The Role of Voltage Transformers in Our Electric Power Systems :
Transformers are devices used in electrical circuits to change the voltage of electricity flowing in
the circuit. Transformers can be used either to increase the voltage (called "stepping up") or
decrease the voltage ("step down").
When electrical energy travels long distances in wires, some of the energy is lost. This happens
to electricity during the journey from a power plant to your home. Less energy is lost if the
voltage is very high, so electrical utilities use high voltage in long-distance transmission wires.
However, this high voltage is too dangerous for home use. Electrical utilities use transformers to
change the voltage of electricity as it travels from the power plant to you. First, the voltage of
electricity coming from the power plant is "stepped up" using transformers to the right level for
long-distance transmission. Later, the voltage is stepped down before it enters your home -
once again using transformers.
In order for the electrical power distribution network to function, voltages must be stepped up
before power is transmitted great distances over power lines. One major problem is that power
is lost between the power plant and the consumers because currents use some of the power to
heat the transmission lines. The power transmitted along the line is equal to the voltage times
the current. The higher the voltage the lower the current that must flow within the
transmission lines to deliver the same power. Lower currents produce much less heating and
much less power loss. Of course, the high voltages (needed to drive the low currents) must be
stepped back down before power is supplied to our homes. Transformers are the critical
elements that step up and down the voltages at each end of the line
Theory on Transformer
The transformer is a static device (means that has no moving parts) that consists of one, two or
more windings which are magnetically coupled and electrically separated with or without a
magnetic core. It transfers the electrical energy from one circuit to the other by
electromagnetic induction principle. The winding connected to the AC main supply is called
primary winding and the winding connected to the load or from which energy is drawn out is
called as secondary winding. These two windings with proper insulation are wound on a
laminated core which provides a magnetic path between windings.
P a g e 2 | 51
Electric transformer
When the primary winding is
energized with alternating
voltage source, an alternating
magnetic flux or field will be
produced in the transformer
core. This magnetic flux
amplitude depends on the
applied voltage magnitude,
frequency of the supply and the
number of turns on the primary
side. This flux circulates through
the core and hence links with the
secondary winding. Based on the principle of electromagnetic induction, this magnetic linking
induces a voltage in the secondary winding. This is called as mutual induction between two
circuits. The secondary voltage depends on the number of turns on the secondary as well as
magnetic flux and frequency.
Transformers are extensively used in electrical power systems to produce the variable values of
voltage and currents at the same frequency. Therefore , by an appropriate primary and
secondary turns proportion desired voltage ratio is obtained by the transformer.
Transformer Construction
The main parts of a transformer are core, windings, container or tank, bushings and conservator
and radiators.
Core
For high power applications, transformer core is made with high permeability material which
provides the low reluctance path for the magnetic flux. The cross section of the core would be
square or rectangular.
Generally the iron core transformers provide better power transformation compared with air
core transformers. Air core transformers are used for high frequency application (above 2 KHz)
whereas , for low frequency applications (below 2 KHz) iron core transformers are employed.
In all types of transformers, core is made up of silicon steel or sheet steel laminations which are
assembled to provide a continuous magnetic path for the flux. With this laminated core eddy
current losses are minimized.
The thickness of these laminated sheets of steel are 0.35 to 5 mm and are insulated with a
varnish, or oxide, or phosphate and then formed as a core.
For a better magnetic properties, Hot rolled grain oriented (HRGO) steel, or Cold Rolled Grain
Oriented (CRGO) steel, or High B (HiB) laminations are used. In case of small transformers, core
P a g e 3 | 51
is constructed with hot rolled silicon steel laminations in the form of E and I, C and I or O are
used.
Construction
Windings
Generally, the (two winding)
transformer has two windings namely
primary and secondary windings which
are made up of high grade copper.
The insulated stranded conductors are
used as windings for carrying high
currents. This insulation avoids turns
contacting with other turns.
Windings of a transformer
The voltage connected to the primary winding is
called primary voltage whereas the induced
voltage in the secondary is called as secondary
voltage. If the secondary voltage is more than
the primary, it is called as step-up transformer
and if less, it is called as step-down transformer.
Therefore, the windings are designated as HV
and LV windings based on the voltage level.
Compared to the LV winding, HV winding needs
more insulation to withstand high voltages, also
needs more clearance to the core and the body.
The transformer coils can be concentric or sandwiched coils. Concentric coils are used in core
type transformers whereas sandwiched coils are used in shell type transformers. In concentric
arrangement, LV winding is placed near to the core and HV winding is placed around the LV
winding for low insulation and clearance requirements. The most commonly used coils for the
transformer include helical, sandwiched, disc and cross over coils.
Other necessary parts of the transformer are conservator tank which is used to provide the
necessary oil storage such that the pressure of the oil under heavy loads settles down. When
the oil in the transformer subject to the heat, naturally, oil expand and contract. Under this, oil
P a g e 4 | 51
is subjected to heavy pressure so without a conservator tank, there will be a chance of bursting
the transformer.
The bushings provide the insulation to the output terminals to be taken from the windings of
the transformer. These can be porcelain or condenser type bushing and based on the level of
operating voltage these are selected.Because of simple, durable and rugged construction,
transformers require a little maintenance. Because of no moving parts, the efficiency of the
transformer is very high which may vary from 95% to 98%.
Classification of Transformers
Transformers are classified into several types depends the various factors including voltage
ratings, construction, type of cooling, number of phases of the AC system, the place where it is
employed, etc. Let us discuss some of these types of transformers.
Based on Function
Transformers are classified into two types based on the conversion of voltage level. These are
step-up and step-down transformers.
Step-up Transformers
In step-up transformer, the secondary voltage is more than the primary voltage. This is due to
the lesser number of coils in the primary compared to the secondary. This type of transformer is
used to raise the voltage to a higher level. These are used in transmission systems and are rated
at higher power levels.
Step-down Transformers
In step-down transformer, secondary voltage is less than the primary voltage due to the less
number of turns in the secondary winding. Hence, this type of transformer is used to reduce the
voltage to specified levels of the circuit. Most of the power supplies use the step-down
transformer to keep the circuit operating range to a specified safer voltage limit. These types of
transformers are used in distribution systems (power transformers) and in electronic circuits
(electronic transformers).
It is to be noted that the transformer is a reversible device, so it can be used as both step-up
and step-down transformer. For example, if the circuit needs a high voltage we will connect the
HV terminals to the load whereas the load or circuit needs a low voltage, we will connect the LV
P a g e 5 | 51
terminals to the load.
The ratio of the voltage of a transformer is determined by the turns ratio. With the use of larger
number of turns in the winding, higher will be the voltage produced in it. Hence, a step down
transformer has lesser number of turns on secondary to produce a low voltage and has more
turns on primary to withstand high voltage levels of the AC supply.
Turns Ratio = Primary Voltage/ Secondary Voltage = Primary Turns/ Secondary turns
The turns ratio is, VP /VS = NP /NS
P a g e 6 | 51
In this type of transformer, windings surround the considerable part of the core. Generally,
distribution transformers are of core type. Some of the large power transformers are of shell
type.
Form-wound, cylindrical coils are used in the core type transformers and these coils may be
rectangular, or oval, or circular. For small size core type transformer, a simple rectangular core
with a cylindrical coil in either circular or rectangular form is used. And for a large sized core
type transformer, cruciform core with round or circular cylindrical coils are used. In most of the
core type transformers, cylindrical coils are used due to their mechanical strength. These
cylindrical coils are wound in helical layers and are insulated from each other by insulating
materials like cloth, paper, mica, etc. It is easy to insulate the LV winding compared to the HV
winding; hence it is placed nearer to the core.
