Elongation (MM) : Format No. T-1 Pull Out Test ISRM Document 2, Part 1 'Suggested Methods of Rockbolt Testing '

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

FORMAT No.

T-1
PULL OUT TEST
ISRM Document 2, Part 1 'Suggested Methods of Rockbolt Testing’

Report No. Date

Project

Engineer

Contractor

Location Chainage

Date of Installation Diameter of


Rockbolt (mm)
Date of Grouting Type of Rockbolt

Date of Testing Length of


Rockbolt (m)
Age (Days) Testing
From the date of Grout Equipment
RAM Diameter of Pull out Area of RAM
Machine
ATSS Reference RESS Reference

Pressure Load Elongation


Sl. No. Remarks
(Bar or Kg/cm2) (tonne) (mm)

Elongation (mm)
10
5
Elongation (mm)
0
1 2 3 4

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-2
READY MIX CONCRETE PLANT CALIBRATION
IS:4926:2003 (R 2017)

Report No. Date

Project

Engineer

Contractor

Location Make of Batching


Plant
Batch capacity Plant Capacity

Calibration of Load Cell


for

Applied Load (Kg) Indicator Load Variation (Kg) Variation (%)


Sl. (Kg) Average
No. (Kg)
Loading Unloading Loading Unloading

Average
Variation in
%=…………….

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-3
SPRAYED CONCRETE EARLY STRENGTH TEST (USING PENETROMETER)
EN 14488-2 (2006)

Report No. Date

Project

Engineer

Contractor

Location Chainage

Accelerator (Make) Make of Shotcrete


Machine
Accelerator (%)

ATSS Reference RESS Reference

Early Strength (N/mm2)


Sl. No.
After 6 Minutes After 10 Minutes After 30 Minutes
1
2
3
4
5
6
7
8
9
10
Average strength
(Achieved)
Strength (Required)

1.2
1
0.8
0.6 Average strength (N/mm2)
0.4 Strength Required (N/mm2)
0.2
0
6 10 30

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-4
SPRAYED CONCRETE MACHINE CALIBRATION (FOR ACCELERATOR DOSE)

Report No. Date

Project

Engineer

Contractor

Location Chainage

Make of Sprayed concrete Accelerator


Machine (Make)
Capacity of Machine Efficiency of
Machine
Diameter of Piston Length of Piston
cylinder of Machine cylinder of
Machine
Volume of Piston Cylinder No. of Piston
Cylinder stroke
per minute
Discharge of Sprayed Cement content
Concrete per minute per cum in
sprayed concrete
Cement content in Specific gravity of
sprayed concrete Accelerator
discharged in 1 minute

Sl. No. Accelerator Dose (in Theoretical Achieved Difference


terms of % of Cement) Quantity (Litres) Quantity Litres %
(Litres)

1.5

1
Theoretical Quantity (Litres)
0.5 Achieved Quantity (Litres)

0
6 7 8 9

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-5
SPRAYED FIBRE REINFORCED CONCRETE WASH OUT TEST
EN 14488-2 (2006)

Report No. Date

Project

Engineer

Contractor

Location Chainage

Steel Fibre (Make) Grade of Sprayed


fibre reinforced
concrete
Qty. of Steel fibre per cum
(Kg)
ATSS Reference RESS Reference

Sl. Determination Sample 1 Sample 2 Sample 3 Average


No.
1 Volume of Sample in Cm3
(Vc)
2 Mass of fibre extracted
from sample in gms. (Mf)
3 Fibre content (Cf) in
Kg/m3 =Mf X 1000/Vc

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-6
SPRAYED CONCRETE THICKNESS VERIFICATION TEST
EN 14488-6 (2006)
Report No. Date

Project

Engineer

Contractor

Location Chainage

Grade of Sprayed
concrete
ATSS Reference RESS Reference

Sl. Hole No. Core Thickness (mm)


No.
1 1
2 2
3 3
4 4
Average (mm)
Required (mm)

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature
FORMAT No. T-7
SPRAYED CONCRETE FINAL STRENGTH TEST (USING CORE EXTRACTION)
EFNARC EUROPEAN GUIDELINES FOR SPRAYED CONCRETE
Report No. Date

Project

Engineer

Contractor

Location Chainage

Grade of Sprayed
concrete
ATSS Reference RESS Reference

Compressive
strength of
Average Length of Core
Date of Core extraction

Average Dia. Of Core

Core
Date of Casting

Date of Testing

Age (Days)

Wt. (gm)

Density
Sl. No.

(g/cc)
(mm)

(mm)

Load
(KN)

Individual

Average
1
2
3
4

Remarks:-…………………………………………………………………………………………………………......

For IRCON For Contractor


Name Designation Name Designation

Signature Signature