Chamba Tunnel Drawings
Chamba Tunnel Drawings
Chamba Tunnel Drawings
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/STR/DWG/CT-001
road (NH-94) with 2-lane with paved shoulder from design
CHAMBA TUNNEL
ARKITECHNO Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
CROSS SECTION FINAL LINING & DETAILS DATE :JULY-2020 REV: D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 JULY-2020 DRAFT SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
DETAIL -B
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/STR/DWG/CT-001
road (NH-94) with 2-lane with paved shoulder from design
CHAMBA TUNNEL
ARKITECHNO Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
CROSS SECTION FINAL LINING & DETAILS DATE :JULY-2020 REV: D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 JULY-2020 DRAFT SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
Feb. 2019
BHARAT CONSTRUCTION
DESIGN CRITERIA AND CALCULATIONS
FOR
STEEL RIB FOR PORTAL REACH
CONTENTS
1.0 INTRODUCTION 1
2.0 LAYOUT 1
ii
ANNEXURES
EXHIBITS
Exhibit-II Steel Rib Portal Reach – Steel Fabrication details Drg. No.
CIPL/D1029/RIB/DWG/01
iii
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
1. INTRODUCTION
Chamba tunnel has been proposed to bypass the main centre of Chamba town as
part of the upgrading of NH-94. The proposed tunnel passes through the ridge on
which Chamba town is located. For the tunnel excavation and support design it is
essential to identify the sub-surface geological conditions along the tunnel alignment
to provide a basis for the design and to reduce the uncertainties associated with the
tunnel excavation. Therefore, an exploration programme was carried out to develop
the geological model along the tunnel alignment.
The main objective of this report is to design Steel rib support for Portal reach.
2. LAYOUT
The layout of Road Tunnel is shown in Exhibit-I. It proposed to provide Horse Shoe
shaped (type) tunnel, the sectional detail of Road Tunnel is shown in fig.1.
Figure-1
1
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
3. DESIGN CRITERIA
The analysis and design of rock support system is broadly divided into two
categories, i.e. section with rock cover less than 1.5 (B + H) called portal reach and
section having rock cover more than 1.5 (B + H), called normal reach or beyond
portal reach. This report deals with portal reach wherein the steel ribs are designed
to carry the rock load equal to the rock cover load. Steel ribs are also proposed in
normal reaches where ‘Q’ value is less than 0.1.
2
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
The north Portal of the tunnel is located partly in bed rock and partly in 13m deep
Colluvium as indicated by BH-3.
• Shotcrete
• Ribs
The finished size of the tunnel will be 5.55 m radius horse shoe-Shaped as shown in
figure-1. The excavated size of the tunnel section shall be computed considering
different support system. However, for computation of rock load on steel ribs,
following ISMB sections have been considered.
3
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
2 q sc t sc
Resistance offered by shotcrete =
BF sc
ii. The rock load can also be calculated using Fenner’s ellipse by the following
equation.
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
b
a = (m − 2)
2
Where,
a = Main axis of ellipse of rock load,
b = Tunnel diameter (excavated)
m = Inverse of Poisson’s ratio for rock
b = 12.3m
1
m = = 5
0.20
12.3
a = (5 − 2)
2
= 18.45 m
iii. As per clause B – 3.1.3 of IS: 4880, Part-IV using Russian Practice.
The rock load may be taken as that for rock area enclosed by a parabola
starting from intersection points of the rupture planes with horizontal length
drawn to the crown of the tunnel section. The dimensions of the parabola are
given below:
5
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
B
h =
2f
Where,
h = Height of parabola
B = Base width of parabola
φ
= b + 2 m tan 450 −
2
b = width of tunnel
= 12.30 m
m = Height of tunnel
= 9.388 m
φ = Angle of internal friction
= 32°
f = Strength factor of rock mass
= 2 (Refer Table 2 of IS: 4880 (Part IV), for moderately strong
rocks)
32°
B = 12.3 + 2 x 9.388 x tan 45° −
2
= 22.70 m
22.70
h = = 5.676m
2×2
6
DESIGN CRITERIA AND CALCULATIONS FOR
STEEL RIB FOR PORTAL REACH
iv. In Fenner’s method and Russian practice, taken from IS-4880, are based on old
state of art (≈1970s) with assumption that rock mass is an isotropic and elastic
media. After late 1970s, it is widely accepted that rocks behave more as an
assemblage of intact rock blocks supported by different types of geological
discontinuities.
