Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

1 Abstract 2 Introduction To The Project Report ..6 3 Breif Overview of The Organisation ..7 4 System Requirement

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 76

TABLE OF CONTENTS

1 ABSTRACT…………………………………………………………………………..6
2 INTRODUCTION TO THE PROJECT REPORT………………………………..6
3 BREIF OVERVIEW OF THE ORGANISATION ………………………………..7
4 SYSTEM REQUIREMENT …..…………………………………………….……...8
Proposed System……………………………………………………………..10

Feasibility Study……………………………………………………………..12

Effort estimation …………………………………………………………….14

Time Estimation ….….……………………………………… ……………...18

Cost/Benefit analysis………………………………………………………....18

Schedule…………………………………………….......................................20

Programming Languages and Development Tools…………………………..20

5 SOFTWARE SPECIFIC REQUIREMENTS…….…………………………….…21

Functionality ………………………………………………………..................31

Reliability …………………………………………………………….…. ....32

Performance ……………………………………………………………..…….32

Security ……………………………………………………….……..……33

System security ………………………………………………….….………… 33

Data Security …………………………………………………..….……........33

Maintainability and Portability …………………………………..………........33

1
Interfaces ……………………………...………………………...……………..33

Hardware Interfaces…………………………..……………………………..…33

Software Interfaces ………………………….……………………………. …..33

Communication Interfaces ………………….……………………………........33

6 HIGH LEVEL DESIGN SPECIFICATION……………………………………...34


Introduction…..………………………………………………………….........34

Design considerations……………………………………………….…...........34

Design ………………………………………………………………..……….34

0 level data flow diagram……………………………………………..………35

1st level data flow diagram ………………………………………………….35

2nd level data flow diagram………………………………………...……..….36

Entity relationship diagram………………………………………………. ….37

Data dictionary …………………………………………………………...…..40

Design constraints………………………………………………………...…..41

7 TEST PLAN………………………………….……………………………………41
Purpose …………………………………………………………………41

Objective…………………………………………………..........................42

Scope…………………………………………………..…………………..42

Test Approach………………………………………………………..........42

Test Phases………………………………………………………………...43

Scope of Testing…………………………………………………………...44

Entry and Exit Criteria…………………………………………..................44

2
Requirement of testing…………………………………………………….45

8 LIMITATION OF PROJECT………………………...………………………….45
9 BIBLOGRAPHY…………………………………… …………………………...46

3
ABSTRACT
Application that could use by the customer to manage Best Practice with respect to

Client’s Project , Project’s Site and Site’s Workshop. Customizable repository is to be created for

the maintenance of the document via internet. It’s a multi-user system and provides an interface

between the user and the application. The System will be responsible for the fallowing activities

Admin Module

 Planning Module
 Statistics Module
 Document
 Helps

4
5
INTRODUCTION OF PROJECT

There are number of ways in which computer affect human lives which are uncountable.

Computer process the function with much faster speed and greater accuracy. So among the

various information system of data processing my project “PATIENT BILLING SYSTEM ” one

of the data processing system, which mainly concerns with the customer billing record of the

hospital made the entire performed are computerized.

The main objective of the project is to hail a fully computerized system for main fining

patient detail, patient bills, and ward details.

The project has the following features:

 Effectiveness

 Easy to use

 Consistency

 Simplicity

 Accuracy

6
The purpose of the Patient Billing System (PBS) is to capture necessary data elements

from the agencies' internal bills/personnel systems, validate the information before bills are

processed, and post the validated bills and personnel information. This new system is being

developed to support the client server efforts. . The main aim of the project is to

create automated software which is purely used for billing operation in a hospital. This

application would be facilitating the particular authorities of a hospital to generate and update the

bills of a patient and store them. This will later be retrieved by the administrator at the time of

discharge.

Developing a local patient billing software system would benefit the hospital management.

This system basically works for the hospital management, helping them to generate bills and

preserve patient’s details in a well-organized approach. Since it is Software driven the quality of

services can be enhanced considerably.

7
A BRIEF OVERVIEW OF THE ORGANIZATION

The purpose of this section is to obtain agreement regarding objectives the system must

meet. Ultimately, this segment defines the boundaries of the effort.

Customer: The target people are the hospital management people. The authorities are provided

with a user id and they maintain their own accounts. The authorities can even change

their passwords.

Purpose: The purpose of this application is to provide complete convenience to the management

of the hospital, in order to make Billing, an effortless task to perform. This project helps

the administrator to overcome the difficulty in tracking and maintaining records of the

patients. It saves his time because the tasks are sub-divided and assigned to respective

authorities. So, every authority has only some degree of job to accomplish and hence

avoids overload.

Scope: Release 1 focuses on :

Particular Authorities in a hospital.

8
SYSTEM REQUIREMENTS:

Problem formulation:-

The first step in the system development life cycle is the identification of a need. This is a

request to change. Improve or enhance an existing system. The main purpose of this phase

problem becomes easy to understand.

Initial Investigation:-

First we went in the hospitals where we done the initial investigation about the hospital.

As we have described earlier in the phase of problem relation that there are several types of

problem in present working of manual working therefore in the phase of initial investigation we

try to find those problems and there solution.