Shell Type Transformer
In a shell type transformer, iron core surrounds a considerable portion of the copper winding as
a reverse case to the core type transformer. In this type also, coils are former wound, but are of
multilayer disc type coils which are wounded in the form of pancakes. These multilayer disc
coils in different layers of are separated each other by paper. The whole winding consists of
stacked discs and in between the coils the insulation space is provided to form the horizontal
insulating and cooling ducts.
Berry transformer is the most commonly used shell type transformer. In shell type, core has
three limbs and the windings are wound around the central limb. Both LV and HV windings are
divided into different coils which are arranged alternately. Between the LV windings, HV
windings are sandwiched. Again to reduce the insulation requirement, LV windings are placed
adjacent to the core. This type of construction is preferred for high rating transformers.
P a g e 7 | 51
distribution system. These have less power rating compared with three phase transformers.
Mostly core type construction is used for this type of transformer.
To work with three phase system, we need three single phase transformers. Thus, for an
economic advantage, three phase transformer is considered for three phase operation. It
consists of three windings or coils which are connected in a proper way to match the input
voltage. This type of transformers, primary and secondary windings are connected in the form
of star- delta or delta-star fashion depending on the load voltage requirements
P a g e 9 | 51
Since the same mutual flux cuts both windings, the EMF induced in the each turn of both
windings are same. Hence the total induced EMF in each winding must be proportional to the
number of turns in that winding. This turns out for the establishment of well-known
relationship between induced EMF and the number of turns. And is given as
E1 /E2 = N1 / N2
Since the terminal voltages of the both windings are slightly different from their induced EMFs,
we can write as
V1/V2 = N1/N2
This is called as the transformation ratio of the transformer. This transformation value is greater
than unity in case of step-up transformer and less than unity in step-down transformer.
In terms of ampere turns balance,
I1N1 = I2N2
I1/I2 = N2/N1
Transformer Equivalent Circuit
An equivalent circuit of a machine or device is merely an interpretation of the equations that
combines the fixed and variable resistors and reactances, which exactly simulates or describes
the complete behavior of the machine. Generally, the problems related to voltage and currents
of a transformer can be solved by using phasor diagrams. However, to make the computations
easy, it is very convenient to represent the transformer by an equivalent circuit. With
application of direct circuit theory to this equivalent circuit, we can easily find out the current
and voltages in the transformer.
The above figure shows the equivalent circuit of the transformer in which it is imagined that the
resistance and reactance of both primary and secondary windings are external (shown
separately) to the winding. The no load current Io is the combination of magnetizing component
Iu and active component Iw. Hence, the effect of magnetizing current is represented as Xo and
the effect of active component or core loss component is represented by the non inductive
resistive Ro. Both Ro and Xo connected across the primary winding as shown in figure. This
parallel combination is called as the equivalent circuit on NO load condition.
P a g e 10 | 51
When the load is connected to the secondary, the current I2 starts flowing through the
secondary circuit and causes the voltage drop across the X2 and R2. As mentioned above, due
to the secondary current I2, primary draws more current. So the primary current I1 causes a
considerable drop across the R1 and X1.
To make the calculations simple, equivalent circuit is further simplified by transferring the
secondary resistances and reactances to the primary side such that the E2/E1 ratio is not
affected in both phase and magnitude.
The primary equivalent of the secondary EMF is
E2’ = E2/K
Where K is the transformation ratio
Similarly the primary equivalent of secondary terminal voltage is
V2’ = V2/K
The primary equivalent of secondary current is
I2’ = I2/K
Let R2’ is the resistance to be transferred to the primary side that produces the drop in primary
as same as it produced in the secondary. So I2’R2’ is the voltage drop in the primary by the R2’.
This turns out that the ratio of I2’R2’ and I2R2 must be same as the N1/N2 (turns ratio).
Therefore,
(I2’R2’) / (I2R2) = (N1/N2) = (1/K)
R2’ = R2 × (I2 / I2’) × (1/K)
But (I2 / I2’) = (N1/N2) = (1/K)
Therefore, R2’ = R2 /K2
Similarly, X2’ = X2 /K2
In the same way, the load resistances and reactances can also be transferred to the primary
side. With all these transferred values, the exact equivalent circuit of the transformer is shown
in below.
P a g e 11 | 51
It is also possible to transfer the primary resistance and reactance (or simply impedance) to the
secondary just as the secondary resistance and reactance (or impedance) transfer to the
primary. Let R1’ and X1’ are the resistance and reactance transferred to the secondary side
from primary, then
R1’ = K2R1
X1’= K2X1
It is noted that the no load current is a small fraction of full load current and also E1 differs from
V1 by a small amount and hence the current I2’ is practically equal to the I1. So the voltage
drops due to the no load current Io across the R1 and X1 are neglected. Therefore, the exact
equivalent circuit further simplified by shifting the no load parallel branch to the left that
consisting of Ro and Xo to the extreme left position as shown in below figure. This circuit is
called as appropriate equivalent circuit of the transformer referred to the primary side. Hence
the analysis becomes simple by adding series resistances and reactances.
Losses in Transformer
The transformer has no moving parts and hence the mechanical losses are absent in it. Hence,
the losses in the transformer are considered as electrical energy losses. Two types of electrical
losses are exist in a transformer which are core losses and copper losses.
Core or Iron Losses
These losses include both hysteresis and eddy current losses.
P a g e 12 | 51
The magnetic flux set up in the transformer core is alternating type; thereby it undergoes a
cycle of magnetization and demagnetization. During this, an appropriate power is required for
continuous reversal of elementary magnets of the iron core. This is called as hysteresis effect
and due to this considerable loss of energy takes place.
Hysteresis loss = Kh Bm1.67f v Watts
Where,
Kh = Hysteresis Constant
Bm = Maximum flux density
f= frequency
v = volume of the core
Since the transformer core is made up of ferromagnetic materials that are also good
conductors. And hence, the magnetic flux linking with core induces emf in the core. Hence the
core set up eddy currents in the core, thereby considerable eddy current losses occurs in the
core.
Eddy Current losses = Ke Bm2f2t2 W/unit volume
Where,
Ke = Eddy current constant
t = thickness of the core
From the above two equations, it is to be observed that the supply voltage at a fixed frequency
is constant and hence the flux in turn flux density in the core is almost constant. Therefore, both
hysteresis and eddy current losses are constant during all loads. Hence the core losses are also
called as constant losses.
By using the high grade core materials like silicon steel having very low hysteresis loop,
hysteresis losses are minimized or reduced. On other hand, eddy current losses are minimized
by using laminated core. These constant or core losses can be measured by conducting an open
circuit on the transformer.
Copper Losses
These losses occur in the winding resistances of the transformer when it carries load current.
The total copper loss in the transformer is obtained by adding both primary and secondary
copper losses. These are found by conducting short circuit rest on the transformer.
Other losses in the transformer include dielectric losses and stray load losses. The stray losses
are results from the eddy currents in the tank and winding conductors. Dielectric losses are
occurs in the insulating materials like oil and solid insulations of the transformer.
Transformer Efficiency
P a g e 13 | 51
It is the ratio of useful power output to the power input of the transformer operating at a
particular load and power factor.
Efficiency = Output/ Input
= Output / (Output + Total Losses) or
= (Input – Losses)/Input
= 1- (Losses/ Input)
Generally the efficiency of the transformer is in the range of 95 to 98%. From the above
efficiency equation, it may be noted that the efficiency is depends on the watts, but not in volt-
ampere rating. Hence, at any volt-ampere rating, the efficiency of the transformer depends on
the power factor. The efficiency is maximum at unity power factor and is determined by
calculating the total losses from OC and SC tests.
