Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Job Components Values

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Job Components Values

Direct labor hours 55


Machine hours 50
Amount of materials in peso 5,600
Average direct labor rate per hour 60
Predetermined overhead rate per direct labor hour 10.5

Direct Labor 3,300


Applied Overhead 577.5
Total cost of the job 9,477.50
Activity Centers Costs Activity Drivers

Utilities 300,000 30,000

Scheduling and set up 280,000 400

Material Handling 750,000 1,200,000

Product A Product B Product C

Prime costs 110,000 120,000 130,000

Machine hours 35,000 15,000 25,000

Number of setups 160 680 390

Pounds of materials 300,000 400,000 200,000

Number of units 65,000 40,000 70,000


produced

Direct Labor hours 40,000 35,000 45,000

Product A Product B Product C


Utilities:
A 350,000
B 150,000
C 250,000

Scheduling & Setups:


A 112,000
B 476,000
C 273,000

Material Handling:
A 201,000
B 268,000
C 134,000

TOTAL 663,000 894,000 657,000


Activity Centers Pool rates

Utilities 10

Scheduling & setup 700

Materials handling 0.67

TOTAL

750,000

861,000

603,000
2,214,000
Sparkle Watches

Annual production 4,000

Annual demand 4000

Set-up cost per batch 800

Annual storage cost per unit 0.10

Economic batch quantity 126


Number of batches per annum 32
Interval between two (2) consecutive optimum runs 0.38
Date Quantity in quintal Distance in km Total quintal-km
December 10, 201C 40 170 6,800
December 15, 201C 30 120 3,600
December 21, 201C 25 260 6,500
December 25, 201C 45 190 8,550

Total quintal-km 25,450


Cost per quintal-km 2

You might also like