WALL FOOTING
FORMULA: VOLUME = L * W * T
CLASS A CONCRETE MIX
LENGTH LT (M) 55.00 M
WIDTH W (M) 0.20 M
THICKNESS T (M) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.65 CU.M.
# OF CEMENT BAGS 15.00 BAGS
VOL. OF SAND CU.M. 0.90 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 1.70 CU.M.
FORMULA: VOLUME = H * W1 * W2
CLASS A CONCRETE MIX
Enter Height L (M) 1.22 M
VOLUME OF CONCRETE FOR EACH COLUME: 0.08 CU.M.
Number of Columns Units 21.00 Units
TOTAL VOLUME OF CONCRETE: 1.60 CU.M.
# OF CEMENT BAGS 15.00 BAGS
VOL. OF SAND CU.M. 0.90 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 1.70 CU.M.
CONCRETE BEAMS
FORMULA: VOLUME = LT * W * D
CLASS A CONCRETE MIX
LENGTH LT (M) 5.00 M
WIDTH W (M) 0.20 M
BEAM DIMENSIONS: DEPTH D (M) 0.30 M
TOTAL VOLUME OF CONCRETE: 0.30 CU.M.
# OF CEMENT BAGS 3.00 BAGS
VOL. OF SAND CU.M. 0.20 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.30 CU.M.
CONCRETE STAIRS
FOOTING MATTING
Footing Length L (m) 1.20
Footing Width W (M) 1.20
# of Bars along L # 6.00
Number of Bars along W # 6.00
Number of Footing # 9.00
Clear Cover Cc (M) 0.075
Standard Clear Cover for footing =0.05m to 0.075m
1 0.2
Use End Hook: 0.200
Total length of each bars should be more than or equal to: 4.20
Total Number of Vertical Bars @ 6M: 48.00
6 Circular Stirrups
Cut Length of each stirrups: 0.90
Number of Stirrups per Column: 28.50
Total Number of Bars required for stirrups @ 6M : 35.00
#16 TIE WIRE required: 7.80
Spiral Stirrups
Cut Length of each stirrups: 0.70
Number of Stirrup Loops per Column: 28.50
Total Number of Bars required for stirrups @ 6m : 30.00
#16 TIE WIRE required: 7.80
BEAM REINFORCEMENT (BEAM TO BEAM = LESS THAN 6.0 METERS) ONE BAY
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 3.00
# of 6m Length Deformed Bars required as Non-Continuous Bars -
WEB BARS
# of 6m Length Deformed Bars required as Web Bars -
BOTTOM BARS
# of 6m Length Deformed Bars required as Continuous Bars 2.00
# of 6m Length Deformed Bars required as Non-Continuous Bars -
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 4.00
# of 6m Length Deformed Bars required as Non-Continuous Bars 3.00
WEB BARS
# of 6m Length Deformed Bars required as Web Bars
BOTTOM BARS
# of 6m Length Deformed Bars used as Continuous Bars 4.00
# of 6m Length Deformed Bars required as Non-Continuous Bars 2.00
BAR
SPACING NUMBER OF STEEL BARS PER SQUARE METER
IN CM.
