Approved Utility Permit Package
Approved Utility Permit Package
Approved Utility Permit Package
PERMIT NO:__________________________________
2019-H-593-00433
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility
Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be
identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint
applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County)
Name: _____________________________________
Duke Energy Distribution (North Central Zone) Name: ______________________________________
Contact Person: _____________________________________
Duke Energy Distribution (North Central Zone) Contact Person: ______________________________________
Address: 452 East Crown Point Road
_____________________________________ Address: ______________________________________
City: Winter Garden
_____________________________________ City: ______________________________________
State: Florida
_____ State: _____
Zip: 34787
_________ Zip: _________
Telephone: 4079053376
_____________________________________ Telephone: ______________________________________
Email: ____________________________________
DEFDistributionGOV@duke-energy.com Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described
below and as depicted in the incorporated documentation.
EXISTING CONDUCTOR TO BE RELOCATED DUE TO CONFLICTS CREATED BY SIDEWALK
_____________________________________________________________________________________________________________________________
INSTALLATION HEADING EAST IN THE NORTH ROW OF E ALTAMONTE DR. BEGINNING FROM
_____________________________________________________________________________________________________________________________
APPROX 525 E ALTAMONTE DR TO 1101 E ALTAMONTE DR.
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No ✔
For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No ✔
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
CULLEN ABERNETHY
Name: ________________________________ Telephone ________________________
(412) 992-6840 ext. ______ Email: _______________________________
CULLEN.ABERNETHY@DUKE-ENERGY.COM
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If
the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT
Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO
and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
1/3/2020
Anticipated Start Date: ___________________
180
Calendar days needed to completed: ________
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Rule 14-46.001 F.A.C.
Florida Department of Transportation December 14, 2016
UTILITY PERMIT
Page 2 of 3
PERMIT NO:_________________________________
2019-H-593-00433
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description,
shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special
instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both
aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further
declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility
owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
9/12/2019
_____________ __________________________________________________________________________________________________
AT&T, CHARTER COMMUNICATIONS, CITY OF ALTAMONTE SPRINGS, CROWN CASTLE, DUKE ENERGY, CROWN CASTLE FIBER, CENTURYLINK, MCI, TECO PEOPLES GAS, AT&T/ DISTRIBUTION, SEMINOLE COUNTY TRAFFIC ENGINEERI
_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________
COUNT STATION 106 6-LANE Additional FDOT Special Instructions are attached and incorporated into this permit. Yes ✔ No
2019-H-593-00433
Carol Hatfield
10/21/2019
Rule 14-46.001 F.A.C.
Florida Department of Transportation December 14, 2016
UTILITY PERMIT
Page 3 of 3
PERMIT NO:_________________________________
2019-H-593-00433
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated
documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated
into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition
than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the
UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant
to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
PERMIT NO.: 2019-H-593-00433
The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.
COUNT STATION1066-LANE
Approved
2019-H-593-00433
Carol Hatfield
special instructions continuation page 10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Legend for Construction Prints
Existing Overhead Install Overhead R/W C/L R/W
Transformer Transformer 113’ – 126’
Existing Underground Install Underground
Transformer Transformer S M
i e G S
P Install Pedestal R Install Recloser G G
d d r i
r r
e i a d
Existing Down Guy Install Down Guy a a
w a s e
s s
Existing Pole a EOP n EOP s w
Install New Pole s s
l a
Install Fuse k l
Existing Fuse
k
Overhead Cable Closed Switch
5’ 21’ 36’ 13’ 36’ 4’ 5’ 6’
------ Underground Cable
Table II
15'
M in.
2'
Work Area Taper Length - Shoulder
A 1
B Taper Length = 3L
1
3L (ft.)
See Table II Speed
* Notes
(mph) 8' 10' 12'
END Shldr. Shldr. Shldr.
ROAD Device Spacing-Taper Device Spacing-Tangent 500'
1
3L = Length of shoulder taper in feet
*250' beyond the ROAD WORK AHEAD sign or
2. This TCZ plan also applies to work performed in the median more than 2' but less
Channelizing Device (See Index 102-600)
than 15' from the edge of travelway.
