TCG 2020
Top marks for
ecology and economy.
For natural gas and biogas with an output from 1,000 to 2,000 kWel
Our experience for your success. The TCG 2020. Top performance from
MWM – used successfully worldwide.

Strong partner for your progress NanJi Water Recycle Centre, Korea
With MWM you can benefit from 140 years of experience in gas engine technology Korea District Heating Corp. is one of the largest suppliers
and energy production. Since 2011 the traditional company, Motorenwerke of district heating in the world. In March 2013, two TCG 2020
Mannheim, has belonged to the worldwide network of Caterpillar Inc. This gives us V16 engines were taken into operation, providing an electri-
an even more unique expertise that benefits you in the development of individual cal output of 1.6 MW each. The units are part of the first plant
complete solutions. installed in South Korea that generates electricity and heat
from biogas.

Worldwide successful technology


2 x MWM TCG 2020 V16 | Commissioning: 2013
MWM offers you the confidence and experience of a specialist who has already
successfully installed hundreds of biogas systems with gas power plants within
and outside of the European region. Efficiency and reliability are the decisive factors
Port Moresby, Papua New Guinea
everywhere.
Two high-efficiency 2020 V12 K gensets with 1.1 MWel output
each ensure 24-hour port operations at Port Moresby. The
special feature of the system is its dual-gas capability, en-
Competent, reliable, and uncomplicated abling it to be run on propane and liquefied natural gas without
We want you to be satisfied with us in every phase of the project: That is why we the need for structural modifications.
clearly spell out all agreements in a written order confirmation with a detailed
schedule. MWM stands for reliability and quality of planning, right down to com-
missioning.
2 x MWM TCG 2020 V12 K | Commissioning: 2012

We stick to our agreements


Sewage Plant Hetlingen, Germany
If you put great value in an optimal return on your investment in a biogas system
and smooth handling, MWM is a natural first choice. We offer comprehensive The WWTP Hetlingen operates four TCG 2020 V12 units with
experience and always keep a close eye on the entire process. Seamless and an output of 1.1 kWel and 1.1 kWth. Sewage gas is used as fuel,
turnkey ready – from initial consultation to handling of the completed system by our which is produced during the anaerobic digestion of sewage
customer service. We say what we do, and we do what we say. sludge. The challenge was to install the gensets without shut-
ting down the sewage plant. The plant was awarded CHP of
the month.

4 x MWM TCG 2020 V12 | Commissioning: 2011


Top marks for ecology and economy.

More profit
The TCG 2020 is highly efficient thanks to its opti-
mized inlet duct, combustion chamber and spark
plugs. Save as much as 15 % per annum on fuel costs
– and increase your plant’s profitability.

Less overall cost


With its optimized engine components, the TCG 2020
requires up to 50 % less lubricating oil than other
similar gensets. In terms of efficiency that means
long-term savings.

Different engines to suit your needs


Whether you need high efficiency or an optimized
standalone unit with good load compensation and
black start properties – we can provide you with an
engine tailored exactly to your needs.

Optimum control concept


TEM (Total Electronic Management) controls not just
the engine but the entire system including the heat
supply from cogeneration. Temperature monitoring
for each cylinder and anti-knock control ensure the
best possible utilization of fuel and maximum power
output, even if gas composition fluctuates.

Flexible usage
The latest technology such as our gas-mixer and TEM
allows you to use a wide variety of gases. Even the
most problematic gases such as colliery gas, landfill
gas and sewage gas can be used without difficulty. TCG 2020 V20
Technical data 50 Hz Technical data 60 Hz

Engine type TCG 2020 V12 K1 1) V12 K 1) V12 2) V16 K 1) V16 2) V20 2) Engine type TCG 2020 V12 K 1) V12 2) V16 K 1) V16 2) V20 2)
Bore / stroke mm 170/195 170/195 170/195 170/195 170/195 170/195 Bore/stroke mm 170/195 170/195 170/195 170/195 170/195
Displacement dm3 53.1 53.1 53.1 70.8 70.8 88.5 Displacement dm3 53.1 53.1 70.8 70.8 88.5
Speed min -1
1,500 1,500 1,500 1,500 1,500 1,500 Speed min -1
1,500 1,500 1,500 1,500 1,500
Mean piston speed m/s 9.8 9.8 9.8 9.8 9.8 9.8 Mean piston speed m/s 9.8 9.8 9.8 9.8 9.8
Length 3)
mm 4,660 4,790 4,790 5,430 5,430 6,200 Length 3)
mm 5,970 5,970 6,640 6,640 7,470
Width 3) mm 1,810 1,810 1,810 1,810 1,810 1,710 Width 3) mm 1,790 1,790 1,790 1,790 1,710
Height 3)
mm 2,210 2,210 2,210 2,210 2,210 2,190 Height 3)
mm 2,210 2,210 2,210 2,210 2,190
Dry weight genset kg 11,200 11,700 11,700 13,300 13,300 17,900 Dry weight genset kg 13,000 13,000 14,900 14,900 19,800

