAPER TO
1'-0"
4" STRIPE
B 3"-6" BELOW C ROADWAY
GI-302 OUTLET INVERT GI-302 GRADE
L
FLOW
GRADING PLAN
SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
NOTES: INVERT (EL___) CULVERT CULVERT INLET INVERT
(EL___)
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE OUTLET PITCH INLET (EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. INVERT (EL___) INVERT (EL___) (EL___)
4"
4"
FOR 3"-6" DEEP
ROADWAY
DEPRESSION
7"
7"
1'-7"
1'-3"
1'-6"
6"
5"
L-SHAPED EDGING 9"
5"
REINFORCED CONCRETE 9"
WITH MINIMUM 9"
STAKES CULVERT
OPEN GRADED STONE BASE
12" MIN.
SEE DRAWING GI-204 6" MIN. (CHANNEL DEPTH VARIES)
3'L x 1'W x 2'H GABION WRAP STONE IN
FILLED WITH GEOTEXTILE (TOP AND
OPEN-GRADED STONE SIDES ONLY) CONCRETE PATHWAY
LEVELING COURSE
GEOTEXTILE WRAPPED
AROUND GABION
ENGINEERED SOIL
18"-24" DEPTH
WRAP STONE IN
FROM LOW POINT
GEOTEXTILE
(TOP AND SIDES ONLY) SECTION B-B OPEN GRADED STONE SECTION C-C
BASE
UNDISTURBED SOIL AT MIDSECTION AT PEDESTRIAN PATHWAY
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS
LAYOUT GUIDELINES
PROPERTY LINE - NO CONNECTION TO SEWERS
CURB LINE
EXISTING
CATCH BASINS (TYP.) EXPANSION
CONCRETE PATHWAY EXISTING
SEE DRAWING GI-312 JOINT EVERY 10' (MAX.) STONE COLUMN-
SEE ROWB STANDARDS CONCRETE
FOR DETAILS SIDEWALK
L-SHAPED EDGING FOR DETAILS
STEEL TREE PIT
WITH MINIMUM 9" BIOFILTER INLET
OUTLET - SEE ROWB GUARDS (TYP.) SEE
STAKES SEE TRANSITION SECTION -
TYPE 1 STANDARDS DRAWING GI-601B SEE DRAWING GI-310
DRAWING GI-204 EXISTING CURB TO
FOR DETAILS FOR DETAILS
NEW HEADER
4" x 4" NOTCHES
TAPER UP TO 4" ABOVE LOW POINT SET
B C (TYP.) - SEE CONCRETE HEADER - EXISTING
SIDEWALK GRADE 3"-6" BELOW GI-304 GI-304 GI-304 FOR 4" ABOVE SIDEWALK CURB
OUTLET INVERT DETAILS GRADE
A FLOW
A
+ +
W
1' OFFSET
1'-0"
3'L x 1'W x 2'H GABION FILLED WITH TAPER TO
4" STRIPE
OPEN-GRADED STONE B C ROADWAY
BELOW STONE STRIP WITH GI-304 GI-304 GRADE
L-SHAPED EDGING ON THREE SIDES REINFORCED LOW POINT SET 3"-6"
CONCRETE BELOW CULVERT
L CULVERT INLET INVERT
FLOW
GRADING PLAN
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE
WITH STORMWATER GREENSTREET CALCULATIONS.
SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH
INVERT (EL___) CULVERT CULVERT INLET INLET INVERT
VARIES. TOTAL DEPTH NOT TO EXCEED 60". (EL___)
OUTLET INVERT INVERT (EL___) (EL___)
(EL___)
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE (EL___) PITCH
DIRECTION OF THE ENGINEER.
6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS. OPEN GRADED STONE BASE
SECTION A-A
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS
LAYOUT GUIDELINES
- NO CONNECTION TO SEWERS
4"
4"
GRADE TO ALLOW SIDEWALK SIDEWALK
ROADWAY ROADWAY
FOR 3"-6" DEEP
DEPRESSION
7"
7"
1'-7"
1'-3"
1'-6"
6"
5"
L-SHAPED EDGING WITH 9" 9"
5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
6" MIN. (CHANNEL DEPTH VARIES) OPEN GRADED STONE BASE
3'L x 1'W x 2'H GABION
FILLED WITH WRAP STONE IN
GEOTEXTILE (TOP AND CONCRETE PATHWAY
OPEN-GRADED STONE
SIDES ONLY) LEVELING COURSE
WRAP STONE IN ENGINEERED SOIL
GEOTEXTILE 18"-24" DEPTH
(TOP AND SIDES ONLY) FROM LOW POINT
GEOTEXTILE WRAPPED
AROUND GABION OPEN GRADED STONE BASE SECTION C-C
UNDISTURBED AT PEDESTRIAN PATHWAY
SOIL
STONE COLUMN
(TYP.) SECTION B-B
AT MIDSECTION (STONE COLUMN)
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT GUIDELINES
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN PROPERTY LINE
A FLOW
+ +
W
CONCRETE NECKDOWN
RADIUS AND LOW POINT SET TAPER TO
CROSSWALK RAMPS AS OUTLET - SEE 3"-6" BELOW ROADWAY
A B C
1'-0"
REQUIRED BY DOT ROWB TYPE 1 OUTLET INVERT GRADE
STANDARDS FOR GI-306 GI-306 1' OFFSET
DETAILS L 4" STRIPE
FLOW
GRADING PLAN
SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
INVERT (EL___) CULVERT CULVERT INLET INVERT (EL___)
OUTLET INLET (EL___)
INVERT (EL___) PITCH INVERT (EL___) (EL___)
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN
ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
+ +
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". OPEN GRADED STONE BASE
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER.