Work Zone Sign 3. When work is being performed on a multilane undivided roadway the signs normally
5. SHOULDER WORK sign may be used as an alternate to the WORKER symbol sign. WHERE ANY VEHICLE, EQUIPMENT,
devices shall be placed in accordance with other applicable TCZ Indexes. 15' BUT NOT CLOSER THAN 2' TO
32:
7. For general TCZ requirements and additional information, refer to Index 102-600.
Approved
9/18/2018
2019-H-593-00433
Carol Hatfield
REVISIO N
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION
MULTILANE, WORK ON SHOULDER
11/01/17 STANDARD PLANS 102-612 1of 1
Table II
Buffer Space and Taper Length
Taper Length
Buffer
Median (12' Lateral
Speed Space
Transition)
(mph)
Dist. L Notes
White Reflectorized Pavement Markings (ft.) (ft.) (Merge)
25 155 125
2'
35 250 245
40 mph or less 200 200 200 2. On undivided highways the median signs as shown are to be omitted. 50 to 70 25 50
50 100 L = Length of taper in feet
45 mph 350 350 350 W = Width of lateral transition in feet
50 mph 3. When work is performed in the median lane on divided highways, the channelizing device plan is inverted
500 500 500 S = Posted speed limit (mph)
*55 mph or greater 2640 1640 1000 and left lane closed and lane ends signs substituted for the right lane closed and lane end signs.
DURATION NOTES
* The ROAD WORK 1 MILE sign may be used The same applies to undivided highways with the following exceptions:
as an alternate to the ROAD WORK AHEAD a. Work shall be confined within one median lane. 1. Temporary white edgeline may be omitted for work operations less than 3
1 b. Additional barricades, cones, or drums shall be placed along the centerline abutting the work area and consecutive calendar days.
sign and the RIGHT LANE CLOSED 2 MILE
sign may be used as an alternate to the across the trailing end of the work area.
2. For work operations up to approximately 15 minutes, signs, channelizing devices,
RIGHT LANE CLOSED AHEAD sign.
When work on undivided highways occurs across the centerline so as to encroach on both median lanes, arrow board, and buffer space may be omitted if all of the following conditions
the inverted plan is applied to the approach of both roadways. are met:
** 500' beyond the ROAD WORK AHEAD sign or
a. Speed limit is 45 mph or less.
midway between signs whichever is less.
4. Signs and traffic control devices are to be modified in accordance with INTERMITTENT WORK STOPPAGE b. No sight obstructions to vehicles approaching the work area for a distance
details (sheet 2 of 2) when no work is being performed and the highway is open to traffic. equal to the buffer space and the taper length combined.
5. The two channelizing devices directly in front of the work area may be omitted provided vehicles in the d. The closed lane is occupied by a class 5 or larger, medium duty truck(s) with
work area have high-intensity rotating, flashing, oscillating, or strobe lights operating. a minimum gross weight vehicle rating (GWVR) of 16,001 lb with high-intensity,
rotating, flashing, oscillating, or strobe lights mounted above the cab height
6. When paved shoulders having a width of 8 ft. or more are closed, channelizing devices shall be used to and operating.
SYMBOLS
close the shoulder in advance of the merging taper to direct vehicular traffic to remain within the travel
way. See Index 102-612 for shoulder taper formulas. 3. For work operations up to 60 minutes, arrow board and buffer
Work Area
space may be omitted if conditions a, b, and c in DURATION NOTE 2
7. When a side road intersects the highway within the TTC zone, additional TTC devices shall be placed in are met, and vehicles in the work area have high-intensity,
Channelizing Device (See Index 102-600)
accordance with other applicable TCZ Indexes. rotating, flashing, oscillating, or strobe lights operating.
8. This TCZ plan does not apply when work is being performed in the middle lane(s) of a six or more lane
Advance Warning Arrow Board
highway. See Index 102-614.
CONDITIONS
33:
10:
Approved
ENCROACH ON THE LANE ADJACENT
9/18/2018
2019-H-593-00433
AREA 2' OUTSIDE THE EDGE OF
Carol Hatfield
TRAVEL WAY.
REVISIO N
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK WITHIN TRAVEL WAY
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-613 1of 2
Arrow Board Operation Discontinued And Arrow Board
Work Area
END
A B C L and Buffer Space
ROAD WORK
ROAD Signs Covered
** Area Temporarily 500'
WORK
Reopened To Traffic
1 MILE
ROAD
SPEEDING FINES
WORK
DOUBLED 1
MILE
2
EVEN PAVEMENT
Work Area
END
A B C L and Buffer Space
ROAD WORK
Area Temporarily 500'
ROAD Hinged Or Overlay Shields
** Reopened To Traffic
WORK
1 MILE
ROAD
WORK UNEVEN
1
SPEEDING FINES 2
MILE LANES Temporary Pavement Markings
UNEVEN PAVEMENT
33:
10:
2019-H-593-00433
Carol Hatfield
REVISIO N
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK WITHIN TRAVEL WAY
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-613 2 of 2
GENERAL NOTES DURATION NOTES
1. Work operations shall be confined to either one lane, or lane combinations as 1. For work operations up to approximately 15 minutes, signs,
c. Outside travel lane and adjoining auxiliary lane; b. No sight obstructions to vehicles approaching the work area
d. Inside travel lane �; for a distance equal to twice the taper length.
