0 PROJECT OVERVIEW
EXECUTIVE SUMMARY
PROJECT CHARTER AND SCHEDULE MILESTONES
CRITICAL SUCCESS FACTORS / KEY PERFORMANCE INDICATORS (CSF/KPI)
SCOPE OF WORK
GOVERNING DOCUMENTS AND GUIDING PRINCIPLES
ABBREVIATIONS, ACRONYMS, AND DEFINITIONS
4.0 ENGINEERING
ENGINEERING AND DESIGN MANAGEMENT
PROCESS OPERATIONS (PROCESS, HSE IN DESIGN, FLOWSHEET DEVELOPMENT,
METALLURGY)
FIELD ENGINEERING AND REQUESTS FOR INFORMATION (RFI)
REDLINES AND AS-BUILTS
5.0 PROCUREMENT
SUPPLY CHAIN MANAGEMENT (PROCUREMENT, EXPEDITING, SUPPLIER QUALITY
SURVEILLANCE)
SUBCONTRACTOR / OTHER CONTRACTOR MANAGEMENT
MATERIAL MANAGEMENT / MATERIAL CONTROL
TRANSPORTATION AND LOGISTICS
6.0 CONSTRUCTION
CONSTRUCTION EXECUTION
SITE HSE
SITE LABOUR RELATIONS
SITE QUALITY
WORKFACE PLANNING AND INSTALLATION WORK PACKAGE (IWP) EXECUTION
PRESERVATION
MODULARIZATION
COMPLETIONS AND TURNOVER
7.0 MISCELLANEOUS
CONSTRUCTION MANAGEMENT
PRE-COMMISSIONING
COMMISSIONING AND START-UP
OPERATIONS AND MAINTENANCE