Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Approved Utility Permit Package

Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

Rule 14-46.001 F.A.C.

FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016


Page 1 of 3
UTILITY PERMIT

PERMIT NO:__________________________________
2019-H-593-00433

STATE ROAD INFORMATION


County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
Seminole 77080000 SR 436 6.565 6.565

APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility
Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be
identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint
applicant.

Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County)
Name: _____________________________________
Duke Energy Distribution (North Central Zone) Name: ______________________________________
Contact Person: _____________________________________
Duke Energy Distribution (North Central Zone) Contact Person: ______________________________________
Address: 452 East Crown Point Road
_____________________________________ Address: ______________________________________
City: Winter Garden
_____________________________________ City: ______________________________________
State: Florida
_____ State: _____
Zip: 34787
_________ Zip: _________
Telephone: 4079053376
_____________________________________ Telephone: ______________________________________
Email: ____________________________________
DEFDistributionGOV@duke-energy.com Email: ______________________________________

WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described
below and as depicted in the incorporated documentation.
EXISTING CONDUCTOR TO BE RELOCATED DUE TO CONFLICTS CREATED BY SIDEWALK
_____________________________________________________________________________________________________________________________
INSTALLATION HEADING EAST IN THE NORTH ROW OF E ALTAMONTE DR. BEGINNING FROM
_____________________________________________________________________________________________________________________________
APPROX 525 E ALTAMONTE DR TO 1101 E ALTAMONTE DR.
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No ✔
For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No ✔

TRAFFIC CONTROL (TCP)

612, 613, 616, 660


✔ The TCP will comply with the following 600 series index(es) ________________________________________________________________________
A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.

MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
CULLEN ABERNETHY
Name: ________________________________ Telephone ________________________
(412) 992-6840 ext. ______ Email: _______________________________
CULLEN.ABERNETHY@DUKE-ENERGY.COM

COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If
the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT
Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO
and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.

1/3/2020
Anticipated Start Date: ___________________
180
Calendar days needed to completed: ________
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Rule 14-46.001 F.A.C.
Florida Department of Transportation December 14, 2016

UTILITY PERMIT
Page 2 of 3

PERMIT NO:_________________________________
2019-H-593-00433

APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description,
shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special
instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both
aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further
declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility
owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
9/12/2019
_____________ __________________________________________________________________________________________________
AT&T, CHARTER COMMUNICATIONS, CITY OF ALTAMONTE SPRINGS, CROWN CASTLE, DUKE ENERGY, CROWN CASTLE FIBER, CENTURYLINK, MCI, TECO PEOPLES GAS, AT&T/ DISTRIBUTION, SEMINOLE COUNTY TRAFFIC ENGINEERI

_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________
_____________ __________________________________________________________________________________________________

Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ 9/17/2019


LISA WOOD (digital signature) Date: ________________ Signature:___________________________ Date: _______________
LISA WOOD
Name (printed): _____________________________________________ Name (printed): __________________________________________
Title: ______________________________________________________ Title: ___________________________________________________

FDOT PROJECT INFORMATION


Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved
prior to commencement of work within the FDOT project limits:
_____________________________________________________________________________________________________________________________
There are NO FDOT constructions (proposed or underway).
_____________________________________________________________________________________________________________________________
This work is NOT related to an approved Utility Work Schedule.
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________

FDOT SPECIAL INSTRUCTIONS


In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
COUNT STATION 5071 6-LANE
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
M.P. 5.412 TO M.P. 6.400 DATE 3/21/2019
_____________________________________________________________________________________________________________________________
NO LANE CLOSURES 11:00 AM TO 7:00 PM DIRECTION EASTBOUND
_____________________________________________________________________________________________________________________________
NO LANE CLOSURES 7:00 AM TO 7:00 PM DIRECTION WESTBOUND
_____________________________________________________________________________________________________________________________
RESTRICTIONS
_____________________________________________________________________________________________________________________________

COUNT STATION 106 6-LANE Additional FDOT Special Instructions are attached and incorporated into this permit. Yes ✔ No

M.P. 6.400 TO M.P. 6.692 DATE PERMIT


1/18/2018 APPROVAL
NO LANE CLOSURES 2:00 PM TO 7:00 PM DIRECTION EASTBOUND
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit
NO LANE CLOSURES 7:00- 9:00 AM TO 12:00 - 6:00 PM DIRECTION WESTBOUND
in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s
RESTRICTIONS
Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
It is un ... (see special instructions cont. page)
Carol Hatfield (digital signature)
Approving Engineer: _____________________________________________ 10/21/2019
Date: _______________
Carol Hatfield
Name: _____________________________________________
OPERATIONS PROGRAM ENGINEER
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________
(407) 278-2777 ext. ______ or Email: _____________________________
laith.kareem@dot.state.fl.us
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No
Rep. Name: _____________________________ Telephone _____________________ Email:
Approved
_____________________________

2019-H-593-00433
Carol Hatfield
10/21/2019
Rule 14-46.001 F.A.C.
Florida Department of Transportation December 14, 2016

UTILITY PERMIT
Page 3 of 3

PERMIT NO:_________________________________
2019-H-593-00433

CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated
documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated
into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition
than when the work began.
Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________


Name (printed): _____________________________________________ Name (printed): ____________________________________________
Title: ______________________________________________________ Title: ____________________________________________________

FINAL INSPECTION OF WORK


The work was inspected and found to be in non-compliance as noted below:
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________

All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the
UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant
to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.

