Sewer and Septic Construction
Sewer and Septic Construction
Sewer and Septic Construction
List number of hours worked on assignment must match State requirement. ________
Name________________________________Signature_______________________________
I have read and understood the disclaimer notice on page 2. Digitally sign XXX
Address: ______________________________________________________________
City_________________________________State_________________Zip________________
Phone:
Home (____)_______________________ Work (____)___________________________
Please circle/check which certification you are applying the course CEU’s/PDH’s.
Wastewater Collection____ O and M____________ Onsite Installer ____
Please pay with your credit card on our website under Bookstore or Buy Now.
Or call us and provide your credit card information
We will stop mailing the certificate of completion so we need your e-mail address. We
will e-mail the certificate to you, if no e-mail address; we will mail it to you.
DISCLAIMER NOTICE
I understand that it is my responsibility to ensure that this CEU course is either
approved or accepted in my State for CEU credit. I understand State laws and rules
change on a frequent basis and I believe this course is currently accepted in my State
for CEU or contact hour credit, if it is not, I will not hold Technical Learning College
responsible. I also understand that this type of study program deals with dangerous
conditions and that I will not hold Technical Learning College, Technical Learning
Consultants, Inc. (TLC) liable for any errors or omissions or advice contained in this
CEU education training course or for any violation or injury caused by this CEU
education training course material. I will call or contact TLC if I need help or
assistance and double-check to ensure my registration page and assignment has
been received and graded.
Professional Engineers; Most states will accept our courses for credit but we do not
officially list the States or Agencies. Please check your State for approval.
You can obtain a printed version of the course manual from TLC for an additional
$69.95 plus shipping charges.
Grading Information
In order to maintain the integrity of our courses we do not distribute test scores,
percentages or questions missed. Our exams are based upon pass/fail criteria with the
benchmark for successful completion set at 70%. Once you pass the exam, your
record will reflect a successful completion and a certificate will be issued to you.
All downloads are electronically tracked and monitored for security purposes.
2
Sewer and Septic Construction Assignment 4/1/2018 TLC
Sewer and Septic Construction Answer Key
Name___________________________________
Phone# __________________________________
You are solely responsible to ensure that this course is accepted for credit by
your State. Did you check with your State agency to ensure this course is
accepted for credit?
You are responsible to ensure that TLC receives the Assignment and Registration Key.
Please call us to ensure that we received it. No refunds.
1. A B C D E F 16. A B C D E F 31. A B C D E F
2. A B C D E F 17. A B C D E F 32. A B C D E F
3. A B C D E F 18. A B C D E F 33. A B C D E F
4. A B C D E F 19. A B C D E F 34. A B C D E F
5. A B C D E F 20. A B C D E F 35. A B C D E F
6. A B C D E F 21. A B C D E F 36. A B C D E F
7. A B C D E F 22. A B C D E F 37. A B C D E F
8. A B C D E F 23. A B C D E F 38. A B C D E F
9. A B C D E F 24. A B C D E F 39. A B C D E F
10. A B C D E F 25. A B C D E F 40. A B C D E F
11. A B C D E F 26. A B C D E F 41. A B C D E F
12. A B C D E F 27. A B C D E F 42. A B C D E F
13. A B C D E F 28. A B C D E F 43. A B C D E F
14. A B C D E F 29. A B C D E F 44. A B C D E F
15. A B C D E F 30. A B C D E F 45. A B C D E F
3
Sewer and Septic Construction Assignment 4/1/2018 TLC
46. A B C D E F 80. A B C D E F 114. A B C D E F
47. A B C D E F 81. A B C D E F 115. A B C D E F
48. A B C D E F 82. A B C D E F 116. A B C D E F
49. A B C D E F 83. A B C D E F 117. A B C D E F
50. A B C D E F 84. A B C D E F 118. A B C D E F
51. A B C D E F 85. A B C D E F 119. A B C D E F
52. A B C D E F 86. A B C D E F 120. A B C D E F
53. A B C D E F 87. A B C D E F 121. A B C D E F
54. A B C D E F 88. A B C D E F 122. A B C D E F
55. A B C D E F 89. A B C D E F 123. A B C D E F
56. A B C D E F 90. A B C D E F 124. A B C D E F
57. A B C D E F 91. A B C D E F 125. A B C D E F
58. A B C D E F 92. A B C D E F 126. A B C D E F
59. A B C D E F 93. A B C D E F 127. A B C D E F
60. A B C D E F 94. A B C D E F 128. A B C D E F
61. A B C D E F 95. A B C D E F 129. A B C D E F
62. A B C D E F 96. A B C D E F 130. A B C D E F
63. A B C D E F 97. A B C D E F 131. A B C D E F
64. A B C D E F 98. A B C D E F 132. A B C D E F
65. A B C D E F 99. A B C D E F 133. A B C D E F
66. A B C D E F 100. A B C D E F 134. A B C D E F
67. A B C D E F 101. A B C D E F 135. A B C D E F
68. A B C D E F 102. A B C D E F 136. A B C D E F
69. A B C D E F 103. A B C D E F 137. A B C D E F
70. A B C D E F 104. A B C D E F 138. A B C D E F
71. A B C D E F 105. A B C D E F 139. A B C D E F
72. A B C D E F 106. A B C D E F 140. A B C D E F
73. A B C D E F 107. A B C D E F 141. A B C D E F
74. A B C D E F 108. A B C D E F 142. A B C D E F
75. A B C D E F 109. A B C D E F 143. A B C D E F
76. A B C D E F 110. A B C D E F 144. A B C D E F
77. A B C D E F 111. A B C D E F 145. A B C D E F
78. A B C D E F 112. A B C D E F 146. A B C D E F
79. A B C D E F 113. A B C D E F 147. A B C D E F
4
Sewer and Septic Construction Assignment 4/1/2018 TLC
148. A B C D E F 182. A B C D E F 216. A B C D E F
149. A B C D E F 183. A B C D E F 217. A B C D E F
150. A B C D E F 184. A B C D E F 218. A B C D E F
151. A B C D E F 185. A B C D E F 219. A B C D E F
152. A B C D E F 186. A B C D E F 220. A B C D E F
153. A B C D E F 187. A B C D E F 221. A B C D E F
154. A B C D E F 188. A B C D E F 222. A B C D E F
155. A B C D E F 189. A B C D E F 223. A B C D E F
156. A B C D E F 190. A B C D E F 224. A B C D E F
157. A B C D E F 191. A B C D E F 225. A B C D E F
158. A B C D E F 192. A B C D E F 226. A B C D E F
159. A B C D E F 193. A B C D E F 227. A B C D E F
160. A B C D E F 194. A B C D E F 228. A B C D E F
161. A B C D E F 195. A B C D E F 229. A B C D E F
162. A B C D E F 196. A B C D E F 230. A B C D E F
163. A B C D E F 197. A B C D E F 231. A B C D E F
164. A B C D E F 198. A B C D E F 232. A B C D E F
165. A B C D E F 199. A B C D E F 233. A B C D E F
166. A B C D E F 200. A B C D E F 234. A B C D E F
167. A B C D E F 201. A B C D E F 235. A B C D E F
168. A B C D E F 202. A B C D E F 236. A B C D E F
169. A B C D E F 203. A B C D E F 237. A B C D E F
170. A B C D E F 204. A B C D E F 238. A B C D E F
171. A B C D E F 205. A B C D E F 239. A B C D E F
172. A B C D E F 206. A B C D E F 240. A B C D E F
173. A B C D E F 207. A B C D E F 241. A B C D E F
174. A B C D E F 208. A B C D E F 242. A B C D E F
175. A B C D E F 209. A B C D E F 243. A B C D E F
176. A B C D E F 210. A B C D E F 244. A B C D E F
177. A B C D E F 211. A B C D E F 245. A B C D E F
178. A B C D E F 212. A B C D E F 246. A B C D E F
179. A B C D E F 213. A B C D E F 247. A B C D E F
180. A B C D E F 214. A B C D E F 248. A B C D E F
181. A B C D E F 215. A B C D E F 249. A B C D E F
5
Sewer and Septic Construction Assignment 4/1/2018 TLC
250. A B C D E F 284. A B C D E F 318. A B C D E F
251. A B C D E F 285. A B C D E F 319. A B C D E F
252. A B C D E F 286. A B C D E F 320. A B C D E F
253. A B C D E F 287. A B C D E F 321. A B C D E F
254. A B C D E F 288. A B C D E F 322. A B C D E F
255. A B C D E F 289. A B C D E F 323. A B C D E F
256. A B C D E F 290. A B C D E F 324. A B C D E F
257. A B C D E F 291. A B C D E F 325. A B C D E F
258. A B C D E F 292. A B C D E F 326. A B C D E F
259. A B C D E F 293. A B C D E F 327. A B C D E F
260. A B C D E F 294. A B C D E F 328. A B C D E F
261. A B C D E F 295. A B C D E F 329. A B C D E F
262. A B C D E F 296. A B C D E F 330. A B C D E F
263. A B C D E F 297. A B C D E F 331. A B C D E F
264. A B C D E F 298. A B C D E F 332. A B C D E F
265. A B C D E F 299. A B C D E F 333. A B C D E F
266. A B C D E F 300. A B C D E F 334. A B C D E F
267. A B C D E F 301. A B C D E F 335. A B C D E F
268. A B C D E F 302. A B C D E F 336. A B C D E F
269. A B C D E F 303. A B C D E F 337. A B C D E F
270. A B C D E F 304. A B C D E F 338. A B C D E F
271. A B C D E F 305. A B C D E F 339. A B C D E F
272. A B C D E F 306. A B C D E F 340. A B C D E F
273. A B C D E F 307. A B C D E F 341. A B C D E F
274. A B C D E F 308. A B C D E F 342. A B C D E F
275. A B C D E F 309. A B C D E F 343. A B C D E F
276. A B C D E F 310. A B C D E F 344. A B C D E F
277. A B C D E F 311. A B C D E F 345. A B C D E F
278. A B C D E F 312. A B C D E F 346. A B C D E F
279. A B C D E F 313. A B C D E F 347. A B C D E F
280. A B C D E F 314. A B C D E F 348. A B C D E F
281. A B C D E F 315. A B C D E F 349. A B C D E F
282. A B C D E F 316. A B C D E F 350. A B C D E F
283. A B C D E F 317. A B C D E F 351. A B C D E F
6
Sewer and Septic Construction Assignment 4/1/2018 TLC
352. A B C D E F 386. A B C D E F
353. A B C D E F 387. A B C D E F
354. A B C D E F 388. A B C D E F
355. A B C D E F 389. A B C D E F
356. A B C D E F 390. A B C D E F
357. A B C D E F 391. A B C D E F
358. A B C D E F 392. A B C D E F
359. A B C D E F 393. A B C D E F
360. A B C D E F 394. A B C D E F
361. A B C D E F 395. A B C D E F
362. A B C D E F 396. A B C D E F
363. A B C D E F 397. A B C D E F
364. A B C D E F 398. A B C D E F
365. A B C D E F 399. A B C D E F
366. A B C D E F 400. A B C D E F
367. A B C D E F
368. A B C D E F
369. A B C D E F
370. A B C D E F
371. A B C D E F
372. A B C D E F
373. A B C D E F
374. A B C D E F
375. A B C D E F
376. A B C D E F
377. A B C D E F
378. A B C D E F
379. A B C D E F
380. A B C D E F
381. A B C D E F
382. A B C D E F
383. A B C D E F
384. A B C D E F
385. A B C D E F
7
Sewer and Septic Construction Assignment 4/1/2018 TLC
You are responsible to ensure that TLC receives the Assignment and Registration
Key. Please call us to ensure that we received it.
