Replace Crude Oil Samplers at Yanbu North Terminal
Replace Crude Oil Samplers at Yanbu North Terminal
Replace Crude Oil Samplers at Yanbu North Terminal
BI-10-02126
Prepared by:
Page 1 of 5
BI-10-02126– (REPLACE CRUDE OIL SAMPLERS AT YANBU NORTH TERMINAL)- 530074
TABLE OF CONTENTS
1.0 WEEKLY PROGRESS REPORT ACTIVITIES WEEKENDING (APRIL 04, 2020) ........................ 3
1.1 ENGINEERING ................................................................................................................................ 3
1.1.1 PROCESS ........................................................................................................................................ 3
1.1.2 INSTRUMENTATION ...................................................................................................................... 3
1.1.3 PIPING ............................................................................................................................................. 3
1.1.4 COMMUNICATION .......................................................................................................................... 3
1.1.5 STRUCTURAL/CIVIL ...................................................................................................................... 3
1.1.6 ELECTRICAL .................................................................................................................................. 3
1.1.7 FIRE PROTECTION (OSB) ............................................................................................................. 4
1.1.8 CORROSION MANAGEMENT PROGRAM (CMP) ........................................................................ 4
1.1.9 MECHANICAL ................................................................................................................................. 4
2.0. AREAS OF CONCERN ................................................................................................................... 5
3.0. ATTACHMENTS .............................................................................................................................. 5
Page 2 of 5
BI-10-02126– (REPLACE CRUDE OIL SAMPLERS AT YANBU NORTH TERMINAL)- 530074
1.1 ENGINEERING
1.1.1 PROCESS
1.1.2 INSTRUMENTATION
1.1.3 PIPING
1.1.4 COMMUNICATION
• Review and provide inputs in the overall SOW particular in SAES standards, SAEP, SAMMS and other international
standards.
• Review the EIDR for Project proposal narrative (Scope of work).
• Review Documents related to the project.
1.1.5 STRUCTURAL/CIVIL
1.1.6 ELECTRICAL
Page 3 of 5
BI-10-02126– (REPLACE CRUDE OIL SAMPLERS AT YANBU NORTH TERMINAL)- 530074
1.1.9 MECHANICAL
Page 4 of 5
BI-10-02126– (REPLACE CRUDE OIL SAMPLERS AT YANBU NORTH TERMINAL)- 530074
• There is impact of COVID-19 Safety & Health Measures on the project progress.
3.0. ATTACHMENTS
Page 5 of 5