Applications of Transformers
Step-up or step-down the level of the voltage in power transmission systems like
transmission and distribution systems.
To isolate the low voltage circuits from high voltage circuits in case of substations,
control circuitry circuits in industries, etc.
Instrument transformers like current and potential transformer are used in protection
and meter indication systems.
These are also used for impedance matching.
1. N2 pressure and Dew point to be checked after receipt of Transformer at Site. It should be
within permissible band
2. Core Insulation Test shall be carried out to check insulation between Core (CC&CL) and
Ground. (Not applicable for Air Core Reactors)
3. The data of impact recorder shall be analyzed jointly in association with the manufacturer. In
case the impact recorder indicates shocks of 3g during shipment, further course of action for
internal inspection shall be taken jointly with the manufacturer/ supplier. Impact Recorder
should be detached from the Transformer/ Reactor preferably when the main unit has been
placed on its foundation.
P a g e 14 | 51
As present day impact recorders are of electronic type, analysis of impact recorder along with
dew point and Core insulation tests to be performed on trailer itself.
Unpacking and inspection of all accessories to be carried out taking all precautions so that the
tools used for opening do not cause damage to the contents. Proper storage of all accessories are
to be ensured after unpacking. Fragile instruments like oil level gauge, temperature indicators,
etc. are to be stored indoor. Any damaged or missing components should be reported to
equipment manufacturer and insuring agency so that the same can be investigated or shortage
made up as per the terms/ conditions of the contract.
Storage of the main unit and the accessories at site:
If erection work can not start immediately due to some reasons, then accessories should be
repacked into their own crates properly and packing list should be retained.
All packing cases should be kept above ground by suitable supports so as to allow free air flow
underneath. The storage space area should be such that it is accessible for inspection, water does
not collect on or around the area and handling/transport would be easy. Proper drainage
arrangement in storage areas to be ensured so that in no situation, any component gets
submerged in water due to rain, flooding etc.
It is preferable to store the main unit on its own location/foundation. If the foundation is not
likely to be ready for more than three (3) months, then suitable action plan has to be taken from
the manufacturer regarding proper storage of the Main Unit.
If the transformer/ Reactor is to be stored up to three (3) months after arrival at site, it can be
stored with N2 filled condition. N2 pressure to be monitored on daily basis so that chances of
exposure of active part to atmosphere are avoided. In case of drop in N2 pressure, dew point of
N2 has to be measured to check the dryness of the Transformer/ Reactor. If there is drop in dew
point, fresh nitrogen need to be filled. Leaks are to be identified and rectified and Nitrogen to be
filled to the required pressure.
In case the transformer/ reactor is to be stored for more than 3 months, it needs to be stored in
oil filled condition. Processed oil to be filled which complies the required specification and ppm
≤5ppm and BDV ≥70kV. In case of storage of transformer in oil-filled condition, the oil filled in
the unit should be tested for BDV and moisture contents once in every three months. The oil
sample should be taken from bottom valve. If BDV is less and moisture content is more than as
given for service condition then oil should be filtered.
Insulating Oil
When oil is dispatched to site separately it is usually in sealed steel drums. In some of the cases,
oil is supplied in tankers also. The oil to be used to filling and topping up must comply with oil
specification given in POWERGRID Technical Specification for acceptance criteria. Oil Samples
shall be taken from oil drums/ tanker received at site and sent to our nearest oil Lab for oil
parameter testing (BDV > 50 kV, ppm<40, Resistivity > 150 x 1012 Ohm-cm & Tan delta < 0.0025
@ 90 °C). The later is important since dirty transportation vessels can significantly contaminate
the oil. High dielectric losses cannot be removed by filter treatment, such lots have to be rejected.
If the oil is supplied in railroad or trailer tanks, one or two samples are sufficient. If the oil is
delivered in 200 litres drums, the following scheme for checking is recommended.
In case any doubt arises, number of drums to be checked needs to be increased. However, before
filling oil, each drum has to be physically checked for free moisture and appearance. A register
P a g e 15 | 51
needs to be maintained indicating the number of drums supplied in each lot as per LOA and
number of drums of each lot used in filling a particular Transformer/ Reactor. The oil test results
carried out as above should also be recorded.
The copy of test certificate of routine testing at oil refinery should be available at site for
comparison of test results.
Samples from Oil Drum
Check the seals on the drums. The drum should first be allowed to stand with bung (lid) vertically
upwards for at least 24 hours. The area around the bung should be cleaned & clean glass or brass
tube long enough to reach to within 10mm of the lowermost part of the drum should be inserted,
keeping the uppermost end of the tube sealed with the thumb while doing so. Remove the
Thumb thereby allowing oil to enter the bottom of the tube. Reseal the tube and withdraw an oil
sample. The first two samples should be discarded. Thereafter, the sample should be released
into a suitable receptacle. Samples to be collected preferably in clean glass bottles. The bottles
are to be rinsed with the same oil and to be without any air bubble
Internal Inspection
Before starting erection, thorough internal inspection of Transformer is to be carried out by
POWERGRID engineer along with manufacturer's representative.
Internal inspection should be preferred in dry and sunny weather and should be finished as
quickly as possible to avoid ingress of moisture admitting dry air.
Prior to making any entry into the transformer tank, establish a foreign material exclusion
programme to avoid the danger of any foreign objects falling into the transformer:
Loose articles should be removed from the pockets of anyone working on the transformer cover.
All jewellery, watches, pens, coins and knives should be removed from pockets.
Protective clothing and clean shoe covers are recommended.
Tools should be tied with clean cotton tape or cord securely fastened.
Plated tools or tools with parts that may become detached should be avoided.
An inventory of all parts taken into transformer should be recorded and checked before closing
inspection cover to assure all items were removed
The inspection should include:
Removal of any shipping blocking or temporary support.
Examination for indication of core shifting.
Tests for unintentional core or core clamp grounds.
Visual inspection of windings, leads, and connections including clamping, bracing, blocking,
spacer alignment, phase barriers, oil boxes, and coil wraps.
Inspection of DETC and in-tank LTCs including contact alignment and pressure.
Inspection of current transformers, including supports and wiring harness.
P a g e 16 | 51
Checks for dirt, metal particles, moisture, or other foreign material.
In case of any abnormality noticed during internal inspection, same to be referred to
manufacturer before starting erection activities.
Detailed photographs of all visible parts/ components as per above are to be taken during
internal inspection and to be attached with pre-commissioning report.
Precautions during erection
During erection, efforts to be made to minimize the exposure of active parts (core and coils) of
transformer/ reactor. Moisture may condense on any surface cooler than the surrounding air.
Excessive moisture in insulation or dielectric liquid lowers its dielectric strength and may cause a
failure of Transformer/ Reactor.
Further, either dry air generator should be running all the time or dry air cylinders may be used
to minimize ingress of moisture. The transformer should be sealed off after working hours.
Transformer/ reactor shall never be allowed to be opened without application of dry air.
Remarks: As N2 is heavier than air, application of Vacuum to be ensured and thereafter dry air
to be admitted before entering inside Transformer after shipment in N2 filled condition. Oxygen
content should be between 19 % and 25 % prior to any entry. During inspection, dry air to be
purged continuously.
