Clean Fuel Project (CFP), Thaioil Public Company Limited: Objective and Project Information Project Location

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Clean Fuel Project (CFP), Thaioil Public Company Limited

Project Location Objective and Project Information


Located in Thaioil Refinery,
Objective
Sriracha, Chonburi
 To increase the company’s competitiveness and enhance energy
security of the country
 To support the region’s aviation industry
 To drive the country’s economy and increase an employment
TOP  To produce clean fuel products
TLB
 To increase energy efficiency of the production process

GPSC Project Information


LAB
TCP  Increasing crude oil refining capacity from 38,200 ton/day (around
TPX 280,000 barrel/day) to 62,270 ton/day (450,000 barrel/day)
Note: Refining capacity includes both TOP1 and TOP2
 Upgrading fuel oil to high-value products eg; diesel and jet
Project Schedule
 The project is expected to finish construction and start operation in
Environmental Mitigation Measures the middle of 2023

Construction Phase Operation Phase


 Spraying water in the construction area to reduce the amount of  Controlling emission from the stacks
particulate matter generated  Controlling the quality of effluent discharged from the plant to
 Having a cover sheet over trucks to prevent the fall-out of materials comply with the wastewater standard of Ministry of Industry,
or equipment during transportation Thailand
 Limiting and controlling the speed of trucks entering construction  Collecting all wastes generated and hiring authorized waste disposal
area companies to dispose them or sending back to the supplier
 Avoiding material transportation or construction activities at night  Providing preventive maintenance for the production units regularly
 Establishing safety rules and/or procedures for contractors, and  Installing emergency alarm system and providing preventive
enforcing contractors to be strictly responsible for those rules maintenance for the alarm system regularly
and/or procedures  Conducting emergency response exercise and providing preventive
 Collecting all wastes generated and hiring authorized waste disposal maintenance for fir protection system regularly.
companies to dispose them
Contact Information
 Providing preventive maintenance for machines and equipment to
Government Relations Section, Thai Oil Public Company Limited
keep them in good conditions