Steel ribs are considered for the portal reach
Rock load per cl. 4 (i) = 0.81 Mpa.
Load carried by 150 mm shotcrete 4 (a) = 0.11 MPa.
Load taken by steel rib = 0.70 Mpa.
7
ANNEXURE-1
4 Design of Rib
Bal. support Pressure W Mpa 0.70
Rib Section mm 200
Rib Depth m 0.2
Clear Rise of Arch h m 5.55
C m 11.10
Rise upto centre of Rib Hribcen m 5.900
Span upto centre of Rib Sribcen m 11.800
Radius upto centre of Rib Rribcen m 5.9
Properties of Rib Section
Weight W Kg/m 25.4
Rib Area Arib cm2 32.33
Rib Section Modulus cm3 223.5
Radius of Gyration of Rib 10.39
Moment of Inertia of Rib cm4 2235.4
Mod. Of Elasticity of Steel kg/cm2 2100000
Yield strength of steel fy Mpa 550
Spacing of Rib Srib m 0.45
Angle between blocking Points Deg. 12.5
Angle of Arch on One side Deg. 90.00
No of blocking points on one side n Nos. 8.0
Height of chord h = (R-R*cos(PI()*0.5/(2*n-1))) m 0.0323
Thrust in steel rib T = (3.14*Rribcen*Srib*0.5*W/n) KN 365.30
Maximum bending moment M=0.86.T.h KN-m 10.15
Maximum extreme fibre stress T/A+M/Z Mpa 158.42
Permissible stresses in steel (in flexural compression ) 0.66fy Rib is sufficient
ANNEXURE-II
RISHIKESH DHARASU
LAYOUT PLAN
L- SECTIONS ·
CLIENT: PROOF CONSULTANT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu CHAMBA TUNNEL DRG. NO. CIPL/D-1029/LA/DWG/01
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to TUNNEL ALIGNMENT DATE : FEBRUARY- 2019 REV:D
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction LAYOUT PLAN & LONGITUDINAL SECTION CHECKED APPROVED
D FEB 19 DRAFT SUBMISSION of 2lane with paved shoulders Chamba Bypass of design length 2.035 DESIGNED DRAWN
BORDER ROADS ORGANIZATION G-ENG ADVISORY SERVICES CIVILMANTRA INFRACON PVT LTD. M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
REV DATE DESCRIPTION A B C D
PVT.LTD. BHARAT CONSTRUCTION. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
PS PS AA
EXHIBIT-II
CLIENT: PROOF CONSULTANT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
DRG. NO. CIPL/D1029/RIB/DWG/01
Rehabilitation and Upgradation of Rishikesh – Dharasu
road (NH-94) with 2-lane with paved shoulder from design FABRICATION
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950 DETAILS OF RIBS DATE :DECEMBER-2018 REV:D
(existing Chainage Km 62.630 to Km 65.000) and new construction
D DEC-3 DRAFT SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION G-ENG ADVISORY SERVICES CIVILMANTRA INFRACON PVT LTD. M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
REV DATE DESCRIPTION A B C D
PVT.LTD. BHARAT CONSTRUCTION. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
PS AK AA
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/STR/DWG/CT-001
road (NH-94) with 2-lane with paved shoulder from design
CHAMBA TUNNEL
ARKITECHNO Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
CROSS SECTION FINAL LINING & DETAILS DATE : JANUARY-2020 REV:R0
(existing Chainage Km 62.630 to Km 65.000) and new construction
R0 6-03-2020 DRAFTS SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CONSULTANTS ( INDIA PVT.LTD. ) CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
REV DATE DESCRIPTION A B C D PVT.LTD. NH Connectivity to Chardham in the State of Uttarakhand. AS SS AA
SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/NP/DWG (02 OF 04)
2. CIPL/D1029/NP/DWG (03 OF 04)
3. CIPL/D1029/NP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/NP/DWG (01 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE :FEB-2019 REV:D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/NP/DWG (01 OF 04)
2. CIPL/D1029/NP/DWG (03 OF 04)
NORTH PORTAL PLAN 3. CIPL/D1029/NP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/NP/DWG (02 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE :FEB-2019 REV: D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/NP/DWG (01 OF 04)
2. CIPL/D1029/NP/DWG (02 OF 04)
3. CIPL/D1029/NP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/NP/DWG (03 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE :FEB-2019 REV:D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/NP/DWG (01 OF 04)
2. CIPL/D1029/NP/DWG (02 OF 04)
3. CIPL/D1029/NP/DWG (03 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/NP/DWG (04 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE :FEB-2019 REV:D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/SP/DWG (02 OF 04)
2. CIPL/D1029/SP/DWG (03 OF 04)
