Remove Oil Pump and Relief Valve

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWE...

Page 1 of 5

Shutdown SIS

Previous Screen

Product: TRACK-TYPE TRACTOR


Model: D3C TRACK-TYPE TRACTOR 1PJ00578
Configuration: D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWERED BY 3204 ENGINE

Disassembly and Assembly


3204 VEHICULAR ENGINES
Media Number -SENR3230-00 Publication Date -01/10/1985 Date Updated -30/11/2001

Oil Pump And Relief Valve


SMCS - 1304-011; 1304-012

Remove Oil Pump And Relief Valve


START BY:

a. remove timing gear cover

1. Remove the bolt and retainer (1) that hold guide (2) for the relief valve. Remove guide (2), the
spring and the plunger from the timing gear cover.

2. Remove bolts (3) and oil pump cover (4).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/m... 9/9/2019
D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWE... Page 2 of 5

3. Remove inner rotor (5) and outer rotor (6) from the timing gear cover.

4. Remove bearing (7) and shaft (8) from the timing gear cover if a replacement is necessary.

Install Oil Pump And Relief Valve

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/m... 9/9/2019
D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWE... Page 3 of 5

1. Install shaft (2) in the timing gear cover until dimension (Y) is 21.84 ± 0.25 mm (.860 ± .010 in.).

2. Use tooling (B) to install bearing (1) in the timing gear cover until dimension (X) is 8.74 ± 0.25
mm (.344 ± .010 in.). Also, the bearing joint must be located 45° ± 30° from centerline (Z).

3. After installation of the bearing in the timing gear cover, check the inside diameter. The inside
diameter (W) of the bearing must be 71.22 ± 0.05 (2.804 ± .002 in.).

NOTICE

When the outer and inner rotors are replaced, they must be replaced
as a set.

4. Install outer rotor (4) and inner rotor (3) in the timing gear cover.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/m... 9/9/2019
D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWE... Page 4 of 5

5. Check the clearance between the inner and outer rotors with feeler gauge (5) as shown. The
clearance must be 0.05 to 0.20 mm (.002 to .008 in.). The maximum permissible clearance must not
be more than 0.28 mm (.011 in.).

6. Put cover (6) in position on the timing gear cover, and install the bolts that hold it in place.

7. Check the oil pump end clearance with feeler gauge (5). The maximum permissible end clearance
must not be more than 0.120 mm (.0047 in.). If the end clearance is more, replace the inner and outer
rotors as a set.

8. Install plunger (9), spring (8) and guide (7) in the timing gear cover. Use tooling (C) to tighten
guide (7) to a torque of 41 ± 7 N·m (30 ± 5 lb.ft.).

9. Install the retainer and bolt that holds the guide in the timing gear cover.

END BY:

a. install timing gear cover

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/m... 9/9/2019
D3C AND D3C LGP TRACTORS / POWERSHIFT / 1PJ00001-UP (MACHINE) POWE... Page 5 of 5

Copyright 1993 - 2019 Caterpillar Inc. Mon Sep 9 01:09:13 UTC+0700 2019
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/m... 9/9/2019

You might also like