Test Plan
Test Plan
Test Plan
Document History
This is a snapshot of an on-line document. Paper copies are valid only on the day they are
printed. Refer to the author if you are in any doubt about the currency of this document.
This is document template format when you copy to use please remove yellow highlight and
replace with your own information.
Revision History
Version Revision Date Summary of Changes Changed by
Number
V 0.1 08 Nov 2015 Initial Version
Reviewer
Name Position/ Department Version Review Date
(Name-Surname) (Position / Department) 9.9 DD/MM/YYYY
Approvals
Name Position/ Department Version Approve Date
Name-Surname) (Position / Department) 9.9 DD/MM/YYYY
Distribution
This document is available to:
Entire Project
Restricted to the following team members
Name Title
(name) (title)
Contents
List of Table.................................................................................................................................... 4
1 Introduction ............................................................................................................................ 5
1.1 Background ...................................................................................................................... 5
1.2 Testing Objectives .......................................................................................................... 5
1.3 Document Audience ........................................................................................................ 5
1.4 References ...................................................................................................................... 6
1.5 Definition and Acronyms .................................................................................................. 6
2 Testable Items ........................................................................................................................ 7
2.1 In Scope .......................................................................................................................... 7
2.1.1 Functional Scope ...................................................................................................... 7
2.1.2 Non Functional Scope ................................................................................................. 7
2.2 Out of Scope .................................................................................................................... 8
2.3 Testing Exclusions ........................................................................................................... 8
3 Detailed Test Approach ........................................................................................................ 9
3.1 Naming Conventions for Function Groups and Functions ............................................... 9
3.2 Test Case Design ............................................................................................................ 9
3.3 Test Scheduling ............................................................................................................... 9
3.4 Data Build ...................................................................................................................... 10
3.5 Results/Sign-Off............................................................................................................. 10
3.5.1 Suspension/Resumption Criteria .......................................................................... 10
3.5.2 Pass/Fail Criteria ..................................................................................................... 11
4 Test Conditions.................................................................................................................... 12
4.1 Business Event 1 - BR001 .......................................................................................... 12
4.2 Business Event 2 - BR002 ............................................ Error! Bookmark not defined.
4.3 Business Event 3 - BR003 .......................................................................................... 12
4.4 Business Event 4 - BR004 ............................................ Error! Bookmark not defined.
4.5 Business Event 5 - BR005 ............................................ Error! Bookmark not defined.
4.6 Business Event 6 - BR006 ............................................ Error! Bookmark not defined.
4.7 Business Event 7 - BR007 ............................................ Error! Bookmark not defined.
4.8 Business Event 8 - BR008 ............................................ Error! Bookmark not defined.
4.9 Business Event 9 - BR009 ............................................ Error! Bookmark not defined.
4.10 Business Event 10 - BR0010 ........................................ Error! Bookmark not defined.
4.11 Business Event 11 - BR0011 ........................................ Error! Bookmark not defined.
4.12 Business Event 12 - BR0012 ........................................ Error! Bookmark not defined.
4.13 Business Event 13 - BR0013 ........................................ Error! Bookmark not defined.
4.14 Business Event 14 - BR0014 ........................................ Error! Bookmark not defined.
5 Test Environments .............................................................................................................. 13
5.1 Client Side Infrastructure ............................................................................................... 13
5.2 Host/Server Side Infrastructure ..................................................................................... 13
5.3 Middleware .................................................................................................................... 13
5.4 Test Data preparation .................................................................................................... 13
6 Test Schedule ...................................................................................................................... 14
Appendix A - System Schematic/s ............................................................................................ 15
List of Table
1 Introduction
1.1 Background
The Detailed Test Plan (DTP) contains a detailed and executable strategy for conducting. It
defines the detailed testing objective specific to a particular system, the testing approach, test
environment, test conditions, and the test plan.
QA
Functional Team
Lead
BA
Business Unit
Development
Team Lead
Infrastructure
Team Lead
Deployment
Team Lead
Deployment
Team
* Remove the role which may not include in your project charter. * If document change version and the
stakeholder name is changed, should modify the name as well..
1.4 References
This document is based on and refers to the following documents:
Table 1: Reference
2 Testable Items
2.1 In Scope
This test activity focuses on the following:
Table 3: Functional
Functional Area Functional Sub Area Description
BR001 BR001_1 Detailed description
BR002 BR002_1 Detailed description
BR003 BR003_1 Detailed description
Identify test approach about test case design before identify the detail of test case test script in
next step. To declare what is the concern item of each module or functional/non functional area
and what the test case design is for detect the defect. The test technique should be state for this
section. XYZ bank test coverage matrix should be mention and state that how to ensure the
project will follow this guideline.
Test design should mention about the group of regression impact. If the most of the defect occur
on the area which test case design should be re-test. And the regression test approach should be
mention as well.
[For complex test schedules reference any external tools or systems you will be
using/developing to support the scheduling. Include specific flags or nomenclature that
will be used to identify/classify test scripts and test cases that have to be executed at a
specific point in the schedule. (pre or post batch, day one, after script xyz has executed,
etc]
3.5 Results/Sign-Off
3.5.1 Suspension/Resumption Criteria
Testing will halt for a particular project item (or function) when:
A critical problem is identified and where the potential code fix will require substantial re-
testing of that function
It is identified that the business or technical specifications require major modifications due to
escalated test issues and those modifications would require additional test analysis and or
modification to the Detailed Test Plan.
The test regions or test environment are not available (for any reason).
The test regions or test environment suffer performance problems below 50% of their normal
operating capacity, such that a region fix will require substantial re-testing of that function.
[Document all other suspension/resumption. Make sure the resumption criteria are
unambiguously defined].
4 Test Conditions
4.1 Business Event 1- BR001
Testing will demonstrate the following:
There is any financial transaction from dormant account. The dormant account means the
account does not have any movement from customer action after end of the first due for 365
days. This excludes all batch jobs i.e. interest posting.
The first due of 3-Month fixed account (1), 31/3/2013 + 365 days = 31/3/2014
If there is no customer transaction within 31/3/2014, this 3-Month fixed account is called
dormant account.
5 Test Environments
List and/or graphically show the proposed testing environment/s. For small testing projects
complete all of the listed sections. Larger projects may require a separate Test Environment Plan
to be produced. If Master test plan already specify may refer to MTP plan instead.
5.3 Middleware
Provide detailed list/s of required Middleware to support testing activity of each test level and test
environment. Eg. Test engine or test stub required for interface test.
6 Test Schedule
[Provide a schedule showing how testing will be divided for execution. Use the following
as an indicative sample. If a separate schedule is used provide an appropriate docref: and
link and reference the rules governing its management].