8
Sewer and Septic Construction Assignment 4/1/2018 TLC
SEWER AND SEPTIC CONSTRUCTION
CEU TRAINING COURSE
CUSTOMER SERVICE RESPONSE CARD
NAME: __________________________
3. Please rate the subject matter on the exam to your actual field or work.
Very Similar 0 1 2 3 4 5 Very Different
_____________________________________________________________________
9
Sewer and Septic Construction Assignment 4/1/2018 TLC
10
Sewer and Septic Construction Assignment 4/1/2018 TLC
Sewer and Septic Construction CEU Training Course Assignment
The Assignment (Exam) is also available in Word on the Internet for your Convenience,
please visit www.ABCTLC.com and download the assignment and e- mail it back to TLC.
You’ll have 90 days from the start of this course to complete in order to receive your
Professional Development Hours (PDHs) or Continuing Education Unit (CEU). A score of 70 %
is necessary to pass this course. We prefer if this exam is proctored. No intentional trick
questions. If you should need any assistance, please email all concerns and the completed
manual to info@tlch2o.com.
We would prefer that you utilize the enclosed answer sheet in the front, but if you are unable to
do so, type out your own answer key. Please include your name and address on your manual
and make copy for yourself. You can e-mail or fax your Answer Key along with the Registration
Form to TLC. (S) Means answer may be plural or singular. Multiple Choice Section, One
answer per question and please use the answer key.
3. Decentralized treatment systems include individual onsite septic systems, cluster systems,
and _____________like constructed wetlands, and recirculating sand filters.
A. Effective management D. Alternative wastewater treatment technologies
B. Clustered wastewater system E. Decentralized treatment system(s)
C. Onsite wastewater management F. None of the Above
4. Which of the following terms account for approximately 25% of all domestic wastewater
treatment in the United States?
A. Septic system(s) D. OSSFs
B. Advanced wastewater treatment E. A septic tank and drainfield combination
C. Centralized sewer system(s) F. None of the Above
5. Recognition of the impacts of _____________on ground water and surface water quality
(e.g., nitrate and bacteria contamination, nutrient inputs to surface waters) has increased
interest in optimizing the systems' performance.
A. Effective management D. Ground water and surface water quality
B. Clustered wastewater system E. Decentralized treatment system(s)
C. Onsite systems F. None of the Above
11
Sewer and Septic Construction Assignment 4/1/2018 TLC
6. Although some __________________ have functioned successfully in the past, problems
persist. Most current onsite regulatory programs focus on permitting and installation.
A. Septic system(s) D. Onsite wastewater management program(s)
B. Advanced wastewater treatment E. A septic tank and drainfield combination
C. Centralized sewer system(s) F. None of the Above
7. Which of the following terms - requires rigorous planning, design, installation, operation,
maintenance, monitoring, and controls?
A. Effective management D. Effective management of onsite systems
B. Clustered wastewater system E. Decentralized treatment system(s)
C. Onsite wastewater management F. None of the Above
10. EPA works with state and local officials, industry professionals, and partner organizations to
support?
A. Conventional system(s) D. Volumes of treated wastewater
B. Onsite wastewater management E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
12. Which of the following terms - treatment increases the percentage of contaminants,
particularly nitrogen and fecal coliform, removed in wastewater?
A. Storm sewer(s) D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. Advanced wastewater F. None of the Above
13. Advanced pretreatment components typically follow _____________ from septic tanks and
decrease the constituents of concern before they reach the final treatment and dispersal
component.
A. Septic system(s) D. Onsite wastewater management program(s)
B. Advanced wastewater treatment E. A septic tank and drainfield combination
C. Centralized sewer system(s) F. None of the Above
12
Sewer and Septic Construction Assignment 4/1/2018 TLC
14. Which of the following terms - components are used when a site has a high risk to public or
environmental health and primary treatment is not protective enough?
A. Storm sewer(s) D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. Advanced pretreatment F. None of the Above
16. Which of the following terms - carry wastewater or sewage from homes and businesses to
treatment plants?
A. Storm sewer(s) D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. System F. None of the Above
17. Which of the following terms - are designed to quickly get rainwater off the streets during
rain events?
A. Conventional system(s) D. Volumes of treated wastewater
B. Storm sewers E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
18. Which of the following terms - do not connect with a treatment plant, but instead drain
directly into nearby rivers, lakes, or oceans?
A. Most storm sewers D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. System F. None of the Above
19. Which of the following terms - carry both wastewater and storm water in the same pipe?
A. Septic system(s) D. Onsite wastewater management program(s)
B. Advanced wastewater treatment E. Combined sewers
C. Centralized sewer system(s) F. None of the Above
21. Outdated pump stations, undersized to carry ____________ from newly developed
subdivisions or commercial areas, can also create a potential overflow hazard, adversely
affecting human health and degrading the water quality of receiving waters.
A. Sewage D. Collection system
B. Wastewater E. Centralized wastewater
C. Septic system F. None of the Above
13
Sewer and Septic Construction Assignment 4/1/2018 TLC
22. The maintenance of the ____________is therefore a continuous, never-ending cycle.
A. Storm sewer(s) D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. Sewer system F. None of the Above
23. Technology has improved collection system maintenance with such tools as television
camera assisted line inspection equipment, jet-cleaning trucks, and improvements in pump
design. Because of the increasing complexity of________, collection system maintenance is
evolving into a highly skilled trade.
A. Storm sewer(s) D. Water quality of receiving waters
B. Sanitary sewer(s) E. Wastewater management system(s)
C. Wastewater collection systems F. None of the Above
24. Collection system operators are charged with protecting public health and the environment,
and therefore must have documented proof of their certifications in the respective?
A. Sewage D. Wastewater management systems
B. Wastewater E. Centralized wastewater treatment
C. Septic system F. None of the Above
26. These practices are really about recycling water: cleaning ___________and returning safe
water to the water cycle. If a septic system is not functioning properly, clean water is not
returned to our groundwater systems.
A. Sewage D. Collection system
B. Wastewater E. Centralized wastewater treatment
C. Septic system F. None of the Above
27. Our goal is to ensure that you can treat __________while protecting human and
environmental health in a cost-effective manner.
A. Your wastewater D. Biological and chemical processes
B. Onsite sewage E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
28. The high cost of centralized wastewater treatment plants and the advances made in
individual and cluster (decentralized) system technologies have expanded the array of available
treatment options and supported development of a more tailored approach to
_______________ management services.
A. Sewage D. Collection system
B. Wastewater E. Centralized wastewater treatment
C. Septic system F. None of the Above
14
Sewer and Septic Construction Assignment 4/1/2018 TLC
29. Which of the following terms - can be closely matched to the types and quantities of
sewage generated through a “just in time” modular approach financed via a “user pays” cost
structure?
A. Wastewater collection and treatment D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
Key Considerations
30. Wastewater flow and strength, site and local infrastructure conditions, and performance
requirements for the _______________are all key considerations in deciding what type of
wastewater collection and treatment system is needed and how it should be designed.
A. Sewage D. Collection system
B. Dispersed or discharged effluent E. Centralized wastewater treatment
C. Septic system F. None of the Above
31. Onsite systems treat wastewater and disperse it on the property where it is generated.
When functioning properly, onsite systems prevent human contact with_________, and prevent
contamination of surface and groundwater. Factors that affect the proper functioning of onsite
systems include the site and soil conditions, design, installation, operation and maintenance.
A. Wastewater D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Sewage F. None of the Above
Primary Treatment
33. Physical treatment processes also includes trapping of solids via ___________or screens
prior to discharge of the tank effluent.
A. Conventional system(s) D. Septic tank effluent filters
B. The tank effluent E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
Secondary Treatment
34. Which of the following terms - designed to remove organic matter, mostly through digestion
and decomposition, often aided by introduction of or exposure to atmospheric oxygen?
A. Wastewater D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
35. A typical standard for ________________ is biochemical oxygen demand (BOD) and total
suspended solids (TSS) concentrations less than or equal to 20 mg/L each on a 30-day average
basis.
A. Wastewater D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
15
Sewer and Septic Construction Assignment 4/1/2018 TLC
Tertiary (Advanced) Treatment
36. Which of the following terms - includes enhanced organic matter removal, pathogen
reduction, and nutrient removal?
A. Advanced treatment of wastewater D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
37. Which of the following terms - parameters can include nitrate-nitrogen, phosphorus, and
bacteria?
A. Conventional system(s) D. Volumes of treated wastewater
B. The tank effluent E. Typical effluent quality
C. The quantity of contaminants F. None of the Above
38. Which of the following terms - can occur via process controls (e.g., alternating oxic/anoxic
conditions) or through exposure to additives or media designed to cause chemical or other
reactions (e.g., disinfection, phosphorus precipitation).
A. Advanced treatment D. Biological and chemical processes
B. Onsite sewage treatment E. Wastewater collection and treatment
C. Enhanced organic matter removal F. None of the Above
Conventional Systems
39. Which of the following terms - are the most commonly used wastewater treatment
technologies, combining primary and secondary treatment?
A. Conventional system(s) D. Volumes of treated wastewater
B. The tank effluent E. Conventional treatment systems
C. The quantity of contaminants F. None of the Above
40. Which of the following terms - consists of a septic tank and a soil absorption field that
allows primary treatment effluent to infiltrate into unsaturated soil?
A. A conventional wastewater treatment system D. Volumes of treated wastewater
B. The tank effluent E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
41. Which of the following terms - can serve individual homes or businesses, or clusters of
buildings?
A. Conventional system(s) D. Volumes of treated wastewater
B. The tank effluent E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
42. The conventional system has two principal parts—the tank and soil absorption field. The
septic tank treats _______________by allowing floatable materials (e.g., fats, oils, grease) to
rise to the surface, forming a scum layer, and the heavier solids to sink to the bottom, creating a
layer of sludge.
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Wastewater
C. Septic tank effluent F. None of the Above
16
Sewer and Septic Construction Assignment 4/1/2018 TLC
43. Which of the following terms - is similar to that of primary sedimentation in larger treatment
facilities, except that it is generally devoid of oxygen?
A. Conventional system(s) D. Volumes of treated wastewater
B. The tank effluent E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
44. Which of the following terms - facilitates aerobic treatment and filtration of the remaining
contaminants?
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. The soil absorption system E. Advanced system
C. Septic tank effluent system F. None of the Above
45. Subsurface discharge of effluent to the soil can be configured to optimize treatment via
pressurized time-dosing of preset volumes of treated wastewater, which facilitates oxygenation
of the soil matrix between doses, promotes film flow of wastewater over soil particles, and
ensures a uniform and consistent application of?
A. Effluent to the entire drainfield D. Volumes of treated wastewater
B. The tank effluent E. Primary and secondary treatment
C. The quantity of contaminants F. None of the Above
Pretreatment Components
46. Which of the following terms - remove many of the contaminants from the wastewater to
prepare the effluent for final treatment and dispersal into the environment?
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
47. Which of the following terms - is reduced to a level the soil can accept and treat. Many
options exist for treatment prior to release into the receiving environment?
A. Advanced system(s) D. The quantity of contaminants
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
48. Which of the following terms - include septic tanks, trash tanks, and processing tanks, while
aerobic treatment units, media filters, and constructed wetlands are considered advanced
pretreatment components?
A. Wastewater pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
49. Which of the following terms - provide the final removal of contaminants and distribute the
effluent for dispersal back into the environment?
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
50. Which of the following terms - are the most widely used dispersal systems?
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
17
Sewer and Septic Construction Assignment 4/1/2018 TLC
51. Which of the following terms - overcome a variety of site limitations. Low pressure,
subsurface drip, and spray distribution systems are designed to function in difficult areas.
These systems are pressurized, which assists in providing even distribution of wastewater.