4. IF DEEPER LOW POINT (L.P.) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED. SECTION A-A
5. PEDESTRIAN PATHWAY WHEN REQUIRED.
4"
4"
SIDEWALK EXISTING
ROADWAY FOR 3"-6" DEEP
DEPRESSION ROADWAY
7"
7"
1'-7"
1'-3"
1'-6"
5"
9"
5"
L-SHAPED EDGING WITH 9"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
(CHANNEL DEPTH VARIES) OPEN GRADED STONE BASE
6" MIN.
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT GUIDELINES
EXISTING - NO CONNECTION TO SEWERS
CATCH BASIN PROPERTY LINE
A FLOW
+ +
W
CONCRETE NECKDOWN LOW POINT SET REINFORCED TAPER TO
OUTLET - SEE 3"-6" BELOW CONCRETE CULVERT ROADWAY
RADIUS AND
A B C
1'-0"
ROWB TYPE 1 OUTLET INVERT GRADE
CROSSWALK RAMPS AS STANDARDS FOR
REQUIRED BY DOT
GI-308 GI-308 1' OFFSET
DETAILS 4" STRIPE
L
FLOW
GRADING PLAN
NOTES: SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE INVERT (EL___) PONDING CULVERT CULVERT PONDING INLET INVERT
(EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. DEPTH 3"-6" OUTLET INLET INVERT DEPTH 3"-6" (EL___)
INVERT (EL___) (EL___) (EL___)
PITCH
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED. OPEN GRADED STONE BASE
8. 5' (MIN.) DISTANCE BETWEEN STONE COLUMNS; NUMBER OF STONE COLUMNS AS SECTION A-A
REQUIRED BY DEP.
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT GUIDELINES
- NO CONNECTION TO SEWERS
STEEL TREE PIT GUARDS
SEE GI-601B FOR CONCRETE PEDESTRIAN
DETAILS PATHWAY
CURB TYPE TO MATCH 6" W 6" CONCRETE HEADER
CONCRETE HEADER - 4" REINFORCED CONCRETE
CONTRACT PLANS
ABOVE SIDEWALK GRADE CULVERT COVER
36"L x 12"W x 6"H MULCH LAYER
1'-0" NEW
STONE STRIP BED EXISTING SIDEWALK
4"
4"
GRADE TO ALLOW SIDEWALK
FOR 3"-6" DEEP ROADWAY
ROADWAY
DEPRESSION
7"
7"
1'-7"
1'-3"
1'-6"
5"
L-SHAPED EDGING WITH 9" 9"
5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
(CHANNEL DEPTH VARIES) OPEN GRADED STONE BASE
6" MIN.
3'L x 1'W x 2'H GABION
FILLED WITH WRAP STONE IN
OPEN-GRADED STONE GEOTEXTILE (TOP AND
SIDES ONLY) CONCRETE PATHWAY
WRAP STONE IN LEVELING COURSE
ENGINEERED SOIL
GEOTEXTILE
18"-24" DEPTH
(TOP AND SIDES ONLY)
FROM LOW POINT
GEOTEXTILE WRAPPED
AROUND GABION OPEN GRADED STONE
UNDISTURBED BASE SECTION C-C
SOIL AT PEDESTRIAN PATHWAY
STONE COLUMN
(TYP.) SECTION B-B
AT MIDSECTION (STONE COLUMN)
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 3 LAYOUT GUIDELINES
- NO CONNECTION TO SEWERS
3'L x 1'W x 2'H GABION
FILLED WITH CURBCUT INLET SEE CONCRETE HEADER -
OPEN-GRADED STONE LOW POINT SET ROWB TYPE 1 DRAWINGS 4" ABOVE SIDEWALK GRADE
EXISTING OUTLET - SEE ROWB
BELOW STONE STRIP 3"-6" BELOW FOR DETAILS
CATCH BASIN TYPE 1 STANDARDS EXISTING EXISTING CURB
WITH L-SHAPED EDGING OUTLET INVERT MEDIAN BIOFILTER INLET
CURB LINE
FOR DETAILS
ON THREE SIDES A ROADWAY
SEE DRAWING GI-311 10% FLOW
FOR TYPICAL DETAILS PITCH
B B
10% EXISTING
+ CONCRETE
W
MEDIAN
10%
10% FLOW
EXISTING (TYP.) EXPANSION PITCH
A ROADWAY JOINT EVERY 10' (MAX.)
