Aktu Report 1
Aktu Report 1
Aktu Report 1
SEMINAR REPORT
on
Award of Degree in
BACHELOR OF TECHNOLOGY
In
MECHANICAL ENGINEERING
by
LUCKNOW
Feb - 2017
ACKNOWLEDGEMENT
It is my pleasure to offer sincerest gratitude in completing the report. I would like to express my heartiest
gratitude to Prof. S.P. ASTHANA, Head of the Mechanical Engineering Department, BBDNITM,
Lucknow, for his unconditional support.
I am also grateful to respect Prof. Dr. Seethalekshmi K., Director, Babu Banarasi Das National Institute of
Technology, Lucknow, for providing me a great academic environment where I can transform myself as
asset of the nation.
Finally, I would like to thank my parents for their blessing and care.
SHYAM KUMAR
ROLL NO-1305440154
ii
ABSTRACT
This report is on the detailed description of the service and maintenance of the Loco of the Indian Railway
in the Northern Railways, Locomotive work shop in Charbagh Lucknow. This service of locomotive
includes the Periodic overhauling (POH), Intermediate overhauling (IOH) and Special Repair along with
the load testing (SR) of the locomotive .This overhauling include the disassembling and assembling of
whole locomotive or hauling and replacing the parts. In the different section of the work shop work with in
the time limitation the report with given the details of the working at different section procedure and testing
of the part.
In include the project study on the TYPE OF PUMP USED IN DIESEL LOCOMOTIVE, its working
principle, types, main- parts its assembly and dis assembling, balancing, testing, defect, advantage, method
to detect rectification, finally various additional to improve the working of waste oil management and
safety factor which will enhance the working of the workshop and making the job done with in dead line
iii
TABLE OF CONTENTS
ACKNOWLEDGEMENT ii
ABSTRACT iii
CHAPTER 1
INTRODUCTION........................................................................................................................................
1.1 LOCOMOTIVE 1
1.2 INTRODUCTION OF INDIAN RAILWAY 1
1.3 INDIAN RAILWAY ZONES 2
1.4 HISTORY OF NORTHERN RAILWAYS LOCOMOTIVE WORKSHOP CHARBAGH 4
1.5 CHARBAGH AT GLANCE 4
1.6 LIST OF IMPORTANT ACHIEVEMENT 6
CHAPTER 2
OVERHAULIING……………………………………………………………...………………….............
2.1 INTRODUCTION 8
2.2 TYPES OF OVERHAULING 8
2.3 PROCEDURE OF DISMANTLE 9
CHAPTER 3
TECHNICAL DETAIL……………………………………………………………………………………..
CHAPTER 4
PUMP SECTION………………………………………………………………………………...………….
4.1 INTRODUCTION 12
4.2 TYPE OF PUMPS USED IN LOCOMOTIVE 12
CHAPTER 5
WATER PUMP……………………………………………………………………………………………...
iv
5.1 INTRODUCTION 13
5.2 MAIN PART OF WATER PUMP 13
5.3 WATER PUMP WORKING 17
CHAPTER 6
6.1 INRTRODUCTION 19
6.2 OBJECTIVES 19
6.3 TYPES OF DEVICES 20
6.4 SAFETY 20
6.5 MAIN PART OF FUEL INJECTOR PUMP 21
6.6 FUEL INJECTION PUMP HAS THREE FUNCTIOS 21
CHAPTER 7
7.1 INTRODUCTION 22
7.2 MAIN PARTS OF LUBE OIL PUMP 22
7.3 WORKING 22
CHAPTER 8
GOVERNOR PUMP………………………………………………………………………….......................
8.1 INTRODUCTION 24
8.2 WORKING 24
CHAPTER 9
VALVE……………………………………………………………………………………………………….
9.1 INTRODUCTION 26
9.2 TYPE OF VALVE USED IN LOCO 26
9.3 RELIF VALVE 26
9.4 REGULATING VALVE 26
9.5 BY PASS VALVE 26
CHAPTER 10
TESTING…………………………………………………………………………………………………….
v
10.2 ZYOLO TEST 27
10.3 RED DYE PENETRATION TEST (RDF) 27
REFERENCE
vi
LIST OF FIGURES
vii
LIST OF TABLES
viii