e. Inside auxiliary lane �; c. Volume and complexity of the roadway has been considered.
f. Inside travel lane and adjoining auxiliary lane � d. The closed lane is occupied by a class 5 or larger, medium
� See Sheet 3 duty truck(s) with a minimum gross weight vehicle rating
If the work area is confined to an auxiliary lane the work area shall be oscillating, or strobe lights mounted above the cab height and
barricaded and the RIGHT (LEFT) LANE CLOSED AHEAD signs replaced by ROAD operating.
2. When vehicles in a parking zone block the line of sight to TCZ signs, the signs board may be omitted if conditions a, b, and c in
shall be post mounted and located in accordance with Index 700-101 DURATION NOTE 1 are met, and vehicles in the work
3. If the work space extends across a crosswalk, the crosswalk should be closed oscillating, or strobe lights operating.
5. The two channelizing devices directly in front and directly at the end of the work
area may be omitted provided vehicles in the work area have high-intensity
6. For general TCZ requirements and additional information, refer to Index 102-600.
SYMBOLS
Work Area
Approved
9/18/2018
2019-H-593-00433
Carol Hatfield
REVISIO N
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 1of 3
DISTANCE BETWEEN SIGNS
Spacing (ft.)
Speed
Work Area A B C
A
ROAD * Spacing
DOUBLED
AHEAD
STOP ROAD Type I or Type II
Speed Cones or
WORK Barricades or Vertical
WHEN WORKERS (mph) Tubular Markers
AHEAD Panels or Drums
PRESENT Erect STOP Sign where the existing stop bar is more than
Taper Tangent Taper Tangent
30' from the taper line. Remove or cover existing STOP
30 to 45 25 50 30 50
RIGHT LANE CLOSED ON FAR SIDE OF MINOR SIDESTREET
Table II
AHEAD
WORK Taper Length - Merge
A
ROAD (12' Lateral Transition)
Speed L Notes
25 125
30 180 WS²
L =
35 245 60
40 320
Work Area
45 540 L=WS
A
W = Width of lateral transition in feet
See
ROAD * S = Posted speed limit (mph)
Table I
WORK END
LEFT ROAD
DOUBLED AHEAD
WHEN WORKERS
PRESENT
27 AM
1. The normal procedure is to close on the near side of the intersection any lane that 2. For intersection approaches reduced to a single lane, left turning movements may
is not carried through the intersection. However, when this results in the closure of
a right lane having significant right turning movements, then the right lane may be
be prohibited to maintain capacity for through vehicular traffic.
Approved
9/18/2018
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 2 of 3
AHEAD ONE WAY
WORK
A
CLOSED
ROAD
ROAD
A
Spacing
* Device Spacing
WORK Device Spacing -Taper Tangent
Max. Distance Between Devices (ft.)
END
AHEAD See Table I See
Type I or Type II
Table II ROAD WORK Speed Cones or
Barricades or Vertical
(mph) Tubular Markers
Panels or Drums
A
(12' Lateral Transition)
Speed L Notes
25 125
30 180 WS²
Work Area L =
35 245 60
40 320
45 540 L = WS
A
ROAD
See Table II Gap See L = Length of taper in feet
WORK * END
LEFT LANE Table I W = Width of lateral transition in feet
AHEAD ROAD WORK S = Posted speed limit (mph)
Device Spacing -Taper
MUST
See Table I TURN LEFT
LEFT LANE
ROAD
SPEEDING FINES
CLOSED WORK
DOUBLED AHEAD
AHEAD
WHEN WORKERS
27 AM
PRESENT
36:
1. The normal procedure is to close on the near side of the intersection any lane that is not carried through
the intersection. However, when this results in the closure of a left lane having significant left turning
Approved
9/18/2018
movements, then the left lane may be reopened as a turn bay for left turns only as show in this detail.
2019-H-593-00433
Carol Hatfield
REVISIO N
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 3 of 3
GENERAL NOTES:
SYMBOLS
1. When encroaching work requires a sidewalk closure for 60 6. Provide a cross-slope with a maximum value of 0.02 for all temporary walkways.
Work Area
minutes or greater, provide an alternate pedestrian route.