GRADING PLAN
WEIR (EL___) SGS INLET
INVERT (EL___)
SGS OUTLET LP (EL___) (EL___)
INVERT (EL___) (EL___)
+
OPEN GRADED STONE BASE
6" W 6"
CURB TYPE TO MATCH
CONTRACT PLANS SECTION B-B
CURB TYPE TO 3" DEEP MULCH LAYER
MATCH EXISTING 1'-0" GRADE TO ALLOW FOR
36"L x 12"W' x 6"H EPOXY NOTES:
ROADWAY 3"-6" DEEP DEPRESSION 1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
STONE STRIP
6"
6"
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
+ ROADWAY
1'-6"
1'-6"
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
L-SHAPED EDGING WITH
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
MINIMUM 9" STAKES
6" MIN.
12" MIN.
V-NOTCHES
VARIES
FLOW
NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A
VARIES
CONCRETE
APRON
GRAVEL STRIP
EXIT WEIR
0"
1'-
6"
TAPER INLET
TO DEPTH
INDICATED
BEGIN TAPER
ENTRY WEIR TO ROADWAY
8" REBAR GRADE
DOWEL
B BROKEN
STONE BERM
EXTERIOR
PERIMETER
CURB
PLAN
2" DEEP
2" BROKEN ENTRY SETTLEMENT TAPER INLET CONCRETE
TOP OF EXTERIOR BROKEN STONE BERM
STONE BERM BASIN WITH OPEN INVERT TO APRON @ NEW SIDEWALK
PERIMETER CURB VARIES
GRADED STONE SETTLEMENT 10% PITCH EXTERIOR 6" 6" 6" 6"
(WITH 4" REVEAL)
4"
EXIT WEIR ENTRY WEIR BASIN PERIMETER CURB
EXISTING
TOP OF INTERIOR ASPHALT
2"
1"
EXISTING ROADWAY
2"
2"
PERIMETER CURB
4"
6"
7"
1'-3"
6"
6"
LANDSCAPE
1'-3"
1'-2"
INTERIOR
1'-0"
6"
EDGING
UNDISTURBED PERIMETER CURB
ENGINEERED SOIL
1'-0"
BROKEN STONE
SOIL
PITCH
10%
CURB TYPE TO 8" 6" 1'-0" 10" 1'-0" 10"
MATCH EXISTING
6"
8" REBAR DOWEL
CONCRETE
SETTLEMENT STRIP
10%
0% SLOPE SIDEWALK CURB
NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A
VARIES
10%
V-NOTCHES CONCRETE
HEADER - 4" ABOVE
SIDEWALK GRADE
EXIT WEIR
6"
LANDSCAPE EDGING
INTERIOR PERIMETER
PITCH
SIDEWALK CURB
SEE ROWB TYPE 1
BROKEN STONE
B ENTRY SETTLEMENT BASIN STANDARDS FOR
BERM WITH CONCRETE PAD DETAILS
FLOW
PLAN
2" DEEP BROKEN
STONE BERM
CONCRETE HEADER - 4" EXTERIOR
EXTERIOR 6" 6" VARIES 6" 6"
2" BROKEN ENTRY SETTLEMENT ABOVE SIDEWALK GRADE SIDEWALK PERIMETER CURB
PERIMETER CURB
STONE BERM BASIN
EXISTING SIDEWALK GRAVEL STRIP UNDISTURBED SOIL EXISTING ROADWAY
BEYOND EXIT WEIR ENTRY WEIR EXISTING ROADWAY
6"
VARIES
7"
TOP OF INTERIOR
2"
1"
4"
1'-6"
PERIMETER
1'-0"
INTERIOR
6"
SIDEWALK
1'-3"
PERIMETER CURB
1'-2"
1'-0"
6"
LANDSCAPE
EDGING BROKEN STONE
ENGINEERED
SOIL GEOTEXTILE OPEN GRADED STONE BASE UNDISTURBED
GEOTEXTILE SOIL
4"
STREET (OUTLET) AT 2% MIN. CLEARANCE ON ALL SIDES CULVERT COVER
1'-0" LEVELING COURSE 3'-0 1/2"
6" MIN.