FDOT Inspector: _____________________________________________ Date: _______________


Name: _____________________________________________
Title: ______________________________________________

Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
PERMIT NO.: 2019-H-593-00433
The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.

Special FDOT Instructions


COUNT STATION50716-LANE

M.P.5.412TO M.P.6.400DATE 3/21/2019


NO LANE CLOSURES11:00 AMTO7:00 PMDIRECTION EASTBOUND
NO LANE CLOSURES 7:00 AMTO7:00 PMDIRECTIONWESTBOUND
RESTRICTIONS

COUNT STATION1066-LANE

M.P.6.400TO M.P.6.692DATE 1/18/2018


NO LANE CLOSURES 2:00 PMTO7:00 PMDIRECTION EASTBOUND
NO LANE CLOSURES7:00- 9:00 AMTO12:00 - 6:00 PMDIRECTIONWESTBOUND
RESTRICTIONS
It is understood and agreed that commencement by the permittee is acknowledgment and acceptance of the binding nature of
all the below listed permit conditions.
comply with the following lane closure restrictions
Permittee shall contact Laith j Kareem at (407) 278-2777 or Carol Hatfield at (407) 278-2774 to provide start notice at least
48 hours prior to starting work.
Prior to any work requiring lane closures, mobile operations or traffic pacing operations, the contractor or permittee shall
submit a request to the department that includes the time, location, and description of work being performed. The lane
closure request shall be submitted to the department a minimum of 2 weeks prior to the proposed closure date and must be
approved by the department before work requiring the closure may begin within the FDOT right of way. Submit lane closure
requests through the lane closure information system (lcis), found at the following website: https://lcis.dot.state.fl.us/. the
UAO is not required to report lane closures for emergencies as described

Approved
2019-H-593-00433
Carol Hatfield
special instructions continuation page 10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
Legend for Construction Prints
Existing Overhead Install Overhead R/W C/L R/W
Transformer Transformer 113’ – 126’
Existing Underground Install Underground
Transformer Transformer S M
i e G S
P Install Pedestal R Install Recloser G G
d d r i
r r
e i a d
Existing Down Guy Install Down Guy a a
w a s e
s s
Existing Pole a EOP n EOP s w
Install New Pole s s
l a
Install Fuse k l
Existing Fuse
k
Overhead Cable Closed Switch
5’ 21’ 36’ 13’ 36’ 4’ 5’ 6’
------ Underground Cable

Typical Construction Notes P


● Duke Energy to restore right of way to equal or better than existing EXIST
condition. FIBER
● Verify depth of utility and storm water/sewers. EXIST STORM DRAINS EXIST
●To avoid conflicts, contractor will coordinate depth of directional bore with 6’ 6’ FIBER
the municipality inspector prior to bores being installed.
POLES TO BE
● Minimum depth of cable in conduit is 36 inches below grade. One foot of
RELOCATED DUE
separation from existing utilities and storm water/sewers required.
TO SIDEWALK
● Conduit is to extend 6’ beyond edge of pavement.
INSTALLATION
● All pull box lids shall be traffic rated when installed within the right of Way.
● Contractor shall maintain an uninterrupted access to all driveways,
sidewalks and side streets always, unless otherwise approved on the MOT
permit. Cable to be 18’ Minimum sag
● A separate permit will be required for any subsurface test holes under
pavement.
TYPICAL CROSS SECTION FOR
● Duke Energy to maintain 3 feet cover. E ALTAMONTE DR LOOKING EAST
● All other right of way users and municipalities in the immediate vicinity of PROJECT LOCATION:
the proposed Construction/installation have been notified in writing. E ALTAMONTE DR
● Minimum depth of cable and conduit under swales and ditches is 3 feet
below the bottom of the swales and ditches. Minimum systems are six (6) feet
WR #: 29533044 Approved DATE: 09/17/19
below the bottom of the system.
● Minimum height of overhead wires and cable is 18 feet over roadways and
2019-H-593-00433
DRAWN: Alanah Lee

16 feet over Driveways.