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
Advanced Systems
52. Treatment system components designed to pretreat septic tank effluent before discharge to
the soil dispersal field are often called?
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
53. Advanced systems can be designed and built on-site or can consist of prefabricated units
designed to overcome some site and soil limitations including:
When the aerated (unsaturated) soil depth below the infiltrative surface in the drainfield is less
than the minimum required, _______________or components (e.g., fixed film treatment units)
can be added to increase pollutant removal prior to soil discharge.
A. Advanced system(s) D. Advanced treatment processes
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
54. In environmentally sensitive areas, _____________ can be used to meet effluent standards
for oxygen-demanding wastes, bacteria, nitrogen, and phosphorus.
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
55. Which of the following terms - malfunctions hydraulically due to a buildup of the biomat at
the infiltrative surface, it may be restored, and treatment may be enhanced, by improving soil
oxidation through timed dosing of septic tank effluent to the dispersal field.
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
56. Which of the following terms - allows the soil to drain between doses, improving soil
oxygen transfer?
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
57. Wastewater with high organic strength can employ __________to improve aeration,
biological decomposition, and treatment of organic wastes.
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced treatment units/processes
C. Septic tank effluent F. None of the Above
18
Sewer and Septic Construction Assignment 4/1/2018 TLC
58. Which of the following terms - that provide timed dosing of septic tank or treatment unit
effluent to the soil can sometimes be used where soil infiltration areas are limited, except in
cases of high-clay content soils.
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
59. Which of the following terms - that employ pressure drip dispersal of the effluent can reduce
bacteria and nutrient loading to groundwater by applying wastewater high in the soil profile,
improving bacteria predation and uptake of nutrients by plants and providing a carbon source for
denitrification.
A. Pretreatment components D. Septic tanks, trash tanks, and processing tanks
B. Gravity flow systems E. Advanced systems
C. Septic tank effluent F. None of the Above
60. Which of the following terms - require management, but advanced systems, due to their use
of pumps, switches, and other electromechanical components, especially need regular
operation and maintenance attention?
A. Advanced system(s) D. Pressurized distribution methods
B. Septic tank effluent E. Final treatment and dispersal components
C. The dose/rest cycle F. None of the Above
62. Effluent flows from the tank or treatment unit to a pump tank and periodically dosed to
the_____________, which is typically constructed of a layer of clean, uniformly graded sand on
a plowed or roughened natural soil surface.
A. At-grade systems D. Modified dispersal area
B. Septic tank effluent E. Aerobic treatment units (ATUs)
C. Soil dispersal field F. None of the Above
63. The tank effluent is uniformly dosed onto the _____________within the mound, which may
be 1-4 ft. above the natural grade. Sand within the mound compensates for shallow unsaturated
soil conditions below the natural grade.
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Infiltrative surface
C. ATU(s) F. None of the Above
Mound Systems
64. Which of the following terms - are appropriate for areas with a high water table or shallow,
fractured bedrock?
A. At-grade systems D. Effluent flows from the tank
B. Septic tank effluent E. Aerobic treatment units (ATUs)
C. Soil dispersal field F. None of the Above
19
Sewer and Septic Construction Assignment 4/1/2018 TLC
65. Which of the following terms - should have cleanouts so they can be flushed at least twice a
year?
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Distribution lines
C. ATU(s) F. None of the Above
67. Three processes are involved in most____________: physical separation (mostly settling),
aerobic treatment (aeration and mixing), and clarification (final settling).
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Aerobic systems
C. ATU(s) F. None of the Above
68. Which of the following terms - vary in design and can consist of simple activated sludge
variations, sequencing batch reactors, trickling filters, and combinations of two or more of these
unit processes?
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Distribution lines
C. ATU(s) F. None of the Above
Media Filters
69. Which of the following terms - can be applied to a layer of sand or gravel, a tank containing
peat or plastic media, or compartments of hanging textile or other material to improve oxygen
access and enhance biochemical treatment processes?
A. Septic tank effluent D. Individual and clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
70. A number of these so-called “______________” are available to treat wastewater. Sand is
the most commonly used media, but clean gravel, crushed glass, textile strips, peat, and tire
crumbs are also used, depending on site restrictions and state/local regulations.
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Distribution lines
C. ATU(s) F. None of the Above
20
Sewer and Septic Construction Assignment 4/1/2018 TLC
72. As the effluent trickles through the _____________, suspended and some colloidal
particles are filtered, and bacteria growing on the media aerobically treat organic wastewater.
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Distribution lines
C. ATU(s) F. None of the Above
73. Effluent that percolates through the media bed is discharged to the?
A. At-grade systems D. Effluent flows from the tank
B. Septic tank effluent E. Aerobic treatment units (ATUs)
C. Soil dispersal field F. None of the Above
75. Which of the following terms - are extremely passive and require little management in
producing a good quality effluent?
A. Septic system(s) D. Collection systems for clustered facilities
B. Cluster system(s) E. Wetland system(s)
C. Treatment facilities F. None of the Above
76. Effluent is further treated when discharged to _____________following flow through the
wetland cell(s).
A. Media D. Vegetative submerged bed(s)
B. Media filter(s) E. Distribution lines
C. Unsaturated soil F. None of the Above
78. Which of the following terms - facilities serving clustered buildings may range from a
communal septic tank and soil dispersal system to a more advanced treatment system.
A. Treatment D. Individual and clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
79. Advanced systems may facilitate local reuse of the treated effluent for toilet flushing,
irrigation, industrial purposes, or to replenish?
A. Aerobic microsite(s) D. Microbes and other particles
B. All sewage E. Waterborne illnesses
C. Aquifer(s) F. None of the Above
21
Sewer and Septic Construction Assignment 4/1/2018 TLC
80. Which of the following terms - must be managed by an entity with the technical, financial,
and managerial capacity to effectively and efficiently handle operation, maintenance, customer
billing, repair/replacement, and other tasks?
A. Septic system(s) D. Collection systems for clustered facilities
B. Cluster system(s) E. Wetland system(s)
C. Treatment facilities F. None of the Above
82. Septic system maintenance is like automobile maintenance; a little effort on a regular basis
can save you a lot of money and significantly prolong the life of the?
A. Septic system(s) D. Collection systems for clustered facilities
B. Cluster system(s) E. System
C. Treatment facilities F. None of the Above
83. Failing systems are a major source of groundwater pollution, cause ________________,
such as dysentery and hepatitis, and are expensive for homeowners to replace.
A. Aerobic microsite(s) D. Microbes and other particles
B. All sewage E. Waterborne illnesses
C. Aquifer(s) F. None of the Above
84. Systems can treat individual homes, clusters of buildings, or whole subdivisions and/or
commercial establishments. ___________ for clustered facilities can work by gravity or operate
via vacuum or pressure pump.
A. Septic system(s) D. Collection systems
B. Cluster system(s) E. Wetland system(s)
C. Treatment facilities F. None of the Above
85. Wastewater is typically treated through primary and secondary processes (and sometimes
tertiary or_____________________) and can be disinfected prior to discharge.
A. Advanced “polishing” procedures D. Individual and clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
22
Sewer and Septic Construction Assignment 4/1/2018 TLC
87. Over the past 20 years the onsite wastewater treatment system (OWTS) industry has
developed many ______________that can achieve high performance levels on sites with size,
soil, ground water, and landscape limitations that might preclude installing conventional
systems.
A. Performance requirements D. Primary and secondary processes
B. Water resources E. New treatment technologies
C. Fixed-film reactors F. None of the Above
89. Which of the following terms - can be expressed as numeric criteria or narrative criteria and
are based on the assimilative capacity of regional ground water or surface waters, water quality
objectives, and public health goals?
A. Performance requirements D. Primary and secondary processes
B. Water resources E. Onsite wastewater treatment system (OWTS)
C. Fixed-film reactors F. None of the Above
90. Which of the following terms - help define system design and size and can be estimated
by comparing the size and type of facility with measured effluent outputs from similar, existing
facilities?
A. Alternative treatment technologies D. Performance-based management
B. Existing technologies E. Wastewater characteristics, and site conditions
C. Wastewater flow and pollutant content F. None of the Above
91. Which of the following terms - integrate detailed analyses of regional hydrology, geology,
and water resources with site specific characterization of soils, slopes, structures, property lines,
and other site features to further define system design requirements and determine the physical
placement of system components.
A. Site evaluations D. Individual and clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
92. Which of the following terms - applied today treat wastes after they exit the septic tank; the
tank retains settleable solids, grease, and oils and provides an environment for partial digestion
of settled organic wastes.
A. Regular maintenance D. Most of the alternative treatment technologies
B. Drainage features E. Approving the use of various treatment technologies
C. Septic system F. None of the Above
93. Post-tank treatment can include aerobic (with oxygen) or anaerobic (with no or low oxygen)
biological treatment in suspended or fixed-film reactors, physical/chemical treatment, soil
infiltration,_________________.
A. Fixed-media filtration, and/or disinfection D. Primary and secondary processes
B. Water resources E. Onsite wastewater treatment system (OWTS)
C. Fixed-film reactors F. None of the Above
23
Sewer and Septic Construction Assignment 4/1/2018 TLC
94. Which of the following terms - based on these technologies are defined by performance
requirements, wastewater characteristics, and site conditions?
A. Alternative treatment technologies D. The application and sizing of treatment units
B. Existing technologies E. Wastewater characteristics, and site conditions
C. Wastewater flow and pollutant content F. None of the Above
Performance-Based Standards
95. The move toward site-appropriate, risk-based system design and the growing interest in
______________has increased the need for performance-based design guidance.
A. Performance requirements D. Primary and secondary processes
B. Clustered facilities E. Onsite wastewater treatment system (OWTS)
C. Fixed-film reactors F. None of the Above
96. Which of the following terms - approaches have been proposed as a substitute for
prescriptive requirements for system design, siting, and operation?
A. Alternative treatment technologies D. Performance-based management
B. Existing technologies E. Wastewater characteristics, and site conditions
C. Wastewater flow and pollutant content F. None of the Above
98. A wastewater system should be matched to the volume and_________________, and the
site, soil, and groundwater/surface water conditions must be known in detail in order to develop
an appropriate system design.
A. Alternative treatment technologies D. Pollutant profile of wastewater
B. Existing technologies E. Wastewater characteristics, and site conditions
C. Wastewater flow and pollutant content F. None of the Above
99. Which of the following terms - permitting programs are expanding the options available for
providing treatment services, especially for sites with limiting soil conditions?
A. Regular maintenance D. State and local wastewater system
B. Drainage features E. Approving the use of various treatment technologies
C. Septic system F. None of the Above
Management Considerations
100. Which of the following terms - systems require management. Management services can
be provided by an outside contractor or responsible management entity.
A. Soil condition(s) D. Life of system components
B. System/technology E. Wastewater treatment
C. Subsurface drainfield(s) F. None of the Above
24
Sewer and Septic Construction Assignment 4/1/2018 TLC
101. Factors that influence system management include:
_________________, such as very cold or wet climates.
A. Complexity of service D. Operation in extreme conditions
B. Final design components E. Designs and materials specifications
C. All system components F. None of the Above
106. If the site has been developed, all structures, utilities, and _______________should be
identified.
A. Regular maintenance D. Ingress and egress pathways
B. Drainage features E. Various treatment technologies
C. Septic system F. None of the Above
107. The source of potable water and distribution lines should be identified as well. If there is
an existing wastewater treatment system, the condition of all components, including the reserve
area, should be recorded and?
A. Drainage features D. System maintenance
B. System location and features E. Minimum setbacks met
C. Installation specifications F. None of the Above
Regular Maintenance
108. Regular maintenance is required for_______________. However, it is especially important
for more complex alternative systems, especially those that use pumps, controls, timers, and
pressure distribution.