1 1/2" x 1 1/2" x 3/16" STEEL
2'-0" ANGLE STEEL TREE PIT 6" THICK LEVELING
4"
GUARD - SEE COURSE
1/2" PRE MOLDED
1 1/8" 3 1/4" 3 1/4" DRAWING GI-601B
VARIES
3'-0 1/2"
B B EXPANSION JOINT
FLOW 3" 3" FILLER 6" x 12" STONE
4"
L-SHAPED EDGING STRIP BED
MATCH DETPH
WITH MINIMUM 9"
L-SHAPED EDGING
STAKES SEE
5"
WITH MINIMUM 9"
DRAWING GI-204 OPEN GRADED STONE
STAKES SEE
5" 5"
BASE
CAST IN DRAWING GI-204
PLACE ENGINEERED SOIL
A CULVERT
CONCRETE CURB GEOTEXTILE
EXISTING ROADWAY FLUSH WITH #3 REINFORCEMENT
OPEN GRADED STONE BASE
PATHWAY SPACED EVENLY CONCRETE PATHWAY
6" 5'-0" 6" WITH 2" CLEARANCE
ON ALL SIDES
SECTION B-B
CONCRETE PATHWAY CONCRETE PATHWAY
PLAN SECTION A-A
CONCRETE CURB GALVANIZED D STEEL BAR
EXISTING METAL BAR GRATE
FLUSH WITH PATHWAY GRATE, BAR SIZE
SIDEWALK STAINLESS STEEL FLAT HEAD
2" x 2" x 1/4" ANGLE SHALL BE 1" x 3/16"
PRECAST POROUS 1/4" TAP INTO SUPPORT BAR
WITH GRATING EDGE OF PLATE
CONCRETE PATHWAY
FASTENERS FLUSH AND TRUE 2" x 2" x 1/4" STEEL ANGLE WITH
GALVANIZED STEEL STEEL TREE PIT 2" x 2" x 1/4" STEEL
L-SHAPED EDGING GRATING FASTENERS
GRATING FASTENERS PITCH TO DRAIN PER PLAN GUARD - SEE ANGLE WITH GRATING
WITH MINIMUM 9" EXPANSION JOINT WITH JOINT FASTENERS
3'-0" DRAWING GI-601B
6" x 12" STONE STRIP STAKES SEE
BED
C DRAWING GI-204 1 1/8"
SEALER GALVANIZED D STEEL
STEEL TREE PIT GUARD - SEE #3 REINFORCEMENT BAR GRATE, BAR SIZE
6" MIN.
DRAWING GI-601B SPACED EVENLY WITH 2" SHALL BE 1" x 3/16"
6 3/4"
L-SHAPED EDGING
VARIES
MATCH DETPH
5"
METAL GRATE
PATHWAY PLAN
STANDARD PLANTING PLANS FOR TYPE 1 R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
RESIDENTIAL PLAN 1 PLANT SCHEDULE RESIDENTIAL PLAN 2 PLANT SCHEDULE
QUAN PLAN COMMON PLAN
KEY TYPE BOTANICAL NAME SIZE SPACING QUAN KEY TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
VERSION NAME VERSION
A SHRUB ILEX GLABRA 'SHAMROCK' INKBERRY #5 CONT. OR B&B A SHRUB ILEX GLABRA 'SHAMROCK' INKBERRY #5 CONT. OR B&B
8 A 2' O.C. 20 A 2' O.C.
B ROSE ROSA 'RADRAZZ' KNOCK OUT SHRUB ROSE #5 CONT. OR B&B B SHRUB ILEX GLABRA 'SHAMROCK' INKBERRY #5 CONT. OR B&B
A PERENNIAL COREOPSIS 'REDSHIFT' TICKSEED #2 CONT. A ROSE ROSA PALUSTRIS SWAMP ROSE #2/#3 CONT.
22 B 12" O.C. 8 B 18" O.C.
B PERENNIAL NEPETA X FAASSENII 'WALKER'S LOW' CATMINT #2 CONT. B SHRUB CLETHRA ANIFOLIA 'HUMMINGBIRD' SWEET PEPPERBUSH #5 CONT. OR B&B
A GROUNDCOVER LIRIOPE SPICATA LILY TURF #1 CONT. A PERENNIAL ECHINACEA PURPUREA 'KIM'S KNEEE HIGH' PURPLE CONE FLOWER #2 CONT.
31 C 12" O.C. 11 C 12" O.C.
B GROUNDCOVER LIRIOPE MUSCARI 'MONROE WHITE' LILY TURF #1 CONT. B PERENNIAL RUDBECKIA SUBTOMENTOSA 'HENRY EILERS' SWEET CONEFLOWER #2 CONT.
ONLY PLANTED IN R.O.W. RAIN GARDEN OR R.O.W. BIOSWALE WITH NO TREE A GRASSES ACORUS CALAMUS 'VARIEGATUS' SWEETFLAG #2 CONT.
6 D 12" O.C.
A PERENNIAL COREOPSIS 'REDSHIFT' TICKSEED #2 CONT. B GRASSES ACORUS CALAMUS 'VARIEGATUS' SWEETFLAG #2 CONT.