NOT TO SCALE.
Carol Hatfield
● Before digging call Sunshine at (800) 432-4770.
10/21/2019
MEASUREMENTS MAY VARY SLIGHTLY ON THIS ROAD
Median

Table II

15'
M in.
2'
Work Area Taper Length - Shoulder
A 1
B Taper Length = 3L
1
3L (ft.)
See Table II Speed
* Notes
(mph) 8' 10' 12'
END Shldr. Shldr. Shldr.
ROAD Device Spacing-Taper Device Spacing-Tangent 500'

WORK See Table I See Table I ROAD WORK 25 28 35 42


SPEEDING FINES

AHEAD DOUBLED 30 40 50 60 WS²


WHEN WORKERS
L=
55 60
PRESENT 35 68 82
Table I
40 72 90 107
Device Spacing
45 120 150 180
Max. Distance Between Devices (ft.)
50 133 167 200
Type I or Type II
Speed Cones or
Barricades or Vertical 55 147 183 220
DISTANCE BETWEEN SIGNS (mph) Tubular Markers L=WS
Panels or Drums 160 200 240
60
Spacing (ft.)
Speed Taper Tangent Taper Tangent
65 173 217 260
A B
25 25 50 25 50
40 mph or less 200 200 70 187 233 280
30 to 45 25 50 30 50
45 mph 350 350
8' minimum shoulder width.
50 mph or greater 500 50 to 70 25 50 50 100
500

1
3L = Length of shoulder taper in feet
*250' beyond the ROAD WORK AHEAD sign or

midway between signs whichever is less.


W = Width of total shoulder in feet

(combined paved and unpaved width)

GENERAL NOTES DURATION NOTES


S = Posted speed limit (mph)
1. Signs and channelizing devices may be omitted if all of the
1. When a high volume of work vehicles are entering and leaving the Work Area at
following conditions are met:
speeds slower than 10 MPH below the posted speed, place an MOT-5-06 sign in the
SYMBOLS a. Work operations are 60 minutes or less.
ROAD WORK AHEAD sign location and shift the ROAD WORK AHEAD sign upstream
b. Vehicles in the work area have high-intensity, rotating,
Work Area 500 ft.
flashing, oscillating, or strobe lights operating.

2. This TCZ plan also applies to work performed in the median more than 2' but less
Channelizing Device (See Index 102-600)
than 15' from the edge of travelway.

Work Zone Sign 3. When work is being performed on a multilane undivided roadway the signs normally

mounted in the median (as shown) shall be omitted.

Lane Identification + Direction of Traffic


4. WORKERS signs to be removed or fully covered when no work is being performed. CONDITIONS

5. SHOULDER WORK sign may be used as an alternate to the WORKER symbol sign. WHERE ANY VEHICLE, EQUIPMENT,

WORKERS OR THEIR ACTIVITIES


6. When a side road intersects the highway within the TTC zone, additional TTC ENCROACH THE AREA CLOSER THAN
16 AM

devices shall be placed in accordance with other applicable TCZ Indexes. 15' BUT NOT CLOSER THAN 2' TO
32:

THE EDGE OF TRAVEL WAY.


10:

7. For general TCZ requirements and additional information, refer to Index 102-600.

Approved
9/18/2018

2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION
MULTILANE, WORK ON SHOULDER
11/01/17 STANDARD PLANS 102-612 1of 1
Table II
Buffer Space and Taper Length
Taper Length
Buffer
Median (12' Lateral
Speed Space
Transition)
(mph)
Dist. L Notes
White Reflectorized Pavement Markings (ft.) (ft.) (Merge)

25 155 125

Work Area 30 200 180 WS²


L =
60

2'
35 250 245

A B C Taper Length=L Buffer Space 500' 40 305 320


END
ROAD See Table II See Table II
45 360 540
** ROAD WORK
WORK
50 425 600
AHEAD Device Spacing-Taper Device Spacing-Tangent 100'

RIGHT LANE 55 495 660


See Table I See Table I
L = WS
CLOSED 60 570 720
SPEEDING FINES AHEAD
65 645 780
DOUBLED
70 730 840
WHEN WORKERS Table I
PRESENT Device Spacing When Buffer Space cannot be attained

Max. Distance Between Devices (ft.) due to geometric constraints, the

greatest attainable length shall be used,


Type I or Type II
Speed Cones or but not less than 200 ft.
Barricades or Vertical
(mph) Tubular Markers
Panels or Drums
Taper Tangent Taper Tangent For lateral transitions other than 12', use
DISTANCE BETWEEN SIGNS GENERAL NOTES
formula for L shown in notes column.
25 25 50 25 50
Spacing (ft.) 1. Work operations shall be confined to one traffic lane, leaving the adjacent lane open to traffic.
Speed Where:
A B C 30 to 45 25 50 30 50

40 mph or less 200 200 200 2. On undivided highways the median signs as shown are to be omitted. 50 to 70 25 50
50 100 L = Length of taper in feet
45 mph 350 350 350 W = Width of lateral transition in feet
50 mph 3. When work is performed in the median lane on divided highways, the channelizing device plan is inverted
500 500 500 S = Posted speed limit (mph)
*55 mph or greater 2640 1640 1000 and left lane closed and lane ends signs substituted for the right lane closed and lane end signs.