A. All systems D. Individual and clustered systems
B. Wastewater systems E. Infiltration area protection
C. Septic systems F. None of the Above
25
Sewer and Septic Construction Assignment 4/1/2018 TLC
109. Verification of _______________ contracts, operator expertise, and reporting
requirements for system maintenance such as tank pumping and repairs should be included in
the approval process.
A. Drainage features D. System maintenance
B. System location and features E. Wastewater treatment system
C. Installation specifications F. None of the Above
111. The _________________. Size is important because graywater (laundry water, sink
water) and blackwater (toilet water) need to be retained in the tank for at least a day or more to
allow solids to separate from the liquids and begin breaking down. If wastewater is pushed
through without proper settling, the solids can clog the drainfield, stressing and possibly
damaging the system.
A. Regular maintenance D. Age of the system
B. Drainage features E. Location of the system
C. Size of the system F. None of the Above
112. The _________________. Knowing where the tank and drainfield are will help you visually
check the area for obvious signs of failure. In addition, poorly sited drainfields can result in
septic system failures. Location of the system in relation to wells, other septic systems, slope of
the land, natural drainage patterns, underlying soil conditions, and lot boundaries may indicate
potential problems with the septic system and should be reviewed by you or a professional.
A. Regular maintenance D. Age of the system
B. Drainage features E. Location of the system
C. Size of the system F. None of the Above
Construction Section
114. Appropriate wastewater treatment system construction and/or installation practices are
critical to the performance of individual and?
A. Pressure distribution D. Clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
26
Sewer and Septic Construction Assignment 4/1/2018 TLC
115. Construction activities can affect short-term and long-term system performance by failing
to adhere to ______________, neglecting proper pipe slope requirements, inadvertently
switching tank inlet/outlet orientation, or failing to protect infiltration area soils from equipment
compaction.
A. Infiltration area D. Secondary treatment unit(s)
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
117. The development of a final design plan that includes drawings, narratives, forms,
calculations, photos, and other data, including____________, will help ensure a successful
outcome. This information must be assembled into a cohesive document to allow the proper
installation of the design without the need for any assumptions.
A. Infiltration area D. Detailed equipment and installation specifications
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
Preparation Phase
118. Conduct a pre-construction conference at the site to identify site component locations,
verify setbacks and other site conditions, check surface elevations, and identify potential
problems or safety concerns (_________________________).
A. Pressure distribution D. Individual and clustered systems
B. Wastewater E. Infiltration area protection
C. Septic system F. None of the Above
119. Assess changes in conditions (__________________) that may have occurred since
design work was completed.
A. Infiltration area D. Secondary treatment unit(s)
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
Project Execution
121. Verify designed treatment system components and materials, such as tank type, size, and
material; piping; and?
A. Infiltration area(s) D. Gravity flow pipe(s)
B. Site component location(s) E. Designed component finished condition(s)
C. Gravity flow system(s) F. None of the Above
27
Sewer and Septic Construction Assignment 4/1/2018 TLC
122. Excavate areas for conveyance piping, the tank(s), secondary treatment units, and
infiltration or soil dispersal components according to designated depths and required?
A. Infiltration area D. Pipe slopes
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
123. For_______________, all elevations are tied to the building sewer line elevation. Ensure
that the proper fall is available from the building to the tank, then to the distribution box(es), and
to the infiltration area.
A. Infiltration area(s) D. Gravity flow pipe(s)
B. Site component location(s) E. Designed component finished condition(s)
C. Gravity flow system(s) F. None of the Above
124. Ensure that the tank is on solid tamped ground, installed level and at the proper elevation,
and that __________________ is correct. Secure tank covers after hours to prevent accidents.
Backfill tanks as soon as possible.
A. Infiltration area D. Secondary treatment unit(s)
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
126. Ensure that ________________are plumbed, wired, and installed to allow easy
inspection, access, and removal (e.g., use quick-connect union and backflow prevention valve
between pump and uphill dispersal piping).
A. Infiltration area D. Pumps
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
127. Ensure that trench bottoms for _________________ are tamped and stable and free of
rocks and roots, and that backfilled areas around pipes are tamped to prevent dips.
A. Infiltration area(s) D. Gravity flow pipe(s)
B. Site component location(s) E. Designed component finished condition(s)
C. Gravity flow system(s) F. None of the Above
129. Extend ___________piping stubs below tank access ports, but do not block ports to
ensure access for pumping and inspection. Use rubber boots or grout to completely seal around
pipes and risers.
A. Infiltration area D. Secondary treatment unit(s)
B. Inlet and outlet E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
28
Sewer and Septic Construction Assignment 4/1/2018 TLC
130. Install access _________________to the surface, install outlet filters/screens, and
complete installation of pumps, wiring, control panels, and other components.
A. Port risers D. Gravity flow pipe(s)
B. Site component location(s) E. Designed component finished condition(s)
C. Gravity flow system(s) F. None of the Above
131. Install _________________in key locations (near building sewer, D-box, etc.); this aids in
operation/maintenance later on.
A. Infiltration area D. Cleanouts and inspection ports
B. Inlet/outlet orientation E. Uphill dispersal piping
C. Distribution pipe effluent F. None of the Above
132. Conduct functional test of the system after installation, checking flows, pump discharge (if
used), operation of ?
A. Infiltration area(s) D. Gravity flow pipe(s)
B. Site component location(s) E. Designed component finished condition(s)
C. Gravity flow system(s) F. None of the Above
134. Site preparation requires a number of activities including clearing and surface preparation
for filling. Use of lightweight tracked equipment will minimize soil?
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
135. Soil ______________ should be determined to ensure that it is dry, and care should be
taken to avoid soil disturbance as much as possible.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
136. To avoid potential soil _______________during construction, the soil below the proposed
infiltration surface elevation must be below its plastic limit during construction (i.e., it must lack
the moisture required to make it moldable into stable shapes). This should be tested before
excavation begins.
A. Compaction D. Excavation
B. Moisture E. Damage
C. Disturbance F. None of the Above
137. Site ______________ is conducted only when the infiltration surface can be covered the
same day to avoid loss of soil permeability from wind-blown silt or raindrop impact.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
29
Sewer and Septic Construction Assignment 4/1/2018 TLC
138. Another solution is to use light-weight gravel-less systems, which reduce the
________________ process. Site access points and areas for traffic lanes, material stockpiling,
and equipment parking should be designated on the drawings for the contractor.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
139. Heavy equipment should be diverted from the absorption field to avoid compaction and
damage to the area. Flagging off the ____________ area as early as possible is critical to
ensure long-term function of the system.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
140. Grubbing of the site (mechanically raking away roots) should be avoided. If the site is to
be filled, the surface should be moldboard- or chisel-plowed parallel to the contour (usually to a
depth of seven to ten inches) when the soil is sufficiently dry to ensure maximum vertical?
A. Compaction D. Permeability
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
141. The organic layer should not be removed. Scarifying the surface with the teeth of a
backhoe bucket is not sufficient. All efforts should be made to avoid any disturbance to the
exposed _______________ surface.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
143. Avoid work during wet conditions. ______________in infiltration trenches should be
scarified and the surface gently raked prior to installing the gravel or gravel-less
piping/chambers.
A. Compaction D. Excavation
B. Moisture E. Infiltration
C. Smeared soil surfaces F. None of the Above
144. If gravel or crushed rock is to be used for the system medium, the rock should be placed
in the trench by using the backhoe bucket to long-term system performance. If soil compaction
occurs during drainfield installation, _______________, but only by removing the compacted
layer.
A. Individual wastewater system(s) D. Long-term system performance
B. Infiltration area E. Distribution pipe(s)
C. System design F. None of the Above
30
Sewer and Septic Construction Assignment 4/1/2018 TLC
145. The removal of this amount of soil over the entire infiltration surface can be significant. It
will reduce the separation distance to the restrictive horizon and could place the infiltration
surface in an unacceptable soil?
A. Compaction D. Horizon
B. Moisture E. Infiltration
C. Disturbance F. None of the Above
146. Which of the following terms - should be carefully placed over the rock, leveled, and
bedded in on the sides?
A. Individual wastewater system(s) D. Long-term system performance
B. Infiltration area E. Distribution pipe(s)
C. System design F. None of the Above
147. After the rock and pipes have been placed in the trench, the ________________should be
placed over the top of the rock to prevent soil from moving into the rock.
A. Filter fabric D. Long-term system performance
B. Infiltration area E. Distribution pipe(s)
C. System design F. None of the Above
148. Flag off the ________________ to keep construction and other traffic away.
A. Individual wastewater system(s) D. Long-term system performance
B. Infiltration area E. Distribution pipe(s)
C. System design F. None of the Above
Management Considerations
149. All ______________programs should carefully consider construction and installation
elements to ensure the proper operation of onsite systems. These programs should include
permits, inspections, and installer training requirements.
A. Individual wastewater system(s) D. Long-term system performance
B. Infiltration area E. Onsite management
C. System design F. None of the Above
Material Replacement
152. Technologies that replace one component of the conventional system with a component
manufactured from?
A. Clustered system(s) D. Advanced or innovative technologies
B. Conventional system(s) E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
31
Sewer and Septic Construction Assignment 4/1/2018 TLC
Enhanced Wastewater Treatment
153. Advanced or innovative technologies that provide a _____________beyond conventional
systems. Generally, these systems have mechanical or moving parts that require periodic
operation and maintenance, inspections, and eventual replacement.
A. Clustered system(s) D. Higher level of treatment
B. Conventional system(s) E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
154. Enhanced wastewater treatment systems are more complex than ____________and
require greater oversight to keep all aspects of the treatment process in balance.
A. Treatment performance D. Conventional systems
B. Cluster system(s) E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
156. Which of the following terms - have become an attractive option for many locations,
especially in areas like small lakeside communities?
A. Treatment performance D. Enhanced wastewater treatment system(s)
B. Cluster system(s) E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
157. The operation and maintenance requirements of cluster systems will vary based on the
size of the system, the wastewater being treated, and the types of technology used. Various
technologies that can be implemented via a?
A. Cluster system(s) D. Advanced or innovative technologies
B. Conventional system(s) E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
Management Considerations
158. In the past, state and local wastewater management programs rarely specified O&M
requirements for?
A. Treatment performance D. Enhanced wastewater treatment system(s)
B. Cluster system(s) E. Conventional or enhanced wastewater systems
C. O&M requirement(s) F. None of the Above
159. As more and more systems malfunction and threaten waterways and as more systems
include higher maintenance electrical and mechanical components, communities are
recognizing the value of?
A. Clustered system(s) D. Advanced or innovative technologies
B. Conventional system(s) E. Private property
C. O&M requirement(s) F. None of the Above
32
Sewer and Septic Construction Assignment 4/1/2018 TLC
160. Many are strengthening programs with a number of tools, including requirements for
homeowner service contracts, routine maintenance inspections, revocable operating permits,
monitoring, and enhanced reporting and data management that support proper ?
A. Treatment performance D. Enhanced wastewater treatment system(s)
B. System performance E. Wastewater alternative technologie(s)
C. O&M requirement(s) F. None of the Above
Maintenance Inspections
161. Maintenance inspections are gaining appeal as a management tool to assess the
condition of systems and determine pumping or___________. In some cases, this is a strictly
voluntary program, while in other cases; communities have elected to mandate pumping based
on third party inspections.
A. Other O&M needs D. Alternative and enhanced wastewater technologies
B. Septic tank pumping E. Operation and maintenance inspection programs
C. Advances in technology F. None of the Above
162. Some local agencies have adopted a sewage management program that requires the
annual inspection of systems with newly issued or modified permits and proof of ___________
for all systems.