 TOO LATE: In the hospital all the working was manual. Due to the

manual working there was too late.

 Being the all process in manual all the process was very low.

Future scope:-

9
In future this may work for the manufacture by making some modification in the project

models by developing some extra networking feature this “PATINET BILLING SYSTEM” will

work in interact very efficiency.

This system would be much more helpful for the near future because it is developed

according to the all condition which happened in the future. Like as add new features .it can

modify of all record, it is also helpful for updating account of patient record and detail.

10
ADVANTAGE OF THE SYSTEM:

 The main advantage of the system is the process is very simple like billing of patient.

 We can easily search any record of available patient.

 We have low chances of errors in this system thus it is more accurate. Various constructs

can be applied on the software.

 It will be more reliable with incensed throughput capacity and Economy.

 It will save our lots of time because of feat processing as compared to human

 We can easily maintain patient record.

 We can easily search the information about particular record with help

of various options.

We can easily search the patient information by giving their name or patient id.

HARDWARE/SOFTWARE REQUIREMENT:-

Server configuration:

Minimum 100MB Hard Disk

P-III processor or equivalent

RAM 128 MB

Windows or Linux

11
Operating System – Linux, Microsoft

Language -- visual basic6.0,

Database --Ms Access

ACCEPTANCE CRITERIA:-

The main aim of the project is to develop a feature-rich, practical Patient Billing Software

(PBS) for a hospital. The authorities of a hospital can login into their respective accounts and

then update the bills consequently. The main aim of the project is to develop a feature-rich,

practical Patient Billing Software (PBS) for a hospital. The authorities of a hospital can login

into their respective accounts and then update the bills consequently.

 PBS will Provide a repository for detailed patients’ bills and personnel data

 Have a standard input format that is not patient specific

 Validate, through edits, the information reported is properly authorized

 Generate proper & valid transactions to initiate the payment process

PBS is needed to get rid of difficult and tiring conventional model. As we can take a look into

conventional model.

12
CONVENTIONAL MODEL:-

The traditional way of maintaining details of a patient in a hospital was to record them

Using case sheets manually. It was difficult to manually retrieve data whenever needed and

almost next to impossible to maintain such capacious data as the years passed by. And the billing

had become a hard-hitting task for the data operators.

Hence to prevent losing of data and enhance the maintainability, various computerized

approaches have been evolved.

NEED FOR AUTOMATION:-

The operations in the manual process are very time consuming and is an overhead

process. And through the manual process of maintaining records, it

became a chaotic operation for the authorities whenever they wanted to refer any patient’s

details.

At that point of time, it was really essential to have an automated system which would make

work easier and proficient.

13
PROPOSED SYSTEM:-
With time and growth of programming capabilities, more and more sophisticated,

automated patient billing systems have evolved. The proposed Patient Billing System has

rectified almost all disadvantages of the existing system. By making this system as automated,

the hospital management’s are benefited the most.

An Automated computerized Billing Software System provides greater enhanced

techniques for maintaining data in a hospital and also helps in easy retrieval and updating of

data, which results in efficient billing.

The PATIENT BILLING SYSTEM method aims at improving the human behaviours at

work (to improve safety and reduce manual work).

The process is the following:

To initiate the project, a visual basic consultant helps Workshop workers to identify the best

practises to follow. This is done for all the workshops. Then, every Workshop involved in the

project has a list of best practises to respect.

The BV consultant setups the application by entering the configuration (sites definition,

workshops definition, shifts definition for all the workshops, list of best practises by workshop).

At a defined frequency (daily, weekly…), for each shift of the workshop, a user uses the

application to generate the list of best practises to follow for his workshop.

The user assesses the best practises respect in the workshop and enters the result into the

application.

The application is able to generate graphs showing the result of the assessments ( rate of respect

for all the best practises and trend of this result during a period)

14
The graphs generated by this application is used during periodic meetings debrief of the result

with the workshop workers and to define which best practises can be added and which practises

can be removed.

15
ADMIN MODULE:-

Through this module user could create update modify and delete in different sub module as

follows:

Patient detail

Ward detail

Bill detail

PLANNING MODULE:-

Here user Planning for best practice for a workshop to improving working standard.

STATISTICS MODULE:-

Statistics showing the status which displays the status of bills the within a time period.

ADVANTAGES OF THE PROPOSED SYSTEM:-


The advantages of proposed system can be summarized as below:
(1) The new system will developed in MS Access concept making it compatible with the user

requirement. As a result there will be minimum redundancy of data and large amount of data can

be stored in the database without any storage problem.

16
(2) The response time information retrieval will reduced to negligible and the processing time

require for retrieving, the desired information from different table is less.

(3) Reports can be generated quickly for effective decision making and up-to-date information

are available and answers to queries are also provided instantly.

17
FEASIBILITY STUDY:-
A feasibility study is defined as an evaluation or analysis of the potential impact of a

proposed project or program. A feasibility study is conducted to assist decision-makers in

determining whether or not to implement a particular project or program. The feasibility study is

based on extensive research on both the current practices and the proposed project and its impact

on the school foodservice operation. The feasibility study will contain extensive data related to

financial and operational impact and will include advantages and disadvantages of both the

current situation and the proposed plan.