10.000 4.369
12.500 3.603
15.000 3.221
17.500 2.647
20.000 2.360
22.200 2.168
25.000 1.977
CONCRETE STAIRS
Riser Height RH (M) 0.18
Tread Run TR (M) 0.30
Stair Width W (M) 1.00
# of Steps N 14.00
Stringer Thickness TS (M) 0.30
0.38 0.35
Spacing (M)
0.30
Spacing (M) Steps Lateral Bar diameter (mm)
0.30 12
Stringer Lateral Bar diameter (mm)
12
Spacing (M)
0.30
Spacing (M) Steps Lateral Bar diameter (mm)
0.30 12
Stringer Horizontal Bar diameter (mm)
10
Number of 12 mm Lateral Bars required @ Steps pcs @ 6M 7.00
Number of 12 mm Horizontal Bars required @ Steps pcs @ 6M 7.00
Number of 12 mm Lateral Bars required @ Stringer pcs @ 6M 5.00
Number of 10 mm Horizontal Bars required @ Stringer pcs @ 6M 3.00
# OF #16 TIE WIRE USED KGS 2.00
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
DETERMINING THE NUMBER OF BARS USED
M
M
pcs
pcs
Units
M
0.05m to 0.075m
M
M
LHS TOTAL WT 266.58133 KGS
Kgs
M
M
M
pcs
LHS
LHS
Kgs
M
Units
mm
M
pcs
mm
M
M
M
LHS
M
M
LHS
Kgs
M
m
LHS
Kgs
M
M
M
M
Units
mm
mm
mm
mm
M
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Kgs
M
M
M
M
M
Units
mm
mm
mm
mm
M
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Kgs
CONCRETE SLAB
TIES (KGS)
0.474
0.316
0.228
0.168
0.132
0.110
0.089
M
M
CM
pcs
KGS
CONCRETE SLAB
TIES (KGS)
0.592
0.416
0.350
0.247
0.174
0.168
0.142
M
M
CM
pcs
KGS
M
M
CM
CM
pcs
pcs
KGS
M
M
M
Steps
M
0.73
pcs
pcs
pcs
pcs
KGS
standard hooks
finished, bend
bar size 90 180
diameter
X(MM) Y(MM)
10ø(#3) 60 180 100
12ø(#4) 72 216 120
16ø(#5) 96 288 160
20ø(#6) 120 360 200
22ø(#7) 132 396 220
M 25ø(#8) 150 450 250
M 28ø(#9) 224 560 336
SQ.M. 32ø(#10) 256 640 384
60cm 36ø(#11) 288 720 432
3 layers
SQ.M.
pcs @ 6M
pcs @ 6M
Kgs
RECTANGULAR COLUMN REINFORCEMENT 150X350 2ND FLOOR
pcs
mm
M
M
M
LHS
M
pcs
LHS
Kgs
ITEM - III STEEL REINFORCEMENT
LENGTH OF REINFORCING BARS FOR CHB IN METERS
(M) LENGTH
(M) LENGTH
OF
OF SPACEING
VERT. SPACING (CM) HORIZONTA
VERTICAL LAYER
L REIN./
REIN./SQ.M.
SQ.M.
FOOTING MATTING
Footing Length L (m) 1.20
Footing Width W (M) 1.20
# of Bars along L # 6.00
Number of Bars along W # 6.00
Number of Footing # 9.00
Clear Cover Cc (M) 0.075
Standard Clear Cover for footing =0.05m to 0.075m
1 0.2
Use End Hook: 0.200
Total length of each bars should be more than or equal to: 4.20
Total Number of Vertical Bars @ 6M: 48.00
6 Circular Stirrups
Cut Length of each stirrups: 0.90
Number of Stirrups per Column: 28.50
Total Number of Bars required for stirrups @ 6M : 35.00
#16 TIE WIRE required: 7.80
Spiral Stirrups
Cut Length of each stirrups: 0.70
Number of Stirrup Loops per Column: 28.50
Total Number of Bars required for stirrups @ 6m : 30.00
#16 TIE WIRE required: 7.80
BEAM REINFORCEMENT (BEAM TO BEAM = LESS THAN 6.0 METERS) ONE BAY
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 3.00
# of 6m Length Deformed Bars required as Non-Continuous Bars -
WEB BARS
# of 6m Length Deformed Bars required as Web Bars -
BOTTOM BARS
# of 6m Length Deformed Bars required as Continuous Bars 2.00
# of 6m Length Deformed Bars required as Non-Continuous Bars -
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 4.00
# of 6m Length Deformed Bars required as Non-Continuous Bars 3.00
WEB BARS
# of 6m Length Deformed Bars required as Web Bars
BOTTOM BARS
# of 6m Length Deformed Bars used as Continuous Bars 4.00
# of 6m Length Deformed Bars required as Non-Continuous Bars 2.00
BAR
SPACING NUMBER OF STEEL BARS PER SQUARE METER
IN CM.
