At a glance
Powered by AI
The key steps presented are to calculate the discharge, diameter of pipe, pressure loss, and pressure required at the remotest point for sprinkler system design.

The steps presented are to calculate the discharge for the hazard level, convert the discharge to diameter of pipe, calculate the pump head required including static head and height of building, and calculate the pressure loss through the pipes.

The total head required is determined by the minimum pressure at the sprinkler, static head/height of building, and pressure loss through the pipes and fittings.

To find Discharge 'Q' for ORDINARY HAZARD LPM

Q= K x Sqrt of P Discharge
K= 80 K - Factor Deponds on the bulb which you are selecting
P= 0.35 Kg/CM2 Pressure
Q= 47.3286382648 LPM For one sprinkler

We have to cosider for max water demand i.e, 16/18


sprinkler

Actual discharge for 16 sprinkler


16 x Q

Q= 2727.55 LPM For 12 sprinklers

To find diametre of the pipe the Q" sall be in M3

Q= LPM /( 60 *1000) M3 /sec

45.459228297
Q= 0.0454592283 M3 /s
Q= AxV
A= 3.14 x D2 / 4 M2 Area
V= 2.5 M/Sec Medium velocity

Q (3.14/D)2/4 x V
D Sqrt ((4 x Q ) / (3.14 x V M Diametre

To convert M to MM D x 1000 MM

0.1818369132
7.85
0.023163938
0.1521970367 M
D= 152.197036718 MM

To find a Pressure Loss P"

6.05 X 105
X L X
Q1.85

p= C1.85 X d4.87 Bar

p = loss of pressure per meter length of pipe (bar)


Q = flow rate through the pipe (in LPM) 2727.554
d = mean bore of the pipe (in MM) 152.197
C = a constant for the type and condition of pipe 120
L = equivalent length of pipe and fittings (in M) 600 AS per the Drawing

The following values shall be used for ‘C’ in sprinkler installations for
calculation purpose:
cast iron = 100
mild steel = 120
galvanized steel = 120

605000
7022.3958231677
42493076812.2586
298403205119950
0.000000002
1.21647486947764E-06
2270809.08119068
2.7623821807 Bar Pressure

To find a Pump Head MWC

Pressure loss through pipes + minimum pressure at sprinkler + static head


Mininum pressure at
sprinkler 0.35 Kg/CM2 For Ordinary Hazard
Static head 3.5 Height of the Building
Total Head 6.6123821807 Bar 10 m = 1 Kg/CM2
66.1238218065 MWC `
55 - 100 hydrants
To find Discharge 'Q' for ORDINARY HAZARD LPM
Pressure required at
remotest point 3.59 Kg/CM2 Pressure
Q= 273 M /HR
3
Discharge
273000
60 Min
Q= 4550 LPM

To find a Pressure Loss P"

6.05 X 105
X L X
Q1.85

p= C1.85 X d4.87 Bar

p = loss of pressure per meter length of pipe (bar)


Q = flow rate through the pipe (in LPM) 4550
d = mean bore of the pipe (in MM) 200 To Find Reff Sprinkler
C = a constant for the type and condition of pipe 120
L = equivalent length of pipe and fittings (in M) 600 AS per the Drawing

The following values shall be used for ‘C’ in sprinkler installations for
calculation purpose:
cast iron = 100
mild steel = 120
galvanized steel = 120

605000
7022.3958231677
160700074789.647
1128499533985554
5.36110101759018E-10
3.21666061055411E-07
5852225.92653312
1.8824624622 Bar Pressure

To find a Pump Head MWC

head shall be 3.5 bar + pressure loss through the pipes / fittings / valves etc.
+ Static head
Pressure required at
remotest point 3.59 Kg/CM2 For Ordinary Hazard
Static head 5 Kg/CM3 Height of the Building
Total Head 10.4724624622 Bar 10 m = 1 Kg/CM2
104.7246246219 MWC
20 - 55 hydrants
To find Discharge 'Q' for ORDINARY HAZARD LPM
Pressure required at
remotest point 3.5 Kg/CM2 Pressure
Q= 171 M /HR
3
Discharge
171000
60 Min
Q= 2850 LPM

To find a Pressure Loss P"

6.05 X 105
X L X
Q1.85

p= C1.85 X d4.87 Bar

p = loss of pressure per meter length of pipe (bar)


Q = flow rate through the pipe (in LPM) 2850
d = mean bore of the pipe (in MM) 200 To Find Reff Sprinkler
C = a constant for the type and condition of pipe 120
L = equivalent length of pipe and fittings (in M) 600 AS per the Drawing

The following values shall be used for ‘C’ in sprinkler installations for
calculation purpose:
cast iron = 100
mild steel = 120
galvanized steel = 120

605000
7022.3958231677
160700074789.647
1128499533985554
5.36110101759018E-10
3.21666061055411E-07
2462991.94214443
0.7922609164 Bar Pressure

To find a Pump Head MWC

head shall be 3.5 bar + pressure loss through the pipes / fittings / valves etc.
Pressure required at
remotest point 3.5 Kg/CM2 For Ordinary Hazard
Static head 5 Kg/CM3 Height of the Building
Total Head 9.2922609164 Bar 10 m = 1 Kg/CM2
92.9226091644 MWC
Up to 100 hydrants
To find Discharge 'Q' for ORDINARY HAZARD LPM
Pressure required at
remotest point 3.5 Kg/CM2 Pressure
Q= 137 M /HR 3
Discharge
137000
60 Min
Q= 2283.3333333333 LPM

To find a Pressure Loss P"

6.05 X 105
X L X
Q1.85

p= C1.85 X d4.87 Bar

p = loss of pressure per meter length of pipe (bar)


Q = flow rate through the pipe (in LPM) 2283.333
d = mean bore of the pipe (in MM) 200 To Find Reff Sprinkler
C = a constant for the type and condition of pipe 120
L = equivalent length of pipe and fittings (in M) 600 AS per the Drawing

The following values shall be used for ‘C’ in sprinkler installations for
calculation purpose:
cast iron = 100
mild steel = 120
galvanized steel = 120

605000
7022.3958231677
160700074789.647
1128499533985554
5.36110101759018E-10
3.21666061055411E-07
1634380.74083836
0.5257248152 Bar Pressure

To find a Pump Head MWC

head shall be 3.5 bar + pressure loss through the pipes / fittings / valves etc.
Pressure required at
remotest point 3.5 Kg/CM2 For Ordinary Hazard
Static head 5 Kg/CM3 Height of the Building
Total Head 9.0257248152 Bar 10 m = 1 Kg/CM2
90.2572481517 MWC