5 B 12" O.C.
B PERENNIAL NEPETA X FAASSENII 'WALKER'S LOW' CATMINT #2 CONT. ONLY PLANTED IN R.O.W. RAIN GARDEN OR R.O.W. BIOSWALE WITH NO TREE
A GROUNDCOVER LIRIOPE SPICATA LILY TURF #1 CONT. A PERENNIAL ECHINACEA PURPUREA 'KIM'S KNEEE HIGH' PURPLE CONE FLOWER #2 CONT.
1 C 12" O.C. 4 C 12" O.C.
B GROUNDCOVER LIRIOPE MUSCARI 'MONROE WHITE' LILY TURF #1 CONT. B PERENNIAL RUDBECKIA SUBTOMENTOSA 'HENRY EILERS' SWEET CONEFLOWER #2 CONT.
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(48) C (6) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(3) D
(1) D (9) B
(4) C (4) C
(9) A (5) C (5) B (1) C
(1) C (9) B
(2) A (6) D
(3) B (3) A
(6) D (3) A (3) A (1) B
(4) B (5) C (7) D (4) B
(1) C (5) D
(8) C (6) B
(5) B (3) D
(6) A (5) D (3) B
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(13) B (12) C
(5) A
(11) B
(7) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(19) C (4) C
(13) A
(3) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(38) C (12) A
(3) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(4) C (5) C
(11) B (9) B
(4) A
(5) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(4) B (11) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
(28) C (12) A
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES.
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
NOTES:
URBAN PLAN 3 PLANT SCHEDULE 1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
QUAN PLAN THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
KEY TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
VERSION
MIRRORED.
A PERENNIAL COREOPSIS 'REDSHIFT' TICKSEED #2 CONT.
16 A 12" O.C.
B PERENNIAL RUDBECKIA FULGIDA 'GOLDSTURM' BLACK-EYED SUSAN #2 CONT. 2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR.
A PERENNIAL NEPETA X FAASSENII 'WALKER'S LOW' CATMINT #2 CONT.
15 B 12" O.C. 3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
B PERENNIAL HYLOTELEPHIUM 'VERA JAMESON' STONECROP #2 CONT.
PERENNIALS, OR GRASSES.
A PERENNIAL HEMEROCALIS 'SCARLET OAK' DAYLILY #2 CONT.
7 C 12" O.C.
B GRASSES HELICTOTRICHON SEMPERVIRENS BLUE OAT GRASS #2 CONT. 4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
A GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS #2 CONT. DETERMINED AS PER THE SCHEDULE ON GI-122.
4 D 18" O.C.
B GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCH GRASS #2 CONT.
ONLY PLANTED IN ROWB WITH NO TREE
A GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS #2 CONT.
1 D 18" O.C.
B GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCH GRASS #2 CONT.
(4) B (4) C
(3) A (8) A
(6) B (1) D
(2) D (2) D
(5) B (3) C
(5) A
OUTLET INLET
URBAN PLAN 3
ROWBS IN COMMERCIAL AND INDUSTRIAL AREAS WITH HIGHER VOLUME CIRCULATION
(7) D (1) A
(1) C (1) A
(4) C (11) A
(6) B (3) C
(7) C (4) C
NOTES: (8) A
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
3. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES. ESPECIALLY WET PLAN
ROWBS WITH GREATER THAN 30% STORMWATER RUNOFF MANAGED
4. PLANTING PLANS FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS ARE
DETERMINED AS PER THE SCHEDULE ON GI-122.
3 ST SPIREA TOMENTOSA MEADOW SWEET #3 CONT. 2' O.C. 3 CA CEANOTHUS AMERICANUS NEW JERSEY TEA #3 CONT. 2' O.C.
DWARF BUSH
10 ES ERAGROTIS SPECTABILIS PURPLE LOVEGRASS #2 CONT. 12" O.C. 2 DL DIERVILLA LONICERA #3 CONT. 2' O.C.
HONEYSUCKLE
WHITE BEARD
12 AT ASCLEPIAS TUBEROSA BUTTERFLY WEED #2 CONT. 12" O.C. 8 PD PENSTEMON DIGITALIS PLUGS 12" O.C.
TONGUE
PURPLE
12 EP ECHINACEA PURPUREA #2 CONT. 12" O.C.
CONEFLOWER
(3) CA
(12) AT (4) PD
(4) PD
(5) ES (3) ST (1) DL (1) DL
(6) EP (5) ES
(6) EP
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
2. PLANTING PLANS FOR VARIABLE SIZE R.O.W. GREEN STRIPS DETERMINED AS PER THE
SCHEDULE ON GI-132.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD PLANTING PLANS FOR TYPES 1 & TYPE 2 R.O.W. GREENSTRIPS
(6) HM**
(17) TV*
(17) LM*
(13) IV**
(16) MP
(4) VIB
(8) CV (1) CV
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF OUTLET INLET
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
RESIDENTIAL PLAN, WET,SUN TO PART SHADE
2. PLANTING PLANS FOR VARIABLE SIZE R.O.W. GREEN STRIPS DETERMINED AS PER THE
SCHEDULE ON GI-132.