Natural gas applications Natural gas applications


NOX ≤ 500 mg / Nm3 6) NOX ≤ 500 mg / Nm3 6)

Engine type TCG 2020 V12 K1 1) V12 K 1) V12 2) V16 K 1) V16 2) V20 2) Engine type TCG 2020 V12 K 1) V12 2) V16 K 1) V16 2) V20 2)
Electrical power 4) kW 1,000 1,125 1,200 1,500 1,560 2,000 Electrical power 4) kW 1,125 1,200 1,500 1,560 2,000
Mean effective pressure bar 15.5 17.4 18.6 17.5 18.1 18.6 Mean effective pressure bar 17.4 18.7 17.6 18.3 18.7
Thermal output 5)
±8 % kW 1,177 1,253 1,190 1,675 1,580 1,977 Thermal output 5)
±8 % kW 1,261 1,196 1,686 1,589 1,991
Electrical efficiency 4) % 40.0 40.9 43.6 40.9 43.2 43.7 Electrical efficiency 4) % 40.7 43.4 40.6 43.0 43.4
Thermal efficiency 4)
% 47.0 45.6 43.3 45.7 43.8 43.2 Thermal efficiency 4)
% 45.6 43.2 45.7 43.8 43.2
Total efficiency 4) % 87.0 86.5 86.9 86.6 87.0 86.9 Total efficiency 4) % 86.3 86.6 86.3 86.8 86.6

Biogas applications Biogas applications


NO X ≤ 500 mg / Nm3 6) Minimum heating value Hu = 5.0 kWh / Nm3 NO X ≤ 500 mg / Nm3 6) Minimum heating value Hu = 5.0 kWh / Nm3
Sewage gas (65 % CH4 / 35 % CO2) Sewage gas (65 % CH4 / 35 % CO2)
Biogas (60 % CH4 / 32 % CO2, rest N2) Biogas (60 % CH4 / 32 % CO2, rest N2)
Landfill gas (50 % CH4 / 27 % CO2, rest N2) Landfill gas (50 % CH4 / 27 % CO2, rest N2)

Engine type TCG 2020 V12 2) V16 2) V20 2) Engine type TCG 2020 V12 2) V16 2) V20 2)
Electrical power 4) kW 1,200 1,560 2,000 Electrical power 4) kW 1,200 1,560 2,000
Mean effective pressure bar 18.6 18.1 18.6 Mean effective pressure bar 18.7 18.3 18.7
Thermal output 5)
±8 % kW 1,194 1,577 2,012 Thermal output 5)
±8 % kW 1,200 1,588 2,026
Electrical efficiency 4) % 43.0 42.6 43.0 Electrical efficiency 4) % 42.8 42.3 42.7
Thermal efficiency 4)
% 42.8 43.1 43.3 Thermal efficiency 4)
% 42.8 43.1 43.2
Total efficiency 4) % 85.8 85.7 86.3 Total efficiency 4) % 85.6 85.4 85.9

1) Version optimized for standalone operation and load 4) According to ISO 3046/1 at U = 0.4 kV, cosphi = 1.0 for Data for special gas and dual gas operation on request. 1) Version optimized for standalone operation and load 4) According to ISO 3046/1 at U = 0.48kV, cosphi = 1.0 for Data for special gas and dual gas operation on request.
compensation. 50 Hz and a methane number of MN 80 (TCG 2020) or compensation. 60 Hz and a methane number of MN 80 (TCG 2020) or
2) Optimized efficiency version. MN 70 (TCG 2020K) for natural gas. The values given on these datasheets are for information 2) Optimized efficiency version. MN 70 (TCG 2020K) for natural gas. The values given on these datasheets are for information
3) Transport dimensions for gensets; components set up 5) Exhaust gas cooled to 120°C for natural gas and 180°C purposes only and not binding. The information given in the 3) Transport dimensions for gensets; components set up 5) Exhaust gas cooled to 120°C for natural gas and purposes only and not binding. The information given in the
separately must be taken into consideration. for biogas. offer is decisive. separately must be taken into consideration. 180°C for biogas. offer is decisive.
6) NO x ≤ 500 mg/Nm³; exhaust gas dry at 5 % O 2. 6) NO x ≤ 500 mg/Nm³; exhaust gas dry at 5 % O 2.
For additional MWM locations, scan
the QR code or visit the website
www.mwm.net/en/mwm-worldwide

Caterpillar Energy Solutions GmbH


Carl-Benz-Straße 1
DE-68167 Mannheim
T +49 621 384-0
Version 01-16/EN

F +49 621 384-8800


info@mwm.net

You might also like