SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-214A 9-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K


2 FW-304 9-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
3 FW-305 9-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K

Page 1
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR
SIGNATURE
DATE

Page 2
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-217 10-Jul-17 WPS 31 12"/10.31 58 888 PIPE/PIPE 1302K

2 FW-306 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K


3 FW-307 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
4 FW-308 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
5 FW-309 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
6 FW-310 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
7 FW-311 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
8 FW-312 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
9 FW-313 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
10 FW-314 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
11 FW-315 10-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
12 FW-342 10-Jul-17 WPS 31 12"/10.31 58 888 PIPE/PIPE 1302K
13 FW-343 10-Jul-17 WPS 31 12"/10.31 58 888 PIPE/PIPE 1302K
14 FW-344 10-Jul-17 WPS 31 12"/10.31 58 888 PIPE/PIPE 1302K
15 FW-345 10-Jul-17 WPS 31 12"/10.31 58 888 PIPE/PIPE 1302K

Page 3
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR
SIGNATURE
DATE

Page 4
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-218 11-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K


2 FW-219 11-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
3 FW-220 11-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
4 FW-221 11-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
5 FW-222 11-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
6 FW-278FRS 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
7 FW-346 11-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
8 FW-347 11-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
9 FW-348 11-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
10 FW-349 11-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
11 FW-350 11-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
12 FW-476 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
13 FW-477 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
14 FW-478 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
15 FW-479 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
16 FW-480 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
17 FW-481 11-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K

Page 5
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR
SIGNATURE
DATE

Page 6
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-223 12-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K


2 FW-224 12-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
3 FW-225 12-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
4 FW-226 12-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
5 FW-227 12-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
6 FW-359 12-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
7 FW-360 12-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
8 FW-361 12-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
9 FW-362 12-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
10 FW-363 12-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
11 FW-482 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
12 FW-483 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
13 FW-484 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
14 FW-485 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
15 FW-486 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
16 FW-487 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
17 FW-488 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
18 FW-489 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K
19 FW-490 12-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE/PIPE 1302K

Page 7
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR
SIGNATURE
DATE

Page 8
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-228 13-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K


2 FW-229 13-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
3 FW-230 13-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
4 FW-231 13-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
5 FW-232 13-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
6 FW-364 13-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K
7 FW-365 13-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K
8 FW-366 13-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K
9 FW-367 13-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K
10 FW-368 13-Jul-17 WPS 31 12"/10.31 58 888 PIPE-PIPE 1302K
11 FW-491 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
12 FW-492 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
13 FW-493 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
14 FW-494 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
15 FW-495 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
16 FW-496 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
17 FW-497 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
18 FW-498 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
19 FW-498 A 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
20 FW-498 B 13-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K

Page 9
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 10
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-369 14-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K


2 FW-370 14-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
3 FW-498 C 14-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
4 FW-514 14-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
5 FW-515 14-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K

Page 11
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR

SIGNATURE
DATE

Page 12
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-371 15-Jul-17 WPS 31 12"/10.31 29/852 58/888 PIPE-PIPE 1302K


2 FW-380 15-Jul-17 WPS 31 12"/10.31 29/852 58/888 PIPE-PIPE 1302K
3 FW-381 15-Jul-17 WPS 31 12"/10.31 29/852 58/888 PIPE-PIPE 1302K
4 FW-382 15-Jul-17 WPS 31 12"/10.31 29/852 58/888 PIPE-PIPE 1302K
5 FW-383 15-Jul-17 WPS 31 12"/10.31 29/852 58/888 PIPE-PIPE 1302K
6 FW-516 15-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
7 FW-521 15-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
8 FW-522 15-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
9 FW-523 15-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
10 FW-524 15-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K

Page 13
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QC INSPECTOR
SIGNATURE
DATE

Page 14
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Sl Pipe Welder Weld Consumables


No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm
1 FW-20 16-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K

2 FW-240 16-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-BEND 1302K

3 FW-384 16-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K

4 FW-385 16-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE


5 FW-386 16-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K

6 FW-387 16-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K

7 FW-388 16-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K

8 FW-525 16-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K

9 FW-526 16-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K

10 FW-527 16-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K

11 FW-528 16-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K

12 FW-529 16-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K

13 FW-549 16-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

14 FW-550 16-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

15 FW-551 16-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

16 FW-552 16-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

17 FW-553 16-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

For Seeh Al-Sarya Engineering LLC


NAME: Mr.SELVA KUMAR
POSITION QA/QC INSPECTOR
SIGNATURE

Page 15
DATE

Page 16
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-21 17-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K