A. O&M needs D. Alternative and enhanced wastewater technologies
B. Septic tank pumping E. Operation and maintenance inspection programs
C. Advances in technology F. None of the Above
163. Which of the following terms - are usually coupled with a mandatory septic tank pumping
program. The local agency notifies the system owner when pumping is due?
A. O&M needs D. Alternative and enhanced wastewater technologies
B. Septic tank pumping E. Operation and maintenance inspection programs
C. Advances in technology F. None of the Above
164. Typical pumping requirements vary from three to five years or more based on the
____________and individual household wastewater characteristics.
A. Service provider(s) D. Performance-based system
B. Typical pumping requirement(s) E. Daily sewage flow
C. Enhanced system(s) F. None of the Above
Maintenance of Systems
166. Enhanced systems may also require an increased frequency of inspections to determine if
they are performing as required. These systems are _________and require an annual operating
permit, maintenance contract, and annual inspection from the county health department.
A. Service provider(s) D. Performance-based treatment systems
B. Typical pumping requirement(s) E. Final inspection
C. Enhanced system(s) F. None of the Above
33
Sewer and Septic Construction Assignment 4/1/2018 TLC
167. A key part of ___________is to track the maintenance of systems. The only way to ensure
that maintenance contracts are kept in effect and that systems are monitored when required is
for the management entity or regulatory authority to have a structured reporting program.
A. An O&M program D. Alternative and enhanced wastewater technologies
B. Septic tank pumping E. Operation and maintenance inspection programs
C. Advances in technology F. None of the Above
168. Service providers should report maintenance events and any lapses in maintenance
contracts to the management or regulatory authority. This information should be managed in a
database to monitor _______________and provide a system of accountability.
A. Service provider(s) D. Performance-based system
B. Typical pumping requirement(s) E. O&M activities
C. Enhanced system(s) F. None of the Above
Operating Permits
169. More complex systems, however, often include_____________, maintenance contracts,
and compliance measures. In the case of a performance-based system, the operating permit
may include specific standards that must be maintained along with monitoring and reporting
requirements.
A. Service provider(s) D. Performance-based system
B. Typical pumping requirement(s) E. Maintenance inspections
C. Enhanced system(s) F. None of the Above
OSSF Maintenance
170. Which of the following terms - can add years to an older system. Even well-designed and
properly installed septic systems can fail earlier than expected if previous homeowners did not
perform routine maintenance.
A. Proper maintenance D. Septic tank or ATU
B. Necessary pumping frequency E. Pressure manifold(s)
C. An advanced OWTS F. None of the Above
171. Keep in mind the necessary pumping frequency depends on the size of the household and
the size of the?
A. Sand/media filter(s) D. Onsite system
B. Septic tank or ATU E. Size of the household and the size of the tank
C. Tank F. None of the Above
172. For example, a four-bedroom home with a 1,250-gallon tank should be pumped
approximately every 2.6 years. Modern conveniences such as garbage disposals, hot tubs, or
whirlpools will increase the?
A. Proper maintenance D. Septic tank or ATU
B. Necessary pumping frequency E. Pressure manifold(s)
C. An advanced OWTS F. None of the Above
Permit
173. Several factors should be considered when choosing the type of onsite system for a site
including: soil/site limitations, available space, operation and maintenance requirements, initial
costs as well as_______________, landscape disturbance, and the owners' preferences.
A. Sand/media filter(s) D. Onsite system
B. Septic tank or ATU E. O & M costs
C. Sewage tank F. None of the Above
34
Sewer and Septic Construction Assignment 4/1/2018 TLC
174. Of these considerations, often the most limiting is the ___________or site and space
limitations.
A. Proper maintenance D. Septic tank or ATU
B. Necessary pumping frequency E. Pressure manifold(s)
C. Soil resource F. None of the Above
Gravity Laterals
177. A system of trenches excavated along ground contours used to distribute effluent by
gravity flow from a _________________and apply the effluent to the soil infiltrative surface.
A. Sand/media filter(s) D. Onsite system
B. Septic tank or ATU E. Size of the household and the size of the tank
C. Sewage tank F. None of the Above
180. The wastewater is dosed onto the surface of the sand through a ____________and
allowed to percolate through the sand to the under-drain system, which collects the filter effluent
for further processing or discharge.
A. Proper maintenance D. Distribution network
B. Necessary pumping frequency E. Pressure manifold(s)
C. An advanced OWTS F. None of the Above
35
Sewer and Septic Construction Assignment 4/1/2018 TLC
Other Media Bio-filters
181. _______________ using other more porous materials, (e.g., peat, textile, or foam) to
provide advanced secondary treatment of septic tank effluent.
A. Packed-bed filter(s) D. An above ground treatment system
B. Engineered distribution system(s) E. A subsurface soil dispersal system
C. An OWTS F. None of the Above
Constructed Wetlands
182. An OWTS that incorporates ________________ consisting of one or more lined basins
which may be filled with a medium and where wastewater undergoes some combination of
physical, chemical, and/or biological treatment and evapotranspiration.
A. Packed-bed filter(s) D. An above ground treatment system
B. Engineered distribution system(s) E. A subsurface soil dispersal system
C. An OWTS F. None of the Above
Sand Mounds
183. Which of the following terms - that incorporates at least 12 inches of clean sand above
the original soil surface and disperses the treated wastewater into the original soil?
A. Packed-bed filter(s) D. An above ground treatment system
B. Engineered distribution system(s) E. A subsurface soil dispersal system
C. An OWTS F. None of the Above
Suitable Soil
186. One tablespoon of soil can contain over one million microscopic organisms, including
bacteria, protozoa, fungi, molds, and?
A. Effluent D. Some organic material and total suspended solids (TSS)
B. Soil microorganism(s) E. Suitable soil
C. Soil condition(s) F. None of the Above
187. The bacteria and other microorganisms in the soil treat the wastewater and purify it before
it reaches groundwater. But the wastewater must pass through the ___________slowly enough
to provide adequate contact time with microorganisms.
A. Effluent D. Some organic material and total suspended solids (TSS)
B. Soil microorganism(s) E. Soil
C. Soil condition(s) F. None of the Above
36
Sewer and Septic Construction Assignment 4/1/2018 TLC
188. Which of the following terms - in soil treat wastewater physically, chemically, and
biologically before it reaches the groundwater, preventing pollution and public health hazards?
A. Complex biological community D. Pathogenic bacteria
B. Microorganism(s) E. TSS and organic material
C. Microbial slime(s) F. None of the Above
189. Under some soil conditions, __________may not accept the wastewater or may fail to
properly treat the wastewater unless special modifications to system design are made.
A. Effluent D. Some organic material and total suspended solids (TSS)
B. Soil microorganism(s) E. Subsurface absorption systems
C. Soil condition(s) F. None of the Above
190. Public health is a major concern because domestic wastewaters contain many substances
that are undesirable and potentially harmful, such as pathogenic bacteria, ___________,
organic matter, toxic chemicals, pharmaceutical drugs (e.g. endocrine disruptors), and excess
nutrients.
A. Complex biological community D. Infectious viruses
B. Microorganism(s) E. TSS and organic material
C. Microbial slime(s) F. None of the Above
191. Which of the following terms - need the same basic conditions as humans do to live and
grow: a place to live, food to eat, water, oxygen to breathe, suitable temperatures, and time to
grow?
A. Effluent D. Some organic material and total suspended solids (TSS)
B. Soil microorganism(s) E. Suitable soil
C. Soil condition(s) F. None of the Above
192. Soil microorganisms attach themselves to soil particles using microbial slimes and use the
oxygen and water that are present in the?
A. Complex biological community D. Soil pores
B. Microorganism(s) E. TSS and organic material
C. Microbial slime(s) F. None of the Above
193. The first component in an individual sewage treatment system is usually a septic tank,
which removes some organic material and?
A. Effluent D. Total suspended solids (TSS)
B. Soil microorganism(s) E. Suitable soil
C. Soil condition(s) F. None of the Above
194. Which of the following terms - removal is very important because it prevents excessive
clogging of the soil infiltrative surface?
A. Complex biological community D. Pathogenic bacteria
B. Microorganism(s) E. TSS and organic material
C. Microbial slime(s) F. None of the Above
Suitably-textured Soil
195. Which of the following terms - must be deep enough to allow adequate filtration and
treatment of the effluent before it is released into the natural environment?
A. Effluent D. Suitably-textured soil
B. Soil microorganism(s) E. Suitable soil
C. Soil condition(s) F. None of the Above
37
Sewer and Septic Construction Assignment 4/1/2018 TLC
196. Usually this release is into groundwater. It has been determined that three feet of aerated
soil will provide sufficient treatment of?
A. Complex biological community D. Septic tank effluent
B. Microorganism(s) E. TSS and organic material
C. Microbial slime(s) F. None of the Above
197. This three-foot treatment zone provides sufficient detention time for final bacteria
breakdown and sufficient distance for the filtration that is essential for the safe treatment of ?
A. Effluent D. Effluent BOD
B. Soil microorganism(s) E. Suitable soil
C. Soil condition(s) F. None of the Above
199. When a septic system fails to effectively treat and disperse _________, it can become a
source of pollution. This type of failure can occur in three different ways.
A. Pollution of groundwater D. Soil treatment and dispersal zone
B. Effluent E. Unsaturated flow
C. Anaerobic bacteria F. None of the Above
200. The second obvious way that ____________can fail is to have effluent backing up into the
dwelling. It is also important to prevent a third, and less obvious, type of failure, which is
contamination of the ground or surface waters.
A. Septic system D. Soil treatment trench
B. Distribution media E. Dispersal zone
C. Biomat F. None of the Above
201. Pollution of groundwater (with nitrogen, pathogens, bacteria, chemicals, etc.) is very
difficult to clean up, since the only access to the water table is through wells, trenches (if the
water table is high enough), or?
A. Pollution of groundwater D. Soil treatment and dispersal zone
B. Effluent E. Unsaturated flow
C. Anaerobic bacteria F. None of the Above
38
Sewer and Septic Construction Assignment 4/1/2018 TLC
203. To varying degrees, the _________ and dispersal zone treats the wastewater by acting as
a filter, exchanger, or absorber by providing a surface area on which many chemical and
biochemical processes occur.
A. Pollution of groundwater D. Soil treatment
B. Effluent E. Unsaturated flow
C. Anaerobic bacteria F. None of the Above
Biomat
204. As septic tank effluent flows into a soil treatment trench, it moves vertically through the
distribution media to the __________ where treatment begins.
A. Wastewater D. Soil treatment trench
B. Distribution media E. Dispersal zone
C. Biomat F. None of the Above
205. The biomat is a biological layer formed by ________, which secrete a sticky substance
and anchor themselves to the soil, rock particles, or other available surfaces.
A. Pollution of groundwater D. Soil treatment and dispersal zone
B. Effluent E. Unsaturated flow
C. Anaerobic bacteria F. None of the Above
206. The biomat develops first along the trench bottom, where effluent begins to pond. The
biomat develops along the soil-media contact surfaces on the trench’s sidewalls. When fully
developed, the gray-to-black sticky ________layer is about one inch thick.
A. Wastewater D. Soil treatment trench
B. Distribution media E. Dispersal zone
C. Biomat F. None of the Above
207. Unsaturated flow increases the travel time of effluent through the soil, ensuring that it has
sufficient time to contact the surfaces of soil particles and?
A. Pollution of groundwater D. Soil treatment and dispersal zone
B. Effluent E. Microorganisms
C. Anaerobic bacteria F. None of the Above
208. A properly functioning ________will have wastewater ponded in the distribution media
while the soil a few inches outside of and below the distribution media will be unsaturated.
