Case Study Production Planning
Case Study Production Planning
Case Study Production Planning
NOTE: DXTR1###makes up 40%, DXTR2###makes up 30% and DXTR3### another 30% of the production
plan created in your Sales and Operations Plan. How is this derived?
CASE STUDY: PRODUCTION PLANNING AND EXECUTION (PP)
STEP 6: REVIEW DEMAND MANAGEMENT
Only a few of the possible statuses need to be set at a particular point in time. If one of these
statuses is missing, the system refers you to it before you can perform any further functions.
System status
System statuses are set when you perform a particular function for the notification. For
example, you perform the system function "Print notification", which sets the status printed for
the notification.
User status
User statuses enable you to further limit the functions that are permitted for a notification due to
a system status. You can assign and delete user statuses directly if you have the authorization
for doing this.
Prerequisites
System statuses are preset by SAP and cannot be changed.
User statuses are defined by the system administrator within a status profile for notifications in
Customizing for Plant Maintenance and Customer Service.
CASE STUDY: PRODUCTION PLANNING AND EXECUTION (PP)
Note The manufacturing output settlement List higher than the consumption expenses for raw materials and semi-
finished goods? Review and explain the expenses and the settlements of your production order in detail. How is the
balance derived?
CASE STUDY: PRODUCTION PLANNING AND EXECUTION (PP)