Rest Area-Layout Plan
Rest Area-Layout Plan
Rest Area-Layout Plan
0
PUMP ROOM
/TUBE WELL
TOILETS BLOCK BIO-DIGESTER DRINKING
(2.4x2.4 M) DORMITARY
100 USER WATER
DG SHED U.G. TANK
W1 W1
V D W
RV3 RV2 RV2 RV2 RV2 RV3
B C
A
D2 1.8x1.5 D2
1.8x1.5
1.0x1.5 1.0x1.5 1.0x1.5 1.0x1.5 1.0x1.5 SPECIAL
SPECIAL URINALS
TOILET TOILET
OPEN
D3 TO D3 D3 D3 D3 2
1.30 SKY 1.30
(1.2x4.37) D
KITCHEN GENTS TOILET LADIES TOILET
Locker
W1 (7.0x4.54) (6.93x4.54)
(10000x5000)
2.27
ATTENDENT ROOM
6.5
D1 D3 D1
2.50X2.50
40
42
44
46
48
36
38
50
52
54
0.80 0.50 0.50 0.80 0.80 0.50 0.50 0.80
56
58
7.4
1.2x1.5 1.0x1.5 1.2x1.5
9.6
1
TOILET BLOCK
D D
RV3 RV3
DRINKING WATER
3.8
RAMP UP
1.2x0.9
RAMP UP
STEP UP
STEP UP
SERVICE COUNTER 1500 MM WIDE
Toilet
W1 1500X1000 1500X1000
RESTAURANT
1500X1000 1500X1000
BIO
2.5
1500X1000 1500X1000
DIGESTER 25
33
CAR/SUV PARKING
W1 USERS
10.0
10.0
10.0
10.0
11.9
11.9
11.9
11.9
TRUCK TRAILER & TRUCK TRAILER &
BUS PARKING BUS PARKING
31
VEHICLE
19.4
W1 D
3
BREAKDOWN
ENTRY
EXIT
BILLING
COUNTER
ADMINISTRATION ADMINISTRATION
5.3 COMPOUND
W1 W1
D1 D1
W1 W1
29
128
100
2
184
158
78
MP
RA
9.6
5.3 8.6 8.6 8.6 8.6 8.6
114
172
196
86
144
1
60
98
76
182
156
126
A
B
9.5
23
25
27
21
112
170
19
194
140
84
62
11.6
18
154
96
74
BUS PARKING
BUS PARKING
BUS PARKING
BUS PARKING
7.0
OPEN PARKING
OPEN PARKING
OPEN PARKING
OPEN PARKING
8.5
192
168
138
110
82
CAR/SUV PARKING
100.0
64
9.5
4' WIDE FOOTPATH
152
122
OPEN PARKING
178
94
72
92
94
96
98
REFER SEPARATE
OPEN PARKING
FOR BOUNDARY
108
WALL DETAIL
166
80
136
190
14
11.7
DRAWING
66
8.0
9.5
150
120
176
WIDE
92
28
88
86
84
CARRIAGEWAY
3.7
3.7
3.7
3.7
12
6.0 14.0
106
188
134
164
3.7
68
118
148
174
10.0
90
10
7.0
12.2
WIDE WIDE WIDE
10.0
104
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
186
132
162
2.5 8.0
70
9.5 9.5 9.5
116
88
146
5.0
5.0
2
8
10.0
130
102
160
BUILDING
# PETROL PUMP
DHABA
23m x 25m
10.4 10.0
COURT
ENTRY
FUEL AND
25m x 35m
FOOD
10.0
ENTRY
EXIT
EXIT
11.7
10.0 15.0
FIRST STD
5.0
AID PCO
NOTES: CLIENT : PROJECT : EPC : AUTHORITY ENGINEER : DESIGN CONSULTANT : JOB No. : TITLE :