ASSIGNMENT
Date of Issue : Week 3
Date of Submission : Week 7
Date of Feedback : Week 13
Weightage of Assignment : 50% of coursework (100 marks)
CLO2: Discuss cost planning and cost control techniques used in pre-tender stage of a building
project. (C2) (CTPS)
CLO3: Compare the cost implication between design variable, construction methods and main cost
elements of construction project. (C4) (CTPS)
INTRODUCTION
This assignment is designed for students to achieve Course Learning Outcome 1. Upon completion
of this assignment, students should be able to:
REQUIREMENTS
_____________________________________________________________________________________________
ATBQ2022 Principles of Building Economics Assignment - Assignment Brief
Page | 1 of 4
FACULTY OF BUILT ENVIRONMENT
___________________________________________________________________________
TASK
1.1 Based on drawings provided, your team are required to prepare the costs estimation based
on elemental breakdown.
1.2 Upon completion of Task 1.1, your team are required to rely on information and/or data in
Task 1.1 to prepare Elemental Cost Analysis using Standard Form of Elemental Costs
Analysis.
1.3 Your team will be given 20 minutes to carry out presentation on the aforesaid tasks to the
management team of your company. All presentation shall be in either or a combination of
Powerpoint, Words or Excel format.
2.1 Comments on the advantages, disadvantages and/or concerns of using Elemental Costs
Analysis to be the method of preliminary estimate for any given development project in
the property industry including individual presentation.
REPORT FORMAT
Introduction and conclusions.
Insertion of table of content and page number.
Consistency of captions and headings.
References (bibliography list and in-text citations) made are in accordance with Harvard
Referencing System. Bibliography list shall be arranged in alphabetical order.
_____________________________________________________________________________________________
ATBQ2022 Principles of Building Economics Assignment - Assignment Brief
Page | 2 of 4
FACULTY OF BUILT ENVIRONMENT
___________________________________________________________________________
SUBMISSION
The submission of your assignment hardcopy shall consist of the following in sequence: -
LATE SUBMISSION
For late submission, there will be a reduction of absolute marks from the mark’s score submitted:
Late 1 to 3 days after deadline of submission: minus 10 marks;
Late 4 to 7 days after deadline of submission: minus 20 marks;
Late more than 7 days after deadline of submission: 0 marks
_____________________________________________________________________________________________
ATBQ2022 Principles of Building Economics Assignment - Assignment Brief
Page | 3 of 4
FACULTY OF BUILT ENVIRONMENT
___________________________________________________________________________
ASSIGNMENT
Assignment CLO
No. Student Name ID. No.
Mark
1. /100 CLO1
2. /100 CLO1
3. /100 CLO1
4. /100 CLO1
5. /100 CLO1
PROGRAMME : DQS21
GROUP :
TUTOR :
DATE OF SUBMISSION :
___________________________________________________________________________
Coursework Declaration
Declaration
I/We confirm that I/we have read and shall comply with all the terms and condition of
Tunku Abdul Rahman University College’s plagiarism policy.
I/We declare that this assignment is free from all forms of plagiarism and for all intents
and purposes is my/our own properly derived work.
I/We further confirm that the same work, where appropriate, has been verified by anti-
plagiarism software Turnitin (please insert).
1.
2.
3.
4.
5.
Query List CLO1 PLO3 Inadequately elaborated: Poorly elaborated: Adequately elaborated: Well-elaborated: query Excellent elaboration
query list is not suitable query list is suitable for query list is suitable for list is tailored for the beyond expectation:
for the project; the project but lack of the project and generally project. query list and details are 5% 1 x /5 /5
extremely lack of some important details. consists of basic details. tailored for the project.
details.
Elemental Breakdown CLO1 PLO3 Inadequately elaborated Poorly elaborated: Adequately elaborated: Well-elaborated with Excellent elaboration
with Cost Estimation and explanation of elaboration lack of appropriate coverage good coverage and beyond expectation with
information details and poor with good explanation of explanation of details explanation from
explanation of information. information. many sources that add
information value to report; excellent
30% 6 x /5 /30
coverage and
explanation of
information.
Elemental Cost CLO1 PLO3 Inadequately elaborated Poorly elaborated: Adequately elaborated: Well-elaborated with Excellent elaboration
Part 1
Analysis and explanation of elaboration lack of appropriate coverage good coverage and beyond expectation with
information details and poor with good explanation of explanation of details explanation from
explanation of information. information. many sources that add
information value to report; excellent
30% 6 x /5 /30
coverage and
explanation of
information.
Report Writing Format CLO1 PLO3 Inadequately elaborated Poorly elaborated: Adequately elaborated: Well-elaborated with Excellent elaboration
and explanation of elaboration lack of appropriate coverage good coverage and beyond expectation with
information details and poor with good explanation of explanation of details explanation from
explanation of information. information. many sources that add
information value to report; excellent
5% 1 x /5 /5
coverage and
explanation of
information.
Sub-total /70
Comments on the advantages, CLO1 PLO3 Unable to comment Weak in commenting Able to comment on Able to comment on Able to comment on
disadvantages and/or on the advantages, on the advantages, the advantages, the advantages, the advantages, 1. 6 x /5 /30
concerns of using Elemental disadvantages and/or disadvantages and/or disadvantages and/or disadvantages and/or disadvantages and/or
concerns of using concerns of using concerns of using concerns of using concerns of using
Costs Analysis to be the Elemental Costs Elemental Costs Elemental Costs Elemental Costs Elemental Costs
method of preliminary 2. 6 x /5 /30
Analysis to be the Analysis to be the Analysis to be the Analysis to be the Analysis to be the
estimate for any given
Part 2
2.
2. /100
3. Total
3. /100
4.
4. /100
5.
5. /100