Earthwork in ordinary soil for embankments lead up to 5.0 Miles including ploughing and mixing with blade grade or disc harrow or
2 other suitable equipment & compaction by mechanical means at Optimum Moisture Content and dressing to design section complete in
all respects: 90 % maximum modified AASHTO dry density.
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
a. 1 16404.20 12 2 393700.80 Cft
Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and
3 compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including
carriage of all material to site of work except gravel and aggregate. (Crushed Stone Aggregate ) lead upto 25 Km
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
Providing and laying base course of crushed stone aggregate of approved quality and grade, and supply and spreading of stone screening,
4 including placing, mixing, spreading and compaction of base course material to required depth, camber and grade to achieve 100%
maximum modified AASHO dry density, including carriage of all materials to site of work except gravel and aggregate lead upto 25 km
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
5 Providing and laying road edging of 3" (75 mm) wide and 9" (225 mm) deep brick on end, complete in all respects.
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
a. 2 16404.20 - - 32808.40 Rft
Total 32808.40 Rft
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
a. 1 16404.20 12 - 196850.40 Sft
Total 196850.40 Sft
Providing and laying local premixed bituminous carpet with 4% bitumen and 2" thickness, including compaction and finishing to
7
required camber, grade and density.
MEASUREMENTS QUANTITY
DESCRIPTION No.
L B H Total Unit
a. 1 16404 12 - 196850 Sft
Total 196850.40 Sft
Say 29300000.000
or 29.30 (M)
LEAD CHART
Earth Work Lead Upto 8 Km.
Sr. No Description RATE (RS/o% cft)
1 MRS BASE RATE 3646.9
2 LEAD UPTO 1/4 MILE 1576.9
3 LEAD 1/4 MILE TO ONE MILE (12X85.80) 1029.6
4 LEAD BEYOND ONE MILE TO FIVE MILE (16X161.65) 2586.4
Total Amount (RS/o %cft)= 8839.800
E (RS/% cft)
2973
161.95
76.4
58.5
40.7
37.75
37.05
34.4
34
31.8
29.6
328.5
3843.65
E (RS/% cft)
4768.2
161.95
76.4
58.5
40.7
37.75
37.05
34.4
34
31.8
29.6
328.5
5638.85
Page 6
Providing and laying base course of crushed stone aggregate of approved quality and grade, and
supply and spreading of stone screening, including placing, mixing, spreading and compaction of
4 base course material to required depth, camber and grade to achieve 100% maximum modified P/Cft. 98425.20 56.389 5550049.390
AASHO dry density, including carriage of all materials to site of work except gravel and
aggregate lead upto 25 km
Providing and laying road edging of 3" (75 mm) wide and 9" (225 mm) deep brick on end,
5 complete in all respects. P/Rft 32808.40 29.050 953084.020
Providing and laying bituminous priming coat, using 10 lbs. kerosene oil and 10 lbs. binder per
6 P/Sft 196850.40 11.088 2182578.810
100 Sft. or 0.5 Kg kerosene and 0.5 Kg binder per square metre.
Providing and laying local premixed bituminous carpet with 4% bitumen and 2" thickness,
7 P/Sft 196850.40 65.569 12907205.137
including compaction and finishing to required camber, grade and density.
29237494.374