PSMS Training Manual - Contractors v2.1
PSMS Training Manual - Contractors v2.1
PSMS Training Manual - Contractors v2.1
Version 2.1
March 11, 2019
Contents
1 Introduction .................................................................................................................................... 3
2 Intended Audience .......................................................................................................................... 3
3 Functional overview ........................................................................................................................ 3
3.1 Process flow for Contractors................................................................................................... 3
3.2 Accessing PSMS ....................................................................................................................... 4
3.3 User Registration..................................................................................................................... 4
3.4 User Login ............................................................................................................................... 5
3.5 Create/ Update Contractor Profile.......................................................................................... 7
3.6 Mark/ View Attendance ........................................................................................................ 10
4 Leave Request Flow ...................................................................................................................... 12
4.1 Request for Leave ................................................................................................................. 12
4.2 Leave Cancellation Request .................................................................................................. 15
5 Timesheet ..................................................................................................................................... 16
2 Intended Audience
This Training Manual is intended to be used by Contract Staff working on HPE projects
3 Functional overview
Following features of PSMS are relevant to Contract Staff:
1. User Registration
2. User Login
3. Create/ Update Contractor Profile
4. Mark/ View Attendance
REGISTER
LOGIN
Create/Update Profile
Your manager will receive an email to approve your registration. Once registration has been
approved, login credentials will be sent to you on your registered email.
b) To sign In to PSMS
h) Select a Qualification from the drop down list. Enter year of passing and select a course type
from drop down list.
p) Once documents have been uploaded, click on “Submit for Approval” to send your profile to
ii) Select the “Date” and “In Time” from the drop down.
iv) Confirmation message will be displayed and Green button will display “Out”
d) To mark Out-Time,
ii) Select the “Date” and “Out Time” from the drop down.
iv) Confirmation message will be displayed and Green button will display “In”
e) Attendance can be approved or rejected by your manager. If rejected, you will need to
submit attendance again for that day.
Login as Contractor
Leave Approval/Rejection by
Manager
i. For applying leave click on ‘Click to Apply Leave’ button then leave form will be
displayed.
iii. Select the ‘From Date’ and ‘To Date’ then ‘Applied Leave Days’ will automatically
be calculated and displayed.
iv. Provide ‘Contact Number’ on which contractor will be available during leave.
vi. If contractor wishes to add any remarks or additional note then he/she can do so in
the “Remarks” field.
vii. Click on ‘Submit’ button. Leave application will be submitted and confirmation
message, in green colour, will be displayed.
viii. After Submission, leave request will be displayed in grid with status as ‘Pending’.
Note: To apply half day leave, contractor has to select same “From Date” and “To Date”. “Applied
Leave Days” will then become editable and can be changed to 0.5.
ii. When leave period contains a weekly off (Sunday) or a holiday, only working days
will be considered as leave (e.g. Leave applied from 1st Oct to 3rd Oct. As 2nd Oct is
a holiday, 2 days leave will be considered and not 3 days)
iii. In the above case(point ii) 2 leaves will be deducted from ‘Cumulative Leave
Balance’ and 2 leaves will be displayed as ‘Leave Availed’ but ‘Applied Leave
Days’ will be displayed as 3.
iv. Holidays are considered as defined in State wise Calendar. State wise calendar is
associated with ‘Current Project Location’ of contractor (E.g. if ‘Vadodara’ is
current project location of any contractor then ‘Gujarat’ calendar will be
applicable for that contractor)
vi. Project Manager will enter total no. of leaves accruable to each contractor in a
year for a certain project. Accordingly, pro-rated leave will get credited to each
contractor automatically at the end of a month.
viii. Once Project Manager approves/rejects leave, contractor will get an email alert. In
case of rejection, remarks given by Manager will be displayed in email alert.
ix. Summary report for contractors will provide leave applied, leave approved and
leave balance for each contractor in a project for the current year.
a. All approved leave requests will be displayed on ‘Leave Cancel Requests’ screen
with ‘Cancel Leave’ button.
d. After clicking on ‘Cancel Leave’ button, record will be removed from the screen
and notification message will be displayed on screen in green colour.
f. Once Project Manager approves leave cancellation request, leave balance will be
appropriately updated.
g. In case Project Manager rejects the cancellation request, there will be no change in
‘Cumulative leave Balance’ and ‘Leave Availed’.
i. Leave cancellation request will not be displayed on the screen, but leave balance
will be updated depending on action taken by Manager.