A. Gravity-fed system D. Soil treatment trench
B. Distribution media E. Dispersal zone
C. Biomat F. None of the Above
209. Unsaturated soil has pores containing both air and water so aerobic microorganisms living
in the soil can effectively treat the wastewater as it travels through the?
A. Pollution of groundwater D. Soil treatment and dispersal zone
B. Effluent E. Soil system
C. Anaerobic bacteria F. None of the Above
210. In order for the wastewater to move through the soil, it must be pulled or wicked through
the fine pores by ?
A. Aerobic bacteria D. Aerobic
B. Clustered wastewater system(s) E. Anaerobic
C. Equilibrium F. None of the Above
39
Sewer and Septic Construction Assignment 4/1/2018 TLC
Sewage Treatment Utilizing Soil
211. A developed biomat reaches ______________ over time, remaining at about the same
thickness and the same permeability if effluent quality is maintained.
A. Final treatment of effluent D. Upstream processes in the treatment train
B. Wastewater flow/strength E. Anaerobic microorganism(s)
C. Quality of the effluent F. None of the Above
212. On the soil side of the biomat beneath the drainfield, oxygen is present so that conditions
are allowing aerobic soil bacteria to feed on and continuously break down the?
A. Aerobic bacteria D. Biomat
B. Clustered wastewater system(s) E. Anaerobic
C. Equilibrium F. None of the Above
213. Which of the following terms - leaving the septic tank decreases because of failure to
regularly pump out the septic tank, more food will be present for the anaerobic bacteria, which
will cause an increase in the thickness of the biomat and decrease its permeability.
A. Final treatment of effluent D. Upstream processes in the treatment train
B. Wastewater flow/strength E. If the quality of the effluent
C. Quality of the effluent F. None of the Above
214. If seasonally saturated conditions occur in the soil outside the trench, aerobic conditions
will no longer exist, which will prevent _________from breaking down the biomat.
A. Aerobic bacteria D. Aerobic
B. Clustered wastewater system(s) E. Anaerobic
C. Equilibrium F. None of the Above
Site Evaluations
215. The success of any soil-discharging wastewater treatment system depends on the
appropriate match between_______________, the treatment system design, and the site that
receives effluent from the system.
A. Final treatment of effluent D. Upstream processes in the treatment train
B. Wastewater flow/strength E. Wastewater flow/strength
C. Quality of the effluent F. None of the Above
40
Sewer and Septic Construction Assignment 4/1/2018 TLC
218. The subsurface “ponding” and slow release of effluent to the soil through the biomat
facilitates treatment via chemical, physical, and biological processes such as________,
adsorption of potential pollutants (e.g., phosphorus), filtration of solids, and decomposition of
organic constituents.
A. Aerobic bacteria D. Upstream processes in the treatment train
B. Clustered wastewater system(s) E. Aerobic nitrification of ammonia
C. Equilibrium F. None of the Above
219. Predicting the ____________and overall treatment efficacy of the soil component of the
system requires a fairly comprehensive understanding of how these processes work.
A. Final treatment of effluent D. Pollutant removal
B. Wastewater flow/strength E. Anaerobic microorganism(s)
C. Quality of the effluent F. None of the Above
Septic Tanks
221. A watertight, covered container designed and constructed to receive the discharge of
sewage from a building sewer. Its function is to separate solids from liquid, digest organic
matter, store liquids through a period of detention and allow the _________________to
discharge to other components of an onsite system.
A. Biological processes D. Digest organic matter
B. Gravity lateral trenches E. A mechanical onsite treatment unit
C. Clarified liquids F. None of the Above
41
Sewer and Septic Construction Assignment 4/1/2018 TLC
Gravity laterals
225. A system of trenches excavated along ground contours used to distribute effluent by
gravity flow from a septic tank or ________________and apply the effluent to the soil infiltrative
surface.
A. Biological processes D. Digest organic matter
B. Gravity lateral trenches E. A mechanical onsite treatment unit
C. ATU F. None of the Above
226. Generally, 18-inch deep trenches are used; however, with _______________can be up to
30 inches deep.
A. Liquid effluent D. System components
B. Approval trenches E. Lateral trenches
C. Pressure manifolds F. None of the Above
230. Which of the following terms - distributed through this system is about 98% water?
A. Fluid waste D. Wastewater
B. Storm sewers E. Solids
C. Combined sewers F. None of the Above
231. The waste floats on, is carried along by, and goes into _________________ in water.
Possible waste includes anything that can be flushed down the drain--human excretion, body
fluids, paper products, soaps and detergents, foods, fats, oil, grease, paints, chemicals,
hazardous materials, solvents, disposable and flushable items; the list is almost infinite.
A. Sewer D. Wastewater
B. Storm sewers E. Drain
C. Suspension or solution F. None of the Above
42
Sewer and Septic Construction Assignment 4/1/2018 TLC
233. "Wastewater" is a more accurate description and has become the standard term for this
fluid waste because it encompasses the total _________________ in water that is gathered
from homes and businesses.
A. Slurry of wastes D. Wastewater
B. Storm sewers E. Stink Pickles
C. Combined sewers F. None of the Above
236. Which of the following terms - are designed to quickly get rainwater off the streets during
rain events.
A. Drains D. Wastewater
B. Storm sewers E. Streets
C. Combined sewers F. None of the Above
237. Most storm sewers do not connect with a _________________, but instead drain directly
into nearby rivers, lakes, or oceans.
A. Treatment plant D. Wastewater factory
B. Storm sewer E. Turd collector
C. Combined sewer F. None of the Above
238. Combined sewers carry both wastewater and storm water in the same pipe. Most of the
time, ________________transport the wastewater and storm water to a treatment plant.
A. Wastewater collection system D. Mammals
B. Sewer systems E. Trucks
C. Combined sewers F. None of the Above
239. However, when there is too much rain, combined sewer systems cannot handle the extra
volume and designed "________________" of raw sewage into streams and rivers occur.
A. Wastewater collection D. Overflows
B. Sewers E. CMOM
C. Combined sewers F. None of the Above
240. The great majority of ________________have separated, not combined, sanitary and
storm water pipes.
A. Wastewater collection system D. Solids
B. Sewer systems E. People
C. Combined sewers F. None of the Above
43
Sewer and Septic Construction Assignment 4/1/2018 TLC
241. As the infrastructure in the United States and other parts of the world ages, increasing
importance is being placed on rehabilitating?
A. Wastewater collection system D. Inspecting equipment
B. Sewer systems E. Collection workers
C. Combined sewers F. None of the Above
242. Cracks, settling, tree root intrusion, and other disturbances that develop over time
deteriorate pipelines and other conveyance structures that comprise ________________,
including stormwater, sanitary, and combined sewers.
A. Wastewater collection systems D. Septic Tanks
B. Sewer systems E. Stormwater systems
C. Combined sewers F. None of the Above
243. Outdated pump stations, undersized to carry sewage from newly developed subdivisions
or commercial areas, can also create a _________________, adversely affecting human health
and degrading the water quality of receiving waters.
A. Wastewater collection system D. FUBAR
B. Potential overflow hazard E. CMOM
C. Combined sewers F. None of the Above
245. As sections of the system age, problems such as corroded concrete pipe, cracked tile, lost
joint integrity, grease, and heavy root intrusion must be?
A. Promoted D. Inspected
B. Patched E. Removed
C. Constantly monitored and repaired F. None of the Above
246. Technology has improved __________________ with such tools as television camera
assisted line inspection equipment, jet-cleaning trucks, and improvements in pump design.
A. Wastewater collection system D. Collection system maintenance
B. Sewer systems E. The space shuttle
C. Combined sewers F. None of the Above
248. Collection system operators are charged with __________________ and the environment,
and therefore must have documented proof of their certifications in the respective wastewater
management systems.
A. Protecting public health D. Inspecting
B. Making arrests E. Debt
C. Smoking out F. None of the Above
44
Sewer and Septic Construction Assignment 4/1/2018 TLC
249. These professionals ensure that the system pipes remain clear and open. They eliminate
obstructions and are constantly striving to ___________________________. They keep the
wastewater moving underground, unseen and unheard.
A. Find problems D. Inspect equipment
B. Create problems E. Hide from the public
C. Improve flow characteristics F. None of the Above
Sewer Main
251. In a centralized __________________, the sewer to which sewer connections are made
from individual residences.
A. Sewer pipe D. Manhole
B. Wastewater treatment system E. Building
C. Combined sewer F. None of the Above
Trunk Lines
252. Sewer pipes measuring more than 12 inches in diameter and having a capacity of 1 to 10
million gallons per day. Trunk lines connect smaller sewer pipes, or ___________________, to
the largest transport pipes or interceptors.
A. Manholes D. Services
B. Wastewater treatment system E. Collectors
C. Combined sewers F. None of the Above
Collectors
253. Small ___________________ measuring twelve inches or less in diameter.
A. Manholes D. Inspection equipment
B. Services E. Sewer pipes
C. Combined sewers F. None of the Above
255. The requirements will help communities improve some of our Nation’s most valuable
infrastructure –our wastewater collection systems–by requiring facilities to develop and
implement new capacity, management, operation, and maintenance programs and?
A. POTW's D. NPDES
B. CWA E. OSHA
C. EPA F. None of the Above
45
Sewer and Septic Construction Assignment 4/1/2018 TLC
256. The 19,000 systems covered by this rule include 4,800 municipal satellite collection
systems which will be directly regulated under the ___________________for the first time.
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
258. The law gave ___________________the authority to set effluent standards on an industry
basis and continued the requirements to set water quality standards for all contaminants in
surface waters.
A. POTW's D. NPDES
B. OSHA E. CWA
C. EPA F. None of the Above
259. The CWA makes it unlawful for any person to discharge any pollutant from a point source
into navigable waters unless a permit (___________________) is obtained under the Act.
A. POTW's D. NPDES
B. OSHA E. CWA
C. EPA F. None of the Above
260. The 1977 amendments focused on toxic pollutants. In 1987, the ___________________
was reauthorized and again focused on toxic substances, authorized citizen suit provisions, and
funded sewage treatment plants (POTW's) under the Construction Grants Program.
A. POTW's D. NPDES
B. Law E. CWA
C. EPA F. None of the Above
261. The CWA provisions for the delegation by the ___________________ of many permitting,
administrative, and enforcement aspects of the law to state governments. In states with the
authority to implement CWA programs, the EPA still retains oversight responsibilities.
A. POTW's D. NPDES
B. OSHA E. CWA
C. EPA F. None of the Above
262. In 1972, ___________________ enacted the first comprehensive national clean water
legislation in response to growing public concern for serious and widespread water pollution.
A. POTW's D. NPDES
B. OSHA E. CWA
C. EPA F. None of the Above
46
Sewer and Septic Construction Assignment 4/1/2018 TLC
263. Which of the following terms - is the primary federal law that protects our nation’s waters,
including lakes, rivers, aquifers, and coastal areas. Lake Erie was dying?
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
264. Which of the following terms - primary objective is to restore and maintain the integrity of
the nation's waters?
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
265. Which of the following terms - focuses on improving the quality of the nation’s waters. It
provides a comprehensive framework of standards, technical tools and financial assistance?
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
266. Which of the following terms - requires major industries to meet performance standards to
ensure pollution control; charges states and tribes with setting specific water quality criteria
appropriate for their waters?
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
267. Which of the following terms - provides funding to states and communities to help them
meet their clean water infrastructure needs?
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
268. After 25 years, the ___________________continues to provide a clear path for clean
water, and a solid foundation for an effective national water program.
A. POTW's D. NPDES
B. Law E. CWA or Act
C. EPA F. None of the Above
In 1972
269. Only a third of the ___________________were safe for fishing and swimming. Wetlands
losses were estimated at about 460,000 acres annually.