3. * AROUND THE PERIMETER ON SLOPE.
4. ** EVENLY SPACED IN THE LOWEST, FLAT PORTION OF GREEN STRIP.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD PLANTING PLANS FOR TYPE 3 R.O.W. GREENSTRIPS
PLANT SCHEDULE: SUN & DRY - OPTION 1 PLANT SCHEDULE: SUN & DRY - OPTION 2
QTY. KEY BOTANICAL NAME COMMON NAME SIZE SPACING QTY. KEY BOTANICAL NAME COMMON NAME SIZE SPACING
SHRUBS PERENNIALS
DWARF BUSH NORTHERN BLUE
2 RA RHUS AROMATICA 'GRO LO' #3 8" 5 IV IRIS VERSICOLOR #2 12"
HONEYSUCKLE FLAG
PERENNIALS
6 LC LOBELIA CARDINALIS CARDINAL FLOWER #2 18"
VERNONIA LETTERMANNII 'IRON NARROWLEAF
6 VL #2 1"
BUTTERFLY' IRONWEED GRASSES
GRASSES
3 CL CHASMANTHIUM LATIFOLIUM INDIAN WOOD #2 18"-24"
8 CL CAREX LURIDA SHALLOW SEDGE #2 1"
(6) LC
(6) VL
(8) CL
RESIDENTIAL PLAN SUN AND DRY - OPTION 1 RESIDENTIAL PLAN SUN AND DRY - OPTION 2
NOTES:
1. PLANTING LOCATIONS ARE SPECIFIC TO THE INLET AND OUTLET ORIENTATION SHOWN. IF
THE INLET AND OUTLET ORIENTATION IS REVERSED, THE PLANTING LOCATIONS MUST BE
MIRRORED.
2. PLANTING PLANS FOR VARIABLE SIZE R.O.W. GREEN STRIPS DETERMINED AS PER THE
SCHEDULE ON GI-132.
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. BIOSWALES - TYPE 'A' WELDED STEEL GUARD
EQUAL PANELS TO ACCOMMODATE
EQUAL
FULL PANELS AS NEEDED [4' MIN, 5' MAX] 3' MAX PANEL, TO ACCOMMODATE 18"
1/2" SQ. BAR
FULL PANELS AS NEEDED TO FACE OF CURB
11" 1/2" X 1-1/2"
TYP. HORIZONTAL BAR
2" DIA BALL
2" SQ. SOLID STEEL POST
1'-0"
4"
12" WIDE
2"
2"
1"
10"
BOTTOM RAIL AND
FINISHED GRADE
ADJACENT TO
SIDEWALK 3
4" x 2' LONG STEEL
2'-0"
SPIKE FULLY
WELDED TO POST
CONCRETE STEEL SPIKE IN 4" DIA. ALL SIDES (TYP.)
ENCASEMENT PLACED CONCRETE ENCASEMENT
ON OPEN-GRADED PLACED IN ENGINEERED
STONE BASE SOIL (TYP.) CONCRETE STEEL SPIKE IN 4"
ENCASEMENT DIA. CONCRETE
PLACED ON ENCASEMENT UNDISTURBED
OPEN-GRADED PLACED IN SOIL
STONE BASE ENGINEERED SOIL
(TYP.)
NOTES:
** FINAL DESIGN OF GUARDS TO BE SELECTED BY DPR/DOT UPON REVIEW OF NEIGHBORHOOD'S CONTEXT
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I.
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED WITH ONE (1) SHOP COAT OF PRIMER AND ONE (1) SHOP COAT OF
INTERMEDIATE AND ONE (1) SHOP COAT (OR ROLLED FIELD COAT) OF FINISH TOP COAT IN COMPLIANCE
WITH THE REQUIREMENTS OF SUBSECTION 2.13.4 OF THE NYC DOT STANDARD HIGHWAY
SPECIFICATIONS. THE COLOR OF TOP COAT SHALL BE BLACK.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. BIOSWALES - TYPE 'B' WELDED STEEL GUARD
EQUAL PANELS [4' MIN, 5' MAX] 1/2" x 1-1/2" TOP RAIL 3' MAX PANEL, TO ACCOMMODATE 18"
EQUAL
TO ACCOMMODATE FULL PANELS AS NEEDED END CAP FULL CIRCLES AS NEEDED TO FACE OF CURB
5 9/16" 1/2" SQ. BENT
ROUND
2" SQ. STEEL POST
7 1/16"
RAILS TO FOLLOW
1"
LINE OF GRADE
1/2" SQ. PICKET
1/2" x 1-1/2" BOTTOM 1-3/4" SQ. STEEL
RAIL POST
1'-5"
5"
OF HEADER AND STRIP
SIDEWALK
2"
2"
1"
1"
10"
BOTTOM RAIL AND
FINISHED GRADE
ADJACENT TO
SIDEWALK 3
4" x 2' LONG STEEL
2'-0"
SPIKE FULLY
WELDED TO POST
CONCRETE STEEL SPIKE IN 4" DIA. ALL SIDES (TYP.)