2 FW-22 17-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
3 FW-23 17-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
4 FW-24 17-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
5 FW-25 17-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
6 FW-389 17-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
7 FW-390 17-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
8 FW-391 17-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
9 FW-530 17-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
10 FW-531 17-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
11 FW-532 17-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-533 17-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
13 FW-554 17-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
14 FW-555 17-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
15 FW-556 17-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
16 FW-557 17-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
17 FW-558 17-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

Page 17
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 18
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-26 18-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K


2 FW-27 18-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
3 FW-33 18-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
4 FW-34 18-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
5 FW-35 18-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE/PIPE 1302K
6 FW-392 18-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
7 FW-393 18-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
8 FW-394 18-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
9 FW-395 18-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
10 FW-396 18-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE/PIPE 1302K
11 FW-534 18-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE/PIPE 1302K
12 FW-535 18-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE/PIPE 1302K
13 FW-536 18-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE/PIPE 1302K
14 FW-537 18-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE/PIPE 1302K
15 FW-538 18-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE/PIPE 1302K

Page 19
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 20
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-36 19-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K


2 FW-37 19-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
3 FW-38 19-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
4 FW-39 19-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
5 FW-40 19-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
6 FW-397 19-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
7 FW-398 19-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
8 FW-399 19-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
9 FW-400 19-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
10 FW-403 19-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
11 FW-539 19-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-540 19-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
13 FW-540 A 19-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
14 FW-540 B 19-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
15 FW-540 C 19-Jul-17 WPS 31 12"/10.31 29/852 29/852

16 FW-559 19-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839

17 FW-560 19-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839

18 FW-561 19-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839

19 FW-562 19-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839

20 FW-563 19-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839

Page 21
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 22
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-41 20-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K


2 FW-42 20-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
3 FW-43 20-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
4 FW-44 20-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
5 FW-45 20-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
6 FW-404 20-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
7 FW-405 20-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
8 FW-406 20-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
9 FW-407 20-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
10 FW-408 20-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
11 FW-540 D 20-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-540 E 20-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
13 FW-540 F 20-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
14 FW-540 G 20-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
15 FW-540 H 20-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE
16 FW-564 20-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE
17 FW-565 20-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE
18 FW-566 20-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE
19 FW-567 20-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE
20 FW-568 20-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE

Page 23
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 24
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-46 21-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K


2 FW-47 21-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
3 FW-409 21-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
4 FW-410 21-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
5 FW-540 I 21-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
6 FW-540 J 21-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
7 FW-569 21-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
8 FW-570 21-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

Page 25
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR
POSITION QA/QC INSPECTOR
SIGNATURE

DATE

Page 26
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-411 22-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K


2 FW-412 22-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
3 FW-413 22-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
4 FW-414 22-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
5 FW-415 22-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
6 FW-540 K 22-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
7 FW-540 L 22-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
8 FW-540 M 22-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
9 FW-540 N 22-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
10 FW-540 O 22-Jul-17 WPS 31 12"/10.31 29/852 1579/1839 PIPE-PIPE 1302K
11 FW-633 22-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
12 FW-634 22-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
13 FW-635 22-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
14 FW-636 22-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
15 FW-637P 22-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE

Page 27
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE

DATE DATE

Page 28
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-416 23-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K


2 FW-417 23-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
3 FW-418 23-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
4 FW-419 23-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
5 FW-420 23-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
6 FW-570A 23-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
7 FW-571 23-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
8 FW-574 23-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
9 FW-575 23-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
10 FW-605 23-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
11 FW-606 23-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-607 23-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
13 FW-638 23-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
14 FW-639 23-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
15 FW-640 23-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
16 FW-641 23-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
17 FW-642 23-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K

Page 29
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE

DATE DATE

Page 30
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-436 24-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K


2 FW-437 24-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
3 FW-438 24-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
4 FW-439 24-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
5 FW-440 24-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
6 FW-576 24-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
7 FW-577 24-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
8 FW-578 24-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
9 FW-579 24-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
10 FW-580 24-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
11 FW-608 24-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-609 24-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
13 FW-610 24-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
14 FW-611 24-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
15 FW-612 24-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
16 FW-643 24-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
17 FW-644 24-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
18 FW-645 24-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
19 FW-646 24-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684
20 FW-647 24-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684