Channelizing Device 7. Maintain temporary walkway surfaces and ramps that are stable, firm, slip-resistant,
2. For spacing of vehicular Channelizing Devices, see applicable and free of any obstructions or hazards such as holes, debris, mud, construction
Work Zone Sign
vehicular temporary traffic control Indexes. equipment, and stored material.
4. For post mounted signs located near or adjacent to a sidewalk, 9. Meet the requirements of Index 522-002 for temporary curb ramps.
Pedestrian Longitudinal Channelizing Device (LCD) with
maintain a minimum 7’ clearance from the bottom of the sign
Mounted Work Zone Sign or separate Work Zone Sign
panel to the surface of the sidewalk. 10. Place pedestrian longitudinal channelizing device(s) across the full width of the
Pedestrian Longitudinal Channelizing Device (LCD) closed sidewalk. For temporary walkways, similar to the Sidewalk Diversion,
5. Provide a 5' wide temporary walkway, except where space restrictions place LCDs to delineate both sides of the temporary walkway.
Temporary Sidewalk
warrant a minimum width of 4'. Provide a 5' x 5' passing space for
temporary walkways less than 5' in width at intervals not to 11. For sidewalk diversions, ensure that there is sufficient R/W for placement of
CR
DETOUR
CR
CROSS HERE
AHEAD
DETOUR
SIDEWALK CLOSED
DETOUR
DETOUR
Taper
1
20:
WALKWAY
CLOSED
DEW ALK CLOSED
DETOUR PEDESTRIAN
CROSS HERE
W o r k
SIDEWALK
AHEAD
SI
CLOSED
USE OTHER SI
DEWALK CLOSED
SID EW ALK
ROAD
C LO SED
SIDEWALK
WORK
W ork Area
W ork Area
AHEAD
SI
A e r a
DE
SIDEWALK
W o r k A r e a CLOSED PEDESTRIAN
WALKWAY
Taper
1
20:
CR
DETOUR
DETOUR DETOUR
SIDEWALK CLOSED DETOUR
CR
DETOUR
ROAD ROAD
DETOUR
WORK WORK
AHEAD AHEAD
36 AM
ROAD
WORK
36:
AHEAD
7:
LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION
PEDESTRIAN CONTROL FOR CLOSURE OF SIDEWALKS
11/01/17 STANDARD PLANS 102-660 1of 1
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
1" = 50'
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 525 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 2 OF 9
TRAFFIC CONTROL
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579 GPS: (28.664282, -81.371516)
Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 653 E FL-436 CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER
TRAFFIC CONTROL
2019-H-593-00433
PLOT 3 OF 9
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579 GPS: (28.664165, -81.369086) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 696 E FL-436 CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 4 OF 9
TRAFFIC CONTROL
GPS: (28.663144, -81.366328) Carol Hatfield
1" = 50'
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 804 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 5 OF 9
TRAFFIC CONTROL
USP: SUB-STATION BREAKER FOR CIRCUIT M579 GPS: (28.662894, -81.362228) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 956 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 6 OF 9
USP: SUB-STATION BREAKER FOR CIRCUIT M579 GPS: (28.662963, -81.358913)
TRAFFIC CONTROL Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1000 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 7 OF 9
TRAFFIC CONTROL
GPS: (28.662921, -81.357479)
Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1088 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 8 OF 9
TRAFFIC CONTROL
GPS: (28.662809, -81.354675) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM
Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1101 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER
2019-H-593-00433
PLOT 9 OF 9
GPS: (28.663463, -81.353939)
TRAFFIC CONTROL Carol1"Hatfield
= 50'
10/21/2019
9/12/2019 IRTH One Call
WO #29533044
Ticket : 255903563 Rev:000 Taken: 09/12/19 09:49ET
Locat: LOCATE BEGINS IN THE NORTH R/W OF E ALTAMONTE SPRINGS EAST OF BOSTON
AVE. CONSTRUCTION CONTINUES EAST PAST JASMINE RD, MAITLAND AVE, HERMITS TRAIL,
NEWBURYPORT AVE, RONALD REAGAN AVE AND ENDS AT 1101 E ALTAMONTE DR.
