Daily Work Report - Structural Concrete: Date
Daily Work Report - Structural Concrete: Date
Daily Work Report - Structural Concrete: Date
(06/08)
Metric DAILY WORK REPORT - STRUCTURAL CONCRETE
English
JOB STAMP Date:
Day of Week: S M T W T F S
AM PM
Weather
CONTRACTOR WORK HOURS: TO Temperature ° C ° C
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Engineer-in-Charge
Reviewed by: Date Reviewed:
Resident Engineer
MURK 1-1 CONTINUATION attached for additional narrative. MURK 1-2 CONTINUATION attached for additional pay items & quantities.
Print Form
MURK 5 REVERSE (06/08)
CONCRETE SPECIFICATIONS
SLUMP AIR CONTENT TEMP (° C)
CLASS MIN MAX MIN MAX MIN MAX
NOTES: MAKE ENTRIES FOR (1) Truck Mix only (2) Truck Mix and Central Mix Only (3) Truck Mix and Transit Mix Only (4) Transit Mix Only
LABOR EQUIPMENT
CLASSIFICATION OP 1 OP 2 OP 3 OP 4 TYPE ID # OP 1 OP 2 OP 3 OP 4
FOREPERSON
LABORER
EQUIP. OPERATOR
TRUCK DRIVERS
IRONWORKERS
CARPENTERS
MASONS
OWN./OPERATORS
OP 1: OP 2: OP 3: OP 4:
Print Form