Systems Monitoring
Strainstall
The World of Load
Measurement and
Stress Analysis
System Features
Control Leg Jacking
Operations
DT505 Multi-channel
DAS, up to 90
Channels
Local Jack-House
Project: Anadarko - Jack-up Rig Permanent Production Facility Displays of Load
The Al Rayyan PPF ‘Al Morjan’, a six-legged jack-up rig, was successfully
located in position 80km north of Qatar in the Arabian Gulf. A milestone in the Simple Hardware
project in which Strainstall UK Ltd played a crucial role. Configuration
Strainstall’s contribution to this successful operation was to provide systems to Deck Tilt Range
accurately monitor the load and tilt at each of the rigs six legs during the +- 1.0 0 Accuracy
important rig jacking operations. These systems enable the precise control of +- 0.001
0
jacking down, and the safe raising of the 10,000 tonne rig to its operational
height. Leg Load 3000
Several jacking operations were performed (M.C.C.) during the construction Tonnes
works and subsequent deployment of the rig. Each time the Strainstall leg load
and deck tilt system performed excellently, providing instant display of the Real-time Trend
decks attitude and the distribution of weight applied to its legs. The Plots
Bargemaster was able to precisely control the weight distribution through
switching of the jacking motors which drive the rig up/down the legs. By Windows XP
momentarily pausing drive on legs 4 and 5 (which initially had taken more of the
rigs weight during touchdown on the seabed), the bargemaster equalised the Mimi Display
load distribution.
Alarm Limits -
For protection of valuable jacking equipment, which can be damaged due to Digital Outputs
overloading if loads are unevenly distributed, and also for protection of the
deck structure, a combined system of leg load and deck tilt monitoring was fully
utilised. The rig designers had determined that whilst the deck structure had
good strength and stiffness, an excessive jacking on one leg, or undue bending
of the deck, could still cause damage. It was therefore important to have both
leg loads and deck tilt monitored simultaneously.
Strainstall UK Ltd
9-10 Mariners Way
The correlation of tilt and load at Cowes
each leg can be readily identified on Isle of Wight
the records of the jackings shown in PO31 8PD
the graph. The deck tilt sensors were Tel: +44 (0)1983 203600
also of assistance during the final Fax: +44 (0)1983 291335
‘leveling-off’ of the structure. Email: sales@strainstall.co.uk
Website: www.strainstall.com
In the case of the Al Morjan (formerly the DMS Venture), an appropriate location for
the sensors was already known, as Strainstall had been involved with the leg load
measurement since the rig had been in operation in the north Sea during the
1980’s. However, before installing the new system, a full stress investigation was
completed during jacking trials at Jebel Ali, UAE. A new multi-channel system was
designed which enabled balanced load measurement, and which compensated for
mis-aligned loads due to leg bending, with 4 strain sensors per leg.
The monitoring system comprised main and back-up circuits. It was installed and
commissioned by Strainstall at the Jebel Ali Freezone site whilst the rig was under
construction. During all the crucial jacking operations, onshore and offshore, our
staff were in attendance to operate the system and ensure 100% success was
achieved.
Load signals were fed directly into local displays at each jack-house and then
routed to a central location (the jacking control cabin), from where all jacking
operations were driven.
The heart of the monitoring system was Type DT505 DAS, which marshalled all the
signal inputs and fed them into a PC Windows management program. The software
Tel: +44 (0)1983 203600
was set up and programmed by Strainstall to the specific requirements of Anadarko. Fax: +44 (0)1983 291335
The on-screen display of load and tilt alarm limits were set so that loads in excess of Email: sales@strainstall.co.uk
2000 tonnes were clearly visible. Website: www.strainstall.com
BSI
The leg loads and tilts will continue to be monitored permanently throughout the life
of the structure, so the long term stability of the rig can be assessed.