Six Sigma Yellow Belt: Mohamed Naser
Six Sigma Yellow Belt: Mohamed Naser
Six Sigma Yellow Belt: Mohamed Naser
MOHAMED
2016-2019 Doha
Greenline Metro Station, Project Manager, Gulf Steel& Engineering
2015-2016 Doha
NASER Change Culture Implementation Program, Project Manager,
Dakahlia Group
PMP, PMO-CP, Lean6Sigma, 2013-2015 Cairo
AMC Abu Qir Thermal Power Plan, Project Engineer, DSD Ferrometalco
2011-2013 Cairo
Zafarana Wind Farm Renewable Energy Phase-3, Project Engineer,
BSc of Mechanical DSD Ferrometalco
Engineering 2009-2011 Cairo
2004, Helwan University Operation& Maintenance, Operation Engineer, GUPCO
Project Management 2006-2009 Red Sea
Diploma Zafarana Wind Farm Renewable Energy Phase-1, Project Engineer,
2009, AUC DSD Ferrometalco
205-2006 Cairo
MOHAMED
NASER
PMP, PMO-CP, Lean6Sigma,
AMC
BSc of Mechanical
Engineering
2004, Helwan University
Project Management
Diploma
2009, AUC
MOHAMED
NASER
PMP, PMO-CP, Lean6Sigma,
AMC
BSc of Mechanical
Engineering
2004, Helwan University
Project Management
Diploma
2009, AUC
MOHAMED
NASER
PMP, PMO-CP, Lean6Sigma,
AMC
BSc of Mechanical
Engineering
2004, Helwan University
Project Management
Diploma
2009, AUC
MOHAMED
NASER
PMP, PMO-CP, Lean6Sigma,
AMC
BSc of Mechanical
Engineering
2004, Helwan University
Project Management
Diploma
2009, AUC
MOHAMED
NASER
PMP, PMO-CP, Lean6Sigma,
AMC
BSc of Mechanical
Engineering
2004, Helwan University
Project Management
Diploma
2009, AUC
How we
work
1. Introduction about 6 Sigma
2. Quality Tools (high level)
3. 6 Sigma Cycle (high level)
4. Exam Preparation
5. Exam Simulator
6. Final Exam
SSYB
1. Evolution of 6 Sigma
2. What is 6 sigma
3. Goals of 6 sigma
4. 6 sigma approach
5. why org adopt 6 sigma
6. 6 sigma mathematics
7. Roles in 6 sigma org
8. Key stakeholders
9. DMAIC cycle
Evolution of 6 Sigma
14
What is 6 Sigma
Customer focus
Process focus
Data driven
Structured improvement
deployment
Goals of 6 Sigma
Reduction in
variation
Strengthening
Eliminate of
of the bottom
defects
line
Goals of 6
Sigma
Enhancement
Improvement
in customer
in yields
satisfaction
Ex: GE’s Medical System division (GEMS) used Six Sigma design techniques to create a breakthrough in medical
scanning technology. Patients can now get a full body scan in half a minute, versus three minutes or more with previous
technology. Hospitals can increase their usage of the equipment and achieve a lower cost per scan, as well.
6 Sigma Approach
Y: The Problem
X The Root
Cause
Why do organizations adopt 6 sigma
Waste
prevention
Mathematical Interpretation
• Sigma, represented by the Greek alphabet ‘σ’, stands for standard deviation from
the ‘mean’.
• ‘Six Sigma’ represents six standard deviations from the mean*.
• Standard deviation is a measure of variability of data
• USL upper specs limit for performance standard
• LSL lower specs limit for performance standard
• Target is the middle between USL-LSL
omer specification
Mathematical Interpretation
• Process standard deviation (σ) should be so minimal that the process performance should be able to
scale up to 12σ (6 Sigma each on either side of the origin on the X-axis) within the customer specification
limits*.
6.6807% 0.6210%
Defect Defect
3 4
Sigma Sigma
6 5
Sigma Sigma
0.00034% 0.0233%
Defect Defect
Roles in Six Sigma Organization
Executive Leadership.
Champion.
Black Belt.
Green Belt.
Project Team.
Stakeholders.
21
Roles in Six Sigma Organization
22
Roles in Six Sigma Organization
23
Roles in Six Sigma Organization
24
Roles in Six Sigma Organization
Project Team.
Stakeholders.
25
Quality Tools
• Types of Data
• 7 Basic Quality Tools
• DFSS
Types of Data
Data
Decision Action-
Process
Symbols step
step
1. Define
2. Measure
3. Analyze
4. Improve
5. Control
omer specification
Mathematical Interpretation
o DMAIC is a data-driven Six Sigma methodology for improving existing products and processes.
o The DMAIC process should be used when an existing product or process requires improvement
to meet or exceed the customer’s requirements.
o This initiative should be consistent with the business goals of the organization.
Control Define
• Control X’s for • Define the
sustained problem
performance
Improve Measure
• Improve the • Measure the outcome (Y)
process by to determine the current
eliminating the process performance
defects (baseline) and validate
the measurement system
Analyze
• Identify X’s (root
causes of the
defects, variation
sources)
1. Define
➢ Identify the areas of improvement and define goals for improvement activity and ensure that resources are
in place for the improvement project
➢ It focuses on a customer requirement in identify project CTQ (Critical to Quality), CTQ is a product or
service characteristic that satisfies a customer requirement or project requirements.
www.6sigmastudy.com
How to Submit for the SSYB Exam
How to Submit for the SSYB Exam
How to Submit for the SSYB Exam
How to Submit for the SSYB Exam
How to Submit for the SSYB Exam
Step#1
➢ Total
$450 $199