DURATION NOTES
* The ROAD WORK 1 MILE sign may be used The same applies to undivided highways with the following exceptions:

as an alternate to the ROAD WORK AHEAD a. Work shall be confined within one median lane. 1. Temporary white edgeline may be omitted for work operations less than 3

1 b. Additional barricades, cones, or drums shall be placed along the centerline abutting the work area and consecutive calendar days.
sign and the RIGHT LANE CLOSED 2 MILE

sign may be used as an alternate to the across the trailing end of the work area.
2. For work operations up to approximately 15 minutes, signs, channelizing devices,
RIGHT LANE CLOSED AHEAD sign.
When work on undivided highways occurs across the centerline so as to encroach on both median lanes, arrow board, and buffer space may be omitted if all of the following conditions

the inverted plan is applied to the approach of both roadways. are met:
** 500' beyond the ROAD WORK AHEAD sign or
a. Speed limit is 45 mph or less.
midway between signs whichever is less.
4. Signs and traffic control devices are to be modified in accordance with INTERMITTENT WORK STOPPAGE b. No sight obstructions to vehicles approaching the work area for a distance

details (sheet 2 of 2) when no work is being performed and the highway is open to traffic. equal to the buffer space and the taper length combined.

c. Volume and complexity of the roadway has been considered.

5. The two channelizing devices directly in front of the work area may be omitted provided vehicles in the d. The closed lane is occupied by a class 5 or larger, medium duty truck(s) with

work area have high-intensity rotating, flashing, oscillating, or strobe lights operating. a minimum gross weight vehicle rating (GWVR) of 16,001 lb with high-intensity,

rotating, flashing, oscillating, or strobe lights mounted above the cab height

6. When paved shoulders having a width of 8 ft. or more are closed, channelizing devices shall be used to and operating.
SYMBOLS
close the shoulder in advance of the merging taper to direct vehicular traffic to remain within the travel

way. See Index 102-612 for shoulder taper formulas. 3. For work operations up to 60 minutes, arrow board and buffer
Work Area
space may be omitted if conditions a, b, and c in DURATION NOTE 2

7. When a side road intersects the highway within the TTC zone, additional TTC devices shall be placed in are met, and vehicles in the work area have high-intensity,
Channelizing Device (See Index 102-600)
accordance with other applicable TCZ Indexes. rotating, flashing, oscillating, or strobe lights operating.

Work Zone Sign


02 AM

8. This TCZ plan does not apply when work is being performed in the middle lane(s) of a six or more lane
Advance Warning Arrow Board
highway. See Index 102-614.
CONDITIONS
33:
10:

WHERE ANY VEHICLE, EQUIPMENT,


9. For general TCZ requirements and additional information, refer to Index 102-600.
WORKERS OR THEIR ACTIVITIES

Approved
ENCROACH ON THE LANE ADJACENT
9/18/2018

TO EITHER SHOULDER AND THE

2019-H-593-00433
AREA 2' OUTSIDE THE EDGE OF

Carol Hatfield
TRAVEL WAY.
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK WITHIN TRAVEL WAY
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-613 1of 2
Arrow Board Operation Discontinued And Arrow Board

Shall Be Removed Or Relocated Outside The Clear


Median
Zone Or Be Shielded By A Barrier Or Crash Cushion

Work Area

END
A B C L and Buffer Space

ROAD WORK
ROAD Signs Covered
** Area Temporarily 500'
WORK
Reopened To Traffic
1 MILE
ROAD
SPEEDING FINES
WORK
DOUBLED 1
MILE
2

WHEN WORKERS Temporary Pavement Markings

PRESENT Placed Through Work Area And Devices Relocated

Laterally 2' To 4' Outside Edge Of Travel Way.

EVEN PAVEMENT

Arrow Board Operation Discontinued And Arrow Board

Shall Be Removed Or Relocated Outside The Clear


Median
Zone Or Be Shielded By A Barrier Or Crash Cushion

Work Area

END
A B C L and Buffer Space
ROAD WORK
Area Temporarily 500'
ROAD Hinged Or Overlay Shields
** Reopened To Traffic
WORK
1 MILE
ROAD
WORK UNEVEN
1
SPEEDING FINES 2
MILE LANES Temporary Pavement Markings

DOUBLED Placed Through Work Area And Devices Relocated

Laterally 2' To 4' Outside Edge Of Travel Way.


WHEN WORKERS
PRESENT
03 AM

UNEVEN PAVEMENT
33:
10:

INTERMITTENT WORK STOPPAGE - LANE REOPENED TO TRAFFIC Approved


9/18/2018

2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK WITHIN TRAVEL WAY
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-613 2 of 2
GENERAL NOTES DURATION NOTES

1. Work operations shall be confined to either one lane, or lane combinations as 1. For work operations up to approximately 15 minutes, signs,

follows: channelizing devices, and arrow board may be omitted if all of

the following conditions are met:

a. Outside travel lane;

b. Outside auxiliary lane; a. Speed limit is 45 mph or less.

c. Outside travel lane and adjoining auxiliary lane; b. No sight obstructions to vehicles approaching the work area

d. Inside travel lane �; for a distance equal to twice the taper length.

e. Inside auxiliary lane �; c. Volume and complexity of the roadway has been considered.

f. Inside travel lane and adjoining auxiliary lane � d. The closed lane is occupied by a class 5 or larger, medium

� See Sheet 3 duty truck(s) with a minimum gross weight vehicle rating

(GWVR) of 16,001 lb with high-intensity, rotating, flashing,

If the work area is confined to an auxiliary lane the work area shall be oscillating, or strobe lights mounted above the cab height and

barricaded and the RIGHT (LEFT) LANE CLOSED AHEAD signs replaced by ROAD operating.