ENCASEMENT PLACED CONCRETE ENCASEMENT
ON OPEN-GRADED PLACED IN ENGINEERED
STONE BASE SOIL (TYP.) CONCRETE STEEL SPIKE IN 4"
ENCASEMENT DIA. CONCRETE
PLACED ON ENCASEMENT UNDISTURBED
OPEN-GRADED PLACED IN SOIL
STONE BASE ENGINEERED SOIL
(TYP.)
NOTES:
** FINAL DESIGN OF GUARDS TO BE SELECTED BY DPR/DOT UPON REVIEW OF NEIGHBORHOOD'S CONTEXT
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I.
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED WITH ONE (1) SHOP COAT OF PRIMER AND ONE (1) SHOP COAT OF
INTERMEDIATE AND ONE (1) SHOP COAT (OR ROLLED FIELD COAT) OF FINISH TOP COAT IN COMPLIANCE
WITH THE REQUIREMENTS OF SUBSECTION 2.13.4 OF THE NYC DOT STANDARD HIGHWAY
SPECIFICATIONS. THE COLOR OF TOP COAT SHALL BE BLACK.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. BIOSWALES - TYPE 'C' WELDED STEEL GUARD
EQUAL PANEL [4' MIN, 5' MAX]
FOUR OR FIVE PANELS 1'-2 15/16" 18"
TO ACCOMMODATE FULL SHAPES
TO ACCOMMODATE FULL SHAPES AS NEEDED TO FACE OF CURB
AS NEEDED
1/2" x 1-1/2" TOP RAIL
EQUAL EQUAL EQUAL EQUAL EQUAL
1"
END CAP
2" SQ. SOLID
1/2" SQ. PICKET STEEL POST
1/2" x 1-1/2" MID RAIL 1/2" SQ. PICKET
5"
1/2" SQ. BAR (TYP)
2" SQ. STEEL POST
1'-5"
1/2" x 1-1/2" 1-3/4" SQ. STEEL
BOTTOM RAIL POST
2"
FINISHED GRADE
7"
STRIP
OF SIDEWALK
1"
1"
ROADWAY
1/2" SQ. BAR (TYP)
10"
1" GAP BETWEEN
BOTTOM RAIL AND
FINISHED GRADE 3 " x 2' LONG STEEL
4
2'-0"
ADJACENT TO SPIKE FULLY WELDED
SIDEWALK TO POST ALL SIDES
CONCRETE STEEL SPIKE IN 4" DIA. (TYP)
ENCASEMENT PLACED CONCRETE ENCASEMENT
ON OPEN-GRADED PLACED IN ENGINEERED
STONE BASE SOIL (TYP.) CONCRETE STEEL SPIKE IN 4"
ENCASEMENT DIA. CONCRETE
PLACED ON ENCASEMENT UNDISTURBED
OPEN-GRADED PLACED IN SOIL
STONE BASE ENGINEERED SOIL
(TYP.)
NOTES:
** FINAL DESIGN OF GUARDS TO BE SELECTED BY DPR/DOT UPON REVIEW OF NEIGHBORHOOD'S CONTEXT
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I.
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED WITH ONE (1) SHOP COAT OF PRIMER AND ONE (1) SHOP COAT OF
INTERMEDIATE AND ONE (1) SHOP COAT (OR ROLLED FIELD COAT) OF FINISH TOP COAT IN COMPLIANCE
WITH THE REQUIREMENTS OF SUBSECTION 2.13.4 OF THE NYC DOT STANDARD HIGHWAY
SPECIFICATIONS. THE COLOR OF TOP COAT SHALL BE BLACK.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. BIOSWALES - TYPE 'D' WELDED STEEL GUARD
6"
2" SQ. SOLID STEEL
BAR 1/2" X 1-1/2"
BOTTOM RAIL
1/2" x 1-1/2"
1'-6"
1'-3"
BOTTOM RAIL
1/ 4" GA. STEEL PLATE 12" WIDE
6 3/4"
CONCRETE
2"
FINISHED GRADE STRIP
OF SIDEWALK
1"
1"
1" GAP BETWEEN ROADWAY
10"
BOTTOM RAIL AND
FINISHED GRADE
ADJACENT TO
SIDEWALK
3
4" x 2' LONG STEEL
2'-0"
SPIKE FULLY
WELDED TO POST
CONCRETE STEEL SPIKE IN 4" DIA. ALL SIDES (TYP)
ENCASEMENT PLACED CONCRETE ENCASEMENT
ON OPEN-GRADED PLACED IN ENGINEERED
STONE BASE SOIL (TYP.) CONCRETE STEEL SPIKE IN 4"
ENCASEMENT DIA. CONCRETE UNDISTURBED
PLACED ON ENCASEMENT SOIL
OPEN-GRADED PLACED IN
STONE BASE ENGINEERED SOIL
(TYP.)
