Job Safety Analysis: Required References Jsa Review

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

JOB SAFETY ANALYSIS

Ref: – JSA-…….

Facility / Site: WS3 sourour Location within Site: Battery solar panel Permit No: Permit Type: Hot Date:
unit RTU SHELTER
 Task Description: Energization and COMMISSION WS3 ABB RTU

REQUIRED REFERENCES JSA REVIEW


Have the relevant Procedures, Standards, Guidelines,
or Safe Work Practices been reviewed? Yes N/A
Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the
significant Task Steps, Hazards, and Controls.

JSA REVIEWER (Supervisor or Designate):


RISK ASSESSMENT
Must existing Procedures or Work Practices be
Yes No Name / Signature: David BAIRD Company: MSBI
modified to perform this work?
After mitigation, are there any hazards that continue to WORK SITE VERIFICATION
present a potentially significant risk? (Scenario-Based Yes No
Risk Assessment required)
The Work Team has assessed the worksite conditions and confirms:
 The JSA addresses the applicable hazards and necessary controls.
PPE REQUIRED DURING THIS TASK
 The Team has the appropriate resources (people and equipment) to do the job safely.
HARD HAT SAFETY GLASSES
 Others that could be affected by the work have been informed.
FACE SHIELD TASK LEADER:
SAFETY SHOES / BOOTS
GOGGLES

Name / Signature: Company:MSBI


FALL PROTECTION
FALL RESTRAINT
COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK
GLOVES:
COTTON Work Team Declaration:
LEATHER I acknowledge that I have reviewed the attached JSA, I understand my roles
and responsibilities, and I will comply with the instructions for this task.
IMPACT PROTECTION
Name (print): Name (print):
Dust mask OTHER (specify):
Work clothes

OTHER PPE (specify):


TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS HAZARD PORT
(Number) (What could go wrong?) (How can harm be prevented?) MITIGATION STATES
 PTW signed by authorised person.
 Ensure correct PPE available for task
 Procedure or task unclear  Carry out toolbox talk
 Miscommunication  Clear access and area around panel.
 MSBI Emergency
1- Work permit in place  Workers involved in the tasks are not  All workers involved are competent and
 Response plan
competent They understand the scope of the work
 Incorrect tools or PPE and the hazards/risks associated with
the task.
 Clean and arrange the work area.
 Post warning signs.
 Set up barriers.  MSBI Emergency
2- Accessibility of the  Trips, slips or falls  Two persons in attendance. response Plan
equipment  Injuries from the impact of equipment  Clear access and area around panel.  First Aid kit in
 Only trained and qualified personnel place
perform the task
 Fall of person From height  PTW and TBT must be held before  MSBI
 Hands injuries starting work.  Emergency
 Electrical tools  Check medical fitness certificates response Plan
 Slips Trips and fall  Persons with vertigo are strictly  First aid box on
 Heat stress prohibited to work at heights. place
 Falling object  Use of safety harness  Emergency contact
3-Working at height  Vertigo  Use of proper PPE’s. list to be in place
 Faulty of fixation  Tools and equipment to be secured
against falls i.e. tied down,
 Throwing of tools and materials
 are strictly prohibited, use rope
 Workers and minimal weight of
materials and tools.

 Use the proper PPE in accordance with  MSBI Emergency


the supply voltage. response Plan
 Only use insulated tools  Fire extinguisher
 Two persons in attendance at all times suitable for
4- Performing operations in  Shock or electrocution
the panel and instrument  Only trained and qualified personnel to electrical fires
perform the task  Qualified/authorised
 Equipment to be left in safe condition personnel on the
when no one in attendance with all worksite
panels closed
 Refer to OMV ATEX Zoning.
 Adhere to PTW system & LOTO  Fire extinguisher to
procedure (if applicable) be in place
 First aid kits and first
 Use of proper PPE’s (anti-static
aiders in place
coverall).
when needed
 Use of proper access or safe work  MSBI Emergency
platforms. Response Plan
 Continuous testing and monitoring of
the atmosphere (multi-gas detector) to
confirm absence of flammable &toxic
atmosphere at worksite.
 Presence of toxic and inflammable gas in the  Sparks arrestor for vehicles.
5- Working in classified area work area.
 Smoking is prohibited.
 Fire.
 Explosion.  Cell phone is prohibited.
 No electrical tools near the well head.
 Check the availability of suitable &
approved Fire Extinguishers at site.
 Ensure that all tools are ATEX inspected
(ZONE CLASS 0).
 Do not wear jewellery, rings... (ZONE
CLASS 0/1).
 Full time supervision (watchman in
place) (ZONE CLASS 0/1).
 Use non Sparking Tools: branz hammer,
keys, clamping tools (ZONE CLASS 0).
 Keep work area tidy and clean  MSBI Emergency
 Slips trips and falls
response Plan
5- Housekeeping  Unsafe access  Regular Housekeeping and keep all area
 Obstacles in work area
 First Aid kit in
free from hazards place

Name Position Date Signed


Prepared By
Checked By Area HSSE Supervisor
Approved By PTW Coordinator