The feasibility study is conducted to assist the decision-makers in making the decision that will

be in the best interest of the school foodservice operation. The extensive research, conducted in a

non-biased manner, will provide data upon which to base a decision. The Feasibility study could

be used because:

Main characteristics of the system:

 Manage the information of client, project, site, workshop and shift.

 Setting and improve working standard.

 Provide Graphical representation of data..

 User Access privilege (Profile).

Within a feasibility study, six areas must be reviewed, including those of Economics, Technical,

Schedule, Organizational, Cultural, and Legal.

18
Economic Feasibility Study:-

This involves questions such as whether the firm can afford to build the system, whether

its benefits should substantially exceed its costs, and whether the project

has higher priority and profits than other projects that might use the same resources. This also

includes whether the project is in the condition to fulfill all the eligibility criteria and the

responsibility of both sides in case there are two parties involved in performing any project.

Technical Feasibility Study:-

This involves questions such as whether the technology needed for the system exists, how

difficult it will be to build, and whether the firm has enough experience using that technology.

The assessment is based on an outline design of system requirements in terms of Input, Output,

Fields, Programs, and Procedures. This can be qualified in terms of volumes of data, trends,

frequency of updating, etc. In order to give an introduction to the technical system.

Schedule Feasibility Study:-

19
This involves questions such as how much time is available to build the new system,

when it can be built (i.e. during holidays), whether it interferes with normal business operation,

etc.

Organizational Feasibility Study:-

This involves questions such as whether the system has enough support to be

implemented successfully, whether it brings an excessive amount of change, and whether the

organization is changing too rapidly to absorb it.

Cultural Feasibility Study:-

In this stage, the project's alternatives are evaluated for their impact on the local and

general culture. For example, environmental factors need to be considered.

Legal Feasibility Study:-

Not necessarily last, but all projects must face legal scrutiny. When an organization either

has legal council on staff or on retainer, such reviews are typically standard. However, any

project may face legal issues after completion too

20
Marketing Feasibility Study:-

This will include analysis of single and multi-dimensional market forces that could affect

the commercial.

So, before developing this system our team will generate some document related to feasibility

study, which include all such feasibility analysis as describe above.

21
EFFORT ESTIMATION:-

The project estimate is only as good as the estimate of the size of work to be

accomplished; choosing a right software sizing metric is an important task.

In the context of project planning, size refers to a comfortable outcome of the software project. If

a direct approach is taken, size can be measured in LOC. If an indirect approach is chosen

functional measures are considered.

The LOC is an artifact of all software development projects and can be easily counted.

Even though, it is not universally accepted as the best way to measure the process of software

development.

Loc measures are programming language independent.

They penalize well designed but shorter programs

They cannot easily accommodate non procedural languages.

Their use in estimation requires a level of detail that may be difficult to achieve.(i.e., the planner

must estimate the LOC to be produced long before analysis and design have been completed)

The functional Point Metrics on the other hand measures the functionality delivered by software

and a measure about the functionality that an application delivers to the users.

Functional points stay constant regardless of the programming languages used.

Functional points can be developed relatively easily by consulting the users at an early stage of

the development process.


22
The steps taken to arrive at the functional point count for a software product are:

The information processing size , is determined by identifying the system components perceived

by the end users and then classify and count the five user function types (known as unadjusted

function points) delivered by the development process.

Unadjusted Function Points

These are classified as follows:

Data Function

Number of Internal Logical Files (ILF): Logical grouping of data in a system, maintained by an

end user, are referred to as internal logical files.

Number of External Interface Files (EIF): All machine readable interfaces that are used to

transmit information to another system.

Transactional Function: Number of External Inputs (EI): An external Input gives the user

capability to maintain the data in ILFs through adding, changing and deleting its contents.

Number of External Outputs (EO): Each user output that provides application oriented

information to the user. In this context output refers to reports, error messages, and so on.

Individual data items within a report are not counted separately.

23
Number of External Inquiries (EQ): An inquiry is defined as an online input that results in the

generation of some immediate software response in the form of an online output.

These components are further categorized as simple, average or complex, depending on the

number of data elements in each type and other factors.

Degree of influence (DI) of fourteen components called ‘general application characteristics’ is

determined. The degree of influence of each of these factors takes a value from 0-5 to signify

none to essential. The sum of the scores of the fourteen characteristics, that is the total degrees of

influence, is converted to the ‘technical complexity factor’ by using the following formula:

TCF = 0.65 + 0.01 x DI

The relative system size expressed in function points (FPs) is computed as:

FP’s = UPF x TCF

For the Proposed Project the details are as stated-below:

(Note: The below stated numbers have been concluded with reference to the Requirements

document, described earlier)

Number of External Inputs: 22

Number of External Outputs: 40

24
Number of External Queries: 18

Internal Logical Files: 4 Files

External Interface Files: 1 File

25
COMPUTATIONS:

Measurements count weighing factor simple

Parameters average complex

EI 22 x3 x4 x6 =88

EO 40 x4 x5 x7 =160

EQ 18 x3 x4 x6 =72

ILF 4 x7 x10 x15 =28

EIF 1 x5 x7 x10 =5

COUNT UFP TOTAL =353

COMPUTING TECHNICAL COMPLEXITY FACTOR(TCF)