It is practical to apply a slight overpressure overnight with dry air or N2 inside – less than 300
mbar (30 kPa or 0.3 atmospheres). Next day the pressure is checked and suspected leaks may be
detected with leak detection instruments/ with soap water or with plastic bags tightened around
valves (being inflated by leaking air)
For oil filled units whenever oil is drained out below the inspection covers, job will be treated as
exposed. Other exposure activities are as below:
1) Bushing erections
2) Jumper connections of Bushings
3) Fixing bushing turrets
4) Core insulation checking (in case the checking point not accessible outside)
5) Buchholz relay pipe work fixing on cover
6) Gas release pipes/equalizer pipe fixing
7) Entering inside the tank for connections/inspection etc
For oil filled units depending upon the level up to which the oil is drained decides the exposure
time. All such exposure time should be recorded in a log sheet to decide the oil processing (drying)
and oil filling of transformer.
"GET THE TRANSFORMER UNDER OIL AS SOON AS POSSIBLE!" It is good practice to proceed with
the erection in such a sequence that all fittings and auxiliaries with oil seals to the tank are
assembled first. The oil filling will then be performed as easily as possible. The "active part" inside
- core and coils - is then impregnated and protected. It has good time to soak properly, before
the unit shall be energized, while remaining fittings are assembled on the unit, and
commissioning checks carried out.
For transformers with a gas pressure of 2.5- 3 PSI, the acceptable limits of dew point shall be as
under: (Courtesy: BHEL, Bhopal)
P a g e 17 | 51
Temperature of Permissible dew Temperature of Permissible dew
Insulation in °F point in °F Insulation in °C point in °C
85 -6 29.44 -21.11
90 -1 32.22 -18.33
95 +3 34.99 -16.11
100 +7 37.75 -13.88
110 +16 43.33 -8.88
120 +25 48.88 -3.88
P a g e 19 | 51
The drums or trailer tanks shall not be emptied to the last drop - a sump of an inch or so is left,
to avoid possible solid dirt or water in the bottom.
Before being used, the tanks and hoses are visually inspected inside for cleanness. Any liquid
residue from earlier use will be carefully removed, and the container flushed with a small
quantity of new oil, which is then discarded.
After filtration, oil sample is tested for meeting POWERGRID specification for new oil.
Prior to filling in main tank at site and shall be tested for:
P a g e 20 | 51
Before filling oil into the conservator, the air cell/ bellow to be inflated to 0.5 PSIG i.e.
0.035kg/cm2 max. by applying pressure (N2/Compressed dry air) so that it can take shape. After
releasing pressure, breather pipe is to be fitted however it is recommended not to fit breather in
position, instead a wire mesh guard over and flange of the pipe to prevent entry of any insect
inside the pipe. This will ensure free air movement from the air cell to the atmosphere.
Use flow meter / indicator on outlet of filter machine and regulate the flow using the valve to
limit oil filling rate to 2000 litres per hour (max.) in case filter capacity is more.
Oil to be pushed slowly into conservator through the transformer via valve No. 5 (valve 2,3 &4
to remain open) till the oil comes out first through valve Nos. 2 & 3 (close these valves) and
then through valve No. 4. Allow some oil to come out through valve No.4. Oil should come out
freely into the atmosphere. This will ensure that air inside the conservator is expelled out and
the space surrounding the air cell is full of oil. (Close valve No. 4). During all these operations
valve No.1 shall be in closed position.
Excess oil from the conservator is to be drained by gravity only through valve No. 1 or through
drain valve of the transformer via valve No. 5. Do not use filter machine for draining oil from the
conservator. Also do not remove buchholz relay and its associated pipe work, fitted between the
conservator and the transformer tank while draining oil.
Stop draining oil till indicator of magnetic oil level gauge reaches position-2 on the dial, which is
corresponding to 30 °C reading on the oil temperature indicator. Fill the conservator according
to the oil temperature and not the atmospheric temperature
After Oil filling, Hot Oil Circulation has to be applied to all the Transformers/ Reactors except
under the circumstances when active part of Transformer/ Reactor gets wet. Following conditions
can be considered to define the Transformer/ Reactor wet:
1. If Transformer received at site without positive N2 pressure.
2. If Dry air not used during exposure while doing erection activities
P a g e 21 | 51
Under above mentioned conditions, Manufacturer shall take necessary action for effective dry
out of the Transformer/ Reactor.
HOT OIL CIRCULATION USING HIGH VACUUM OIL FILTER MACHINE
To ensure proper dryness and absorption of possible trapped gas bubbles, the oil in the tank is
circulated through the vacuum filter and with circulation direction as shown in Fig.-4.
The circulation procedure for the main tank is as follows.
1. The Transformer/ Reactor is connected to the oil filter machine in a loop through the
upper and lower filter valves. The direction of circulation shall be from the filter to the
transformer at the top and from the transformer to the filter at the bottom. (Please note
that at the initial oil filling time the direction is reverse to avoid air bubble formation).
2. The temperature of the oil from the filter to the Transformer should be around 60 ° C and
in no case it should go beyond 70 ° C otherwise this may cause oxidation of oil.
3. The circulation shall proceed until a volume of oil has passed through the loop
corresponding to 2 times the total oil volume in the tank. (At freezing ambient
temperature the circulation time is increased, circulate 3 times the volume at
temperature down to minus 20 ° C, increase to 4 times below that temperature).
The oil sample from the transformer tank, after filling in tank before commissioning
should meet the following specifications given in table below.
Table
a) Acidity
: 0.3 (mg KOH /g) (max.)
b) Sludge
: 0.05 % (max.)
P R O C E D U R E F O R D RY O U T O F W E T W I N D I N G O F TRANSFORMER/REACTOR BY
APPLICATION OF VACUUM, N2 FILLING AND HEATING
The drying of a new Transformer/ Reactor is required when the moisture gets absorbed by the
solid insulation used in Transformers/ Reactors due to various reasons. The process of drying out
a transformer requires care and good judgment. If the drying out process is carelessly or
improperly performed, a great damage may result to the transformer insulation. In no case shall
a transformer be left unattended during any part of the dry out period unless on-line dryout
process is adopted which incorporates all necessary safety features. The transformer should be
carefully watched throughout the dry-out process and all observations to be carefully recorded.
When the transformer is being dried out, it is necessary to ensure that fire fighting equipment is
available near the transformer as a precaution as there are chances of fire as we are dealing with
heat and inflammable oil.
Isolation Required
All the openings of transformer main tank like openings for coolers/radiators, conservator, OLTC
etc. is to be properly isolated and totally blanked.
Procedure
a. Fill the main transformer/ reactor tank with Nitrogen (Use only Dry N2 gas as per IS:
1747 with less than 50 ppm moisture and 1% oxygen by volume) until it comes to a positive
pressure of 0.15 Kg/cm2. It is kept for about 48 hrs. At the end of 48 hrs, dew point of N 2 at outlet
P a g e 23 | 51
is measured. If the dew point is not within acceptable limits as per Table-I, dry out method should
be continued
b. While N2 circulation is in progress, the heaters are to be installed around the transformer
tank. The heaters are to be kept ON until we achieve a temperature of about 75–80 °C of the core
& winding of transformer as measured by top oil temperature in the transformer.
c. After ascertaining that there is no leakage, pull out vacuum and keep the
transformer/reactor under near absolute vacuum (1-5 torr) and keep under vacuum for about 96
hours running the vacuum pump continuously. The duration of vacuum can vary between 48 to
96 hrs depending upon the dew point being achieved. Keep vacuum machine ON and collect
condensate for measurement. Observe the rate of condensate collection on hourly basis.
