Specification Format
Specification Format
Specification Format
L. S. ABELAR Construction
Blk. 13 Lot 3 St. Mattheew Street, St. Michael Subd.
Brgy. Gulang – gulang, Lucena City
Attention:
Owner
Thru:
Project-in-Charge
Project:
For furnishing of materials, labor, supervision, tools, equipment for the construction of the
above subject/project in the Lump Sum amount of;
PHILIPPINE CURRENCY: FIVE MILLION TWO HUNDRED FIFTY ONE THOUSAND FIVE HUNDRED
TWENTY SIX PESOS & 44/100 ONLY. (P5,251,526.44)
e. All other conditions not stated in this proposal and not indicated on the plans shall be subjected
to mutual agreement prior to construction.
We hope that you would find the above in order and thankyou very much for you interest in our
professional services.
SPECIFICATIONS
1.0 GENERAL CONDITIONS, SPECIAL PROVISIONS & SCOPE OF WORK
1.1 INTENT OF CONTRACT DOCUMENTS
The Contract Document are complementary and what is called for by all. The intent of the
drawings and specifications is to prescribe a complete work which the Builder undertakes to
do in full compliance with the Contract Documents. The Builder shall perform all items of
work covered and stipulated in the proposal and on the drawings, and do such special,
additional, extra and ancidental work as may be considered necessary. He shall furnished,
unless otherwise provided in the Specifications, or in special or in the contract, all
appliances, equipment, forms, labor, machinery, materials, tools, supplies, transportation,
ready for occupancy and operation by the owner/ or developer
All work shall conform to Contract Documents. No change shall be made without the Builder
having first received permission from the Owner/or Developer. Where detailed information
is needed, the Contractor before proceeding with the work shall refer matter to the
Owner/or Developer and or Architect.
The Builder shall prepare at his own expense and submit all shop drawing which maybe
required to the Architect for his approval. The Contractor shall see that all work indicated on
shop drawings are accurately and distinctly illustrated and that work is in conformity with
contract documents.
In general, the Builder shall comply with all the laws, city and all municipal ordinances.
National Building Codes, Subdivision Codes, Homes Owners rules and regulations, in so far
as they are binding upon or affect the parties hereto, the work, or those engaged thereon.
Before the Bidding and Awarding of the Contract, the Builder is expected to have visited the
site of the work(s) and made his own estimates of the facilities and difficulties concerning
and said execution of the proposed contract.
Final Certification shall be submitted upon completion of any section of work. If required by
the Architect, and before final payment is made. Any exception or deviations from the
Contract.
Documents shall be noted on the final certification, and there shall be include any drawings,
plots, notes, etc. as maybe necessary to constitute a full and complete report.
Names of proposed manufacturers, materials, men and dealers who are to furnish
materials, fixtures, appliances, or other fittings shall be submitted to the Architect for
approval, as early as possible, to afford proper investigation and checking. All materials shall
be brand new, unless otherwise specified.
The Builder shall furnish for approval samples as specified or required, in order to establish
standard of quality, the Architect has reffered to certain materials by name. This procedure
is not to construed as eliminating from consideration other products of equal or better
quality by other by manufacturers where fully suitable in design.
The Builder shall furnish the complete list of proposed substitutions together with such
engineering and catalogue data for the complete information of Architect/Owner.
The Builder shall abide by the Architects judgement when proposed substitute items are
judged as acceptable and shall furnish the specified item in such case. All proposals for
substitutions shall be submitted by the Builder and not by the individual trades or materials
suppliers. The Architect shall approved or disapproved proposed substitutions. No
substitute shall be used unless previously approved.
Other finishing materials shall be Owner supplied. The specific materials shall be identified
in a separate list for the Builders guidance, said finishing materials shall be installed by the
Builder according to manufacturers instructions, except for materials/items that are
classified as specialty works therefore shall be installed by suppliers themselves.
The Builder shall provide and maintain adequate protection for all his work and of the
Owners property.
1.10 LABOR
The Builder shall employ only competent and efficient engineers supervisors, foreman,
mechanics, laborers or artisans.
The Builder must be a licensed engineer or architect, if he supervises line work personally;
otherwise he must have in his employ a competent supervisor who has a background in
construction & will supervise the work personally.
The project engineer or architect shall represent the contractor in his absence and all
direction given to him shall be binding as if given to the Builder. He shall have full authority
to execute orders or directions of the Architect, supply such materials, tools, plant,
equipment, and labor as maybe required.
The Builder shall use such methods and appliances for the performance of all the operations
connected with the project as well as will produce a satisfactory quality of work.
a. Builder shall take special care existing plants, other properties that the Owner may
declare to be important to them and shall be taken care of during construction. (if there
is any)
b. All work shall proceed in a manner which shall eliminate or of least reduce the amount
of dust noise, heat, and other work related consequences which may in one way or
another damage the neighbors or adjacent properties.
3.0 FOUNDATION
1. No footing shall rest on fill where excavation reveal that footing will rest on fill,
excavation shall be carried deeper under the desired stratum is reach for the safe of soil.
2. Filling shall be made in layers of fifteen centimeter (15cm) in thickness and each layer
being thoroughly tamped. All column footings and hollow blocks (CHB) footing shall be
class “A” mixture of concrete slab.
Immediately prior to backfilling around foundation and wall footings and to placing of
concrete floor slab on fill, soil poisoning, shall be applied as he in after specified.
6.0 ELEVATIONS
1.) Finished Ground Floor Line from street level :at least 0.60m.
2.) Ground Floor to 2nd floor height :at least 3.00m.
7.0 STRUCTURAL
Designed Criteria
1. For all footings, columns, girders, beams and slabs :F’c=20.68Mpa(3,000psi)@28 days
2. For all slabs on fill/ grade :F’c=17.24Mpa(2,500psi)@28 days
3. For all beams reinforcing steel bars, def. (ASTM615) :Fy=227.48Mpa(33,000psi)
4. For all structural steel (ASTM36) :Fy= 248.16(36,000psi)
Nothing Follows
____________oOo_____________
___________ __________________
JOY LABANZA ROLLANDO BANDILLA JR.
Project Manager Owner