WORK AHEAD signs, and the merge symbol signs eliminated.

2. For work operations up to 60 minutes, the arrow

2. When vehicles in a parking zone block the line of sight to TCZ signs, the signs board may be omitted if conditions a, b, and c in

shall be post mounted and located in accordance with Index 700-101 DURATION NOTE 1 are met, and vehicles in the work

area have high-intensity, rotating, flashing,

3. If the work space extends across a crosswalk, the crosswalk should be closed oscillating, or strobe lights operating.

using the information in Index 102-660.

4. Signs are required on the median side for divided highways.

5. The two channelizing devices directly in front and directly at the end of the work

area may be omitted provided vehicles in the work area have high-intensity

rotating, flashing, oscillating, or strobe lights operating.

6. For general TCZ requirements and additional information, refer to Index 102-600.

SYMBOLS

Work Area

Work Zone Sign

Advance Warning Arrow Board

Type III Barricade


26 AM

Channelizing Device (See Index 102-600)


36:

Lane Identification + Direction of Traffic


10:

Approved
9/18/2018

2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 1of 3
DISTANCE BETWEEN SIGNS
Spacing (ft.)
Speed
Work Area A B C

40 mph or less 200 200 200

45 mph 350 350 350

* 500' beyond the ROAD WORK AHEAD sign or

Taper Length=L 500' midway between signs whichever is less.


A B C
Device
See Table II

A
ROAD * Spacing

WORK Device Spacing -Taper Tangent

AHEAD See Table I See


END
Table II
Table I
ROAD WORK
RIGHT LANE
CLOSED
Device Spacing
Max. Distance Between Devices (ft.)
SPEEDING FINES

DOUBLED
AHEAD
STOP ROAD Type I or Type II
Speed Cones or
WORK Barricades or Vertical
WHEN WORKERS (mph) Tubular Markers
AHEAD Panels or Drums
PRESENT Erect STOP Sign where the existing stop bar is more than
Taper Tangent Taper Tangent
30' from the taper line. Remove or cover existing STOP

sign and reinstall when through lane reopened to traffic. 25 25 50 25 50

30 to 45 25 50 30 50
RIGHT LANE CLOSED ON FAR SIDE OF MINOR SIDESTREET

Table II
AHEAD
WORK Taper Length - Merge

A
ROAD (12' Lateral Transition)

Speed L Notes

(mph) (ft) (Merge)

25 125

30 180 WS²
L =
35 245 60

40 320
Work Area
45 540 L=WS

For lateral transitions other than 12',

use formula for L shown in the notes


Device
column. Where:
Spacing
A 500' L = Length of taper in feet
B C Tangent

A
W = Width of lateral transition in feet
See
ROAD * S = Posted speed limit (mph)
Table I
WORK END

AHEAD RIGHT LANE ROAD WORK


THRU
MUST
TRAFFIC
MERGE TURN RIGHT

LEFT ROAD

SPEEDING FINES WORK

DOUBLED AHEAD

WHEN WORKERS

PRESENT
27 AM

RIGHT LANE CLOSED ON FAR SIDE OF INTERSECTION


36:

WITH SIGNIFICANT RIGHT TURNING MOVEMENTS


10:

1. The normal procedure is to close on the near side of the intersection any lane that 2. For intersection approaches reduced to a single lane, left turning movements may
is not carried through the intersection. However, when this results in the closure of

a right lane having significant right turning movements, then the right lane may be
be prohibited to maintain capacity for through vehicular traffic.
Approved
9/18/2018

restricted to right turns only as shown in this detail.


2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 2 of 3
AHEAD ONE WAY

WORK

A
CLOSED
ROAD
ROAD

DISTANCE BETWEEN SIGNS


Spacing (ft.)
Speed
A B C

40 mph or less 200 200 200

45 mph 350 350 350


Work Area

* 500' beyond the ROAD WORK AHEAD sign or

midway between signs whichever is less.

