TEST CERTIFICATE OF TRANSFORMER AKSHAR ELECINFRA PVT. LTD.


Client ADANI POWER (JHARKHAND) LTD., GODDA Tested On 10/02/2019
Plant GODDA THERMAL POWER PROJECT (2X800 MW) Tested By DEBOJYOTI
Location TRANSFORMER 630 KVA Comp. Code

1.0 DETAILS OF H.T CABLE UNDER TEST :


FROM FEEDER NUMBER-12 TO TRANSFORMER 630KVA
SIZE OF CABLE 3CX185 SQMM VOLTAGE GRADE 11KV
LENGTH 21MTR TYPE OF CABLE XLPE
MAKE TORRENT POWER LTD

2.0 INSULATION RESISTANCE TEST BEFOR HI-POT TEST: AT 5KV DC (Test For 1 min)
Megger Used : 5 KV Range : 0 - 1 T-
R-Y Y-B R-B R-E Y-E B-E
MEASURED VALUE 197GΩ 100GΩ 117GΩ 565GΩ 685GΩ 780GΩ

2.1 D. C. HIGH VOLTAGE TEST :


VOLTAGE APPLIED MEASUREMENT OF LEAKAGE CURRENT

18 KV DC(%80 OF 2N+1) (milli - AMPS)


PHASE AFTER 5 MINUTES
R-(Y+B+Earth) 0.02
Y-(B+R+Earth) 0.01
B-(R+B+Earth) 0.01

2.2 INSULATION RESISTANCE TEST AFTER HI-POT: AT 5KV DC (Test For 1min)
Megger Used : 5 KV Range : 0 - 1 T-
R-Y Y-B R-B R-E Y-E B-E
MEASURED VALUE 219GΩ 135GΩ 98GΩ 540GΩ 460GΩ 624GΩ

3.0 CONTINUITY CHECK : OK.


3.1 REMARKS : TESTED OK

Date Date Date 28/01/2019


Witness by Witness by NUPUR
Prepared by
HTG ADANI
Sign Sign Sign
AKSHAR ELECINFRA PVT. LTD.