TIME PLAN Revision Date :
STRIP LAYOUT/METHOD
CUSTOMER INPUT FEASIBILITY CONCEPT & ASSY DWG DESIGN DESIGN REVIEW
PLAN APPROVAL
INTERNAL
PROJECT DESIGN TENTATIVE MFG DWG FINAL
NAME/ NO LOI/PO APPROVAL DESIGN BOM DATE RELEASE R/M PRE-M/C ROUGH VMC HRD GRINDING F.VMC/W.C INSPECTION ASSY T0 TRIAL T1 TRIAL Tool Dispatch
REVIEW
RECEIVED RECEIVED RECEIVED RECEIVED
SEND DATE DATE SEND DATE DATE SEND DATE DATE SEND DATE DATE START COMPLETION SEND DATE RECIVE DATE
Sr. No Input Format No Process flow Output Document Check point Responsibility Remarks
9 Final Design Mail/ MOM Design Review Final Design DFMEA-1 Design
11 Final Design MOM Internal Design Review Final Design DFMEA-2 Design
Raw material
12 Final Design F/Des/00 BOM Procurement Design
13 Final Design & BOM F/Des/00 DWG Release for MFG 2D drawing file Design
Sr. No Input Format No Process flow Output Document Check point Responsibility Remarks
Mail&
8 Customer input Design Final Design Reecord Design
F/Des/00
9 Final Design Mail/ MOM Design Review Final Design DFMEA-1 Design
11 Final Design MOM Internal Design Review Final Design DFMEA-2 Design
Raw material
12 Final Design F/Des/00 BOM Design
Procurement
13 Final Design & BOM F/Des/00 DWG Release for MFG 2D drawing file Design
Sr. No Input Reference document Process flow Output Check point Responsibility Document/Format Remarks
Mail, Customer requirements, MOM MOM/Mail ECN No. Register entry CFT ECN Register
Tool Design, Customer requirements, MOM DFMEA, MOM Feasibility Study Feasibility Report Changes should be feasible Technically & CFT Feasibility Report
(Cost) Economically
Tool Design, modified Drawings, Process Flow Process flow Manufacturing MTC/IR Manufacturing MFG Log
Tool Design, modified Drawings, Inspection IR Tool assembly Tool Inspection Sheet Manufacturing Tool Inspection Sheet
Reports
Tool Inspection Sheet/MTC/IR Tool Inspection Sheet T_0 First Trial Trial Report Manufacturing Tool Trial Report
Fine tuning
T_0 Trial Report Tool Trial Report T_1 DVP Trial Report/Part FIR/DVP(Cust Approval) QA Tool Trial Report/Part FIR/DVP
Cust approval (DVP)
DVP/T_1 Trail Report DVP/Tool Trial Report Pilot lot Cust Approval Trial Report/Part IR/Cust Approval/Process QA Tool Trial Report/Part IR/DVP/CP
Capabilities CPK
MOM/Design/Process Flow/Control Refer PPAP Requirements PPAP Cust Approval PPAP should be close with all mandatory QA Refer PPAP Requirements
plan/ECN/QA Reports/Etc Documents
Mail/feasibility/PO/DVP Feasibility Report/LOI/PO/Mail Tool Buyof Tool Buyof should close in Written/Documented Managements Tool Buyof sheet
as per deal
T_2 Trial Report/Tool Inspection sheet/IR/Tool Trial Report/Tool Inspection Tool Commissioning NPD Process Complete Tool Should Run Properly at Customer END manufacturing MOM/IR
Buyof sheet/IR/Tool Buyof