:
Remarks : DUKE ENERGY CONTACT: CULLEN ABERNETHY @ 412-992-6840
*** LOOKUP BY MANUAL ***
:
Grids : 2839A8121A 2839A8121B 2839A8121C 2839A8122C 2839A8122D
Work date: 01/03/20 Time: 23:59ET Hrs notc: 1838 Category: 3 Duration: 180 DAYS
Due Date : 01/03/20 Time: 23:59ET Exp Date : 01/30/20 Time: 23:59ET
Work type: INSTALLING A POLE Boring: N White-lined: U
Ug/Oh/Both: U Machinery: N Depth: 6' Permits: Y 29533044
Done for : DUKE ENERGY
Service
Service Area Name Contact Phone Numbers Utility Type
Area Code
ATTF01 AT T NDCI GROUP Day: (800) 252 - 1133 FIBER,
Approved
COMMUNICATION
2019-H-593-00433
LINES
BH1956 CHARTER COMMUNICATIONS HELENE HERNANDEZ Day: (407) 532 - 8092 Carol
FIBER, Hatfield
www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 1/3
9/12/2019 IRTH One Call
TELEPHONE, CATV
BH1957 CHARTER COMMUNICATIONS HELENE HERNANDEZ Day: (407) 532 - 8092 FIBER,
TELEPHONE, CATV
CAS541 CITY OF ALTAMONTE SPRINGS JAMES THOMPSON Day: (407) 571 - 8591 FIBER, WATER,
ELECTRIC, SEWER
CC1966 CROWN CASTLE FIBERDIG TEAM Day: (888) 632 - 0931 x2 ELECTRIC
FPC322 DUKE ENERGY USIC DISPATCH Day: (800) 778 - 9140 ELECTRIC
FPLFAD CROWN CASTLE FIBER STAKE CENTER LOCATING Day: (801) 364 - 1063 FIBER
DISPATCHER**
L3C900 CENTURYLINK TECH ON DUTY Day: (877) 366 - 8344 FIBER
SBF02 A T & T/ DISTRIBUTION USIC DISPATCH Day: (800) 778 - 9140 TELEPHONE
SCT994 SEMINOLE COUNTY TRAFFIC ROBERT LOYER Day: (407) 665 - 5642 FIBER
ENGINEERING Alt: (321) 377 - 2405
SEM814 SEMINOLE COUNTY CHRIS GRAYBOSCH Day: (407) 840 - 4058 RECLAIMED
Approved
WATER, WATER,
2019-H-593-00433
SEWER
SL1086 UNITI FIBER LLC SOUTHERN LIGHT EMERGENCY Day: (877) 652 - 2321 Carol
FIBER Hatfield
www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 2/3
9/12/2019 IRTH One Call
RESPONSE DISPATCH
UTI296 CENTURYLINK DISPATCH ** Day: (855) 742 - 6062 FIBER,
TELEPHONE
Approved
2019-H-593-00433
Carol Hatfield
www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 3/3
Pike Engineering, LLC 4427 PET Lane, Suite 101 Lutz, Florida 33559 813-909-1200
Duke Energy Florida, LLC Florida, has applied for a Right of Way permit to Construct and maintain facilities
as shown on the attached prints.
Please review the plans and advise our office if you have any objections to the proposed construction.
Please send any correspondence regarding this matter to my attention. If you have any questions, or need
additional information, please feel free to contact Lisa Wood at her office (813) 909-1287 or her email at
Lisa.Wood@duke-energy.com .
Sincerely,
Enclosure/cc:
BH1956 CHARTER COMM HELENE HERNANDEZ Day: (407) 532 - 8092 FIBER, TELEPHONE, CATV
BH1957 CHARTER COMM HELENE HERNANDEZ Day: (407) 532 – 8092 FIBER, TELEPHONE, CATV
CITY OF ALTAMONTE SPRINGS JAMES THOMPSON Day: (407) 571 – 8591 FIBER, WATER, ELECTRIC, SEWER
CROWN CASTLE FIBER STAKE CENTER LOCATING DISPATCHER Day: (801) 364 – 1063 FIBER
MCI FIELD CONTACTS Day: (800) 624 – 9675 FIBER, COMMUNICATION LINES
TECO PEOPLES GAS PHYLLIS BRIDGES Day: (813) 228 – 4025 Emerg: (877) 832 – 6747 GAS
SEMINOLE COUNTY TRAFFIC ENGINEERING ROBERT LOYER Day: (407) 665 – 5642 Alt: (321) 377 – 2405 FIBER
SEMINOLE COUNTY CHRIS GRAYBOSCH Day: (407) 840 – 4058 RECLAIMED WATER, WATER, SEWER
UNITI FIBER LLC SOUTHERN LIGHT EMERGENCY Day: (877) 652 - 2321 FIBER Approved
CENTURYLINK RESPONSE DISPATCH 2019-H-593-00433
Day: (855) 742 – 6062 FIBER, TELEPHONE
Carol Hatfield