CI CHARACTERISTIC DI COMMENT

C1 Data communication 2 Client/server

architecture

C2 Distributed functions 3 Client/server

Architecture

C3 Performance 2 Client/server

architecture

26
C4 Heavily used configuration 1 Application design

C5 Transaction rate 5 Strong influence for

transaction handling

C6 Online data entry 4 Majority operations

depends on online entries

C7 End user efficiency 3 Exclusivity is sprawled

over user friendly

menu

C8 Online update 2 Moderate

influence

C9 Complex processing 4 Database

functions.

C10 Re-usability 3 Modules must be

re-usable for further

enhancements

C11 Installation Ease 3

C12 Operational Ease 5

C13 Multiple Ease 5

C14 Facilitate Change 3

TOTAL DI 45

Degree of Values Degree of Values

27
Influence Influence

Not Present 0 Average 3

Influence

Insignificant 1 Significant 4

Influence Influence

Moderate 2 Strong 5

Influence Influence,

Throughout

Technical complexity as defined above:

TCF = 0.65 + 0.01 x DI

Computed as:

TCF = 0.65 + 0.01 x 45

TCF = 1.1

Function point defined as:

FP = UPF x TCF

i.e. FP = 353 x 1.1

FP = 388

For Object Oriented Technologies LOC/FP = 30


28
LOC = FP x 30

LOC = 388 x 30

LOC = 11649 DLOC

 Expected lines of code to be developed: 12 KDLOC Approx.

 Expected scheduled delivery time: 1.8 * man-months period.

(From company’s empirical data, the similar projects based on Visual Basic and MS

Access it is assumed that the project must complete within above specified period of time.)

29
TIME ESTIMATION-

According to COCOMO Model-

Estimation of Development Effort-

Organic : Effort=2.4(KLOC)1.05 PM

In this project KLOC as estimated above=11649

Therefore, Effort = 2.4*(11649)1.05

Effort = 15.181

Estimation of Development Time--

Organic : Tdev=2.5(Effort)0.38 Months

As estimated above, Effort = 15.181

Therefore, Tdev = 2.5*(15.181)0.38

Estimated Time = 5 Months Approx.

(From company’s empirical data, the similar projects based on Visual Basic and MS

Access it is assumed that the project must complete within above specified period of time.)

30
COST BENEFITS ANALYSIS:-

The costs associated with the system are expenses outlay or losses arising from

developing and using a system. But the benefits are the advantage received from installing and

using. Cost and benefits can tangible or intangible, fixed or variable, direct or indirect.

Tangible or Intangible cost:-

Tangible cost is that which value can be measured. The outlay of cash for any specific item or

activity is referred to as a tangible cost. These costs are known and be estimated accurately. Cost

that are known to exist but their financial value can not be exactly measured are referred to as

intangible cost.

Cost of the system

One PC core 2 due 36000/Rs

One inkjet printer 4500/Rs

Total Hardware costs 40500/Rs

Cost of the SOFTWARE

Visual basic 6.0 10000/RS

Ms Access 5000/RS

Total software cost 15000/RS

31
Development cost:

Programming 20000/Rs

For Analyst 5000/Rs

Total development cost 25000/Rs

Intermediate printouts 150/Rs

Electricity cost 500/RS

Others 100/Rs

Total cost 650/Rs

32
COST ESTIMATION OF PROJECT:-

This is the full-fledged industrial project containing database handling, active documents,

good designing, validation checks, good security and easy to use interface etc.

In this project I have used latest s/w technologies. Visual basics 6.0 is the front end and used, ms

access is used as database (back end), operating system windows vista ultimate.

Total Effort Estimation = 15.181

Nominal Development Time =5 Months

Salary of Programmer =12,000

Cost required developed the product=60,000 Approx

DIRECT AND INDIRECT COSTS:-

Direct costs are those which are directly associated with a system. Its are applied directly to

operator of the site.

Indirect costs are not directly associated with a specific activity in a system. It is often refers to

as overhead expenses.

33
DIRECT OR INDIRECT BENEFITS:-

Direct benefits also can be specially attributes to a given project.

Saving of time is writing the record and transforming the old data from the store.

Saving man power.

Indirect benefits are realized as a byproduct of another system for example:

o Easy entry of record

o Easy to modify any record

o Easy to calculate feedback and determine weak points of any system.

o Easy access of information with specific requirements.

o Information can access from any other site of same objective.

Request Period:-

It is not necessary that all the required projects are desirable or feasible, because

requested projects only initialize when they are feasible in each and every aspect. If the cost is

more than the cost of benefits after the project release then the project request are dropped.

Under this feasibility study the user system “Patient Billing System” are feasible in each and

every aspects. In other words we can say that the end user system is technically feasible

economically feasible operational feasible and legally and time feasible.

