HAZOP Worksheet
HAZOP Worksheet
HAZOP Worksheet
Project Title: "Project title should be the same as the project title in your drawings"
Group No.: Group 13
Date: 31/Mar/2015
Drawing No. and "P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1 and P-0005 (SHT 2 of 3), Rev. 1
Revision:
Node No.: 1 Person-in-charged:
Node Example: Furnace F-100 includes coil from oil inlet (before flow measurement) to vapour outlet (after temperature control) and natural gas to burners
Description:
Design Intent: Example: Liquid oil flows from the feed line is heated in the furnace. Oil is vaporize, superheat and transfer oil vapour to the process.
Design Design temperature: XXX °C (Furnace F-100), XXX °C (upstream of XXXX) ; Design pressure: XXX barg (Furnace F-100), XXX barg (upstream of XXXX)
Condition:
Operating Operating temperature: XXX °C (Furnace F-100), XXX °C (upstream of XXXX) ; Operating pressure: XXX barg (Furnace F-100), XXX barg (upstream of XXXX)
condition:
Guideword/
Item Possible Causes Consequences Safeguards
Deviation
1 1 1 No flow 1) FCV-100 fails closed 1.1) No flow of process fluid leading to 1.1.1) Low flow alarm (FAL-100) is provided
high temperature in F-100. 1.1.2) High high temperature trip (TZAHH-
100) is provided to shut SDV-100 and SDV-
102
1 1 2 2) Plugging of coil in F-100 2.1) No flow of process fluid leading to 2.1.1) Low flow alarm (FAL-100) is provided
high temperature in F-100. 2.1.2) High high temperature trip (TZAHH-
100) is provided to shut SDV-100 and SDV-
102
1 1 5 5)
1 2 1 More Flow 1) FV-100 malfunction stuck xxx None
opened
1 3 1 Less Flow
1 3 2
1 3 3
1 4 1 Reserved Flow
1 6 1 Low Pressure
1 10 1 Low Level
HAZOP Worksheets
ment) to vapour outlet (after temperature control) and natural gas to burners
vaporize, superheat and transfer oil vapour to the process.
Design pressure: XXX barg (Furnace F-100), XXX barg (upstream of XXXX)
X) ; Operating pressure: XXX barg (Furnace F-100), XXX barg (upstream of XXXX)
Party
Recommendations Responsible
1) Consider to provide low flow detector, alarm Consultant
and trip downstream of F-100 to close main
burner valve, V-201
xxx
HAZOP Worksheets
Project Title: "Project title should be the same as the project title in your drawings"
Group No.: Group 13
Date: 31/Mar/2015
Drawing No. and "P&ID drawing number and Revision". Example: P-0005 (SHT 1 of 3), Rev. 1
Revision:
Node No.: 2
Node Description: xxx
Design Intent: xxx
Design Condition:
Operating condition:
Guideword/
Item Possible Causes Consequences Safeguards
Deviation
2 1 1 No Flow
2 1 2
2 1 3
2 2 1 More Flow
2 2 2
2 3 1 Less Flow
2 3 2
2 4 1 Reserved Flow
2 5 1 High Pressure
2 6 1 Low Pressure
2 7 1 High
Temperature
2 8 1 Low
Temperature
2 9 1 High Level
2 10 1 Low Level
HAZOP Worksheets
Party
Recommendations Responsible