Depending on the value of rate of condensate (less than 40 ml/hr for 24 hrs), continuation of
further vacuum shall be decided.
d. Then the vacuum is broken with dry nitrogen. The dew point of nitrogen at the inlet is to be
measured and should be of the order of - 50 °C or better. When the nitrogen
comes to the positive pressure of 0.15 kg/cm2, it is stopped and kept for 24 hours. Heating from
outside is to be continued while N2 circulation is in progress. Then the nitrogen pressure is
released and the outlet nitrogen dew point is measured. If the dew point is within acceptable
limits as per Table-I then the dryness of transformer is achieved. If not again the transformer is
taken for vacuum treatment and then nitrogen is admitted as mentioned above and tested. The
cycle is to be continued till desired dew point as per Table-1 is achieved.
e. Periodicity of vacuum cycle may vary between 48-96 hrs. Initially two N2 cycles may be kept
for 24 hrs. After that it may be kept for 48 hrs depending upon dew point being achieved.
After completion of drying process, oil filling and hot oil circulation is to be carried out before
commissioning. Please ensure standing time as per table given below before charging.
P a g e 24 | 51
Transformer HV Application of Vacuum & STANDING TIME After Oil
Rated Voltage holding for (before oil filling)* circulation and before energising
(in kV) (in Hours) (in Hours)
Up to 145kV 12 HRS 12 HRS
145 kV and up to 24 HRS 48 HRS
420kV
Above 420 kV 48 HRS 120 HRS
Note: If already known that the transformer is wet based on the tests or exposure
time, then (a) above can be skipped to save time.
*Without running the vacuum pump and leakage rate to be 40mbar-lit/sec
After the expiry of this time, air release operation is to be carried out in Buchholz relays,
turrets and other release points given by the manufacturers before charging.
P a g e 25 | 51
PRE- COMMISSIONING CHECKS/TESTS FOR
TRANSFORMERS
Once oil filling is completed, various pre-commissioning checks/ tests are performed to ensure
the healthiness of the Transformer/ Reactor prior to its energization. Various electrical tests are
to be performed and their significance is given below
Sr. Name of Test/
Purpose of test/ check
measurement
case, the resistance is more, proper treatment is to be given.
3.3 Insulation Test reveals the condition of insulation (i.e. degree of dryness of
3.4 Capacitance and Measurement of C1 & C2 Capacitance and Tan ä in UST mode.
3.5 Capacitance and Tan Dissipation factor/Loss factor nda capacitance measurement of
P a g e 26 | 51
3.6 Turns ratio (Voltage To determine the turns ratio of transformers to identify any
3.7 Vector Group & To determine the phase relationship and polarity of transformers
Polarity
3.8 Magnetic Balance This test is conducted only in three phase transformers to check
3.12 Operational checks To ensure smooth & trouble free operation of OLTC during
on OLTCs operation.
3.13 Tests/ Checks on To ascertain the healthiness of bushing current transformer at the
3.14 Operational Checks Operational checks on cooler bank (pumps & Fans), Breathers
P a g e 27 | 51
actuated relays (Buchholz, PRD, SPR etc.) and simulation test of
protection system
3.17 Winding resistance To check for any abnormalities due to loose connections, broken
3.18 Dissolved Gas Oil sample for DGA to be drawn from transformer main tank
Analysis (DGA) of before commissioning for having a base data and after 24 hrs. of
oil sample charging subsequently to ensure no fault gas developed after first
charging. DGA analysis helps the user to identify the reason for
gas formation & materials involved and indicate urgency of
corrective action to be taken
P a g e 28 | 51
transformer that could affect the integrity of its core insulation and at other times, when
indicated by DGA (key gases being ethane and/or ethylene and possibly methane) or usually
during a major inspection.
For core-insulation to ground test, remove the cover of the terminal block, Disconnect the closing link
that connects the two terminals CL-G. Apply 1.0 kV direct voltage between CL and CC + G (core
grounding strap). The tank shall be grounded during the test.
Acceptable Limit: The insulation value after 1min. should be minimum 10 M for new transformer at
the time of commissioning. Core insulation resistance is generally more than 100 M for new assembled
transformer when tested at factory
P a g e 29 | 51
In this method, earth tester terminals C1 & P1 are shorted to each other and connected to the
earth electrode (pipe) under test. Terminals P2 & C2 are connected to the two separate spikes
driven in earth. These two spikes are kept in same line at the distance of 25 meters and 50 meters
due to which there will not be mutual interference in the field of individual spikes. If we rotate
generator handle with specific speed we get directly earth resistance on scale.
Acceptable Limit: Value of earth pit resistance should be less than or equal to 1? .
INSULATION RESISTANCE (IR) MEASUREMENT
IR measurements shall be taken between the windings collectively (i.e. with all the windings being
connected together) and the earthed tank (earth) and between each winding and the tank, the rest
of the windings being earthed. Before taking measurements the neutral should be disconnected
from earth. Following table gives combinations of IR measurements for auto-transformer, three -
winding transformer & Shunt Reactor
HV + IV to LV HV + IV to LV HV to E
HV + IV to E HV + LV to IV
LV to E HV + IV +LV to E
Acceptable Limits: Unless otherwise recommended by the manufacturer, the following IR values
as a thumb rule may be considered as the minimum satisfactory values at 30°C (one minute
measurements) at the time of commissioning.
11kV 300 M
33kV 400 M
P a g e 30 | 51
66kV & above 500 M
Insulation resistance varies inversely with temperature and is generally corrected to a standard
temperature (usually 20°C) using table (Source: BHEL instruction Manual) as given below:
10 1.65
20 2.6
30 4.2
40 6.6
50 10.5
(The measured value to be multiplied by the factor k i.e T20 = k*T measured)
The ratio of 60 second insulation resistance to 15 second insulation resistance value is called dielectric
absorption coefficient or Index (DAI). For oil filled transformers with class A insulation, in reasonably
dried condition the absorption coefficient at 30°C will be more than 1.3.
The polarization index test is performed generally by taking mega ohm readings at 1min and 10min
insulation resistance value. The polarization index is the ratio of the 10 min to the 1 min mega ohm
readings.
PI= R10 / R1 (dimensionless),Where PI is Polarization Index and R is resistance
The following are guidelines for evaluating transformer insulation using polarization index values
Polarization Index Insulation Condition
1.0-1.1 Poor
1.1-1.25 Questionable
1.25-2.0 Fair
P a g e 31 | 51
A PI of more than 1.25 and DAI of more than 1.3 are generally considered satisfactory for a
transformer when the results of other low voltage tests are found in order. PI less than 1 calls for
immediate corrective action. For bushings, an IR value of above 10,000 MÙ is considered
satisfactory.
Dissipation Factor
Dissipation factor/loss factor (Tan delta) is defined as the ratio of resistive component (I r) of current
to that of capacitive current (Ic) flowing in an insulating material.
Power Factor
Power factor is the ratio of resistive current to that of total current. For very low value of resistive
currents, values of dissipation factor and power factor are same (up to 2%).
UST
Test set connected for Ungrounded Specimen Test mode. This is used when specimen is isolated from
earth e.g. Transformer bushing, CTs with test tap, CVTs and CB voltage grading capacitors. The test
mode is often used to reduce the effect of stray capacitance losses to ground, and to reduce the effect
of interference pickup from energized apparatus.
GST
Test set connected for grounded specimen test mode. This is used when specimen do not have two
specific points (isolated from ground) for Tan delta measurement e.g. Transformer/ Reactor winding,
CTs without test tap etc.
GSTg
This test is used to separate the total values of a GST test into separate parts for better analysis. Often
this test is used with GST test to confirm the test readings made using the UST mode
TEST EQUIPMENT
10 KV or 12 KV fully automatic Capacitance and Tan delta test kit to be used for accurate
measurement and repeatability of test results.