34
SCHEDULE:

Development Schedule
MODULES START DATE END DATE

A. Documentation 15-sep-2011 4-oct-2011


1. SRS 7-oct-2011 15-oct-2011
2. HLD 29-oct-2011 30-oct-2011
3. LLD 20-oct-2011 21-oct-2011
4.Test Plan 20-nov-2011 28-Nov-2011
5.Test Case Report for all modules 28-Nov-2011 29-nov-2011

PROGRAMMING LANGUAGE AND DEVELOPMENT TOOL:-

Programming language: Visual basic 6.0,Ms Access. Operating system: windows vista,etc.

SOFTWARE REQUIREMENTS SPECIFICATION:-

35
Product Perspective:-

PBS collects and stores bills and personnel data in a database on the Comptroller's mainframe.

The system applies edits to validate data before accepting a transaction. The following diagram

depicts the processes contained within PBS:-

Class Diagram :

Ward detail
Patient detail
Ward no
Patient name
Bed no
Patient id
Patient id
Address
ICU
Patient age
Phone number
Gender
Bill detail
Date of admit
Disease Ward bills
ICU bills
Medical bills
Total bills

36
PRODUCT FUNCTIONS:-

The PBS functional architecture is shown in the figure below. There are 6 major functions in

SPRS. The specifics of these components are detailed in Section 3.0, Requirements

Specifications.

37
SEQUENCE DIAGRAM FOR PATIENT MANAGEMENT:-

38
SEQUENCE DIAGRAM FOR PATIENTBILLING MANAGEMENT:

39
40
System Feature ID: System Feature Name:

Patient Registration
SRS_PBS_REG_01

Description: Patient registration feature enables the registration process of the

patient. The feature stores the data in a database and retrieve using

registration ID. Updates the Patient data whenever necessary.

Activity Diagrams,
Sequence Diagrams,List the graphical models used to analyze the features and to better
Class Diagrams:
understand what needs to happen in the system. This can help

identify issues such as omissions in the requirements. Remember

that this is an analysis activity and not yet a design activity. Proceed

only to a level of detail that allows you to understand the problem

domain.

The diagrams are defined as delineated in the Unified Modeling

Language (UML):

Activity diagrams that show the user-system interactions: Use this

type of diagram to better understand the flow of the work, and, in

particular, the branching.

41
Sequence diagrams that show object interactions: Use this type of

diagram to identify the key concepts of the domain, i.e., the objects

that will implement the behavior.

Class diagrams that summarize the classes of objects that appear in

the sequence diagram: Use this type of diagram as a complement to

the previous diagram.

System Feature ID:System Feature Name:


SRS_PBS_WARD_01 WARD Management
Description: This feature enable to maintain the wards(General/ICU) and about

their

Patients information .

Activity Diagrams,<List the graphical models used to analyze the features and to better
Sequence Diagrams,
understand what needs to happen in the system. This can help
Class Diagrams:
identify issues such as omissions in the requirements. Remember

that this is an analysis activity and not yet a design activity. Proceed

42
only to a level of detail that allows you to understand the problem

domain.

The diagrams are defined as delineated in the Unified Modeling

Language (UML):

Activity diagrams that show the user-system interactions: Use this

type of diagram to better understand the flow of the work, and, in

particular, the branching.

Sequence diagrams that show object interactions: Use this type of

diagram to identify the key concepts of the domain, i.e., the objects

that will implement the behavior.

Class diagrams that summarize the classes of objects that appear in

the sequence diagram: Use this type of diagram as a complement to

the previous diagram. >

System Feature ID: System Feature Name:


BILLING SYSTEM

43
SRS_PBS_BS_01

Description: This feature enable to give billing information so that patient billls

can be calculated easily.

Activity Diagrams,<List the graphical models used to analyze the features and to better
Sequence Diagrams,
understand what needs to happen in the system. This can help
Class Diagrams:
identify issues such as omissions in the requirements. Remember

that this is an analysis activity and not yet a design activity. Proceed

only to a level of detail that allows you to understand the problem

domain.

The diagrams are defined as delineated in the Unified Modeling

Language (UML):

Activity diagrams that show the user-system interactions: Use this

type of diagram to better understand the flow of the work, and, in

particular, the branching.

Sequence diagrams that show object interactions: Use this type of

diagram to identify the key concepts of the domain, i.e., the objects

that will implement the behavior.

Class diagrams that summarize the classes of objects that appear in

the sequence diagram: Use this type of diagram as a complement to

the previous diagram. >

44
S. No. Class Name Responsibility Persistent (Y / N)
S1 PATIENT The patient must enter all thePermanent Database
personal details
S2 ADMINISTRATOR Receptionist: He has thePermanent Database
responsibilities to take the
patient details and to assign to
doctor concern for the disease
suffering by the patient .

S3 BILLS Bills class has responsibility to


maintain bills of each patient.
S4 MEDICINE This class has the responsibility
to maintain the medicine details
which are given to the patients..
S5 DOCTOR DETAILS This class has the responsibility
to maintain Doctor‘s schedule
,and allotted the respective
doctor to the patient.
S6 WARD DETAILS This class has the responsibility
that should maintain the WARD
details of patients and fee details

45
of patient for General/ICU and
also shifting of ward details.

