Work Experience 4
Period : 10 December 2018 to 15.Nov.2019.
Company : GR Infraprojects Ltd.
Project : Four laning of Sangali -Solapur (package -III:Watambare to
Mangalwedha of length 45.600 km.)section of NH-166 from existing ch.km.272.394 to
ch.314.969 (Design chainge km.276.000 ti km.321.600) of length 45.600km in state of
maharashtra on Hybrid Annuity Mode.
Concessionaire : G.R SANGALI -SOLAPUR HIGHWAY PVT.LTD
Independent Engineer : Dhruv Consultancy Services Pvt Ltd.
Client : NHAI
Project Cost : 957 Crore
Work Experience 3
Period : 05 July 2017 to 07Dec. 2018.
COMPANY : M/s DILIP BUILDCON LTD
PROJECT :- Four Lining of Guna-Biaora section of NH-3 from Km 332.100 to Km 426.100
in the State of Madhya Pradesh under NHDP Phase-lV to be executed in BOT (Toll) mode on
DBFOT basis.(Design chain age :-97+700 to 191+200 Package-II).
Project Cost :- Rs.1013 Core.
Project Length: - 4 Lane, 93.5 km
Consultant : M/s AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT.
L.T.D
Client : NHAI
Role : JR.QC. Engineer (Quality Control)
.
Work Experience 2
Duration : 1st Apr. 2015 to 03 July 2017.
Company : M/s DILIP BUILDCON LTD
Project : Mohanpura Multi Purpose Dam Project Rajgarh (Biaora) in the State of
Madhya Pradesh under WRD Client. It consists of 8 lakhs cum concrete work and 12 lakhs cum
earthwork. .,
Work Experience 1
Duration : 1ST July 2014 to 27 March. 2015
Company : M/s DILIP BUILDCON LTD
Project : Four Lining of Rewa-MP/UP Border Section of NH-07 from KM 229+800 to
KM140+600 in the State of Madhya Pradesh on Design, Build, Finance, Operate and Transfer
(DBFOT) Basis.
Project Cost: - Rs.670 Core
Project Length: - 4 Lane, 89.2 km.
Consultant: M C Consulting Engineers Pvt. Ltd
Client : MPRDC
Concessionaire : Vindhyachal Expressway Pvt. Ltd
Role : Training Engineer (Quality Control)
Activities Done:
SOIL:
1) OGL&Barrow area sample collection
2)soil tests: Grain size analysis(GSA),Liquid Limit Plastic Limit(LL&PL),Free swell
index(FSI),Maximum dry density optimum moisture content(MDD&OMC),California
bearing ratio(CBR) As per IS code of practice.
3) Reports preparation
CEMENT&CONCRETE:
1) cements tests: Normal consistency, Initial and final setting time, Fineness of cement and
Soundness of cement as per IS code of Practice
2) Concrete: writing concrete pour cards, concrete cubes casting, supervision of mixing
proportion of concrete ingredients. Concrete tests: Workability of concrete by slump cone test,
concrete cubes strength test by compression testing machine in order to check 7 and 28 days
strength of cubes.
AGGREGTES:
1) Coarse aggregate: Gradation, AIV (10mm, 20mm and 40mm (individual/combined)
2) Fine aggregate: Gradation, Fineness modulus as per IS code of practice.
3) Specific Gravity Tests on Fine and Coarse aggregates
FDD:
1) Calculating field dry density by sand replacement method
2) Moisture content by rapid moisture meter in order to get relative compaction of about 97%.
MIX DESIGNS:
GSB, WMM and Concrete mix design (M15PCC, M20 PCC and M25RCC, M30RCC,
M40RCC) basics i.e.as an assistant to senior lab engineer.
BITUMEN TESTS:
1) Penetration test
2) Softening point
3) Ductility
4) Marshal stability
Educational Background:
Personal Profile:
Declaration:
I (DIPU SINGH), here by declared that the above information provided by me to the best of
my knowledge.
Place: BALLIA(U.P)
DIPU SINGH