CASE HISTORY

ZAF / CH / 019: Eng - Rev. 03, Nov 2007

INKONGWENI RIVER BANK PROTECTION


MARGATE, SOUTH COAST, KZN
HYDRAULIC & EROSION CONTROL / RIVER BANK PROTECTION
Product: Gabions & Reno Mattresses

Problem
The residents of Santana Flats, a multi-storey development on
the Margate beachfront that lies adjacent to the Inkongweni
River on the KwaZulu-Natal South Coast, were concerned that
the deterioration of the riverbank would cause instability to their
buildings foundation.

Evidence suggested that the erosion was caused by the strong


flow of the water in the river.

Solution
The solution entailed the construction of a 2m high gabion
structure resting on a 300mm thick Reno mattress spanning a
total length of 160m. The mattress extended in front of the
structure for a further 2,5m thus forming an apron to protect the
superstructure from scour. In addition, a mattress revetment During construction Date: Jul 2000
with a width of 2m was constructed on the slope behind the
superstructure to protect the embankment during high flows.

The structure was constructed with PVC coated mesh and this
will considerably increase the design life and durability of the
structure.

Benefits
PVC coated mesh used in the structure provided for an
economical, yet durable solution.

The labour intensive nature of gabion construction allowed for


employment of local labourers.

The flexibility of the Reno mattress apron allows for


settlements and will prevent undermining of the base of the
structure should scour occur.
Immediately after construction Date: Sep 2000
Since gabions are environmentally friendly, the structure
blends into the surroundings in the serene seaside town of
Margate.

Client name:
MARGATE TLC
Main contractor name:
MARGATE ASPHALT
Consultant:
KANTEY & TEMPLAR
Product used:
GABIONS, RENO MATTRESSES
Construction info:
Construction date: JULY 2000
Completion date: AUGUST 2000 After construction Date: Dec 2000

Page 1 of 2
Maccaferri SA (Pty) Ltd reserves the right to amend product specifications
without notice and specifiers are requested to check as to the validity of the
specifications they are using.

0
2000 200

300mm thick Reno Mattress


2x1x1 Gabion Units placed transversly protection on the slope
1000

2x1x1 Gabion Units placed longitudinally

1,5x1x1 Gabion Units placed transversly


AG 200 Geotextile
1000

2500
300

5000

Typical Section

Maccaferri SA (Pty) Ltd


HEAD OFFICE - DURBAN, SOUTH AFRICA
P O Box 15777, Westmead, 3608 Tel: +27-31-700 8456 Fax: +27-31-700 8469 e-mail: dbnsales@maccaferri.co.za
JOHANNESBURG, SOUTH AFRICA
P O Box 2285, North Riding, 2162 Tel: +27-11-704 0160 Fax: +27-11-704 0159 e-mail: jhbsales@maccaferri.co.za
CAPE TOWN, SOUTH AFRICA
P O Box 22150, Fish Hoek, 7974 Tel: +27-21-702 1416 Fax: +27-21-702 2977 e-mail: cptsales@maccaferri.co.za
MADAGASCAR
BP 168 Antananarivo 101, Madagascar Tel: +261-20-22-231 02 Fax: +261-20-22-553 90 e-mail: maccaferri@moov.mg
www.maccaferri.co.za

Page 2 of 2

You might also like