Administrator (Receptionist) will be provided with a login name and


State Analysis
password. When a valid user enters the system, a list of services will be
displayed as hyper links. User can select any option and perform desired
operations like master updating, deletions, insertions, taking reports etc.
Data updating service will be provided to only designated user. Higher
officials can see the reports. User can select logout option and exit from
the system.

State Transition Diagram-

Active

idle
iiiii
Login Regestratio Upadate detail

View Report
Logout

46
USER CHARACTERISTICS:-

The following agencies are expected to submit bills/personnel transactions to the PBS

from internal billing and personnel systems:

End Users:

Hospital management officials, which include:

 Lab Authority

 Ward Authority

 Pharmacy Authority

 Administrator

Users have update access to PBS through batch processing and can perform online changes to

PBS data. A limited number of inquiry screens are available to these agencies and Comptroller

staff. The heaviest use of the data is among Lab Authority, Ward Authority, Pharmacy Authority,

and Administrator

Only authorized people sign in to the system, others cannot sign in and update the daily

transactions.

47
ASSUMPTIONS AND DEPENDENCIES:-

 The details related to the product, customer, payment and service transaction

Provided manually.

 Administrator is created in the system already.

 Roles and tasks are predefined.

 Only authorized users can access the system.

48
FUNCTIONALITY:-

Functional Requirements:-

Feature Analysis The PBS project module consists of following sub modules

Admission of new patients.

Search/view details of existing patients.

 Transfer of patients.
 Billing

System Feature ID: System Feature Name:


SRS_REG_01 Patient Billing System.

Description: Enables the hospital authorities to perform billing efficiently and

maintain patient details without any discrepancies.

Activity Diagrams, The diagrams are defined as delineated in the Unified Modeling
Sequence Diagrams,
Language (UML):
Class Diagrams:
Activity diagrams that show the user-system interactions: Use this type

of diagram to better understand the flow of the work, and, in particular,

the branching.

Sequence diagrams that show object interactions: Use this type of

diagram to identify the key concepts of the domain, i.e., the objects that

49
will implement the behavior.

Class diagrams that summarize the classes of objects that appear in the

sequence diagram: Use this type of diagram as a complement to the

previous diagram.

Operations: Register new patients.

Keep track of all the facilities used by the patients and charge them

accordingly.

Provide Bill to the patient.

RELIABILITY:-

The factors used to determine system reliability are:

 System should complete processing during the processing window.

 System shall provide a data check-point that saves all completed transactions.

 System shall retain historical records as follows:

 System will archive to tape (tapes will be maintained for a period of seven

years):

 Patients’ transactions with an effective date prior to the current fiscal year

plus two prior fiscal years.

50
 Patients’ transactions with a payment date prior to the current calendar

year plus two prior calendar years.

o System will archive to disc:

 Data extract files, until the next time the extract program is run. The System Input/Output

Section within the Comptroller's office maintains 255 back-up versions of all data extract

files transmitted to agencies.

 255 back-up versions of all print extract files transmitted to agencies. After 255 versions

are created, the System Input/Output Section moves them to tape and maintains them for

an additional four years.

Safety and reliability By incorporating a robust and proven RDBMS (MYSQL) into the system,

Requirements reliable performance and integrity of data is ensured.

There must be a power backup for server system

PERFORMANCE:-

PBS performs overnight batch processing. A batch queuing process ensures that batches

are processed in the correct order. Batches are queued for processing by the date/time stamp of

the batch on a first in, first out basis. Batches are submitted to the queue by the agency .

51
All PBS batches received before the specified time are processed that night. Batches received

after the specified are processed the next night.

Performance System can withstand even though all the authorities try to update

Requirements the data in the database tables at the same time. Access is given to

the only authenticated employees of a hospital who are assigned

respective tasks.

SECURITY:-

SYSTEM SECURITY:-

PBS Security is managed through existing procedures within the Comptroller's office

using system Security. A user identification (User ID) consisting of the users first name, users

last name and the users’ designation in hospital/department shall be assigned to all users

accessing the system. In some cases, to avoid duplicate User IDs, the convention may vary. Only

users’ with a needed designation in hospital/department will be provided authorized logon

privileges. Should an attempt to logon fail after three times, the User ID shall be locked out of

the system until the user contacts a Security Coordinator to resolve the problem.

DATA SECURITY:-

SPRS will be backed up as part of the scheduled backups.

52
MAINTAINABILITY AND PORTABILITY:-

PBS is a mainframe system to be developed using software currently supported within

the Comptroller's office.

INTERFACES:-

1. Login screen.

2. User id and Password screen

3. Update database details screen.

5. Delete database Details screen.

6. Billing screen.

HARDWARE INTERFACES:-

Server configuration:

Minimum 1GB Hard Disk

P-III processor or equivalent

RAM 128 MB

Windows or Linux

SOFTWARE INTERFACES:-

Operating System – Linux, Microsoft

53
Language -- visual basic6.0,

Database --Ms Access

COMMUNICATIONS INTERFACES:-

LAN protocols and TCP/IP

Mozilla web browser or equivalent

HIGH LEVEL DESIGN SPECIFICATION:-

PURPOSE
This document provides the detailed system design of Document Management System. It

describes the high-level design that explains the functionality of the system. The purpose of this

document defines the architecture, implementation, database design details of the system to the

development team.