Page 31
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE DATE

Page 32
SEEH AL-SARYA ENGINEERING L L C

DAILY WELD PRODUCTION REPORT


Contract No: SWL-2011-24000017460 Work Order No
Contract Title: Construction of Flow line DPR#
Client: Occidental of Oman Incl Project no.
12" OIL PRODUCTION HEADER FROM REHAM MANIFOLD TO
TEST PACK SAQR MANIFOLD Specification:

Welder Weld Consumables


Sl Pipe
No Joint No Weld date WPS
Size W#01 W#02
Item E 6010
3.2mm

1 FW-441 25-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K


2 FW-442 25-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
3 FW-443 25-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
4 FW-444 25-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
5 FW-445 25-Jul-17 WPS 31 12"/10.31 888/58 888/58 PIPE-PIPE 1302K
6 FW-581 25-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K
7 FW-613 25-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
8 FW-614 25-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
9 FW-615 25-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
10 FW-616 25-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
11 FW-617 25-Jul-17 WPS 31 12"/10.31 29/852 29/852 PIPE-PIPE 1302K
12 FW-648 25-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
13 FW-649 25-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
14 FW-650 25-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
15 FW-651 25-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
16 FW-652 25-Jul-17 WPS 31 12"/10.31 1581/1684 1581/1684 PIPE-PIPE 1302K
17 FW-670 25-Jul-17 WPS 31 12"/10.31 1579/1839 1579/1839 PIPE-PIPE 1302K

Page 33
For Seeh Al-Sarya Engineering LLC
NAME: Mr.SELVA KUMAR

POSITION QA/QC INSPECTOR


SIGNATURE
DATE

Page 34
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-33
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-33


1187A 1301C 1261-33
1187A 1301C 1261-33

Page 35
r Seeh Al-Sarya Engineering LLC

Page 36
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-34
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-34


1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34
1187A 1301C 1261-34

Page 37
r Seeh Al-Sarya Engineering LLC

Page 38
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-35
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-35


1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35
1187A 1301C 1261-35

Page 39
r Seeh Al-Sarya Engineering LLC

Page 40
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-36
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-36


1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36
1187A 1301C 1261-36

Page 41
r Seeh Al-Sarya Engineering LLC

Page 42
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-37
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-37


1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37
1187A 1301C 1261-37

Page 43
r Seeh Al-Sarya Engineering LLC

Page 44
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-38
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-38


1187A 1301C 1261-38
1187A 1301C 1261-38
1187A 1301C 1261-38
1187A 1301C 1261-38

Page 45
r Seeh Al-Sarya Engineering LLC

Page 46
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-39
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-39


1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39
1187A 1301C 1261-39

Page 47
r Seeh Al-Sarya Engineering LLC

Page 48
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-40
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm
1187A 1301C 1261-40
1187A 1301C 1261-40
1187A 1301C 1261-40
1261-40
1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

1187A 1301C 1261-40

r Seeh Al-Sarya Engineering LLC

Page 49
Page 50
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-41
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1271-41


1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41
1187A 1301C 1271-41

Page 51
r Seeh Al-Sarya Engineering LLC

Page 52
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-42
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-42


1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42
1187A 1301C 1261-42

Page 53
r Seeh Al-Sarya Engineering LLC

Page 54
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-43
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-43


1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43
1187A 1301C 1261-43

Page 55
r Seeh Al-Sarya Engineering LLC

Page 56
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-44
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-44


1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44
1187A 1301C 1261-44

Page 57
r Seeh Al-Sarya Engineering LLC

Page 58
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-45
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-45


1187A 1301C 1261-45
1187A 1301C 1261-45
1187A 1301C 1261-45
1187A 1301C 1261-45
1187A 1301C 1261-45
1187A 1301C 1261-45
1187A 1301C 1261-45

Page 59
r Seeh Al-Sarya Engineering LLC

Page 60
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-46
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-46


1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46
1187A 1301C 1261-46

Page 61
r Seeh Al-Sarya Engineering LLC

Page 62
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-47
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-47


1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47
1187A 1301C 1261-47

Page 63
r Seeh Al-Sarya Engineering LLC

Page 64
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-48
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-48


1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48
1187A 1301C 1261-48

Page 65
r Seeh Al-Sarya Engineering LLC

Page 66
AL-SARYA ENGINEERING L L C

Y WELD PRODUCTION REPORT


Work Order No SAS 1261
DPR# 1261-49
Project no. 1207897

Specification: API 1104

Weld Consumables
Remarks
E 7010 P1 E 7010 P1
3.2mm 4mm

1187A 1301C 1261-49


1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49
1187A 1301C 1261-49