P a g e 32 | 51
TESTING PROCEDURE
Typical arrangement for Tan δ measurement is given below:
P a g e 33 | 51
PRECAUTIONS
b) HV lead should be screened with double shield and shields should not have internal shorting
otherwise tests in GST/GSTg modes, shall not be possible. Check the same by Insulation Tester(100V)
c) Test leads should not touch any live part.
d) Never connect the test set to energized equipment
e) The ground cable must be connected first and removed at last
f) High voltage plugs should be free from moisture during installation and operation.
g) Testing must be carried out by experienced/ certified personnel only.
h) After testing with high voltage (10 kV), test terminals must be grounded before being touched
by any personnel.
For 3-Ph auto-transformer, short together all 400kV, 220kV and Neutral (isolated from earth)
Bushings. Also short all 33kV Bushings and earth the same.
Measurement of C1 Capacitance and Tanδ: Connect the crocodile clip of the HV cable to the top
terminal of the shorted HV/IV bushings. Unscrew the test tap cover, Insert a pin in the hole of the
central test tap stud by pressing the surrounding contact plug in case of 245 kV OIP Bushing and remove
the earthing strip from the flange by unscrewing the screw (holding earth strip to the flange body) in
case of 420 kV OIP Bushing. Connect the LV cable to the test tap (strip/central stud) of the bushing
under test to the C & TANδ KIT through a screened cable and earth the flange body. Repeat the test
for all Bushings by changing only LV lead connection of the kit to test tap of the Bushing which is to be
tested
Measurement of C2 Capacitance and Tanδ : HV lead to be connected to the test tap of the bushing
under test (if required additional crocodile type clip may be used) and LV of the kit to be connected to
the ground. HV of the bushing is to be connected to the Guard terminal of the test kit. Test to be carried
out in GSTg mode at 1.0kV.
For measurement of 33kV Bushing Tan Delta, earth HV/IV Bushings (already shorted). Apply HV lead of
the Test kit to shorted 33kV Bushings and connect LV lead of the test kit to Test tap of the Bushing
under test.
Measurements shall be made at similar conditions as that of a previous measurement. The oil-paper
insulation combination of bushings exhibit fairly constant tan delta over a wide range of operating
temperature. Hence, effort is to be made for testing at temperature near to previous test and
correction factor need not be applied.
Do not test a bushing (new or spare) while it is in its wood shipping crate, or while it is lying on wood.
Wood is not as good an insulator as porcelain and will cause the readings to be inaccurate. Keep the
test results as a baseline record to compare with future tests.
It is to be ensured that C& Tan ä measurement of bushings and testing of turrets carried out before
installation. This will prevent installation of bushings having C& Tan ä values beyond permissible limits.
P a g e 34 | 51
It is to be ensured that Test Tap points are earthed immediately after carrying out the measurements
for that particular Bushing and earthing of test tap to be ensured by carrying out continuity test.
Acceptable Limits: Bushing Tan ä should be less than 0.5% for all type of bushings.
The combination for C & tan ä measurement of winding is same as that of measurement of IR value.
The summery of probable combination is given below.
(Two winding)
Ensure that test specimen is isolated from other equipments. Removal of Jumpers from Bushings is
Pre-Requisite for C & Tan ä Measurement of Windings.
For ICTs (Auto-Transformers): Shorting of all three phase Bushings (400kV&220kV) and neutral to be
done. In case of single phase, 400kV, 220kV and neutral Bushings to be shorted Capacitance and Tan
ä measurement of windings should be done in following combinations.
P a g e 35 | 51
Test Winding Test Cap
Test lead Connection Remarks
Combination mode Symbol
No.
1. HV-IV/LV UST
C HV lead of test kit to
HL
HV/IV bushings of
transformer
bushing of transformer
3. HV-IV / LV with
C do-- LV to be
GSTg HG
Guard Guarded
4 HV-IV/LV UST
C HL LV lead of test kit to
HV/IV bushings of
transformer
bushing of transformer
· DF1=C2DF2-C3DF3 / C2-C3= C4DF4-C5DF5 / C4-C5 Where C stands for capacitance and DF for
dissipation factor or tan ä and attached suffix (1…6) denotes the sr. no. of test in above
table.
Acceptable Limit: Winding Tan ä should be less than 0.5% in all combinations.
P a g e 36 | 51
TURNS RATIO (VOLTAGE RATIO) MEASUREMENT
Ratio measurements must be made on all taps to confirm the proper alignment and operation of
the tap changers. The test should preferably be performed by automatic Transformer turns ratio
(TTR) meter.
Open turns in the excited winding will be indicated by very low exciting current and no output
voltage. Open turns in the output winding will be indicated by normal levels of exciting current, but
no or very low levels of unstable output voltage. The turns-ratio test also detects high-resistance
connections in the lead circuitry or high contact resistance in tap changers by higher excitation
current and a difficulty in balancing the bridge.
Acceptable Limit: Results of the voltage ratio are absolute, and may be compared with the specified
values measured during factory testing. The turns-ratio tolerance should be within 0.5 % of the
nameplate specifications. For three phase Y connected winding this tolerance applies to phase to
neutral voltage. If the phase-to-neutral voltage is not explicitly indicated in the nameplate, then the
rated phase-to-neutral voltage should be calculated by dividing the phase-to-phase voltage by √3.
1.1
1.2
For a single-phase transformer having a ratio of transformation of 30 to 1 or less, the polarity test
shall be done as follows. The line terminal of high voltage winding (1.1) shall be connected to the
adjacent line terminal low-voltage winding (2.1) as shown in figure 7.
Any convenient value of alternating voltage shall be applied to the full high-voltage winding and
readings shall be taken of the applied voltage and the voltage between the right-hand adjacent high-
voltage and low-voltage leads.
When the later reading is greater than the former, the polarity is additive.
P a g e 37 | 51
When the later reading is less than the former (indicating the approximate difference in voltage
between that of the high-voltage and low-voltage windings), the polarity is subtractive. The test
shall be conducted with 3 phase, 415V supply.
By the measured voltage data, it should be verified that the desired conditions of vector group and
polarity are fulfilled
Example for Y D11
- Connect neutral point and LV phase with Earth
1R1
- Join 1R1 & 3R1 Terminals
3R1
3Y1
- Apply 415 , 3-Ø supply to HV
3B1 - Ensure 2R1-N=2Y1-N=2B1-N=Constant
2R1
- If 3R1-N>3Y1-N>3B1-N, and 3Y1-1B1>3Y1-1Y1
Vector group Yna0d11 is confirmed and polarity
2B1 2Y1 verified.
1B1 1Y1
This test is a low voltage test conducted at factory and site by applying single phase voltage
between phase and neutral of a winding and measuring voltage induced in other two phases of
the same winding. This test is carried out only in three phase units.
Keep the tap in nominal tap position. Disconnect transformer neutral from ground. Apply single
phase 230 V across one phase of Highest Voltage (HV) winding terminal and neutral (call it v1) then
measure voltage in other two HV terminals across neutral (call them v2 and v3 respectively).
Repeat the test for each of the three phases. Repeat the above test for Intermediate Voltage (IV)
winding also. The identical results confirm no damage due to transportation. The following points
may be noted.
Transformer neutral should be disconnected from ground
(i) No winding terminal should be grounded, otherwise results would be erratic and
confusing.
(ii) Zero voltage or very negligible voltage induced in any of the other two phases
shall be investigated.
(iii) It is proposed that a set of readings should be taken for information and
comparison later during service of the transformer.
Acceptable Limit: Also the applied voltage may be expressed as 100% voltage and the induced
voltage may be expressed as percentage of the applied voltage. This will help in comparison of the
two results when the applied voltages are different. The voltage induced in the centre phase shall
P a g e 38 | 51
be 50 to 90% of the applied voltage. However, when the centre phase is excited then the voltage
induced in the outer phases shall be 30 to 70% of the applied voltage.
