Roof Deck Framing Plan: E I K C F A B G D H J
Roof Deck Framing Plan: E I K C F A B G D H J
Roof Deck Framing Plan: E I K C F A B G D H J
STAIR
WELL
5.00
B16
B16
B16
B17
B17
B18
B18
B18
B18
B19
S5 S5 S5 S6 S6 S6 S6 S6 ISSUED:
D E C K
6.50
BUILDING OFFICIAL DATE
6.50
SB
CB5b
S8
S8
B14 B14 B14 B14 B14 B14 B14 B14 B14
2 2
2.50
B20
CB6
1.50
CB6
CB6
CB6
CB6
CB6
CB6
CB6
CB6
CB6
CB7
S7 S7 S7 S8 S8 S8 S8 S8 S8 S8
A B C D E F G H I J K
E F
4.20 NOTE : PROVIDE STIFFENER COLUMN @
EVERY 2.0m
1 B21 1
S9
CS1 CS1
MARK b (mm) h (mm) Location Cont. End Midspan Discont. End Stirrup
B22
B22
5.00
Top
D E C K B21 250 400
6.50
6.50
Web N/A N/A N/A
S9 Top
B22 250 400 Bot. REST @ 150 TO C.L.
B21
2 2 Web N/A N/A N/A
0.60
CS1
Top
B23 250 400 Bot. REST @ 150 TO C.L.
Web N/A N/A N/A
0.25
E F
.
CHB THK
@3-50 REST @ 150
TYP. SC DETAIL
S-135-5 SCALE 1 : 150m S-14 5-5 SCALE: 1 : 150m
RUEL A. AYAG
PTR NO. 10645911 PROPOSED 3 STOREY APARTMENT
UPERT BUILDING PERMIT
CONSTRUCTION
OWNER'S APPROVAL
PRESENTATION
S
DATE : 01/12/2016 OWNER/REPRESENTATIVE
CIVIL ENGINEER 5 5
ADDRESS: SAN VICENTE,LILO-AN, CEBU TIN : 931-376-662 LOCATION : ADDRESS :
DATE