A. Nitrogen levels D. Lakes and Rivers
B. Phosphorus and nitrogen E. Fish
C. Wetlands F. None of the Above
270. Agricultural runoff resulted in the erosion of 2.25 billion tons of soil and the deposit of large
amounts of _____________________into many waters. Sewage treatment plants served only
85 million people.
A. Nitrogen levels D. Lakes and Rivers
B. Phosphorus and nitrogen E. Fish
C. Wetlands F. None of the Above
47
Sewer and Septic Construction Assignment 4/1/2018 TLC
Today
271. Two-thirds of the nation's waters are safe for fishing and swimming. The rate of annual
wetlands _____________________is estimated at about 70,000-90,000 acres according to
recent studies.
A. Nitrogen levels D. And lakes l
B. Losses E. Including fish
C. Replenishment F. None of the Above
272. The amount of soil lost due to ______________________ has been cut by one billion tons
annually, and phosphorus and nitrogen levels in water sources are down. Modern wastewater
treatment facilities serve 173 million people.
A. Nitrogen levels D. Losses
B. Agricultural runoff E. Pollution
C. Dust F. None of the Above
The Future
273. All Americans will enjoy clean water that is safe for ________________________. We will
achieve a net gain of wetlands by preventing additional losses and restoring hundreds of
thousands of acres of wetlands.
A. Fishing and swimming D. Drinking
B. Hunting and Camping E. Birds
C. Preservation F. None of the Above
274. Soil erosion and runoff of phosphorus and nitrogen into watersheds will be minimized,
helping to sustain the nation's farming?
A. Nitrogen levels D. Additional losses
B. Economy and aquatic systems E. Discharges
C. Wetlands F. None of the Above
276. More than 40,000 sanitary sewage overflows _______________________ occur every
year, causing huge monetary losses, damage to fish/shellfish beds, polluting groundwater, and
decreased tourism.
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
277. Which of the following terms - release raw sewage from the collection system before it
can reach a treatment facility?
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
48
Sewer and Septic Construction Assignment 4/1/2018 TLC
278. Sewage _______________________, into businesses and homes, and eventually ends
up in local waterways.
A. OSSF D. Clean Water Act
B. CMOM or MOM E. Is not harmful
C. Infiltration and Inflow (I/I) F. None of the Above
280. Cities have used a wide variety of building materials, designs, and installation techniques,
which aren’t _______________________to withstand heavy, continuous use.
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
281. Problems can be especially bad where an older system is attached to a new system or an
older system has?
A. OSSF D. Problems
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
282. Which of the following terms - is a release of untreated wastewater before the flow
reaches a treatment plant. SSOs pose a significant threat to public health and water quality.
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
The term or means or and is only here to help you in answering the question. Not a trick
Municipality Self-Assessment
283. Under the MOM Programs Project, Region 4 invites municipalities to undertake a detailed
self-assessment of their _______________________programs.
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
284. The municipalities submit this self-assessment along with recommendations for
improvements to the _______________________ programs and/or remedial measures to
correct sewer infrastructure problems.
A. OSSF D. Clean Water Act
B. SSOs E. CMOM or MOM
C. Infiltration and Inflow (I/I) F. None of the Above
49
Sewer and Septic Construction Assignment 4/1/2018 TLC
285. In consideration for undertaking the self-assessment, the municipality is able to establish
its own reasonable goals and schedules, and the Region may use its discretion to significantly
reduce penalties related to?
A. OSSF D. Clean Water Act
B. CMOM or MOM E. SSOs
C. Infiltration and Inflow (I/I) F. None of the Above
286. Where an enforcement action is necessary, the Region works with the municipality to
identify necessary _______________________and to establish schedules. The Region will
likely defer any penalty decision until after the completion of the necessary improvements.
A. OSSF D. Clean Water Act
B. Permits E. Maintenance
C. Infiltration and Inflow (I/I) F. None of the Above
Project Initiation
287. In 1998, Region 4 began the _______________________Programs Project by identifying
priority watersheds and geographical areas in each of the eight States in the Region.
A. OSSF D. Clean Water Act
B. SSOs E. CMOM or MOM
C. Infiltration and Inflow (I/I) F. None of the Above
288. These included areas where _______________________ could cause significant public
health concerns, such as beaches, shellfish harvesting areas and drinking water supplies. In
addition, watersheds already listed as impaired by collection system overflows or bacterial
contamination were identified.
A. OSSF D. Clean Water Act
B. SSOs E. CMOM or MOM
C. Infiltration and Inflow (I/I) F. None of the Above
291. Which of the following terms - can also occur when excess waters from roof drains,
broken pipes and bad connections at sewer service lines infiltrates the sanitary sewer?
A. Sanitary Sewer Overflows (SSOs) D. Inflow
B. Line/main breaks E. Leaks
C. Infiltration and Inflow (I/I) F. None of the Above
50
Sewer and Septic Construction Assignment 4/1/2018 TLC
Structural Failures
292. Which of the following terms - are a major result of structural failure. Undersized systems
do not have large enough pumps or lines to carry all the sewage generated by the buildings
attached to them. This is especially true for new subdivisions or commercial areas.
A. Sanitary Sewer Overflows (SSOs) D. Inflow
B. Line/main breaks E. Leaks
C. Infiltration and Inflow (I/I) F. None of the Above
295. Which of the following terms - can release untreated sewage into basements or out of
manholes and onto city streets, playgrounds, and into streams before it can reach a treatment
facility.
A. Sanitary Sewer Overflows (SSOs) D. Inflow
B. Line/main breaks E. Leaks
C. Infiltration and Inflow (I/I) F. None of the Above
The term or means or and is only here to help you in answering the question. Not a
trick.
296. Which of the following terms - are often caused by blockages and breaks in the sewer
lines?
A. Sanitary Sewer Overflows (SSOs) D. Inflow
B. Line/main breaks E. Leaks
C. Infiltration and Inflow (I/I) F. None of the Above
51
Sewer and Septic Construction Assignment 4/1/2018 TLC
Problems that Can Cause Chronic SSOs Include:
299. Infiltration and Inflow (I&I): too much rainfall or snowmelt infiltrating through the ground
into leaky sanitary sewers not designed to hold rainfall or to drain property, and excess water
inflowing through roof drains connected to sewers, broken pipes, and?
A. Break or collapse D. Badly connected sewer service lines
B. Infiltration and inflow E. Carry sewage
C. Inflow F. None of the Above
300. Undersized Systems: Sewers and pumps are too small to _____________________ from
newly-developed subdivisions or commercial areas.
A. Break or collapse D. Badly connected sewer service lines
B. Infiltration and inflow E. Carry sewage
C. Inflow F. None of the Above
301. Pipe Failures: blocked, broken or cracked pipes, tree roots grow into the sewer, sections
of pipe settle or shift so that pipe joints no longer match, and sediment and other material builds
up causing pipes to?
A. Break or collapse D. Badly connected sewer service lines
B. Infiltration and inflow E. Carry sewage
C. Inflow F. None of the Above
305. Many municipalities have asked for national consistency in the way permits are
considered for wastewater discharges, including ___________________________, and in
enforcement of the law prohibiting unpermitted discharges.
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
52
Sewer and Septic Construction Assignment 4/1/2018 TLC
306. This SSO Federal Advisory Subcommittee examines the need for national consistency in
permitting and enforcement, effective sewer operation and maintenance principles, public
notification for ___________________________ with potential health or environmental dangers,
and other public policy issues.
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
307. The EPA carefully considers the Subcommittee's recommendations for regulatory and
nonregulatory actions to reduce ___________________________ nationally.
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
53
Sewer and Septic Construction Assignment 4/1/2018 TLC
313. Which of the following terms - are designed to overflow occasionally and discharge
excess wastewater directly to nearby streams, rivers, or other water bodies?
A. Combined Sewer Overflows D. Sanitary Sewer systems
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
314. These overflows, called ___________________________contain not only storm water but
also untreated human and industrial waste, toxic materials, and debris.
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
315. They are a major water pollution concern for the approximately 772 cities in the U.S. that
have combined sewer systems. ___________________________may be thought of as a type
of "urban wet weather" discharge.
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
316. Which of the following terms - and storm water discharges, they are discharges from a
municipality's wastewater conveyance infrastructure that are caused by precipitation events
such as rainfall or heavy snowmelt?
A. Combined Sewer Overflows D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
317. The Policy provides guidance on how communities with combined sewer systems can
meet Clean Water Act goals in as flexible and cost-effective a manner as possible. EPA's
Report to Congress on implementation of the ___________________________Control Policy
assesses the progress made by EPA, states, and municipalities in implementing and enforcing
the CSO Control Policy.
A. Combined Sewer Overflows or (CSOs) D. Sanitary Sewer Overflows (SSOs)
B. Infiltration and inflow E. Maintenance activities
C. Inflow F. None of the Above
Purposeful
319. When MOM programs are present and __________________, they support customer
service and protect system assets, public health, and water quality.
A. Maintenance activities D. Goals
B. POTW E. Properly maintained
C. MOM F. None of the Above
54
Sewer and Septic Construction Assignment 4/1/2018 TLC
Goal-Oriented
320. Which of the following terms - programs have goals directed toward their individual
purposes. Progress toward these goals is measurable, and the goals are attainable.
A. Maintenance activities D. Goals
B. POTW E. Properly maintained
C. MOM F. None of the Above
324. Sewer _______________________to reduce or eliminate SSOs can be expensive, but the
cost must be weighed against the value of the collection system asset and the added costs if
this asset is allowed to further deteriorate.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Evaluation
C. Sanitary sewer collection systems F. None of the Above
325. Ongoing maintenance and _____________ adds value to the original investment by
maintaining the system's capacity and extending its life.
A. Rehabilitation D. Performance measures
B. SSOs E. Evaluation
C. Sanitary sewer collection systems F. None of the Above
326. The costs of rehabilitation and other measures to correct _____________ can vary widely
by community size and sewer system type.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Evaluation
C. Sanitary sewer collection systems F. None of the Above
55
Sewer and Septic Construction Assignment 4/1/2018 TLC
Overflow Response Plan
327. The overflow response plan should be designed provide a quick response to?
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Evaluation
C. Sanitary sewer collection systems F. None of the Above
329. Performance measures and indicators are important in evaluating collection system
performance and ____________________________, operation and maintenance programs.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Implementing capacity management
C. Sanitary sewer collection systems F. None of the Above
Communication/Notification
330. If an ____________________________ occurs, sanitary sewer facilities will be required to
immediately notify the NPDES permit authority.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Record keeping provisions
C. Sanitary sewer collection systems F. None of the Above
331. Facilities must post locations of recurrent _____________ and let the public know that the
annual report is available to them.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Record keeping provisions
C. Sanitary sewer collection systems F. None of the Above
332. The ____________________________ mandate that facilities must maintain records for
three years about all overflows, complaints, work orders on the system, and implementation
measures.
A. Rehabilitation or Upgrading sewer D. Performance measures
B. SSOs E. Record keeping provisions
C. Sanitary sewer collection systems F. None of the Above
56
Sewer and Septic Construction Assignment 4/1/2018 TLC
335. Investigate the causes of ____________________________ and take corrective
measures.
A. Inspection schedule D. Performance measures
B. SSOs E. Record keeping provisions
C. Hydraulic (capacity) F. None of the Above
Continuous Training
339. Which of the following terms - for emergency response plans should be understood and
practiced by all personnel in order to ensure safety of the public and the collection system
personnel responding?
A. Inspection schedule D. Procedures
B. SSOs E. Appropriate responses
C. Skill of the responding crews F. None of the Above
340. Which of the following terms - should be specific to the type of emergency that could
occur?