Zero voltage or very negligible voltage induced in the other two windings should be investigated.
This test is conducted by applying 3 phase 415 volt supply across HV windings or IV winding as the
case may be after disconnecting the transformer neutral from the ground. For a healthy
transformer, when 3 phase balance voltage is applied, the voltage between neutral and ground is
zero or otherwise a negligible voltage will appear. But in case there is a short circuited winding, the
voltage between the neutral and the ground is appreciable. This test will also help in detecting the
gradual deterioration or development of fault in the winding during service.
Acceptable Limit For a healthy transformer the voltage between neutral and ground should be zero
or negligible. In case, significant voltage appears between neutral and ground, matter to be
referred to the manufacturer.
This test is used to detect winding movement that usually occurs due to heavy fault current or
mechanical damage during transportation or installation since dispatch from the factory.
Ensure the isolation of Transformer from High Voltage & Low voltage side with physical inspection
of open condition of the concerned isolators/ disconnectors. In case tertiary is also connected,
ensure the isolation of the same prior to commencement of testing
The measurement is performed in single phase mode. This test is performed for the combination of
two windings. The one of the winding is short circuited and voltage is applied to other winding. The
voltage and current reading are noted.
The test shall be conducted with variac of 0-280 V, 10 A, precision RMS voltmeter and ammeter.
The conductors used for short-circuiting one of the transformer windings should have low
impedance (less than 1m-ohm) and short length. The contacts should be clean and tight.
Acceptable Limit: The acceptable criteria should be the measured impedance voltage having
agreement to within 3 percent of impedance specified in rating and diagram nameplate of the
transformer. Variation in impedance voltage of more than 3% should be considered significant and
further investigated.
P a g e 39 | 51
This test should be done before DC measurements of winding resistance as saturation of winding
due to the application of DC voltage may alter the test results. If there is suspected residual
magnetism in the winding, transformer under test may be demagnetized before commencement
of magnetizing current test.
Three-phase transformers are tested by applying Single-phase 10 kV voltage to one phase (HV
terminals) and keeping other winding open circuited and measuring the current at normal,
minimum and max. tap positions.
Keep the tap position in normal position and keep HV and LV terminals open. Apply 1phase 10kV
supply on IV terminals. Measure phase to phase voltage between the IV terminals and current on
each of the IV windings.
Acceptable Limit: The set of reading for current measurement in each of the tap position should
be equal. Unequal currents shall indicate possible short circuits in winding. Results between similar
single-phase units should not vary more than 10 % .The test values on the outside legs should be
within 15 % of each other, and values for the centre leg should not be more than either outside for
a three-phase transformers. Results compared to previous tests made under the same conditions
should not vary more than 25%. If the measured exciting current value is 50 times higher than
the value measured during pre-commissioning checks, then there is likelihood of a fault in the
winding which needs further analysis. The identical results confirm no damage due to
transportation. The availability of test data of normal condition and faulty condition results help us
to analyze the problem in future.
Manual Operation: The tap changer has to be run manually by the hand crank through the total
operating cycle. In each operating position, the position indicators of motor drive and tap changer
(On TC head) show the same position.
Motor drive for step by step tap changing operation: Push button to be kept pressed till the motor
stops i.e. driving motor should be automatically switched off when the tap changer has performed
one switching operation.
(Note: At the time of change over selector operation (i.e. 9b to 10 & vice-versa), higher torque is
required. Tap changer end position should be checked that the same is not overrun to avoid any
failure during operation. Same can be seen through the inspection glass in the tap changer head
cover).
With the tap-changer fully assembled on the transformer the following sequence of operations
shall be performed:
P a g e 40 | 51
b. With the transformer un-energised, and with the auxiliary voltage reduced to 85% of its rated
value, one complete cycle of operation.
c. With the transformer energized at rated voltage and frequency at no load, one complete cycle
of operation.
The following additional check points/ guidelines for OLTC is recommended in consultation with
OLTC manufacturer to ensure the absence of problems and proper operation:
c) Fastener tightness
d) Signs of moisture such as rusting, oxidation or free standing water and leakages
f) Operation and condition of tap selector, changeover selector and arcing transfer switches
h) Counter operation, Position indicator operation and its co-ordination with mechanism and tap
selector positions
q) Oil BDV and Moisture content (PPM) to be measured and recorded (Min BDV should be 60 KV
and Moisture content should be less than 10 PPM)
Continuity, Polarity and secondary winding resistance tests of individual cores of Bushing CTs.
P a g e 41 | 51
OPERATIONAL CHECKS ON PROTECTION SYSTEM
1) Operational Checks on Breathers (Conventional Silcagel or Drycol as supplied with the
transformers).
i. Checks on cooling fans-rotation, speed & Control (Manual /temp /load) setting checks
6) Checks on temperature Gauges (OTI/WTI-Calibration and Cooler Control, alarm & trip setting
tests)
7) Checks on gas actuated (SPRs/ PRDs/ Buchholz) relays –Operational checks by simulation as
well as shorting the respective contacts as applicable
9) Checks on Transformer/ Reactor protection (differential, REF, Over-current & stability tests etc.)
2) Measure the spill current in REF relay which should be nearly zero.
4) Reverse the polarity of R phase Bushing CT and again start Current Injection. Appreciable spill
current will appear in REF relay.
5) Normalize the CT circuit which was reversed in step no. (4), after switching off Current
injection.
P a g e 42 | 51
6) Repeat the same procedure for Y and B phases and note down the results in formats.
8) This test has to be performed from both HV side & LV side w.r.t. Neutral.
However, if Primary Test Tap is not available in the Turret CTs, adopt following procedure:
1) After opening the Circuit Breakers and Isolators at both side (H.V. and L.V. side) of transformer
apply 440V three phase voltage at three phase bushing of H.V. side with the help of three phase
variac.
2) Earth the R phase of the LV side (through isolator earth switch or discharge rod).
3) Measure the spill voltage (in mV)/ spill current (in mA) at REF relay which should be nearly
zero.
5) Reverse the polarity of R phase Bushing CT and again switch on 440V supply. Appreciable spill
voltage/ current will appear in REF relay.
6) Normalize the CT circuit which was reversed in step no. (5), after switching off 440V supply.
7) Repeat the same procedure for Y and B phases and note down the results in formats.
1) After opening the Circuit Breaker and Isolators of Reactor, use “Primary Test Tap (M point or
PI1/PI2)” provided in the BUSHING TURRET CTs to bypass the Reactor with the help of Primary
current injection leads. Now, after ensuring completion of all CT wiring & normal polarity, inject
Current with the help of Primary Injection kits in the relevant Turret CTs of R phase of Reactor &
earth side CT of NGR, subject to the maximum rating of Primary Test Tap.
2) Measure the spill current in REF relay which should be nearly zero.
4) Reverse the polarity of R phase Bushing CT and again start Current Injection. Appreciable spill
current will appear in REF relay.
5) Normalize the CT circuit which was reversed in step no. (4), after switching off Current
injection.
6) Repeat the same procedure for Y and B phases and note down the results in formats.
1) After opening the C.B. and isolators of Reactor, remove the jumpers of three phase
bushings. Reactor Neutral will remain connected to NGR, however Earth connection of NGR
Bushing will be opened.
2) Apply 415 volts, phase to phase voltage across R phase bushing of Reactor & earth side Bushing of
NGR, after ensuring completion of all CT wiring & normal polarity.
3) Measure the spill voltage (in mV)/ spill current (in mA) in REF relay which should be nearly
zero.
8) Now normalize the polarity of the Bushing CT which was reversed in step (5).
9) Repeat the same procedure for Y and B phase and note down the results in formats.