3. CIPL/D1029/SP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/SP/DWG (01 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE :FEB-2019 REV:D0
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/SP/DWG (01 OF 04)
2. CIPL/D1029/SP/DWG (03 OF 04)
3. CIPL/D1029/SP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/SP/DWG (02 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE :FEB-2019 REV:D0
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/SP/DWG (01 OF 04)
2. CIPL/D1029/SP/DWG (02 OF 04)
3. CIPL/D1029/SP/DWG (04 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/SP/DWG (03 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE :FEB-2019 REV:D0
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
Refrence Dwg :-
1. CIPL/D1029/SP/DWG (01 OF 04)
2. CIPL/D1029/SP/DWG (02 OF 04)
3. CIPL/D1029/SP/DWG (03 OF 04)
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/1029/SP/DWG (04 OF 04)
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950 SOUTH PORTAL DATE :FEB-2019 REV:D0
(existing Chainage Km 62.630 to Km 65.000) and new construction
D0 DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION BHARAT CONSTRUCTION. CIVILMANTRA INFRACON PVT LTD. G-ENG ADVISORY SERVICES M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to
PS NK PS AA
REV DATE DESCRIPTION A B C D NH Connectivity to Chardham in the State of Uttarakhand.
PVT.LTD. SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE : REV:
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS Km including 440m long tunnel on EPC Mode under improvement to
CIVILMANTRA INFRACON PVT LTD. PS NK PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE : REV:
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS CIVILMANTRA INFRACON PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
PS PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
NORTH PORTAL DATE : REV:
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS CIVILMANTRA INFRACON PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
PS PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE : REV:
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS CIVILMANTRA INFRACON PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
PS PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE : REV:
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS CIVILMANTRA INFRACON PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
PS PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
CLIENT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to SOUTH PORTAL DATE : REV:
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
(existing Chainage Km 62.630 to Km 65.000) and new construction
DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
NATIONAL HIGHWAYS CIVILMANTRA INFRACON PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
PS PS AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA OASIS TECHNOCONS LIMITED. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
ELEVATION OF
TUNNEL PORTAL
SECTION C-C
LEGEND:-
NOTE:-
CLIENT: PROOF CONSULTANT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
DATE :DECEMBER-2018 REV:D
(existing Chainage Km 62.630 to Km 65.000) and new construction
D DEC-3 DRAFT SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION G-ENG ADVISORY SERVICES CIVILMANTRA INFRACON PVT LTD. M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
REV DATE DESCRIPTION A B C D
PVT.LTD. BHARAT CONSTRUCTION. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
PS PS AA
STIRRUP
NOTES:
ELEVATION OF
TUNNEL PORTAL
LEGEND:-
SECTION C-C
CLIENT: PROOF CONSULTANT: EPC CONTRACTOR : AUTHORITY ENGINEER: DESIGN CONSULTANT : SAFETY CONSULTANT: PROJECT : DRAWING TITLE :
Rehabilitation and Upgradation of Rishikesh – Dharasu
DRG. NO. CIPL/D1029/HW/DWG/
road (NH-94) with 2-lane with paved shoulder from design
Chainage km 58.603 to km 58.853 (existing Chainage Km 59.420 to
Km 59.650), from Design Chainage Km 61.630 to Km 63.950
DATE :DECEMBER-2018 REV:D
(existing Chainage Km 62.630 to Km 65.000) and new construction
D DEC-3 DRAFT SUBMISSION DESIGNED DRAWN CHECKED APPROVED
of 2lane with paved shoulders Chamba Bypass of design length 2.035
BORDER ROADS ORGANIZATION G-ENG ADVISORY SERVICES CIVILMANTRA INFRACON PVT LTD. M A SOLUTIONS PVT LTD. Km including 440m long tunnel on EPC Mode under improvement to NK
REV DATE DESCRIPTION A B C D
PVT.LTD. BHARAT CONSTRUCTION. NH Connectivity to Chardham in the State of Uttarakhand.
SCALE : AS SHOWN PAPER SIZE : A3
PS PS AA