SCOPE

The Scope of this document includes the design details for the functioning of different modules

of the system, database details are also included that is required for the storage of information.

DESIGN CONSIDERATIONS

54
 The issues that measure the design are:

 User-friendly interface.

 Authorized users can only access the application.

 Access is limited by the authorization level.

 The new version replaces the older version when the document uploads

 Ms Access is the database manager and visual basics as a front end.

DESIGN:-

DFDs showing Patient Billing System-

0 Level DFD -

patie
Login Bill
nt

55
1 Level DFD-

patient

Patient data store

patient detail

patient detail

payment advice
report case paper data store

admission process system


payment reciptl

case paper report


bills

payment data store

2 Level DFD-

56
Patient data store

patie nt detail

payment reg id
patient reg.& payment
Syatem
request
patient

Patient payment data store

bills

payment advice update


patient data store
update
payment process system

case paper report update


update

Case paper data store

57
E-R DIAGRAM: -

Data models are tools used in analysis to describe the data requirements & Assumptions in the

system from a top-down perspective .They also set stage for the design of databases.

There are three basic elements in E-R Models:

 Entities are “things” about which we seek information

 Attributes are the data we collect about the entities.

 Relationships provide the structure needed to draw information from multiple entities.

DEVELOPING AN E-R DIAGRAM: -

Developing an E-R Diagram require an understanding of the system & its

components before discussing the procedure, let’s look at a narrative created

by us.

58
59
RELATIONSHIP DIAGRAM

Patient_Details
Doctor_Details

Patient_id
Doctor_id
Name Transaction_Details
Name
Sex
Sex
Father’s name Patient_id
Department
Address Transaction id
Address
Ward_Details
Contact No Date_of_Addmission
Contact_No
Doctor_id Date_of_Discharge
Ward_No
Disease Ward_No
Total_Days
Is Ward_No
Ward
Age Final_Bill_Details
a
Cost_Per_Bed
Date
Patient_id
Bill_id
Status
60
Total_Bill
Patient_id
Status
Patient_Name

Ward_Bill
Other_Bill_Details

Bill_id

Patient_id

ICU_Bill

Message_Bill

LOGICAL DATA ANALYSIS OF THE SYSTEM

DATA DICTIONARY: -

The classification of the Total Number, Types & Names of Databases & Tables used in the

project are shown below here:

1. Patient_id Text
2. Patient_Name Text
3. Sex Text
4. Father’s_Name Text

61
5. Address Text
6. Contact_No Number
7. Doctor_id Text
8. Disease Text
9. Ward_No Number
10. Age Number
11. Date Date/Time
12. Status Text
13. Doctor_Name Text
14. Department Text
15. Total_Days Number
16. Ward Text
17. Cost_Per_Bed Currency
18. Total_Bill Currency
19. Transaction Text
20. Date_of_Admit Date/Time
21. Date_of_Discharge Date/Time
22. ICU_Bill Currency
23. Medicine Bill Currency
24. Total Currency
25. Other_Bill Currency
26. User_Name Text
27. Password Text
28. Type Text

DESIGN CONSTRAINTS:-

 GUI is only in English.

 Login and password is used for identification of users and there is no facility for guest.

62
 This system can be accessed by the authorized users only.

 There is no maintainability of back up so availability will get effected.

63
TEST PLAN:-

PURPOSE:-

This document is a high-level overview defining our testing strategy for the patient

billing system. This document will address the different standards that will apply to the unit and

functional testing of the application, to achieve correct code and ensure all functional and design

requirements are implemented as specified in the SRS documentation.

The purpose of the Test Plan document is to:

 Specify the approach that Testing will use to test the application.

64
 Break the product down into distinct areas and identify features that are to be

tested.

 Specify the procedures to be used for testing sign-off and product release.

 Indicate the tools used to test the product.

 List the resource and scheduling plans.

 Identify risks and contingency plans that may impact the testing.

 Specify bug management procedures for the project.

OBJECTIVE:-

The objective of our test plan is to find and report as many bugs as possible to improve

the integrity of our program. Although exhaustive testing is not possible, we will exercise a

broad range of tests to achieve our goal.

SCOPE:-

Testing will be conducted at the different level. The scope of testing will be limited to the

top-level panels of the design. Both the functional aspect, i.e. validity of the reports generated, as

well as compliance to the GUI guidelines will be verified, the look and feel of the screens, the

overall functionality of the application. The Test Plan identifies the details of the test approach,

identifying the associated test case areas within the specific product for this release cycle.

65
TESTING APPROACH:

Testing is the process of executing programs with the Intent of finding errors, rather than (a

misconception) of showing the correct functioning of the programs. The distinction may sound

like a matter of semantic, but it has been observed to have profound effect on testing success.