10) After completing the test for all three phases normalize the reactor CT connection and
jumpers & Earth connection of NGR Bushing.
Frequency Response Analysis (FRA) is conducted to assess the mechanical integrity of the
transformer which may get disturbed due to transportation shocks. FRA signatures will be taken
after assembly and oil filling and compared with factory testing to ensure the healthiness of core
/coil assembly during transportation. These signatures will be the benchmark for future reference.
The FRA signatures should be analyzed in conjunction with Impact Recorder readings. Report of
Impact recorder readings is to be obtained from manufacturer.
It is recommended to follow the standard procedure for the SFRA measurement as per the Table
It should be done on maximum, normal and minimum tap of the transformer.
P a g e 44 | 51
Combination of tests for Auto Transformer
Test 1 H1-X1
Series Winding (OC)
Test 2 H2-X2 H1-X1
All Other Terminals Floating
Test 3 H3-X3
Test 4 X1-H0X0
Common Winding (OC)
Test 9 Y3-Y2
Preferably to be carried out using Automatic kit, in case of non availability V/I method can be
adopted.
P a g e 45 | 51
To reduce the high inductive effect, it is advisable to use a sufficiently high current to saturate the
core. This will reduce the time required to get a stabilized reading. It is essential that temperatures
of the windings are accurately measured. Care shall be taken that self inductive effects are
minimized. Care also must be taken to ensure that direct current circulating in the windings has
settled down before the measurement is done. In some cases this may take several minutes
depending upon the winding inductance.
The winding resistance shall be preferably done when the difference in the top and bottom
temperature of the winding (temperature of oil in steady-state condition) is equal to or less than 5
°C.
The winding resistance should preferably be carried out last after completion of all other LV tests,
as after this test core gets saturated and tests like magnetizing current, magnetic balance etc.
carried out after winding test may be affected and indicate a misleading results, if the core is not
de-magnetized before carrying out these tests.
For star connected auto-transformers the resistance of the HV side is measured between HV
terminal and IV terminal, then between IV terminal and the neutral AT ALL TAPS. The tap changer
should be changed from contact to contact so that contact resistance can also be checked.
Measurement of winding resistance is to be carried out from tap position 1 to 17 and again from 17
to 9. While doing measurements in reverse order, 2 to 3 steps shall be enough.
During tap changing operation, continuity checks between HV to neutral to be carried out by analog
multimeter while changing tap.
For delta connected windings, such as tertiary winding of auto-transformers, measurement shall be
done between pairs of line terminals and resistance per winding shall be calculated as per the
following formula:
Take the winding temperature reading while doing the resistance measurement.
Acceptable Limit: The resistance value obtained should be compared with the factory test value.
Results are compared to other phases in Star-connected transformers or between pairs of terminals
on a Delta–connected winding to determine if a resistance is too high or low. Because field
measurements make it unlikely that precise temperature measurements of the winding can be
made, the expected deviation for this test in the field is not more than 5.0% of the factory test value.
DISSOLVED GAS ANALYSIS (DGA) OF OIL SAMPLE
Dissolved Gas Analysis (DGA) is a powerful diagnostic tool to detect any incipient fault developing
inside the oil-filled equipment. The oil sample is to be taken after oil filling (before commissioning )
as a benchmark and there after 24hrs of charging, 7 days, 15 days, one month and three months
after charging to monitor the gas build up if any. The oil samples are to be sent to the designated
labs for DGA and first two samples for oil parameter testing also.
P a g e 46 | 51
CHECK LIST FOR ENERGISATION OF
TRANSFORMER
PRELIMINARY CHECKS
1. Release air at the high points, like oil communicating bushings, buchholz petcock, tank cover
and the cooling devices including headers, radiators, pumps, expansion joints etc. of the
transformer. Air release should be resorted from low points to high points.
2. Check the whole assembly for tightness and rectify where necessary.
3. Check the general appearance and retouch the paint work if needed.
4. Check that the valves are in the correct position : Tank: valves
closed and blanked Cooling circuit: valves open Conservator
connection:valves open By-pass: valves open or closed as the case may
be. On-load tap changer:valves open
5. Check that the silica gel is completely filled in the breather and is blue and that there is oil
in the breather cup (oil seal)
6. Ensure that CC & CL are properly grounded.
7. Check the oil level in the main conservator and the conservator of on-load tap changer, as
per manufacturers recommendations
8. Check the bushings:
Oil level ( bushings fitted with sight-glasses) Adjustment of spark-gaps /arcing horn –gaps, if
provided Conformity of connection to the lines (no tensile stress on the terminal heads) Bushing
CT secondary terminals must be shorted and earthed, if not in use. Neutral bushing effectively
earthed
Tan delta cap should be tight and properly earthed.
9. Check the on-load tap changer:
Conformity of the positions between the tap changer control cubicle and the tap changer head
11. Prior to energization at site, oil shall be tested for following properties &
acceptance norms as per below generally in line with IS: 1866 / IEC 60422:
7. *Oxidation Stability
(Test method as per IEC 61125
method C, Test duration: 500
hour for inhibited oil)
· *For Sr. No. 7 separate oil sample shall be taken and test results shall be
submitted within 45 days after commissioning for approval of POWERGRID
12 Check that equalizing link between OLTC tank and Main tank is removed
13 Extraneous materials like tools, earthing rods, pieces of clothes, waste etc. should be
removed before energizing.
P a g e 48 | 51
2. Check the setting and working of the mercury switches of winding and oil temperature
indicators
3. Ensure presence of oil in the thermometer pockets. Follow the same procedure for the
thermal replicas
5. Check the operation of the buchholz relay and the surge protective relay of the tap-
changer for:
6. Check the insulation of the auxiliary circuits with respect to ground by 2 kV insulation tester
for 1 min. It should withstand the test.
7. Check the earthing of the tank and auxiliaries like cooler banks at two places.
9. Check the cooling system for the following: Check the direction of installation of oil pumps
Check the direction of rotation of the pumps and fans Check the working of the oil flow
indicators Check the setting of the thermal overload relays
Go through the starting up sequences, control and adjust, if necessary, the relay time delays
10. Check that there is sufficient protection on the electric circuit supplying the accessories and
tightness of all electrical connections
12. Check the schemes of differential protection, over-current protection, restricted earth fault
protection, over-fluxing protection etc. With implementation of settings as recommended by
CC/Engg
After the inspection / tests are completed, the transformer may be energized from the incoming
side on NO LOAD, 400kV or 220kV. The initial magnetizing current at the time of switching will
be very high, depending upon the particular moment in the cycle. The transformer should be
kept energised for twelve hours before taking on load. During this time, vibrations, abnormal
cracking noise, etc. are to be observed.
After that it may be checked for gas collection. If the gas prove to be inflammable, try to detect
the cause which may probably be an internal fault. If the breaker trips on differential /REF,
P a g e 49 | 51
buchholz or any other protective device, the cause must be investigated thoroughly before re-
energizing the transformer/ reactor. After successful charging, performance of transformer /
rector should be checked under loading; OTI/WTI readings should be monitored for 24 hours and
ensured that they are as per loading.
DGA samples may be sent as per Standard practice (after 24 hrs of energizing, one week, 15 days,
one month and three months after charging, thereafter as per normal frequency of 6 months).
Loading data may be forwarded to CC/OS and manufacturer (if requested by them).
P a g e 50 | 51
POST COMMISSIONING CHECKS/TESTS
FOR TRANSFORMERS
red scanning (IR on the surface of the tank as well as in the vicinity of the Jumper
mechanism.
measurement of Oil- the reactor. Movement of the core-coil assembly and shielding
assembly