ǁ Profile Summary
A professional with nearly 6 years of experience as an Engineer- Projects HVAC
Expertise in implementing plans / schedules for maintenance & annual turnaround with focus on optimum
utilization of manpower
Possess clear understanding of industry & technology trends, ensuring smooth functioning of overall
operations and enhancing operational efficiency by making use of leading edge technologies
Proficient in supervising project activities from conceptualization to execution including technical
specifications, stage inspections, progress monitoring, site management and manpower planning
Spearheaded projects involving contract administration, resource planning with a flair for adopting modern
methodologies in compliance with quality standards
Familiar with control wiring drawings in HVAC system
A team leader with excellent communication & analytical competencies
Successfully conducting measurement/bill preparation and certification with clients as well as quality checking
of the work performed by labours
ǁ Key Skills
Project Management
Labour and Material Management
Process Enhancement
Quality Assurance
HVAC Engineering
Maintenance Operations
Resource Optimization
Costing & Estimation
ǁ Work Experience
Dec’18 to Jun’19: Unique Engineers Pvt. Ltd., Kolkata as Engineer- Projects HVAC
Jan’18 to Dec’18: Betterman Contracting LLP, Kolkata as Project Manager MEP
Mar’16 to Dec’17: Jhonson Controls- Hitachi Air Conditioning India Ltd., West Bengal
as Executive Engineer- Projects HVAC
Mar’13 to Mar’16: ETA Engineering Pvt. Ltd., Kolkata as Engineer- Projects HVAC
Key Result Areas:
Spearheaded the management of IOM (installation, operations and maintenance) activities of a range of
equipment while ensuring compliance with the set norms
Supervised a skilled team of technicians and rendering technical solutions for daily service calls
Anchored on-site erection & commissioning activities and ensuring completion of project within the time & cost
parameters and effective resource utilization for maximizing the output
Understood tender document along with tender drawings and specified discrepancies, to the seniors, client /
consultant
Assisted in preparation and approval of shop drawings from the consultants and architects
Prepared work schedule, method statement, work progress report, quality plan, various check lists, and so on
Administered control on cost of maintenance, labour and supplies within budget by implementing initiatives
Managed corrective, preventative, predictive and proactive maintenance programs while steering continuous
line improvement through KPI improvement
Monitored and analysed quantity of tools available, usage, breakage loses as well as arranged resources like
manpower, contractors, equipment, and so on
Ensured work measurements correctly & certification from client / consultant
Handed over systems to client / facility management team complete with close out documentation including pre-
commissioning & commissioning reports, brief process description, test reports, installation checklists, technical
data, operation manual, and so on
Managed billing, payment collection and material reconciliation
Analyz available work scope as per original contract and examining the past data for preparation of performance
improvement plans & recommendations
Controlling the maintenance functions by planning, organizing and assigning duties to ensure most effective use
of the personnel, materials and financial budget
ǁ Organizational Projects
Swagat Super Specialty Surgical Institute cum Nursing Home, a two pipe HVAC System for cooling and
ventilation of 80 bedded hospital, from 1st March 2013 to 4th July 2013
Courtyard Marriott a five-star hotel for Maxim Infrastructure & Real Estate Pvt. Ltd., a four pipe HVAC system
for a five-star hotel of 200 Guest Rooms cooling, heating and ventilation, from 5th July 2013 to 30th November
2014
+-800 KV, 6000 MW, HVDC, ABB AB, North East Agra, a project of hydro power distribution, for Power Grid
Corp. Of India Ltd., a two pipe HVAC system for cooling and ventilation, from 1 st December 2014 to 5th January
2015
HVAC works for Water System for Heat Strip Mill for TATA Projects Ltd., a two pipe HVAC system for cooling
and ventilation, from 6th January 2015 to 17th March 2016
Proposed 8 Storey Tertiary Healthcare Hospital for West Bengal Medical Services Corporation Ltd. Build by
Shapoorji Pallonji & Co. Pvt. Ltd., a two pipe HVAC system for cooling and ventilation system, from 18 th March
2016 to 31st December 2017
Diamond Beverages Pvt. Ltd. New Office Building, a two pipe HVAC system for cooling and ventilation
Retrofit job HVAC for Fox Solutions Pvt. Ltd. at Kolkata sector 5, Infinity Benchmark building
Retrofit job HVAC for Techna Infrastructure Pvt. Ltd. at Kolkata sector 5, Bengal Eco Intelligent Park building
Retrofit job for HVAC Capital Numbers Ltd. at Kolkata rajarhat, Mani Cassadona building
R.S Mall at burrabazar Kolkata, a fully decorated plumbing job
Madhepura Medical College cum Hospital, at Madhepura Bihar, a 2000 HP VRV system from Daikin for HVAC
works
Construction of Permanent Campus of IISER Kolkata at Haringhata, Kalyani, Dist.:- Nadia (W.B.) Phase-II, SH:
Supply, Installation, testing and commissioning of Air-conditioning system (Low side) in Auditorium
ǁ Academic Project
Mini
Industrial Appliances Controlled using IR
Major
Wireless Sensor Network Designing for Prototype Module
Automatic Train
ǁ Education
Bachelor of Technology in Electronics and Communication Engineering from Nizam Institute of Engineering
and Technology, JNTU, Hyderabad in 2012
12th from Sri Chaitanya Jr. Kalasala, Board of Intermediate Examination, Miyapur Branch, Hyderabad in 2008
10th from from Kendriya Vidyalaya 1, (C.B.S.E), Dundigal, Hyderabad, 2006
ǁ Technical Skills
Client Operating Systems: Win XP, Vista, Windows 7, Windows 8 & Windows 10
Applications: MS Office
ǁ Personal Details