Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Aktu Report 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

A

SEMINAR REPORT
on

TYPES OF PUMPS USED IN DIESEL LOCOMOTIVE & THERE MAINTENANCE


Submitted

In Partial Fulfillment of the

Award of Degree in

BACHELOR OF TECHNOLOGY
In

MECHANICAL ENGINEERING
by

SHYAM KUMAR (1305440154)


Department of Mechanical Engineering

BABU BANARASI DAS NATIONAL INSTITUTE OF TECH& MANAGEMENT,


LUCKNOW
Affiliated
to the

Dr. A.P.J ABDUL KALAM TECHNICAL UNIVERSITY


(Formerly Uttar Pradesh Technical University)

LUCKNOW
Feb - 2017
ACKNOWLEDGEMENT
It is my pleasure to offer sincerest gratitude in completing the report. I would like to express my heartiest
gratitude to Prof. S.P. ASTHANA, Head of the Mechanical Engineering Department, BBDNITM,
Lucknow, for his unconditional support.

I am also grateful to respect Prof. Dr. Seethalekshmi K., Director, Babu Banarasi Das National Institute of
Technology, Lucknow, for providing me a great academic environment where I can transform myself as
asset of the nation.

Finally, I would like to thank my parents for their blessing and care.

Date: _______ SUBMITTED BY

SHYAM KUMAR

ROLL NO-1305440154

ii
ABSTRACT
This report is on the detailed description of the service and maintenance of the Loco of the Indian Railway
in the Northern Railways, Locomotive work shop in Charbagh Lucknow. This service of locomotive
includes the Periodic overhauling (POH), Intermediate overhauling (IOH) and Special Repair along with
the load testing (SR) of the locomotive .This overhauling include the disassembling and assembling of
whole locomotive or hauling and replacing the parts. In the different section of the work shop work with in
the time limitation the report with given the details of the working at different section procedure and testing
of the part.

In include the project study on the TYPE OF PUMP USED IN DIESEL LOCOMOTIVE, its working
principle, types, main- parts its assembly and dis assembling, balancing, testing, defect, advantage, method
to detect rectification, finally various additional to improve the working of waste oil management and
safety factor which will enhance the working of the workshop and making the job done with in dead line

iii
TABLE OF CONTENTS
ACKNOWLEDGEMENT ii

ABSTRACT iii

LIST OF FIGURES vii

LIST OF TABLES viii

CHAPTER 1

INTRODUCTION........................................................................................................................................

1.1 LOCOMOTIVE 1
1.2 INTRODUCTION OF INDIAN RAILWAY 1
1.3 INDIAN RAILWAY ZONES 2
1.4 HISTORY OF NORTHERN RAILWAYS LOCOMOTIVE WORKSHOP CHARBAGH 4
1.5 CHARBAGH AT GLANCE 4
1.6 LIST OF IMPORTANT ACHIEVEMENT 6

CHAPTER 2

OVERHAULIING……………………………………………………………...………………….............

2.1 INTRODUCTION 8
2.2 TYPES OF OVERHAULING 8
2.3 PROCEDURE OF DISMANTLE 9

CHAPTER 3

TECHNICAL DETAIL……………………………………………………………………………………..

3.1 GAUGE DESIGNATIONS AND DIMENSIONS 10


3.2 TYPE OF TRACTION DESIGNATIONS 10
3.3 TYPE OF LOAD OR SERVICE DESIGNATIONS 10
3.4 HORSE POWER DESIGNATIONS 11

CHAPTER 4

PUMP SECTION………………………………………………………………………………...………….

4.1 INTRODUCTION 12
4.2 TYPE OF PUMPS USED IN LOCOMOTIVE 12

CHAPTER 5

WATER PUMP……………………………………………………………………………………………...

iv
5.1 INTRODUCTION 13
5.2 MAIN PART OF WATER PUMP 13
5.3 WATER PUMP WORKING 17

CHAPTER 6

FUEL INJECTION PUMP…………………………………………………………………………….……

6.1 INRTRODUCTION 19
6.2 OBJECTIVES 19
6.3 TYPES OF DEVICES 20
6.4 SAFETY 20
6.5 MAIN PART OF FUEL INJECTOR PUMP 21
6.6 FUEL INJECTION PUMP HAS THREE FUNCTIOS 21

CHAPTER 7

LUBE OIL PUMP…………………………………………………………………………………………...

7.1 INTRODUCTION 22
7.2 MAIN PARTS OF LUBE OIL PUMP 22
7.3 WORKING 22

CHAPTER 8

GOVERNOR PUMP………………………………………………………………………….......................

8.1 INTRODUCTION 24
8.2 WORKING 24

CHAPTER 9

VALVE……………………………………………………………………………………………………….

9.1 INTRODUCTION 26
9.2 TYPE OF VALVE USED IN LOCO 26
9.3 RELIF VALVE 26
9.4 REGULATING VALVE 26
9.5 BY PASS VALVE 26

CHAPTER 10

TESTING…………………………………………………………………………………………………….

10.1 ULTRASONIC TESTING 27

v
10.2 ZYOLO TEST 27
10.3 RED DYE PENETRATION TEST (RDF) 27

REFERENCE

vi
LIST OF FIGURES

Fig.1 Locomotive workshop, Charbagh Lucknow 4

Fig.2 Gauge designation 10

Fig.3 Internal parts of water pump 14

Fig.4 Fuel Injection Pump 20

Fig.5 Lube Oil Flow 22

Fig.6 Governor Pump 24

vii
LIST OF TABLES

TABLE 1.1 Vital Statistics 6

TABLE 1.2 Main Activities 7

viii

You might also like