Taper Length=L 500'


A B C Device Table I
See Table II
ROAD

A
Spacing
* Device Spacing
WORK Device Spacing -Taper Tangent
Max. Distance Between Devices (ft.)
END
AHEAD See Table I See
Type I or Type II
Table II ROAD WORK Speed Cones or
Barricades or Vertical
(mph) Tubular Markers
Panels or Drums

LEFT LANE Taper Tangent Taper Tangent


SPEEDING FINES ROAD
CLOSED
CLOSED ROAD
DOUBLED AHEAD 25 25 50 25 50
WORK
WHEN WORKERS ONE WAY 30 to 45 25 50 30 50
AHEAD
PRESENT

LEFT LANE CLOSED ON FAR SIDE OF MINOR AHEAD


WORK
SIDESTREET - RESTRICTED TURNING MOVEMENTS ROAD Table II
Taper Length - Merge

A
(12' Lateral Transition)

Speed L Notes

(mph) (ft.) (Merge)

25 125

30 180 WS²
Work Area L =
35 245 60

40 320

45 540 L = WS

Device For lateral transitions other than 12',

Spacing use formula for L shown in the notes

A B C Taper Length=L 100' Tangent 500' column. Where:

A
ROAD
See Table II Gap See L = Length of taper in feet
WORK * END
LEFT LANE Table I W = Width of lateral transition in feet
AHEAD ROAD WORK S = Posted speed limit (mph)
Device Spacing -Taper
MUST
See Table I TURN LEFT

LEFT LANE
ROAD
SPEEDING FINES
CLOSED WORK
DOUBLED AHEAD
AHEAD
WHEN WORKERS
27 AM

PRESENT
36:

LEFT LANE CLOSED ON FAR SIDE OF INTERSECTION TURNING MOVEMENTS ALLOWED


10:

1. The normal procedure is to close on the near side of the intersection any lane that is not carried through

the intersection. However, when this results in the closure of a left lane having significant left turning
Approved
9/18/2018

movements, then the left lane may be reopened as a turn bay for left turns only as show in this detail.
2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION MULTILANE, WORK NEAR INTERSECTION
11/01/17 STANDARD PLANS MEDIAN OR OUTSIDE LANE 102-616 3 of 3
GENERAL NOTES:
SYMBOLS
1. When encroaching work requires a sidewalk closure for 60 6. Provide a cross-slope with a maximum value of 0.02 for all temporary walkways.
Work Area
minutes or greater, provide an alternate pedestrian route.

Channelizing Device 7. Maintain temporary walkway surfaces and ramps that are stable, firm, slip-resistant,

2. For spacing of vehicular Channelizing Devices, see applicable and free of any obstructions or hazards such as holes, debris, mud, construction
Work Zone Sign
vehicular temporary traffic control Indexes. equipment, and stored material.

Required Locations For Either Temporary


CR
3. Cover or deactivate pedestrian traffic signal display(s) controlling 8. Remove temporary walkways immediately after reopening of the sidewalk, unless
Or Permanent Curb Ramps.
closed crosswalks. otherwise noted in the plans.
Lane Identification + Direction of Traffic

4. For post mounted signs located near or adjacent to a sidewalk, 9. Meet the requirements of Index 522-002 for temporary curb ramps.
Pedestrian Longitudinal Channelizing Device (LCD) with
maintain a minimum 7’ clearance from the bottom of the sign
Mounted Work Zone Sign or separate Work Zone Sign
panel to the surface of the sidewalk. 10. Place pedestrian longitudinal channelizing device(s) across the full width of the

Pedestrian Longitudinal Channelizing Device (LCD) closed sidewalk. For temporary walkways, similar to the Sidewalk Diversion,

5. Provide a 5' wide temporary walkway, except where space restrictions place LCDs to delineate both sides of the temporary walkway.
Temporary Sidewalk
warrant a minimum width of 4'. Provide a 5' x 5' passing space for

temporary walkways less than 5' in width at intervals not to 11. For sidewalk diversions, ensure that there is sufficient R/W for placement of

exceed 200'. temporary sidewalk and pedestrian longitudinal channelizing devices.

CR

DETOUR
CR
CROSS HERE

AHEAD
DETOUR
SIDEWALK CLOSED
DETOUR

DETOUR

Taper
1
20:
WALKWAY
CLOSED
DEW ALK CLOSED
DETOUR PEDESTRIAN

CROSS HERE
W o r k

SIDEWALK
AHEAD
SI

CLOSED
USE OTHER SI

DEWALK CLOSED

SID EW ALK

ROAD
C LO SED

SIDEWALK
WORK

W ork Area
W ork Area
AHEAD
SI
A e r a
DE

SIDEWALK
W o r k A r e a CLOSED PEDESTRIAN
WALKWAY

Taper
1
20:
CR

DETOUR

DETOUR DETOUR
SIDEWALK CLOSED DETOUR

USE OTHER SIDE


DETOUR

CR

DETOUR
ROAD ROAD
DETOUR

WORK WORK
AHEAD AHEAD
36 AM

ROAD
WORK
36:

AHEAD
7:

