Pondy CRZ Regulation
Pondy CRZ Regulation
Pondy CRZ Regulation
No. 17|/DSTF,IP
GOVERNMENTOF PUDUCHERRY
DEPARTMENTOF SCIENCE.TECHNOLOGY& ENVIRONMENT
PUDUCHERRYCOASTAL ZONE MANAGEMENT AUTHORITY
3.dFLooR. PHI} BUILDING. ANNA NAGAR, PUDUCHERRY_ 5.
Phone: (04f3) 2201256 Fax: (0413)2203494
Puducherry,,n.
W, B Jui 2.t1fr
To
Shri S.K. Srivastava
Additional Director
Ministry of Environment,Forests& Climate Change
Governmentof India
Indira ParyavaranBhavan,Jor Bagh Road
Ali Ganj,New Delhi - 110003.
Sir,
i) The project shall not interferewith the regularfishing activitiesin the area.
ii) Continuousmonitoring of the levels of crest of berm or other appropriatemethods
shall be carried out by the Project Proponentto assessthe shorelinechangesfor the
entire coast of the Union Territory and report shall be submitted to PCZMA every
ot year.
: 1 .ouT
o.f, (Continuedto PageNo. 2)
lht/
'! 1 jill- ?fi"l$
1' ..g.
6
. r*
- t
{
.*
-)-
Yours sine.ereh'.
(M. DWARAKANATH)
Director/ MS-PCZMA
Copyto:
4. TheDirector,NIOT, Chennai.
2. TheChiefEngineer,PWD,puducherry.
3. StandingGuardFile.
I
"r-,
'd
rvrnutes orS|-pC-JEIVlA Meeting held on
f3.06.2016
Additional Aeenda
I'
AgendaItem No. 1: cRZ clearancefor construction
1?'n'aaitional of one near shore
/" reef, one offshore and beach nourishmentnear Gandhi statue, Beach road.
Puducherry.
The Authority heardthe proposaland discussed
the
subjectin detail.After due
deliberation,the Authority resolved to recommend
the proposal to Ministry of
Environment,Forestsand ClimateChange,Governmentof
India for appro'al subiectto
thefollorvingconditions:
i) Theprojectshallnot interferewith the regularfishingactivities
in the area.
ii) continuousmonitoringof the levelsof crestof bermor other
appropriate methods
shall be carriedout by the ProjectProponentto assessthe
shorelile changesfor
the entirecoastof the union Territoryand reportshall be submitted pcZMA
to
CVCrV VCAI.