Testing should bear the following objectives:

 to reveal design errors

 to reveal logic errors

 to reveal performance bottlenecks

 to reveal security loopholes

 to reveal operational deficiencies

The Test Approach sets the scope of system testing, the overall strategy to be adopted, the

activities to be completed, the general resources required and the methods and processes to be

used to test the release. It also details the activities, dependencies and effort required to conduct

the System Test. The test approach should reveal the following details:

 New & revised Transaction Processing

 New Query Processes

 Revised Audit process

 Relocate Exceptions

66
 Revised Query Management process

 Revised Retrievals process

A successful testing approach is one that detects an undiscovered error.

A necessary part of a testing approach is a definition of the expected outputs or results. Do not

plan testing effort on assumption that no errors will be found.

The probability of the existence of more errors in a section of a program is proportional to the

number of errors already found in that section.

Testing libraries should be set up allowing Regression test to be performed at the time of system

maintenance and enhancement. The later in the development life cycle a fault is discovered, the

higher is the cost of correction. Successful testing relies on complete and unambiguous

specification.

67
TEST PHASES:-

Test Phases Testing Strategy

Applied

Unit Testing

- Testing of the program modules in isolation with the White box testing

objective to find discrepancy between the programs and the in LLD

68
program specifications.

Integration Testing

- Testing of the linkages between testing program modules with White box testing

the objective to find discrepancy between the programs and in LLD

system specifications.

Function Testing Black box testing

- Testing of the integrated software on a function-by-function

basis with the objective to find discrepancy between the

programs and the function specifications.

Systems Testing Black box testing

- Testing of the integrated software with the objective to find

discrepancy between the programs and the original objectives

with regard to the operating environment of the system (e.g.

Recovery, Security, Performance, Storage, etc.).

Acceptance Testing Black box testing

- Testing of the integrated software by the end-users (or their

proxy) with the objective to find discrepancy between the

programs and the end-user needs.

69
SCOPE OF TESTING:-
System testing is the process of testing the integrated software with regard to the

operating environment of the system.( i.e. Recovery, Security, Performance, storage, etc)

It’s worthwhile to note that the term has been used with different environments. In its widest

definition especially for the small scale projects, it also covers the scope of integration testing

and the function testing.

For our application which combines the integration testing, functional testing, system testing in

one set.

All the testing done at the customers site are hopefully well and are similar to those are shown in

the description of design phase of these software. The entire input screens are same. All output

screen are same ,because we used the technique provided by MICROSOFT in our program so

that if a computer can satisfy a minimum set of hardware and software requirement then out

program behave equally well on both computer that on development site or customer’s site.

Therefore if you want to see any data, input screen, output screen reports and printouts then you

can see them in the previous description of design phase.

70
ENTRY CRITERIA:-

The Entrance Criteria specified by the system test controller, should be fulfilled before

System Test can commence. In the event, that any criterion has not been achieved, the System

Test may commence if Business Team and Test Controller are in full agreement that the risk is

manageable.

All developed code must be unit tested. Unit and Link Testing must be completed and signed off

by development team.

System Test plans must be signed off by Business Analyst and Test Controller.

All human resources must be assigned and in place.

All test hardware and environments must be in place, and free for System test use.

EXIT CRITERIA:-

All High Priority errors from System Test must be fixed and tested

If any medium or low-priority errors are outstanding - the implementation risk must be signed

off as acceptable by Business Analyst and Business Expert

Project Integration Test must be signed off by Test Controller and Business Analyst.

Business Acceptance Test must be signed off by Business Expert.

71
REQUIREMENT OF SYSTEM TESTING:-

Testing is vital to the system. System testing makes a logical assumption that if all the parts

of the system are correct, the goal be successfully achieved. Contesting leads to errors that create

problems.

The time lag between the cause and the appearance of the problem The effect of system

errors on files and records within the system. A small system error can conceivably explode into

a much problem. Effective testing early the process translate directly into term cost saving from a

reduced number of error.

System testing is usable as a user oriented vehicle before implementation. It is helpful to a

system tester to bridge the communicate barrier.

LIMITATION OF THE PROJECT:-

This project will not work for all hospitals. The project I am making is a real life project. Still

there are few loopholes, which should be taken care in the long term. The project I am making is
72
used in fewer organizations because it is a traditional system of maintaining the patient billing

management. So as and when time changes few more details may be required in this project,

hence we have update it at regular interval of time. Few limitations that I can oversee at this

point of time are as under:-

o This application is for standalone machine.

o Typical (or as told by the clients).

73
BIBLIOGRAPHY

References

Steven Holzner, Visual Basic 6 Programming Black Book, Dream Tech Press,

2007

Evangelos Petroutsos, Mastering Visual Basic 6, BPB Publication, 2006

74
Rajib Mall, Fundamentals of Software Engineering, PHI Learning Private Limited,

2008

Sajan Mathew, Software Engineering, S.Chand & Company Ltd, 2007

Prabhakar Gupta, Software Engineering, Pragati Prakashan, 2007

Roger S Pressman, Software Engineering a Practitioner’s Approach, Mcgraw Hill

International Edition, 2005

Zultner R, Quality Function Deployment for software satisfying customers,

American Programmer, 1992

Gilb T, Principles of Software Engineering Management, Addison Wesley, 1998

75
Budd T, fundamental of data base management, Addison-Wesley, 1996

76

You might also like