10.000 4.369
12.500 3.603
15.000 3.221
17.500 2.647
20.000 2.360
22.200 2.168
25.000 1.977
Length L (M) 3.00
Width W (M) 4.00
Bar Spacing cm 25.00
CONCRETE STAIRS
Riser Height RH (M) 0.18
Tread Run TR (M) 0.30
Stair Width W (M) 1.00
# of Steps N 14.00
Stringer Thickness TS (M) 0.30
0.38 0.35
Spacing (M)
0.30
Spacing (M) Steps Lateral Bar diameter (mm)
0.30 12
Stringer Lateral Bar diameter (mm)
12
Spacing (M)
0.30
Spacing (M) Steps Lateral Bar diameter (mm)
0.30 12
Stringer Horizontal Bar diameter (mm)
10
Number of 12 mm Lateral Bars required @ Steps pcs @ 6M 7.00
Number of 12 mm Horizontal Bars required @ Steps pcs @ 6M 7.00
Number of 12 mm Lateral Bars required @ Stringer pcs @ 6M 5.00
Number of 10 mm Horizontal Bars required @ Stringer pcs @ 6M 3.00
# OF #16 TIE WIRE USED KGS 2.00
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
DETERMINING THE NUMBER OF BARS USED
M
M
pcs
pcs
Units
M
0.05m to 0.075m
M
M
LHS
Kgs
M
M
M
pcs
LHS
LHS
Kgs
M
Units
mm
M
pcs
mm
M
M
M
LHS
M
M
LHS
Kgs
M
m
LHS
Kgs
M
M
M
M
Units
mm
mm
mm
mm
M
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Kgs
M
M
M
M
M
Units
mm
mm
mm
mm
M
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Kgs
CONCRETE SLAB
TIES (KGS)
0.474
0.316
0.228
0.168
0.132
0.110
0.089
M
M
CM
pcs
KGS
CONCRETE SLAB
TIES (KGS)
0.592
0.416
0.350
0.247
0.174
0.168
0.142
M
M
CM
pcs
KGS
M
M
CM
CM
pcs
pcs
KGS
M
M
M
Steps
M
0.73
pcs
pcs
pcs
pcs
KGS
M
M
SQ.M.
60cm
3 layers
SQ.M.
pcs @ 6M
pcs @ 6M
Kgs
RECTANGULAR COLUMN REINFORCEMENT 150X350 2ND FLOOR
pcs
mm
M
M
M
LHS
M
pcs
LHS
Kgs
ITEM - II MASONRY WORKS
A. DETERMINING THE NUMBER OF CONCRETE HOLLOW BLOCKS USED
B. DETERMINING THE NUMBER OF CEMENT & VOLUME OF SAND FOR MORTAR & PLASTERING
Wall Height H (M) 3.00 M
Wall Length L (M) 63.00 M
Area of Window AW (SQ.M.) - SQ.M
Area of Door AD (SQ.M) - SQ.M.
Breakage Allowance % 3.00 %
RIPRAPING WORKS
Height H (M) 2.00 M
Width 1 W1 (M) 1.00 M
Width 2 W2 (M) 0.60 M
Length L (M) 20.00 M
k Mix: 1:2
k Mix: 1:2
ground floor
TILING WORKS
Enter Wall or Floor Area 45.00 SQ.M.
Enter Breakage Allowance (5 - 10%) 5.00 %
ROOF PAINT
KIND OF PAINT USES THINING DRYING TIME
COVERAGE/Gal ENAMEL AND GLOSS PAINT
for G.I.
