Drilling 12 1/4" hole up from 400 m to 1490 Drilling 12 1/4" hole up from 400 m to 1499
8 144 237 9.9 1490.0 8 213 359.25 15.0 1499.0
Meters. Wiper trips at 750,1100m Meters. Wiper trips at 750,1100m
Circulation, wiper trip up to 400 m, circulation, Circulation, wiper trip up to 400 m, circulation,
9 14 251 10.5 1490.0 9 18.25 377.5 15.7 1499.0
drop totco & POOH for logging drop totco & POOH for logging
10 Logging 12 263 11.0 1490.0 10 Logging 0 377.5 15.7 1499.0
11 Round trip break & lay down 8" DC 18 281 11.7 1490.0 11 Round trip break & lay down 8" DC 0 377.5 15.7 1499.0
12 R/I 9 5/8" Casing,Cementing 18 299 12.5 1490.0 12 R/I 9 5/8" Casing,Cementing 17.25 394.75 16.4 1499.0
WOC (meanwhile hang BOP, drop slips, rough WOC (meanwhile hang BOP, drop slips, rough
13 cut casing, install & test casing head spool. 24 323 13.5 1490.0 13 cut casing, install & test casing head spool. 16.25 411 17.1 1499.0
N/U & test BOP N/U & test BOP
Pickup Directional BHA (Motor, MWD/ LWD) Pickup Directional BHA (Motor, MWD/ LWD)
with 8 1/2" PDC bit and test at surface. RIH with 8 1/2" PDC bit and test at surface. RIH
15 down to float collar and tag cement & Change 19 342 14.3 1490.0 15 down to float collar and tag cement & Change 21.75 432.75 18.0 1499.0
to SOBM. Drilling cement, float shoe & collar, to SOBM. Drilling cement, float shoe & collar,
test shoe, drill 3 m formation & carry out LOT test shoe, drill 3 m formation & carry out LOT
Drilling 8 1/2" hole from 1490 m to 1750 m, Drilling 8 1/2" hole from 1490 m to 1750 m,
18 34 376 15.7 1750.0 18 27.75 460.5 19.2 1750.0
Circulation, totco survey & wiper trip Circulation, totco survey & wiper trip
Drilling 8 1/2" hole from 1750 m to 2050 m. Drilling 8 1/2" hole from 1750 m to 2050 m.
20 40 416 17.3 2050.0 20 41.5 502 20.9 2050.0
Circulation, totco survey & wiper trip Circulation, totco survey & wiper trip
22 Drilling 8 1/2" hole from 2050 m to 2350 m 38 454 18.9 2350.0 22 Drilling 8 1/2" hole from 2050 m to 2270 m 64.5 566.5 23.6 2270.0
Circulation, wiper trip up to shoe, circulation, Circulation, wiper trip up to shoe, circulation,
23 18 472 19.7 2350.0 23 11.75 578.25 24.1 2270.0
drop totco & POOH drop totco & POOH
24 Logging 120 592 24.7 2350.0 24 Logging 64.25 642.5 26.8 2270.0
25 Round wiper trip & soft P/O 22 614 25.6 2350.0 25 Round wiper trip & soft P/O 24.5 667 27.8 2270.0
26 R/I casing & circulation.Cementing 34 648 27.0 2350.0 26 R/I casing & circulation.Cementing 24 691 28.8 2270.0
WOC (Meanwhile install slip, N/D BOP, N/U WOC (Meanwhile install slip, N/D BOP, N/U
28 tubing head spool and X mas tree & Rig 24 672 28.0 2350.0 28 tubing head spool and X mas tree & Rig 24 715 29.8 2270.0
Release) Release)
Total hours 672 Total hours 715
Planned Days v/s Depth CB10B-
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
0
Drilling 17 1/2" hole from 30m down to 400 m
Circulation, POOH
100
R/I 13 3/8" casing and Cementing
400
500
600
700
800
900
1000
1100
Depth (m, TVDRT)
1200
1300
1400
1500
1600
1700
Depth (
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Logging
ned Days