A. Inspection schedule D. Procedures
B. SSOs E. Appropriate responses
C. Skill of the responding crews F. None of the Above
341. The ability to deal with emergencies depends on the knowledge and _______________, in
addition to availability of equipment.
A. Inspection schedule D. Procedures
B. SSOs E. Appropriate responses
C. Skill of the responding crews F. None of the Above
342. The crew should be able to _____________________ in the field under stress and select
the right equipment needed to correct the problem.
A. Routine preventative operations D. Rapidly diagnose problems
B. Procedures E. Be utilized to perform
C. Exceed the capacity of staff F. None of the Above
57
Sewer and Septic Construction Assignment 4/1/2018 TLC
343. If resources are limited, consideration should be given to contracting other departments or
private industries to respond to some emergency situations, for example, those rare
emergencies that would?
A. Routine preventative operations D. Rapidly diagnose problems
B. Procedures E. Be utilized to perform
C. Exceed the capacity of staff F. None of the Above
346. Which of the following terms - including cleaning and removing roots from small and large
diameter lines?
A. Routine preventative operations D. Rapidly diagnose problems
B. Procedures E. Routine operations and maintenance activities
C. Exceed the capacity of staff F. None of the Above
347. Closed-circuit television (CCTV) is used to assess the condition of the sewers. There are
four types of activities that the system or a CCTV contractor can also perform: 1) inspect new
work, 2) inspect condition of older portions of the wastewater collection system, 3) routine
inspection of approximately 10% of the wastewater collection, and 4) _____________________
to determine the cause of selected overflow events. Manhole inspection, manhole coating (to
prevent concrete deterioration) and manhole painting (for roach control) are also routinely
performed.
A. Routine preventative operations D. Routine operations and maintenance activities
B. Damage your system E. Necessary process
C. Problem identification F. None of the Above
348. Sewer filled with grass will ________________________, pumps, and upset the
wastewater treatment system. Require your industrial users like golf courses to install grass,
grease, and sand/oil interceptors.
A. Routine preventative operations D. Routine operations and maintenance activities
B. Damage your system E. Necessary process
C. Problem identification F. None of the Above
349. Certain compounds and undesirable solids, like grease and grass clippings, can disturb
this delicate balance and ________________________ at the wastewater treatment facility.
A. Routine preventative operations D. Routine operations and maintenance activities
B. Damage your system E. Necessary process
C. Problem identification F. None of the Above
58
Sewer and Septic Construction Assignment 4/1/2018 TLC
350. There are compounds and mixtures that should never be introduced into a?
A. Stormwater Program D. Permit conditions
B. Sanitary sewer system E. NPDES
C. WET F. None of the Above
352. Which of the following terms - permits regulate the discharges from publicly owned
wastewater treatment facilities, other wastewater treatment facilities?
A. Stormwater Program D. Permit conditions
B. Sanitary sewer system E. NPDES
C. WET F. None of the Above
353. The ________________________ program also regulates wet weather discharges such
as stormwater discharges from industrial activities (e.g. factory stormwater runoff) and municipal
stormwater discharges including urban storm-water runoff, combined sewer overflows, and
storm sewer overflows.
A. Stormwater Program D. Permit conditions
B. Sanitary sewer system E. NPDES
C. WET F. None of the Above
354. Which of the following terms - permits are developed to ensure that such discharges to
receiving waters are protective of human health and the environment?
A. Stormwater Program D. Permit conditions
B. Sanitary sewer system E. NPDES
C. WET F. None of the Above
Wastewater Collection
356. A very economical and quick method of determining if a new sewer line is straight and
unobstructed is called “_______________________” and can be done with a mirror and a bright
source of light, for example a headlight at night or Sunlight.
A. Flamer D. Candling
B. Lamping E. Lighting
C. Natural lighting F. None of the Above
59
Sewer and Septic Construction Assignment 4/1/2018 TLC
357. Which of the following terms - coupled with a good cleaning program can be a highly
effective maintenance tool.
A. Gravity-flow D. Video inspection
B. Lamping E. Taste testing
C. Natural elevation F. None of the Above
358. Which of the following terms - your lines, restrictions caused by debris, roots and grease
buildup can be prevented?
A. Video inspection D. Bucketing
B. By cleaning and root sawing E. Rodding
C. Gravity-flow sanitary sewers F. None of the Above
359. Sewage collection systems that have video inspection closed circuit television (CCTV) and
cleaning programs, _______________________in the number of emergency calls because the
system was cleaned and potential trouble spots were located prior to problems occurring.
A. Video inspection D. Bucketing
B. By cleaning and root sawing E. Rodding
C. Gravity-flow sanitary sewers F. None of the Above
360. Sanitary sewers are designed to transport the wastewater by utilizing the potential energy
provided by the _______________________ of the earth resulting in a downstream flow.
A. Gravity-flow D. Video inspection
B. Lamping E. Taste testing
C. Natural elevation F. None of the Above
361. This energy, if not designed properly, can cause losses due to free falls, _____________,
and sharp bends.
A. Designed to follow the topography of the land
B. Dissipate excess potential energy
C. Turbulent junctions
D. Population served, density of population, and water consumption
E. Based on the quantity of wastewater to be transported
F. None of the Above
60
Sewer and Septic Construction Assignment 4/1/2018 TLC
364. Design flows are?
A. Designed to follow the topography of the land
B. Dissipate excess potential energy
C. Maintain proper flow velocities with minimum head loss
D. Population served, density of population, and water consumption
E. Based on the quantity of wastewater to be transported
F. None of the Above
369. Most of the time the flow surface is exposed to the atmosphere within the sewer and it
functions as an open channel. At extreme peak flows the wastewater will?
A. Surcharge back into the manholes
B. Evaluate the capacity
C. Protect the health of the customers we serve
D. Population served, density of population, and water consumption
E. Understanding of flow velocities
F. None of the Above
61
Sewer and Septic Construction Assignment 4/1/2018 TLC
370. In order to design a sewer system, many factors are considered. The purpose of this topic
is to aid in the ____________________and design depths of flow.
A. Surcharge back into the manholes
B. Evaluate the capacity
C. Protect the health of the customers we serve
D. Understanding of flow velocities
E. None of the Above
371. The ultimate goal for our industry is to____________________. This is achieved by
prevention of sewer manhole overflows.
A. Surcharge back into the manholes
B. Evaluate the capacity
C. Protect the health of the customers we serve
D. Population served, density of population, and water consumption
E. Understanding of flow velocities
F. None of the Above
373. The ____________________builds upon ongoing activities and the everyday preventive
maintenance that takes place in a system.
A. General inspection D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Continuously update
C. Capacity evaluation program F. None of the Above
374. The system then undergoes general inspection which serves to ____and add to the
inventory information.
A. General inspection D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Continuously update
C. Capacity evaluation program F. None of the Above
Capacity Limitations
375. The next step in the ____________________is to identify the location of wet weather
related SSOs, surcharged lines, basement backups, and any other areas of known capacity
limitations.
A. General inspection D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Continuously update
C. Capacity evaluation F. None of the Above
62
Sewer and Septic Construction Assignment 4/1/2018 TLC
376. These areas warrant further investigation in the form of ____________________and
inspection procedures to identify and quantify the problem.
A. General inspection D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Continuously update
C. Capacity evaluation program F. None of the Above
377. The reviewer should determine that the capacity evaluation includes an estimate peak
flows experienced in the system, an estimate of the ____________________ components, and
identifies the major sources of I/I that contribute to hydraulic overloading events.
A. Alleviate capacity limitations D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Options or alternatives
C. Capacity of key system F. None of the Above
378. The capacity evaluation should also make use of a hydraulic model. This model will help
identify areas that need to?
A. Alleviate capacity limitations D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Options or alternatives
C. Capacity of key system F. None of the Above
380. A sewer inspection is an important part of a sewer system capacity evaluation and
determining your?
A. Alleviate capacity limitations D. Address hydraulic deficiencies
B. Flow and rainfall monitoring E. Options or alternatives
C. Capacity of key system F. None of the Above
Flow Monitoring
381. Fundamental information about the collection system is obtained by?
A. Flow monitoring D. Temporary monitoring
B. Records of each inspection E. Base flow
C. Discharge point F. None of the Above
382. Which of the following terms - provides information on dry weather flows as well as areas
of the collection system potentially affected by I/I.
A. Flow monitoring D. Temporary monitoring
B. Records of each inspection E. Base flow
C. Discharge point F. None of the Above
383. Which of the following terms - may also be performed for billing purposes, to assess the
need for new sewers in a certain area, or to calibrate a model?
A. Flow monitoring D. Temporary monitoring
B. Records of each inspection E. Base flow
C. Discharge point F. None of the Above
63
Sewer and Septic Construction Assignment 4/1/2018 TLC
384. Permanent installations are done at key points in the collection system such as the
_________ of a satellite collection system, pump stations, and key junctions.
A. Flow monitoring D. Temporary monitoring
B. Records of each inspection E. Base flow
C. Discharge point F. None of the Above
385. Which of the following terms - consists of flow meters typically installed for 30-90 days?
A. Flow monitoring D. Temporary monitoring
B. Records of each inspection E. Base flow
C. Discharge point F. None of the Above
Sewer Cleaning
386. The purpose of ______________________is to remove accumulated material from the
sewer.
A. Preventing blockages D. Scraping
B. Lamping E. Rodding
C. Sewer cleaning F. None of the Above
387. Which of the following terms - helps to prevent blockages and is also used to prepare the
sewer for inspections.
A. Prevent blockages D. Scraping
B. Identify E. Rodding
C. Cleaning F. None of the Above
388. Stoppages in gravity sewers are usually caused by a structural defect, poor design, poor
construction, an ______________________, or root intrusion.
A. Prevent blockages D. Scraping
B. Identify E. Rodding
C. Sewer cleaning F. None of the Above
391. Hydraulic ______________________ refers to any application of water to clean the pipe.
A. Preventing blockages D. Scraping
B. Lamping E. Rodding
C. Cleaning F. None of the Above
64
Sewer and Septic Construction Assignment 4/1/2018 TLC
392. Mechanical ___________________ uses physical devices to scrape, cut, or pull material
from the sewer.
A. Preventing blockages D. Scraping
B. Lamping E. Rodding
C. Cleaning F. None of the Above
393. Chemical cleaning can ___________________ the control of odors, grease buildup, root
growth, corrosion, and insect and rodent infestation.
A. Prevent blockages D. Identify
B. Recordkeeping E. Facilitate
C. Identified F. None of the Above
396. Potential problem areas ___________________ should include those due to grease or
industrial discharges, hydraulic bottlenecks in the collection system, areas of poor design (e.g.,
insufficiently sloped sewers), areas prone to root intrusion, sags, and displacements.
A. Prevent blockages D. Cleaning
B. Recordkeeping E. Facilitate
C. Identified F. None of the Above
397. The connection between problem areas in the collection system and the preventive
maintenance _________________ schedule should be clear.
A. Prevent blockages D. Cleaning
B. Stoppages E. Facilitate
C. Identified F. None of the Above
398. The owner or operator should also be able to identify the number of ________________
experienced per mile of sewer pipe.
A. Prevent blockages D. Cleaning
B. Stoppages E. Facilitate
C. Identified F. None of the Above
65
Sewer and Septic Construction Assignment 4/1/2018 TLC
400. Which of the following terms - occurs when surface water such as storm water enters the
sewer system through roof downspout connections, holes in manhole covers, illegal plumbing
connections, or other defects?
A. Inflow D. Sewer odors
B. Infiltration E. Leaks
C. I/I F. None of the Above
66
Sewer and Septic Construction Assignment 4/1/2018 TLC