CROSSWALK CLOSURE AND Approved


10/24/2018

SIDEWALK DETOUR SIDEWALK DIVERSION


PEDESTRIAN DETOUR 2019-H-593-00433
Carol Hatfield
REVISIO N

LAST DESCRIPTION:
FY 2019-20
10/21/2019
INDEX SHEET
REVISION
PEDESTRIAN CONTROL FOR CLOSURE OF SIDEWALKS
11/01/17 STANDARD PLANS 102-660 1of 1
Approved
2019-H-593-00433
Carol Hatfield
10/21/2019
1" = 50'
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 525 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 2 OF 9
TRAFFIC CONTROL
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579 GPS: (28.664282, -81.371516)
Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 653 E FL-436 CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER
TRAFFIC CONTROL
2019-H-593-00433
PLOT 3 OF 9
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579 GPS: (28.664165, -81.369086) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 696 E FL-436 CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 4 OF 9
TRAFFIC CONTROL
GPS: (28.663144, -81.366328) Carol Hatfield
1" = 50'
USP: RECLOSER ON POLE 8331317 FOR CIRCUIT M579
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 804 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 5 OF 9
TRAFFIC CONTROL
USP: SUB-STATION BREAKER FOR CIRCUIT M579 GPS: (28.662894, -81.362228) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: SUB-STATION BREAKER FOR CIRCUIT M575 911 ADDRESS: 956 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 6 OF 9
USP: SUB-STATION BREAKER FOR CIRCUIT M579 GPS: (28.662963, -81.358913)
TRAFFIC CONTROL Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1000 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 7 OF 9
TRAFFIC CONTROL
GPS: (28.662921, -81.357479)
Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1088 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER 2019-H-593-00433
PLOT 8 OF 9
TRAFFIC CONTROL
GPS: (28.662809, -81.354675) Carol Hatfield
1" = 50'
10/21/2019
L:\Distribution Coordination\2018 RGB Central Projects\WO 29533044 SR 436 Anchor Rd to Boston Ave\AutoCAD\Design\Anchor to Boston Design.dwg, August 15, 2019 10:52 AM

Approved
USP: RECLOSER ON POLE 5038156 FOR CIRCUIT M574 911 ADDRESS: 1101 E ALTAMONTE DR CAUTION: HEAVY TRAFFIC IN AREA - USE PROPER
2019-H-593-00433
PLOT 9 OF 9
GPS: (28.663463, -81.353939)
TRAFFIC CONTROL Carol1"Hatfield
= 50'
10/21/2019
9/12/2019 IRTH One Call

WO #29533044
Ticket : 255903563 Rev:000 Taken: 09/12/19 09:49ET

State: FL Cnty: SEMINOLE GeoPlace: ALTAMONTE SPRINGS


CallerPlace: ALTAMONTE SPRINGS
Subdivision:

Address : 525 to 1101


Street : E ALTAMONTE DR
Cross 1 : BOSTON AVE
Within 1/4 mile: Y

Locat: LOCATE BEGINS IN THE NORTH R/W OF E ALTAMONTE SPRINGS EAST OF BOSTON
AVE. CONSTRUCTION CONTINUES EAST PAST JASMINE RD, MAITLAND AVE, HERMITS TRAIL,
NEWBURYPORT AVE, RONALD REAGAN AVE AND ENDS AT 1101 E ALTAMONTE DR.
:
Remarks : DUKE ENERGY CONTACT: CULLEN ABERNETHY @ 412-992-6840
*** LOOKUP BY MANUAL ***
:
Grids : 2839A8121A 2839A8121B 2839A8121C 2839A8122C 2839A8122D

Work date: 01/03/20 Time: 23:59ET Hrs notc: 1838 Category: 3 Duration: 180 DAYS
Due Date : 01/03/20 Time: 23:59ET Exp Date : 01/30/20 Time: 23:59ET
Work type: INSTALLING A POLE Boring: N White-lined: U
Ug/Oh/Both: U Machinery: N Depth: 6' Permits: Y 29533044
Done for : DUKE ENERGY

Company : DUKE ENERGY Type: MEMB


Co addr : 36453 EILAND BOULEVARD
City : ZEPHYRHILLS State: FL Zip: 33541
Caller : ALANAH LEE Phone: 813-909-1273
Contact : CULLEN ABERNETHY Phone: 412-992-6840
BestTime: 48 HOURS PRIOR TO WORK START
Email : ALANAH.LEE@DUKE-ENERGY.COM

Submitted: 09/12/19 09:49ET Oper: ALA Chan: WEB


Mbrs : ATTF01 BH1956 BH1957 CAS541 CC1966 FPC322 FPLFAD L3C900 MCIU01 PGSORL
Mbrs : SB2186 SBF02 SCT994 SEM814 SL1086 UTI296

Service
Service Area Name Contact Phone Numbers Utility Type
Area Code
ATTF01 AT T NDCI GROUP Day: (800) 252 - 1133 FIBER,
Approved
COMMUNICATION
2019-H-593-00433
LINES
BH1956 CHARTER COMMUNICATIONS HELENE HERNANDEZ Day: (407) 532 - 8092 Carol
FIBER, Hatfield

www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 1/3
9/12/2019 IRTH One Call