NOTES:
** FINAL DESIGN OF GUARDS TO BE SELECTED BY DPR/DOT UPON REVIEW OF NEIGHBORHOOD'S CONTEXT
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I.
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED WITH ONE (1) SHOP COAT OF PRIMER AND ONE (1) SHOP COAT OF
INTERMEDIATE AND ONE (1) SHOP COAT (OR ROLLED FIELD COAT) OF FINISH TOP COAT IN COMPLIANCE
WITH THE REQUIREMENTS OF SUBSECTION 2.13.4 OF THE NYC DOT STANDARD HIGHWAY
SPECIFICATIONS. THE COLOR OF TOP COAT SHALL BE BLACK.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD FOR R.O.W. BIOSWALES - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
CENTER AND LEFT FRONT PANEL -
RIGHT FRONT PANEL - EQUAL PANELS TO ACCOMMODATE
EQUAL PANELS TO ACCOMMODATE 9/16" GROOVE FOR
FULL CIRCLES AS NEEDED
FULL CIRCLES AS NEEDED CONNECTING PLATE
2" SQ. STEEL POST WITH 9/16" 1/2" x 1-1/2" TOP RAIL (TYP.) SIDE PANEL 8" 18"
4 7/8"- 5 3/16" DIA. END CAP
GROOVE FOR CONNECTING 1/2" SQ. BENT ROUND, FULL CIRCLES AS NEEDED TO FACE OF CURB
5" DIA. MAX. COUNTERSUNK FOR SS
PLATE (TYP.)
1/2" SQ. PICKET 1/2" DIA. SOCKET HEAD
3" DIA.
CAP SCREWS (TYP.)
MIRROR CONNECTION
1 1/2"
6 1/4"
6 1/4"
POST FOR OPPOSITE RAILS TO FOLLOW
END OF ROW LINE OF GRADE
POST
6 1/4"
6 1/4"
PLATE
FINISHED GRADE 12" WIDE
2"
OF HEADER AND CONCRETE
SIDEWALK STRIP
5"
4"
1"
TYPICAL LEFT AND CENTER RIGHT FRONT PANEL 1/2" x 1-1/2"
1/2" CONNECTION BOTTOM RAIL
FRONT PANEL WITH POST PLATE (TYP.) WITH CONNECTION ENGINEERED SOIL
24"
AND CONNECTION PLATE PLATE AT EACH END 1/4" x 1 1/2" GA.
STEEL PLATE CONCRETE LOCKING
AT EACH END OF PANEL HOLES
SPIKE BOLTED
TO POST
NOTES:
** FINAL DESIGN OF GUARDS TO BE SELECTED BY DPR/DOT UPON REVIEW OF NEIGHBORHOOD'S CONTEXT
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO ASTM - A36 SPECIFICATION
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL POST AND GROOVE CONNECTIONS TO BE BOLTED.
5. ALL VISIBLE BOLTS TO BE COUNTERSUNK AND FLUSHED WITH THE POSTS
6. ALL STEEL TO BE PAINTED WITH ONE (1) SHOP COAT OF PRIMER AND ONE (1) SHOP COAT OF INTERMEDIATE AND ONE (1)
SHOP COAT (OR ROLLED FIELD COAT) OF FINISH TOP COAT IN COMPLIANCE WITH THE REQUIREMENTS OF SUBSECTION 2.13.4
OF THE NYC DOT STANDARD HIGHWAY SPECIFICATIONS. THE COLOR OF TOP COAT SHALL BE BLACK.
7. RAILS TO FOLLOW LINE OF GRADE.
8. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS
P.E. 07-19-2017
DIRECTOR OF IN-HOUSE DESIGN & RIGHT-OF-WAY GREEN INFRASTRUCTURE DATE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD DETAILS FOR R.O.W. BIOSWALES - TYPE 'B-1' STEEL GUARD WITH BOLTED
PANELS
1
2x2 Steel post 2"
GROUND
11 4" 11 4" LEFT PANEL CENTER PANEL CENTER PANEL RIGHT PANEL
20" 20"
SIDE PANEL
SIDE PANEL
Spike bolted Spike bolted
to the 2x2 post to the 2x2 post
FLOW FLOW
1
2" High steel cap
7 " welded to the post R5 8"
8 9 3 " 1"
1 " 4
11 2" 2 16" 9
16" Holes
2"
R1116"
9
16" 4"
Concrete
9" 61 4" 11 4" 9"
13 8" Locking
4" 9
18" 171 2" 173 8" 16"
24"
22" 4"
4" 61 4" 4"
R5 8" 4"
418" 313 16"
1" GROUND
5"
FRONT PANELS SCHEDULE SIDE PANELS SCHEDULE
1"
R1116" 2" 4"