1. All Shts, 4 hrs. allow
weather asbestos overnight 40 to 50
water KIND OF PAINT USES THINING DRYING TIME
COVERAGE/Gal
acylic roof bricks before sq.m.
shield concrete recoating
and stucco
G.I. roofs
for exterior
and other 6 hrs. allow 5 hrs. allow
1. Quick & interior
2. Davies metal such Paint overnight 30 to 40 Paint 8 hrs. 30 to 40
Drying wood and
Roof paint as Thinner before sq.m. Thinner before sq.m.
Enamel metal
aluminum recoating recoating
surface
and steel
Interior 6 hrs. allow
2. Interior
wood and Paint overnight 25 to 30
semi-Gloss
metal Thinner before sq.m.
Enamel
surfaces recoating
3 hrs. allow
for interior
3. Flat wall Paint overnight 40 to 50
wall &
Enamel Thinner before sq.m.
ceilings
recoating
for exterrior
wood and 6 hrs. allow
4. Exterior properly Paint 48 hrs. 30 to 35
Gloss paint primed Thinner before sq.m.
metal recoating
VARNISHING surfaces
5. Tinting Oil Base
KIND OF PAINT USES THINING DRYING TIME
COVERAGE/Gal
Colors tinting color
GE/Gal
W2
W1
W1
NUMBER OF BOARD FOOT OF STUDS & NAILING JOIST PER SQUARE METER
Lumber
size in
SPACING IN CENTIMETER (C TO C )
inches 30 x 30 30 x 60 40 x 40 40 x 60 60 x 60
1x2 4.103 3.147 3.189 2.686 2.268
2x2 8.198 6.293 6.379 5.373 4.594
2 x 3 12.284 9.440 9.569 8.060 6.898
2 x 4 16.414 12.592 12.758 10.746 9.195
# OF 1" CWNails Used for Boards (ONE SIDE) KGS 0.6 KGS
# OF 1" CWNails Used for Boards (TWO SIDES) KGS 1.1 KGS
1/2" CWNails Used for Joining the Studs together KGS 1.4 KGS
E METER
ROOFING WORKS
Pitch
12
DETERMINING THE DESIRABLE NUMBER OF SHEETS IF USING MORE THAN ONE SHEET
Rafter L1 3.2310989 Enter Span (Ls) M 3.00 M
Angle 0.4227932 Enter Height (H) M 1.20 M
H2 0.40 Enter Projection Width (Bulada) M 1.00 M
Rafter L2 1.0767661
# of pulins 8.00 Total Length of Rafter M 4.31 M
USING ONLY TWO SHEETS
Roofing Length 4.38 Total Roofing Net Length M 4.38 M
2.40 Enter Roof Sheet Length 1 FT 8 FT
2.10 Enter Roof Sheet Length 2 FT 8 FT
Overlap 0.42 M 1.37 FT
OK Roof Sheet combination
ROOF ACCESSORIES
ITEM Effective Length in Meters
Gutter 2.35
Flashing 2.3
Ridge Roll 2.2
Valley Roll 2.3
Hipped Roll 2.2
DETERMINING THE TOTAL MATERIALS USED FOR BEAMS & GIRDER FORMS
SCAFFOLDINGS
PARTS OF SCAFFOLDINGS
1. Vertical Support
2. Base of Vertical Support
3. Horizontal Member
4. Diagonal Braces
5. Block and Wedges
6. Nails & Bolts
COLUMN BEAM
r Column Height M 3.00 Enter Beam Length M
ter # of Columns Units 10.00 Enter # of Beams Units
l Column Height: 30.00 M. Ht. Total Beam Length: 21.00
FLOORING
Enter Floor Area SQ.M. 80.00
1.22
0.25
0.25
4.00
11.52
(Resusable form)
Bd.ft
L (ft)
8
PCS
Sheet(s)
KGS
Kgs
7.00
0.30
0.20
4.00
25.20
Bd.ft
L (ft)
8
PCS
Sheet(s)
KGS
Kgs
M
3.50
6.00
M. Ht.
Bd.ft
L (ft)
8
PCS
KGS