TELEPHONE, CATV

BH1957 CHARTER COMMUNICATIONS HELENE HERNANDEZ Day: (407) 532 - 8092 FIBER,
TELEPHONE, CATV

CAS541 CITY OF ALTAMONTE SPRINGS JAMES THOMPSON Day: (407) 571 - 8591 FIBER, WATER,
ELECTRIC, SEWER

CC1966 CROWN CASTLE FIBERDIG TEAM Day: (888) 632 - 0931 x2 ELECTRIC

FPC322 DUKE ENERGY USIC DISPATCH Day: (800) 778 - 9140 ELECTRIC

FPLFAD CROWN CASTLE FIBER STAKE CENTER LOCATING Day: (801) 364 - 1063 FIBER
DISPATCHER**
L3C900 CENTURYLINK TECH ON DUTY Day: (877) 366 - 8344 FIBER

MCIU01 MCI FIELD CONTACTS Day: (800) 624 - 9675 FIBER,


COMMUNICATION
LINES
PGSORL TECO PEOPLES GAS- ORLANDO PHYLLIS BRIDGES Day: (813) 228 - 4025 GAS
Alt: (813) 917 - 8974
Emerg: (877) 832 - 6747

SBF02 A T & T/ DISTRIBUTION USIC DISPATCH Day: (800) 778 - 9140 TELEPHONE

SCT994 SEMINOLE COUNTY TRAFFIC ROBERT LOYER Day: (407) 665 - 5642 FIBER
ENGINEERING Alt: (321) 377 - 2405

SEM814 SEMINOLE COUNTY CHRIS GRAYBOSCH Day: (407) 840 - 4058 RECLAIMED
Approved
WATER, WATER,
2019-H-593-00433
SEWER
SL1086 UNITI FIBER LLC SOUTHERN LIGHT EMERGENCY Day: (877) 652 - 2321 Carol
FIBER Hatfield

www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 2/3
9/12/2019 IRTH One Call

RESPONSE DISPATCH
UTI296 CENTURYLINK DISPATCH ** Day: (855) 742 - 6062 FIBER,
TELEPHONE

Approved
2019-H-593-00433
Carol Hatfield
www.online811.com//IRTHOneCall/Centers/PrinterFriendlyConfirmation.aspx
10/21/2019 3/3
Pike Engineering, LLC  4427 PET Lane, Suite 101  Lutz, Florida 33559  813-909-1200

September 17TH, 2019

Subject: WO #29533044 / 525 E ALTAMONTE SPRINGS DR

Dear Sir / Ma’am:

Duke Energy Florida, LLC Florida, has applied for a Right of Way permit to Construct and maintain facilities
as shown on the attached prints.

Please review the plans and advise our office if you have any objections to the proposed construction.
Please send any correspondence regarding this matter to my attention. If you have any questions, or need
additional information, please feel free to contact Lisa Wood at her office (813) 909-1287 or her email at
Lisa.Wood@duke-energy.com .

Sincerely,

Alanah Lee / Permit Coordinator


Signature and Title

Enclosure/cc:

AT&T NDCI GROUP Day: (800) 252 - 1133FIBER, COMMUNICATION LINES

BH1956 CHARTER COMM HELENE HERNANDEZ Day: (407) 532 - 8092 FIBER, TELEPHONE, CATV

BH1957 CHARTER COMM HELENE HERNANDEZ Day: (407) 532 – 8092 FIBER, TELEPHONE, CATV

CITY OF ALTAMONTE SPRINGS JAMES THOMPSON Day: (407) 571 – 8591 FIBER, WATER, ELECTRIC, SEWER

CROWN CASTLE FIBERDIG TEAM Day: (888) 632 - 0931 x2 ELECTRIC

DUKE ENERGY USIC DISPATCH Day: (800) 778 – 9140 ELECTRIC

CROWN CASTLE FIBER STAKE CENTER LOCATING DISPATCHER Day: (801) 364 – 1063 FIBER

CENTURYLINK TECH ON DUTY Day: (877) 366 – 8344 FIBER

MCI FIELD CONTACTS Day: (800) 624 – 9675 FIBER, COMMUNICATION LINES

TECO PEOPLES GAS PHYLLIS BRIDGES Day: (813) 228 – 4025 Emerg: (877) 832 – 6747 GAS

AT&T/ DISTRIBUTION USIC DISPATCH Day: (800) 778 – 9140 TELEPHONE

SEMINOLE COUNTY TRAFFIC ENGINEERING ROBERT LOYER Day: (407) 665 – 5642 Alt: (321) 377 – 2405 FIBER

SEMINOLE COUNTY CHRIS GRAYBOSCH Day: (407) 840 – 4058 RECLAIMED WATER, WATER, SEWER

UNITI FIBER LLC SOUTHERN LIGHT EMERGENCY Day: (877) 652 - 2321 FIBER Approved
CENTURYLINK RESPONSE DISPATCH 2019-H-593-00433
Day: (855) 742 – 6062 FIBER, TELEPHONE

Carol Hatfield
10/21/2019

You might also like